GovChime
Notice ID: 3094c913d4a540ba9a04811d094315a1Sources SoughtArchived

Multi-Topic Database

Archived on September 1, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
4:00 PM CDT
Posted
August 7, 2026
Notice type
Sources Sought
Set-aside
No Set aside used
NAICS
516210: Media Streaming Distribution Services, Social Networks, and Other Media Networks and Content Providers
Agency
Department of WarDepartment of the Air Force

Notice details

Office
AIR FORCE MATERIEL COMMAND.AF INSTALLATION & MISSION SUPPORT CENTER.FA8052 773 ESS
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
FA80522608072026C
Notice ID
3094c913d4a540ba9a04811d094315a1

Description

The Department of the Air Force (DAF) Library Program requires a Multi-Topic Database package Subscription. Must include an academic research, a biography, a general reference, and a military and intelligence databases.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (1)

  • Multi Topic Database Sources Sought.pdf

    132 KBAdded in Sources Sought version 3Posted
    Download

Lifecycle

  1. 3
    Version 3Sources SoughtArchivedCurrent

    Multi-Topic Database

    Notice 3094c913d4a540ba9a04811d094315a1 on SAM.gov

  2. 6
    Version 6Special NoticeArchived

    Type changed from Sources Sought to Special Notice

    Notice of Intent to Award Sole Source - Multi-Topic Database

    Notice bf4bb4f24c2941f1aff14e2c0d00d711 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Contract FA452827P0006 for Cable TV Services has been awarded to Midcontinent Communications. The period of performance is for one 12-month base year and four 12-month option years. The total contract value inclusive of all options is $157,490.40. Cable TV Services are provided pursuant to the Cable Communications Policy Act of 1984. Midcontinent Communications is the sole provider of CATV services in the Minot AFB area.
-Sole Source / J&AOpen
The Department of the Air Force, 502nd Contracting Squadron (502 CONS)/PKA, located at Joint Base San Antonio (JBSA) Lackland, Texas, hereby publicizes its intent to solicit, negotiate, and award a Firm-Fixed-Price (FFP), sole-source contract to The Gordian Group, Inc. (30 Patewood Drive, Building 2, Suite 350, Greenville, SC 29615; CAGE Code: 0ZKV8; Unique Entity ID: R8JXSHBYMJS2). This notice is published in accordance with the Revolutionary Federal Acquisition Regulation Overhaul (RFO) 5.101 and 12.202. This acquisition is conducted under the statutory authority of 10 U.S.C. 3204(a)(1), as implemented by RFO 6.103-1, Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements. The 802nd Civil Engineer Squadron (802 CES) requires commercial software subscriptions and database access for RSMeans Data Online Complete for 100 concurrent/named users. RSMeans Data Online Complete provides localized, quarterly updated construction cost estimating data (material, labor, and equipment unit pricing) required to develop accurate Independent Government Estimates (IGEs), validate contractor proposals, and manage military construction, facilities sustainment, restoration, and modernization projects. This notice of intent is not a request for competitive quotes or proposals, and no solicitation document is available for distribution. However, all responsible sources may submit a capability statement, proposal, or quotation, which shall be considered by the agency. Any response to this notice must provide clear and convincing evidence that the prospective offeror can provide the required software and proprietary cost data, including: Company Information: Company name, Point of Contact (POC), email, phone number, CAGE code, and active SAM.gov Unique Entity ID (UEI). Technical Capability: Documentation demonstrating the ability to meet all functional requirements. Authorization: Official documentation from The Gordian Group, Inc. verifying that the respondent is an authorized reseller or distributor of RSMeans Data Online. Responses must be submitted in writing via email to BOTH contacts listed below no later than Friday, November 13, 2026, at 10:00 AM CST, referencing Notice ID FA301627Q7007NOI in the subject line: Theresa Viveros, Contract Specialist: theresa.viveros@us.af.mil and Alexis Garcia, Contracting Officer: alexis.garcia.14@us.af.mil The Government will not reimburse any costs incurred in responding to this notice. A determination by the Government not to compete this proposed contract based upon responses to this notice is solely within the discretion of the Government. Any information received will be retained solely for market research purposes.
-Special Notice11/13/2026
This Amendment to the Combined Synopsis/Solicitation Notice is as follows: VA Information Technology will purchase, install, and connect to the VA Network the following two CISCO systems. One unit will be dedicated to the Large LRC, and a 2nd unit will be dedicated to the Small LRC. Bids should include collaboration on integration of the VA purchased equipment into the audio-visual monitors, speakers, microphones, and control systems in both rooms to meet the requirements of the updated Salient Characteristics. Units provided by VA For the project will be equivalent to Two Cisco Webex Room Kit Pro PTZ 4K systems with an audience-facing camera and a presenter facing PTZ camera for each room. In addition, these are respones to the following questions: Will the Government determine, before quote submission or after award, which existing components, such as speakers and wiring, will be reused versus replaced? If this determination occurs after award, how will any resulting change in scope be handled for pricing purposes? Answer: The contractor can bid assuming re-use of existing speakers and wiring. If during install, if wiring or speakers are found to be broken, then replacement by additional purchases outside of this contract can be completed. 