Notice ID: 31e4aac171a14349aee1e9bbe5a00888Combined Synopsis/Solicitation
N073--Copy of Dining Enhancement VISN 1
Archived on August 19, 2021. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 3:30 PM UTC−04:00
- Posted
- July 27, 2021
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Veteran-Owned Small Business Set-Aside (specific to Department of Veterans Affairs)
- NAICS
- 561210: Facilities Support Services
- Agency
- Department of Veterans Affairs
Notice details
- Office
- 241-NETWORK CONTRACT OFFICE 01 (36C241)
- Place of performance
- VISN 1 All Locations Togus VAMC 1 VA Center Augusta, Maine, 04330
- Last updated
- Dec 6, 2025
Identifiers
- Solicitation number
- 36C24121Q0591
- Notice ID
- 31e4aac171a14349aee1e9bbe5a00888
Description
A.1 SOLICITATION 36C24121Q0591 DESCRIPTION This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Items, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation quotations are being requested, and a written solicitation document will not be issued. The Solicitation number is 36C24121Q0591 and is a request for quotations (RFQ). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2021-04. This is a Veteran Owned Small Business Set Aside (VOSB) and the associated North American Industrial Classification System (NAICS) code for this procurement is 561210, with a small business size standard of 750 Employees. PRECEDENCE The Terms and conditions included in this BPA apply to all purchases made pursuant to it. In the event of an inconsistency between the provisions of this BPA and the Contractor's invoice, the provisions of this BPA will take precedence. This is an VOSB Set-aside open-market combined synopsis/solicitation for Enhanced Dining Services as defined herein. The government intends to award a Firm Fixed Price BPA as a result of this combined synopsis/solicitation that will include the terms and conditions set forth herein. To facilitate the award process, all quotes, must include a statement regarding the terms and conditions herein as follows: "The terms and conditions in the solicitation are acceptable to be included in the award document without modification, deletion, or addition." OR "The terms and conditions in the solicitation are acceptable to be included in the award document with the exception, deletion, or addition of the following:" quotes shall list exception(s) and rationale for the exception(s). The Time and Date of all Site Visits shall be sent to Harold.nice@va.gov once scheduled with Justin Bakaian. All Site Visits shall be completed by 3:00 P.M. EST 7/23/2021. Questions and concerns shall be submitted NLT 3:00 EST 7/27/2021 Via email to Harold.nice@va.gov. Quotes shall be received not later than 3:30 EST 08/04/2021. All quotes will be emailed to Harold.nice@va.gov with the subject line to include 36C24121Q0591. Late submissions shall be treated in accordance with the solicitation provision at FAR 52.212-1(f). Any questions or concerns regarding this solicitation should be forwarded in writing via e-mail to the contracting officer Harold Nice @ Harold.nice@va.gov No later than 3:00 PM EST 7/27/2021. Point of Contact Harold Nice contracting officer, Harold.nice@va.gov
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
36C24121Q0591- Combined Synopsis
- 3×Combined SynopsisCurrentJul 2, 2021
N073--Copy of Dining Enhancement VISN 1
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Sources Sought for Multi Function Device (MFD) Printer Services Lease for approx. 140 locations for printer models: RICOH-PRO C7210SX PRODUCTION COPIER. XEROX-VERSALINK B7035SG VB 2A3NM, VERSALINK C7030S VB2D5, VERSALINK C7035 VB2D5, VERSALINK B7035, VERSALINK B7035 VB2D5, ALTALINK C8045 MFP VB 2A3NC, ALTALINK C8045HG VB 3A3NC, ALTALINK C8055HG VB 4A3NC, ALTALINK C8045 MFP, ALTALINK C8055 MFP VB 4A3NC, ALTALINK C8045 MFP VB 3A3NC, ALTALINK C8055 MFP HG VB 4A3NC, ALTALINK C8055 MFP, VERSALINK C7025 VB 1D5, VERSALINK C7025SG, VERSALINK C7025SG, VERSALINK C7836H VB 1B5, VERSALINK C7025, VERSALINK B7025SG, VERSALINK C7025SG VB 1A3NC, ALTALINK C8135 MFP, ALTALINK C8135 COLOR MFP, ALTALINK C8135, ALTALINK C8135 COLOR MFP. The lease and service includes placement of printers at all locations, regular maintenance as needed and on-call for repair. Service also includes supply of ink and toner for all devices and maintenance for the production printer with multi-folding unit and trimmer unit add-ons. | 51% | Market Research | 11/02/2026 |
