Notice ID: 0d0e2968bff44514834b2eb67ac4197eAward NoticeAwarded
N059--Replace Boiler Plant Stratus
Awarded on September 21, 2022. Full description on SAM.gov.
Awarded tounder 36C24122P1385 (source: SAM.gov award notice)• $12.1K
Overview
- Posted
- October 18, 2022
- Notice type
- Award Notice
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 238210: Electrical Contractors and Other Wiring Installation Contractors
- Agency
- Department of Veterans Affairs
Notice details
- Place of performance
- Department of Veterans Affairs VAMC Providence 830 Chalkstone Avenue, Providence, 02908
- Last updated
- Sep 9, 2025
- Award date
- Sep 21, 2022
- Award amount (SAM.gov award notice)
- $12.1K
Identifiers
- Solicitation number
- 36C24122Q1208
- Notice ID
- 0d0e2968bff44514834b2eb67ac4197e
- Award number (PIID)
- 36C24122P1385
Description
Replace the Ethernet switch, Stratix 6000 and cables for our main panel to monitor our boilers
Award Overview
Award Number
36C24122P1385
Award Amount (SAM.gov award notice)
$12.1K
Award Date
Sep 21, 2022
Awardee
Awardee UEI
HQLWLLA1PQN6
Original Solicitation
Notice ID: 0d0e2968bff44514834b2eb67ac4197e
Posted Date: Oct 18, 2022
Original Response Deadline: Not specified
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
36C24122Q1208- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- Pre-SolicitationSep 14, 2022
N059--Replace the Ethernet switch, Stratix 6000 and cables
- SolicitationSep 14, 2022
N059--Replace the Ethernet switch, Stratix 6000 and cables
- AwardedCurrentOct 18, 2022
N059--Replace Boiler Plant Stratus
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The Department of Veterans Affairs, Networking Contracting Office (NCO 01) located in West Roxbury, MA intends to enter a sole source procurement, pursuant to the authority of FAR 6.302-1, with Encore Holdings LLC, for the following requirement: STATEMENT OF WORK (SOW) Background The VAMC West Roxbury campus operates an Edwards EST-3 fire alarm network that supports life safety monitoring, campus fire alarm annunciation, and associated interfaces. The existing EST-3 platform is aged and obsolete. The Government requires an in-kind/successor-platform migration from Edwards EST-3 to Edwards EST-4 to improve system reliability, maintainability, cybersecurity posture, and code compliance while preserving operational continuity and minimizing disruption to an occupied healthcare campus. The existing SIGA series field devices are expected to remain in place and are understood to be compatible with the EST-4 platform. Objective The objective of this requirement is to furnish all labor, supervision, programming, materials, tools, equipment, project management, testing, documentation, and training required to transition the VAMC West Roxbury campus fire alarm network from the existing Edwards EST-3 platform to an Edwards EST-4 networked platform while maintaining required fire alarm coverage and minimizing impairment duration. Applicable Standards and Requirements Work shall comply with applicable federal, state, local, VA, VHA, Joint Commission, OSHA, and Authority Having Jurisdiction requirements, including the latest adopted editions applicable to this facility. At a minimum, work shall be performed in accordance with the following, as applicable: NFPA 70, National Electrical Code. NFPA 72, National Fire Alarm and Signaling Code. NFPA 101, Life Safety Code. NFPA 25, where sprinkler supervisory and waterflow interfaces are affected. VA/VHA life safety, interim life safety measures, cybersecurity, and facility access requirements. Manufacturer requirements for Edwards EST-4 hardware, programming, FireWorks integration, and compatible SIGA field devices. Scope of Work The Contractor shall provide a complete, operational, tested, documented, and accepted Edwards EST-4 upgrade of the existing West Roxbury campus fire alarm network. The scope includes, but is not limited to, the following work elements. Project Management and Coordination Conduct a kickoff meeting with VA Engineering, Safety, IT, Police/Dispatch, clinical stakeholders as needed, and the Contracting Officer Representative (COR). Develop and maintain a project schedule identifying submittal dates, material procurement, programming milestones, outage/cutover windows, testing, training, and closeout. Coordinate all work affecting fire alarm service, system monitoring, FireWorks, master box/monitoring paths, network drops, building access, and any life safety impairment with the VA before work begins. Submit a written cutover plan before any node, panel, annunciator, or network segment is taken offline. The plan shall identify expected downtime, temporary monitoring method, notifications, responsible parties, rollback steps, and acceptance testing