Notice ID: 2dbb7652707547eea958debd84beb7a2Combined Synopsis/Solicitation
Heavy-Duty Professional Production Scanners Indefinite Delivery Indefinite Quantity (IDIQ)
Archived on August 31, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 10:00 AM UTC−04:00
- Posted
- June 30, 2025
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 333310: Commercial and Service Industry Machinery Manufacturing
- Agency
- Department of WarDEFENSE LOGISTICS AGENCY
Notice details
- Office
- DCSO-P NEW CUMBERLAND
- Place of performance
- DLA Contracting Services Office (DCSO)5404 J Avenue, Bldg. 404New Cumberland, PA 17070-5008, 17070
- PSC
- 3590: MISCELLANEOUS SERVICE AND TRADE EQUIPMENT
- Last updated
- Dec 5, 2025
Identifiers
- Solicitation number
- SP700025Q1040
- Notice ID
- 2dbb7652707547eea958debd84beb7a2
Description
DLA Contracting Services Office (DCSO) intends to create multiple-award Indefinite Delivery Indefinite Quantity (IDIQ) firm fixed price contracts. Delivery orders placed off these IDIQs will be firm fixed price. Inspection and acceptance will occur at FOB destination. IDIQ contracts will be awarded to up to a maximum of five (5) vendors, based on price, past performance, and Technical Acceptability. Technical Acceptability may be determined via testing and approval. DLA will be the only organization that will be permitted to place orders against these IDIQs. Amendment 0001 answers the following questions: 1. PWS Section 4.3: Since all equipment must come with a 5-year manufacturer warranty as stated in Section 4.3 of the PWS, are the 1-year, 3-year, and 5-year warranties shown in Attachment 3 to be priced as post warranty pricing?Answer: All warranties need to be quoted as individual CLINs. This will make purchasing easier in the future. 2. PWS Section 18.3 (including subsections 18.3.1 and 18.3.2: Only two scanners are shown as Common Criteria and NIAP Certified. This is a request to delete this requirement. Answer: The requirement will not be deleted. This is all tied into being TAA compliant.3. Solicitation Document (Page 6 of 30 on Part III: Past Performance): The requirement states: Each quoter is required to submit information, on a single page. Does this mean that each Past Performance reference should go on a maximum of one (1) page, or does it mean all three references should go on one page total? Answer: All 3 past performance references should go on 1 page.
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
SP700025Q1040- Combined Synopsis
- 2×Combined SynopsisCurrentJun 12, 2025
Heavy-Duty Professional Production Scanners Indefinite Delivery Indefinite Quantity (IDIQ)
Similar Opportunities
- 73--Equipment IST - FTRD
Department of War · Posted 10/29/2026
- 35--WASHER-DRYER,HOUSEHOLD
Department of War · Posted 10/28/2026
- 46--FILTER ELEMENT,WATER P
Department of War · Posted 10/28/2026
- 42--BAG,BREATHING,DIVER'S
Department of War · Posted 10/28/2026
- 73--Equipment IST - FTRD
Department of War · Posted 10/27/2026
Additional Details
Solicitation Number
SP700025Q1040
Archive Date
Aug 31, 2025