Answers and Questions in response to solicitation 36C24627Q0084 Question 1) The price schedule lists 4 JB for CLIN 0001 and for each option year CLIN (1001 4001), while the CLIN descriptions and PWS describe an annual steam quality test and audit. How many testing events per year should be priced: one annual event, or four (quarterly)? Answer 1) The solicitation has since been updated. There was an error in the first posting. To clarify the testing needs to be done quarterly over a 12 month period (4 Quarterly testings). Question 2) If the quantity is 4 JB per year, does each JB represent a full test event (dryness, non-condensable gases and the steam, condensate and water audit), or a test at one location or sterilizer? Answer 2) Each JB represent a full test event for all Locations required. (3 each) Sterilizers and Associated Steam Traps. They also check the Condensate leaving the Sterilizers (Water Audit). Question 3) How many steam sample points are to be installed in the base year, and how many sterilizers or test points in Building 110A (CG48A) are to be tested at each event? Answer 3) There are three (3) Steam Sample Points, one on each Sterilizer. There is no need to install sample points during base year. The testing can be accomplished by removing a section of the steam piping to the Sterilizer, install testing equipment and complete testing. Upon completion, remove testing equipment and return system to per-existing alignment of system. However, if contract wants to for ease of access they can install points at their own expense. This is not a requirement of this Solicitation. Question 4) Please confirm whether we should price the broader audit scope for four jobs per year as listed in the price schedule, or the narrower testing scope once annually as stated in the Performance Work Statement. Answer 4) 4 jobs per year | 39% | Solicitation | 11/20/2026 |
Presolicitation Notice Presolicitation Notice Page 5 of 5 Presolicitation Notice *=Required Field Presolicitation Notice Page 1 of 5 The contractor will provide all material, labor, equipment, and supervision necessary to complete the above-named project at the VA Maryland Health Care System (VAMHCS), Building 1 Community Living Center (CLC) of the Loch Raven Campus. Primary Deliverables and Project Requirements Covid Ward 2nd floor B wing Upgrade exhaust fans Air Handling Unit (AHU-B) located in attic Replace and upgrade EF-1A and EF-1B for higher CFM outputs Install heat tracing for chillers Wiring and junction box located in room G-15. Chiller located outside CLC in the pit behind the service road. Assess current heat tracing for chill water line. Complete and terminate existing heat tracing wiring to an emergency electrical panel in G-17 in coordination with the VA. Panel selection is TBD. Install a 20-amp GFPE circuit breaker for the heat tracing to the panel selected by the VA. Kitchen basement Replace cooling coil(s) AHU-E located in attic. Replace fan motor AHU-E located in attic. AHU has one fan. New motor must be rated for and capable of sustaining a fan speed of 60Hz. Replace Variable Frequency Drive (VFD) VFD located in the attic and attached to the AHU Replace VFD in kind with Manufacturer (ABB) Controls Integration & Coordination VA has an existing contract with Johnson Controls International (JCI). The contractor shall coordinate with the COR and Facility Maintenance to satisfy necessities for the facility s existing Building Automation System (BAS) controls corresponding to all new work. Contractor will replace/reinstall or provide new hardware or connections for BAS monitoring when required to complete BAS programming or integration. This can include control wiring, modulators, switches, routing, existing equipment etc. These requirements are determined on a case-by-case basis. Testing Adjusting & Balancing (TAB) TAB shall occur after HVAC modifications are made. It must be performed by a certified vendor/contractor per TABB and/or other ANAB accredited programs for standard industry HVAC system performance compliance Contractor shall provide notice to and request attendance of the COR and/or other COR-approved VA representation prior to TAB. A report on the TAB results must be delivered to the COR. TAB report will be reviewed and approved by the VA prior to contractual closeout and final payment Warranty, Operations & Manuals (O&Ms) and Shop Drawings Contractor and/or subcontractor shall provide a warranty letter including point of contact, to the VA. Warranty is based on workmanship, material and equipment. Duration of warranty starts after acceptance and use of new equipment & components O&Ms for all new equipment and other components requiring preventative maintenance shall be provided to the VA. All O&M documents must be received by the VA prior to contractual closeout and final payment Contractor shall provide training to the VA. Shop Drawings All layout changes and new equipment shall be updated in as-builts, shop drawings, manufacturer diagrams, details, where applicable. Due to the nature of the contract, this requirement will be determined based on off application by the COR at completion of work. If no applicable documents are required, then the COR will opt for omission. Assumptions Contractor to provide a cost/unit for each of the deliverable items above and use the total amounts provided for their proposal. Contractor to track the quantities used on their pay applications with any amounts left over being returned to the government after final payment. All deliverables must be received by the VA prior to final payment. Line items will be tracked in every pay application. Financial progress for a line item will be