sequence. Coordinate with VA IT staff for FireWorks integration, IP/network drops, cybersecurity review, firewall modules, and any network-connected components required for the EST-4 platform. Provide manufacturer-certified project supervision and programming support throughout the project. EST-3 to EST-4 Programming Migration Pre-program and transition the existing Edwards EST-3 fire alarm program/database into an Edwards EST-4 architecture for the existing campus fire alarm network. Use qualified Edwards/EST-4 factory-trained programming personnel. Complete pre-programming off-site to the maximum practical extent and have the EST-4 program ready for integration after hardware upgrades are completed. Replicate any approved changes made to the EST-3 program before implementation into the EST-4 program before cutover. Perform program verification, input/output mapping, matrix verification, cause-and-effect review, FireWorks point mapping, and device/zone/nodal naming verification before final acceptance testing. Hardware Replacement and Installation Decommission and replace existing EST-3 internal fire alarm panel components that must be replaced as part of the EST-4 upgrade. Furnish and install Edwards EST-4 networked platform components, panel hardware, power supplies, network cards, modules, enclosures, batteries, and accessories required for a complete operational system. Replace all existing remote annunciators and backboxes in their existing locations with compatible EST-4 units. New units may differ in size from existing units; contractor shall identify any surrounding finish impacts before installation. Reuse existing field wiring, fiber, initiating devices, notification appliances, sprinkler/suppression interface points, and SIGA addressable devices where compatible and functional. Label new and replaced components, update panel directories, and provide device/node identifiers consistent with the accepted program and testing documents. Protect existing finishes, equipment, patient care areas, and building systems. Cutting, patching, and painting are excluded unless separately authorized in the final contract. Field Device and System Integration Integrate all existing addressable initiating devices, notification devices, sprinkler points, control points, and field wiring into the EST-4 platform to the extent they are compatible and functional. Maintain existing fire alarm sequence of operations unless changes are approved in writing by the VA. Integrate the upgraded system with the existing FireWorks system and campus monitoring architecture. Advanced scheduling with VA staff and IT staff is required. Verify interfaces to supervisory circuits, waterflow/tamper devices, elevator recall/shunt trip interfaces, HVAC shutdown, door release, smoke control or other building systems where such interfaces are part of the existing fire alarm sequence. Replacement of field devices, node-to-node rewiring, correction of existing wiring defects, and correction of pre-existing system troubles are excluded unless separately authorized by the Contracting Officer. Continuity of Monitoring and System Impairment Control No fire alarm panel, node, annunciator, or monitoring path shall be removed from service until the VA approves a written impairment/cutover plan. The Contractor shall support the VA in identifying temporary measures required to maintain monitoring coverage during each cutover window. Temporary cellular dialer or similar temporary monitoring measures shall be used if included in the final award or otherwise authorized by the Contracting Officer. The Contractor shall provide advance notice for all impairments and shall not leave a system impaired without VA approval. If fire watch is required by VA or the AHJ, the VA will establish the fire watch approach or add it by contract action. Testing, Inspection, and Acceptance After hardware installation and programming are complete, perform 100 percent testing of the upgraded fire alarm system. Testing shall include, at a minimum, all addressable initiating points, control points, sprinkler points, supervisory points, notification appliances, audio/visual devices, remote annunciators, power supplies, batteries, FireWorks graphics/point reporting, monitoring outputs, and required interfaces. Provide sufficient technicians to complete acceptance testing efficiently while minimizing disruption to the occupied medical campus. Notify the VA Safety Office, Engineering, IT, affected building occupants, monitoring personnel, and other stakeholders before testing. Testing shall be coordinated in advance with the COR. Document all passed/failed tests, deficiencies, corrective actions, retests, and final acceptance results. Deficiencies caused by existing