GovChime
Notice ID: 325eb9985f564330b59e81e62516b794Combined Synopsis/Solicitation

H361--LEX Triannual Energy Study and ARC Flash Testing

Active, responses due . Full description on SAM.gov.

Overview

Response deadline
11:00 AM CST
Posted
November 9, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
NAICS
238210: Electrical Contractors and Other Wiring Installation Contractors
Agency
Department of Veterans Affairs

Notice details

Office
249-NETWORK CONTRACT OFFICE 9 (36C249)
Place of performance
Department of Veterans Affairs Lexington, KY Bowling & Sousley Divisions,, Lexington, Kentucky, 40511
PSC
H361: INSPECTION- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT
Last updated
Nov 9, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
36C24927Q0038_0001
Notice ID
325eb9985f564330b59e81e62516b794

Description

This amendment is to address typographical errors regarding offer due date and the site visit information on RFQ 36C24927Q0038 page 2, replaced entirely below:

Offer due date: 11/30/2026 @11:00am CT

Site visits are scheduled on Monday 11/16/2026 at 08:30am ET for the Lexington Sousley Campus 2250 Leestown Road, Lexington, KY 40511, Bldg. 20 and Tuesday 11/17/2026 at 08:30 AM ET for the Lexington Troy Bowling Campus, 1101 Veterans Dr., Lexington, KY 40502 in the main lobby.

No other changes are made at this time.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

diane.ziegler@va.gov
Diane Ziegler

Documents

Files (26)

  • 36C24927Q0038 0001.docx

    25 KBAdded in Combined Synopsis/Solicitation version 2Posted
    Download
  • VAMC Contacts list.docx

    15 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Troy Bowling Floorplans.pdf

    1.3 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Sousley VA One Line Drawings.pdf

    7.5 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Sousley VA Combined Test Report 2023.pdf

    25 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Sousley Combined Arc Flash Project - Volume 2 Data Files.pdf

    17 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Sousley Campus Map.pdf

    481 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • CLC Phase 2 - One Line Diagram.pdf

    185 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Bowling VA One Line Drawings.pdf

    7.7 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Bowling VA Combined Test Report 2023.pdf

    13 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Bowling Tower SWB SBB SBF SBG One Line.pdf

    141 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Bowling Tower SWB SBA SBC SBD SBE SBH One Line.pdf

    182 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Bowling Tower Gen 1 2 One Line.pdf

    112 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Bowling Tests Summary.pdf

    1.8 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Bowling SITE View.pdf

    38 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Bowling ONE-LINE E-602-1.pdf

    231 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Bowling Generator and ATS testing 2025 2026.pdf

    24 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Bowling Electrical Risers.pdf

    925 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Bowling Electrical Main Hospital One Line.pdf

    158 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Bowling Combined Arc Flash Project - Volume 2 Data Files.pdf

    15 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Bowling B MV One Line.pdf

    118 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • 260573OvercurrProtDevC.docx

    39 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • 2025 Lexington Sousley Campus Monthly generator reports.pdf

    28 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • 1028_D_2020-02-24.pdf

    336 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • P07 WD 2015-4683 Rev. 34 DATED 08.22.2026.docx

    34 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • 36C24927Q0038.docx

    66 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/Solicitation

    H361--LEX Triannual Energy Study and ARC Flash Testing

    Notice d4444eb574bb46fcbf7faa751ce6bd5e on SAM.gov

  2. 2
    Version 2Combined Synopsis/SolicitationCurrent

    H361--LEX Triannual Energy Study and ARC Flash Testing

    Notice 325eb9985f564330b59e81e62516b794 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

36C24927Q0038_0001

Archive Date

Dec 30, 2026

Office Address

MURFREESBORO, TN, 37129