cross-referenced with the corresponding item s physical progress and/or completion status. Misrepresentation of a line item s financial progress may result in rejection from the COR and require the contractor to resubmit the pay application with revision(s). Pay applications must be submitted with a total amount not to exceed the Purchase Order (PO) balance. A contract modification from the Contracting Officer (CO) is required for payment application submissions exceeding the PO balance. Additional work outside of the contract and contractual supplement documents (provided drawings, as-builts, details, existing product information, etc) require authorization and written execution from the CO. Any additional work (quantified via labor, material or equipment) performed/provided by the contractor without guidance from the VA or direction from the CO shall not be included in payment applications. The contractor is committed to working at their own expense and risk under this condition. Supplemental contractual and scope of work include existing as-builts, details and compliance for VA guidelines, federal & state guidelines, applicable codes, etc. VA can provide the contractor with additional available drawings and other documentation. These are considered items pertaining to the original contract s scope of work Standard Inclusions & General Compliance Contractor is responsible for cleaning the work area of trash regardless of if it is their trash or not. This includes areas that other entities may have access to like the attic and mechanical spaces. Contractor is responsible for stewardship of work area and compliance with VA medical facility guidelines. Contractor will adhere to VA-granted permitting requirements and industry standard safety practices including but not limited to: Infection Control Risk Assessment (ICRA) Pre-Construction Risk Assessment (PCRA) Hot or burn work Confined space entry work (if applicable) Lock out tag out (LOTO) procedures PPE Parking at the Loch Raven campus is limited and contractors are subject to facility guidelines for locations of contractor vehicles. Guidance for contractor parking is enforced by the COR, Facility Maintenance Supervisor, Campus Manager, and Deputy Medical Director. Parking outside the campus boundary is not in the VA s jurisdiction The contractor shall coordinate with the facility prior to work that impacts patient care such as shutting down A/C, heating, power or other utilities. Utility and HVAC shutdowns require at least a 14-day written request to the facility per the VA s internal Standard Operating Procedure. Period of performance is 90 calendar days. | 39% | Solicitation | 11/30/2026 |
The contractor will provide all material, labor, equipment, and supervision necessary to complete the above-named project at the VA Maryland Health Care System (VAMHCS), Building 1 Community Living Center (CLC) of the Loch Raven Campus. Primary Deliverables and Project Requirements Covid Ward 2nd floor B wing Upgrade exhaust fans Air Handling Unit (AHU-B) located in attic Replace and upgrade EF-1A and EF-1B for higher CFM outputs Install heat tracing for chillers Wiring and junction box located in room G-15. Chiller located outside CLC in the pit behind the service road. Assess current heat tracing for chill water line. Complete and terminate existing heat tracing wiring to an emergency electrical panel in G-17 in coordination with the VA. Panel selection is TBD. Install a 20-amp GFPE circuit breaker for the heat tracing to the panel selected by the VA. Kitchen basement Replace cooling coil(s) AHU-E located in attic. Replace fan motor AHU-E located in attic. AHU has one fan. New motor must be rated for and capable of sustaining a fan speed of 60Hz. Replace Variable Frequency Drive (VFD) VFD located in the attic and attached to the AHU Replace VFD in kind with Manufacturer (ABB) Controls Integration & Coordination VA has an existing contract with Johnson Controls International (JCI). The contractor shall coordinate with the COR and Facility Maintenance to satisfy necessities for the facility s existing Building Automation System (BAS) controls corresponding to all new work. Contractor will replace/reinstall or provide new hardware or connections for BAS monitoring when required to complete BAS programming or integration. This can include control wiring, modulators, switches, routing, existing equipment etc. These requirements are determined on a case-by-case basis. Testing Adjusting & Balancing (TAB) TAB shall occur after HVAC modifications are made. It must be performed by a certified vendor/contractor per TABB and/or other ANAB accredited programs for standard industry HVAC system performance compliance Contractor shall provide notice to and request attendance of the COR and/or other COR-approved VA representation prior to TAB. A report on the TAB results must be delivered to the COR. TAB report will be reviewed and approved by the VA prior to contractual closeout and final payment Warranty, Operations & Manuals (O&Ms) and Shop Drawings Contractor and/or