field devices, field wiring, fiber, or pre-existing troubles shall be identified separately from contractor installation deficiencies. Final acceptance requires successful completion of 100 percent functional testing, receipt of required documentation, VA/COR acceptance, and AHJ acceptance when applicable. Training and Closeout Provide training to VA Engineering, Safety, and other designated personnel on the EST-4 system, panel operation, FireWorks functionality, alarm/supervisory/trouble response, disabling/enabling devices, global disconnects, and routine operator functions. Provide closeout documentation, final programming files/backups, record drawings, point lists, test reports, as-built sequence of operations, manufacturer literature, warranty information, and contact information for service support. Provide documentation sufficient for future maintenance, troubleshooting, and competitive support by qualified authorized providers where manufacturer restrictions allow. Work Hours and Scheduling Routine work is anticipated Monday through Friday, 8:00 a.m. to 5:00 p.m., excluding federal holidays, unless otherwise approved by the VA. Outages, cutovers, testing, and work in sensitive clinical or operational areas may require after-hours scheduling at the direction of the VA. The Contractor shall coordinate all work with the COR and shall provide advance scheduling for testing and cutover activities. The NAICS code for this requirement is 238210. The VAMC West Roxbury campus fire alarm network is an existing Edwards EST-3 network integrated with campus life safety operations, FireWorks monitoring, remote annunciators, sprinkler points, control points, notification appliances, and existing addressable SIGA field devices. The Government need is not simply to purchase fire alarm equipment; it is to safely migrate an occupied healthcare campus from an obsolete Edwards EST-3 network to the manufacturer successor Edwards EST-4 network while maintaining life safety coverage, preserving existing field device compatibility, and reducing the risk of outages or incompatible programming. The existing EST-3 system is aged and obsolete. The EST-3 platform has been discontinued and that obsolete parts are difficult to source, with some critical components unavailable entirely. The production of the EST-3 platform concluded on December 31, 2023, that no new orders were accepted after that date, and that replacement parts are being phased out in waves. Continuing to rely on EST-3 exposes the VA to increasing risk that a failed panel component, power supply, annunciator, or other critical component cannot be promptly replaced, potentially impairing fire alarm functionality in an occupied medical campus. An Edwards EST-4 platform is required because it is the successor platform for the existing Edwards EST-3 network and allows the VA to reuse compatible existing SIGA field devices and field wiring. The SIGA series field devices are backward- and forward-compatible, allowing reuse of existing field devices. Use of a non-Edwards platform would require redesign and replacement of major portions of the fire alarm infrastructure, new field devices and/or modules, extensive rewiring, revised FireWorks integration, new sequence of operations, re-commissioning, and additional outages. That approach would substantially increase cost, schedule, risk, and disruption compared with the EST-4 in-kind/successor platform conversion. Encore has existing familiarity with the VA Boston Edwards fire alarm systems, campus FireWorks configuration, panel histories, deficiencies, VA safety/engineering coordination procedures, and the active service/programming environment. This work requires pre-programming and transition of the existing EST-3 fire alarm program to EST-4 by Encore lead programming personnel, with any changes to the EST-3 program before implementation replicated in the EST-4 program. That requirement makes continuity of programming knowledge and current system control critical. A site-specific fiber issue that must be coordinated during the upgrade: existing fiber terminations at each FACP node are problematic and may contribute to network instability on the EST-4 network. The contractor performing the EST-4 upgrade must understand and sequence this fiber-demarcation work with panel/node cutover, FireWorks integration, and acceptance testing. Encore has direct knowledge of the current fire alarm service environment and can coordinate the cutover without introducing avoidable responsibility gaps between the incumbent fire alarm service provider and a separate upgrade contractor. Award to a different contractor would require the new contractor to obtain or recreate the existing EST-3 database, verify every device