2. CLIN 0005 references an “OFE Equipment Rack.” Please confirm what “OFE” designates and whether the equipment rack is contractor-furnished or Government-furnished. Answer: Sorry for the confusion on this point. Please include a new Lectern within the bid. The existing “Open Frame Equipment Rack” located in the storage room to the front right of the large LRC can be re-used (Government-furnished) or replaced, whichever is more economically feasible during Vendor tear down the current system while managing existing wiring during that teardown. 3. CLIN 0004 includes “communication devices” without further specification. Please identify the type and quantity of communication devices required. Answer: 0004 is referring to the control boxes that would be required to incorporate the 4 LRC monitors, 1 Small LRC room monitor, Speakers in both rooms, and multiple microphones in both rooms. Deferring to the vendor on what kind, how many, and where these control boxes need to be located. Microphones requested: 1 wired mic in the large LRC, 2 wireless lavalier, overhead audience, and 2 handheld mics in the large LRC small LRC: 2 handheld mics, 2 wireless lavaliers, overhead included as well. 4. CLIN 0002 references conference-system touch panels, while CLIN 0004 identifies separate 10-inch and 7-inch control interfaces. Please confirm the total quantity and required room placement of all touch/control interfaces for the Large and Small LRC. Answer:1 touch panel near the front of the Large LRC 1 touch panel in the back elevated technology deck area at the back of the Large LRC (mirroring the functions of the front panel) 1 touch panel near the computer at the side of the room in the Small LRC 5. The Delivery Schedule lists the Training deliverable at 1,290 calendar days after contract start, which appears inconsistent with the stated period of performance ending December 31, 2026. Please confirm the correct training milestone. Answer: Between equipment purchases, setup off-site, tear down, install, setup, programming, and training. I am guessing completion in late spring 2027 realistically. 6. Please clarify the anticipated coordination process and lead time for VA IT to connect the Cisco control system to the VA network, including the appropriate point of contact or scheduling process after award. Answer: Estimated within 60 days that the CISCO equipment will be on site (please see the amendment at the end of this email for clarity of this statement). 7. Please confirm the invoicing platform that will apply to the resulting purchase order and the applicable payment terms. Answer: Financial Services Center Tungsten e-Invoice Setup: 1-877-489-6135 www.tungsten-network.com/login FSC e-Invoice Contact: 1-877-353-9791 FSC e-invoice email: vafsccshd@va.gov 8. Will the Government provide a formal inspection/acceptance procedure or checklist for project handoff, or will acceptance be based on COR and Education staff review and sign-off? COR sign off following completion of Education Staff training and initial use during that training would be appropriate. 9. Please confirm any facility-access requirements applicable to contractor personnel during installation, including badging, escorts, background screening, or similar requirements, along with the anticipated processing time. Answer:All the particulars will be included in the award package. 10. The solicitation identifies NAICS 516210. Please confirm that this is the intended NAICS code for this audio-visual system design and installation requirement. Answer:Yes 11. Are floor plans, room layouts, reflected ceiling plans, existing AV drawings, equipment layouts, photographs, cable-pathway information, or other drawings available for the Large and Small LRC? If available, we respectfully request that these documents be provided to assist offerors in developing accurate equipment, cabling, installation, and labor pricing. Answer: Not sure, please stand by. 12. Additionally, considering the technical clarifications above and the limited time between the Government’s anticipated responses and the current quote deadline, Communication Logic respectfully requests an extension of the proposal due date to September 30, 2026. This additional time would allow us and our integration partners to properly incorporate the Government’s responses and provide a complete and accurately priced proposal. Answer: The Offer due date remains unchanged. 13. Is it acceptable to replace the "Cisco" equipment with the Crestron Collaboration/Flex? Products are identical. The Cisco equipment is significantly more expensive. Answer: VA CANNOT use that Creston system.
-Combined Synopsis09/22/2026
This is a notification of the sole source justification for award to procure new Windows 11 software and associated equipment from Monaco Enterprises Inc to upgrade the Monaco Fire Alarm Reporting System (FARS) D-21 and associated equipment within the JBSA Emergency Communication Centers (ECC). Please refer to the justification for full details of the sole source requirement.
-AwardedOpen
This requirement was awarded on an unusual and compelling basis. Please refer to attached Justification and Approval for additional details.
-AwardedOpen

Additional Details

Solicitation Number

FA80522608072026C

Archive Date

Sep 1, 2026

Office Address

SAN ANTONIO, TX, 78236-0119