subcontractor shall provide a warranty letter including point of contact, to the VA. Warranty is based on workmanship, material and equipment. Duration of warranty starts after acceptance and use of new equipment & components O&Ms for all new equipment and other components requiring preventative maintenance shall be provided to the VA. All O&M documents must be received by the VA prior to contractual closeout and final payment Contractor shall provide training to the VA. Shop Drawings All layout changes and new equipment shall be updated in as-builts, shop drawings, manufacturer diagrams, details, where applicable. Due to the nature of the contract, this requirement will be determined based on off application by the COR at completion of work. If no applicable documents are required, then the COR will opt for omission. Assumptions Contractor to provide a cost/unit for each of the deliverable items above and use the total amounts provided for their proposal. Contractor to track the quantities used on their pay applications with any amounts left over being returned to the government after final payment. All deliverables must be received by the VA prior to final payment. Line items will be tracked in every pay application. Financial progress for a line item will be cross-referenced with the corresponding item s physical progress and/or completion status. Misrepresentation of a line item s financial progress may result in rejection from the COR and require the contractor to resubmit the pay application with revision(s). Pay applications must be submitted with a total amount not to exceed the Purchase Order (PO) balance. A contract modification from the Contracting Officer (CO) is required for payment application submissions exceeding the PO balance. Additional work outside of the contract and contractual supplement documents (provided drawings, as-builts, details, existing product information, etc) require authorization and written execution from the CO. Any additional work (quantified via labor, material or equipment) performed/provided by the contractor without guidance from the VA or direction from the CO shall not be included in payment applications. The contractor is committed to working at their own expense and risk under this condition. Supplemental contractual and scope of work include existing as-builts, details and compliance for VA guidelines, federal & state guidelines, applicable codes, etc. VA can provide the contractor with additional available drawings and other documentation. These are considered items pertaining to the original contract s scope of work Standard Inclusions & General Compliance Contractor is responsible for cleaning the work area of trash regardless of if it is their trash or not. This includes areas that other entities may have access to like the attic and mechanical spaces. Contractor is responsible for stewardship of work area and compliance with VA medical facility guidelines. Contractor will adhere to VA-granted permitting requirements and industry standard safety practices including but not limited to: Infection Control Risk Assessment (ICRA) Pre-Construction Risk Assessment (PCRA) Hot or burn work Confined space entry work (if applicable) Lock out tag out (LOTO) procedures PPE Parking at the Loch Raven campus is limited and contractors are subject to facility guidelines for locations of contractor vehicles. Guidance for contractor parking is enforced by the COR, Facility Maintenance Supervisor, Campus Manager, and Deputy Medical Director. Parking outside the campus boundary is not in the VA s jurisdiction The contractor shall coordinate with the facility prior to work that impacts patient care such as shutting down A/C, heating, power or other utilities. Utility and HVAC shutdowns require at least a 14-day written request to the facility per the VA s internal Standard Operating Procedure. Period of performance is 90 calendar days. | 39% | Pre-Solicitation | 12/14/2026 |
The Department of Veterans Affairs will be soliciting for vendors that can provide Steam Quality Testing Services for the Hampton VA Medical Center located in Hampton, VA. This will be performed in accordance with the Performance Work Statement included in the solicitation.  A Request for Quotation will be issued on or about November 6, 2026.  This is a Small Business Set-Aside. To be eligible for award, the contractor must be registered in in the SAM database at http://www.sam.gov. The applicable North American Industry Classification System (NAICS) Code is 561210, Facilities Support Services, the Size Standard is $47.0 Million, and the Product Service (PSC) Code is H144, Quality Control Furnace, Steam Plant and Drying Equipment; Nuclear Reactors. Contractors interested in providing this service should monitor Contract Opportunities for the solicitation #36C24627Q0084.  Point of Contact: Yanique WilliamsChin    Email: Yanique.WilliamsChin@va.gov | 39% | Pre-Solicitation | 11/20/2026 |
Additional Details
Solicitation Number
36C24121Q0591
Archive Date
Aug 19, 2021
Office Address
TOGUS, ME, 04330