and interface, learn the VA campus FireWorks and monitoring architecture, develop a cutover strategy without the incumbent service history, coordinate the West Roxbury fiber-demarcation issue, and coordinate responsibility boundaries with the service contractor during a life safety system transition. The use of a separate vendor would increase operational risk during cutover because the service contractor would remain responsible for fire alarm service continuity while another contractor altered the system baseline. This requirement is not based on lack of advance planning or the availability of funds. It is driven by technical lifecycle risk, discontinued/obsolete EST-3 components, compatibility with the existing Edwards/SIGA/FireWorks infrastructure, the West Roxbury FACP fiber-demarcation issue, and the need to safely transition the campus fire alarm network while maintaining fire alarm coverage in a healthcare environment. Encore Holdings LLC is the only firm capable of providing the supplies and services described above without the Veterans Health Administration experiencing substantial duplication of cost that could not be expected to be recovered through competition and unacceptable delays in fulfilling its requirements. This notice of intent is not a solicitation nor is it a request for proposal. However, interested parties that believe they can satisfy the requirement must clearly identify their capability to do so in writing by October 16, 2026 at 12 pm EST time. Response should be sent to Issa Shawki at issa.shawki@va.gov. Information submitted in response to this notice will be used solely to determine whether competitive procedures could be used for this acquisition. A determination not to open this requirement to competition based upon responses to this notice is solely within the discretion of the Government. | - | Special Notice | 10/16/2026 |
The Department of Veterans Affairs, Networking Contracting Office (NCO 01) located in Brockton, MA intends to enter a sole source procurement, pursuant to the authority of FAR 6.302-1, with Encore Holdings LLC, for the following requirement: STATEMENT OF WORK (SOW) Background The VAMC Brockton campus operates an Edwards EST-3 fire alarm network that supports life safety monitoring, campus fire alarm annunciation, remote annunciation, sprinkler and control point reporting, notification appliances, and associated interfaces. The existing EST-3 platform is aged and obsolete. Place of Performance: 940 Belmont Street, Brockton, MA Objective The objective of this requirement is to furnish all labor, supervision, programming, materials, tools, equipment, project management, testing, documentation, and training required to transition the VAMC Brockton campus fire alarm network from the existing Edwards EST-3 platform to an Edwards EST-4 networked platform while maintaining required fire alarm coverage and minimizing impairment duration. Applicable Standards and Requirements Work shall comply with applicable federal, state, local, VA, VHA, Joint Commission, OSHA, and Authority Having Jurisdiction requirements, including the latest adopted editions applicable to this facility. At a minimum, work shall be performed in accordance with the following, as applicable: NFPA 70, National Electrical Code. NFPA 72, National Fire Alarm and Signaling Code. NFPA 101, Life Safety Code. NFPA 25, where sprinkler supervisory and waterflow interfaces are affected. VA/VHA life safety, interim life safety measures, cybersecurity, infection-control, and facility access requirements. Manufacturer requirements for Edwards EST-4 hardware, programming, FireWorks integration, and compatible SIGA field devices. Scope of Work The Contractor shall provide a complete, operational, tested, documented, and accepted Edwards EST-4 upgrade of the existing Brockton campus fire alarm network. The scope includes, but is not limited to, the following work elements. Project Management and Coordination Conduct a kickoff meeting with VA Engineering, Safety, IT, Police/Dispatch, clinical stakeholders as needed, the VA fiber contractor if applicable, and the Contracting Officer Representative (COR). Develop and maintain a project schedule identifying submittal dates, material procurement, programming milestones, outage/cutover windows, fiber-demarcation coordination, testing, training, and closeout. Coordinate all work affecting fire alarm service, system monitoring, FireWorks, master box/monitoring paths, network drops, building access, and any life safety impairment with the VA before work begins. Submit a written cutover plan before any node, panel, annunciator, or network segment is taken offline. The plan shall identify expected downtime, temporary monitoring method, notifications, responsible parties, rollback steps, and acceptance testing sequence. Coordinate with VA IT staff for FireWorks integration, IP/network drops, cybersecurity review, firewall modules, and any network-connected components required for the EST-4 platform. Provide manufacturer-certified project supervision and programming support throughout the project. EST-3 to EST-4 Programming Migration Pre-program and transition the existing Edwards EST-3 fire alarm program/database into an Edwards EST-4 architecture for the existing campus fire alarm network. Use qualified Edwards/EST-4 factory-trained programming personnel. Complete pre-programming off-site to the maximum practical extent and have the EST-4 program ready for integration after hardware upgrades are completed. Replicate any approved changes made to the EST-3 program before implementation into the EST-4 program before cutover. Perform program verification, input/output mapping, matrix verification, cause-and-effect review, FireWorks point mapping, and device/zone/nodal naming verification before final acceptance testing. Hardware Replacement and Installation Decommission and replace existing EST-3 internal fire alarm panel components that must be replaced as part of the EST-4 upgrade. Furnish and install Edwards EST-4 networked platform components, panel hardware, power supplies, network cards, modules, enclosures, batteries, and accessories required for a complete operational system. Replace all existing remote annunciators and backboxes in their existing locations with compatible EST-4 units. New units may differ in size from existing units; contractor shall identify any surrounding finish impacts before installation. Reuse existing field wiring, initiating devices, notification appliances, sprinkler/suppression interface points, and SIGA addressable devices where compatible and functional. Label new and replaced components, update panel directories, and provide device/node identifiers consistent with the accepted program and testing documents. Protect existing finishes, equipment, patient care areas, and building systems. Cutting, patching, and painting are excluded unless separately authorized in the final contract. Field Device and System Integration Integrate all existing addressable initiating devices, notification devices, sprinkler points, control points, audio/visual devices, and field wiring into the EST-4 platform to the extent they are compatible and functional. Maintain existing fire alarm sequence of operations unless changes are approved in writing by the VA. Integrate the upgraded system with the existing FireWorks system and campus monitoring architecture. Advanced scheduling with VA staff and IT staff is required. Verify interfaces to supervisory circuits, waterflow/tamper devices, elevator recall/shunt trip interfaces, HVAC shutdown, door release, smoke control, or other building systems where such interfaces are part of the existing fire alarm sequence. Replacement of field devices, node-to-node rewiring, correction of existing wiring defects, and correction of pre-existing system troubles are excluded unless separately authorized by the Contracting Officer. Brockton Fiber Coordination and Network Stability Review the existing FACP node fiber terminations and identify any fiber-demarcation conditions that could affect EST-4 network stability. Coordinate with the VA and VA fiber contractor regarding local demarcation panels adjacent to each FACP, fiber patch cords within each panel enclosure to each FACP, and any other fiber remediation recommended before or during EST-4 cutover. Document any fiber-related deficiencies, risks, or recommended actions discovered during planning or cutover. Fiber-related costs, fiber installation, fiber remediation, and third-party fiber contractor work are excluded unless separately authorized. Do not proceed with final cutover of affected FACP nodes where identified fiber conditions create an unacceptable risk of network instability unless the VA approves the risk mitigation or sequencing plan. Continuity of Monitoring and System Impairment Control No fire alarm panel, node, annunciator, or monitoring path shall be removed from service until the VA approves a written impairment/cutover plan. The Contractor shall support the VA in identifying temporary measures required to maintain monitoring coverage during each cutover window. Temporary cellular dialer or similar temporary monitoring measures shall be used if included in the final award or otherwise authorized by the Contracting Officer. The Contractor shall provide advance notice for all impairments and shall not leave a system impaired without VA approval. Fire watch is excluded from the base proposal unless separately authorized. If fire watch is required by VA or the AHJ, the VA will establish the fire watch approach or add it by contract action. Testing, Inspection, and Acceptance After hardware installation and programming are complete, perform 100 percent testing of the upgraded fire alarm system. Testing shall include, at a minimum, all addressable initiating points, control points, sprinkler points, supervisory points, notification appliances, audio/visual devices, remote annunciators, power supplies, batteries, FireWorks graphics/point reporting, monitoring outputs, and required interfaces. Provide sufficient technicians to complete acceptance testing efficiently while minimizing disruption to the occupied medical campus. Notify the VA Safety Office, Engineering, IT, affected building occupants, monitoring personnel, and other stakeholders before testing. Testing shall be coordinated in advance with the COR. Document all passed/failed tests, deficiencies, corrective actions, retests, and final acceptance results. Deficiencies caused by existing field devices, field wiring, fiber, or pre-existing troubles shall be identified separately from contractor installation deficiencies. Final acceptance requires successful completion of 100 percent functional testing, receipt of required documentation, VA/COR acceptance, and AHJ acceptance when applicable. Training and Closeout Provide training to VA Engineering, Safety, and other designated personnel on the EST-4 system, panel operation, FireWorks functionality, alarm/supervisory/trouble response, disabling/enabling devices, global disconnects, and routine operator functions. Provide closeout documentation, final programming files/backups, record drawings, point lists, test reports, as-built sequence of operations, manufacturer literature, warranty information, and contact information for service support. Provide documentation sufficient for future maintenance, troubleshooting, and competitive support by qualified authorized providers where manufacturer restrictions allow. Contractor Qualifications Contractor personnel performing programming, installation, testing, and troubleshooting shall be factory trained and qualified for Edwards EST-3/EST-4 fire alarm systems and FireWorks integration, as applicable. Contractor shall provide proof of certifications and qualifications for personnel performing system programming and acceptance testing upon request. Contractor shall comply with VA access, identification, background, safety, infection control, and work notification requirements. Contractor shall provide personnel, tools, test equipment, ladders/lifts, programming equipment, and manufacturer software/hardware required for the work. Work Hours and Scheduling Routine work is anticipated Monday through Friday, 8:00 a.m. to 5:00 p.m., excluding federal holidays, unless otherwise approved by the VA. Outages, cutovers, testing, and work in sensitive clinical or operational areas may require after-hours scheduling at the direction of the VA. Overtime is excluded from the proposal unless included in the final award or separately authorized. The Contractor shall coordinate all work with the COR and shall provide advance scheduling for testing, fiber-demarcation coordination, and cutover activities. The NAICS code for this requirement is 238210. The VAMC Brockton campus fire alarm network is an existing Edwards EST-3 network integrated with campus life safety operations, FireWorks monitoring, remote annunciators, sprinkler points, control points, notification appliances, and existing addressable SIGA field devices. The Government need is not simply to purchase fire alarm equipment; it is to safely migrate an occupied healthcare campus from an obsolete Edwards EST-3 network to the manufacturer successor Edwards EST-4 network while maintaining life safety coverage, preserving existing field device compatibility, and reducing the risk of outages or incompatible programming. The existing EST-3 system is aged and obsolete. The EST-3 platform has been discontinued and that obsolete parts are difficult to source, with some critical components unavailable entirely. The production of the EST-3 platform concluded on December 31, 2023, that no new orders were accepted after that date, and that replacement parts are being phased out in waves. Continuing to rely on EST-3 exposes the VA to increasing risk that a failed panel component, power supply, annunciator, or other critical component cannot be promptly replaced, potentially impairing fire alarm functionality in an occupied medical campus. An Edwards EST-4 platform is required because it is the successor platform for the existing Edwards EST-3 network and allows the VA to reuse compatible existing SIGA field devices and field wiring. The SIGA series field devices are backward- and forward-compatible, allowing reuse of existing field devices. Use of a non-Edwards platform would require redesign and replacement of major portions of the fire alarm infrastructure, new field devices and/or modules, extensive rewiring, revised FireWorks integration, new sequence of operations, re-commissioning, and additional outages. That approach would substantially increase cost, schedule, risk, and disruption compared with the EST-4 in-kind/successor platform conversion. Encore has existing familiarity with the VA Boston Edwards fire alarm systems, campus FireWorks configuration, panel histories, deficiencies, VA safety/engineering coordination procedures, and the active service/programming environment. This work requires pre-programming and transition of the existing EST-3 fire alarm program to EST-4 by Encore lead programming personnel, with any changes to the EST-3 program before implementation replicated in the EST-4 program. That requirement makes continuity of programming knowledge and current system control critical. A site-specific fiber issue that must be coordinated during the upgrade: existing fiber terminations at each FACP node are problematic and may contribute to network instability on the EST-4 network. The proposal recommends that the VA fiber contractor provide local demarcation panels adjacent to each FACP with patch cords into each FACP enclosure. The contractor performing the EST-4 upgrade must understand and sequence this fiber-demarcation work with panel/node cutover, FireWorks integration, and acceptance testing. Encore has direct knowledge of the current fire alarm service environment and can coordinate the cutover without introducing avoidable responsibility gaps between the incumbent fire alarm service provider and a separate upgrade contractor. Award to a different contractor would require the new contractor to obtain or recreate the existing EST-3 database, verify every device and interface, learn the VA campus FireWorks and monitoring architecture, develop a cutover strategy without the incumbent service history, coordinate the Brockton fiber-demarcation issue, and coordinate responsibility boundaries with the service contractor during a life safety system transition. The use of a separate vendor would increase operational risk during cutover because the service contractor would remain responsible for fire alarm service continuity while another contractor altered the system baseline. This requirement is not based on lack of advance planning or the availability of funds. It is driven by technical lifecycle risk, discontinued/obsolete EST-3 components, compatibility with the existing Edwards/SIGA/FireWorks infrastructure, the Brockton FACP fiber-demarcation issue, and the need to safely transition the campus fire alarm network while maintaining fire alarm coverage in a healthcare environment. Encore Holdings LLC dba Encore Fire Protection / Encore Fire Protection is the only firm capable of providing the supplies and services described above without the Veterans Health Administration experiencing substantial duplication of cost that could not be expected to be recovered through competition and unacceptable delays in fulfilling its requirements. This notice of intent is not a solicitation nor is it a request for proposal. However, interested parties that believe they can satisfy the requirement must clearly identify their capability to do so in writing by October 16, 2026 at 12 pm EST time. Response should be sent to Issa Shawki at issa.shawki@va.gov. Information submitted in response to this notice will be used solely to determine whether competitive procedures could be used for this acquisition. A determination not to open this requirement to competition based upon responses to this notice is solely within the discretion of the Government. | - | Special Notice | 10/16/2026 |
3-Year Electrical Testing and Repair Contract Performance Work Statement (PWS) General Requirements: Contractor shall furnish all supplies, materials, equipment, personnel/labor and technical supervision required to perform inspections, repairs, testing, cleaning, calibrations and adjustments on the electrical power distribution system and associated equipment at the Hampton Veterans Affairs Medical Center within the allotted time frame of this contract. This is a 4160 volt primary system that includes various secondary voltages and both emergency and normal power sources. A comprehensive list of equipment is included in this contract as well as a dollar amount to be set aside for repairs. All inspections and testing procedures must meet the criteria of the original equipment manufacturer along with the latest editions of the following codes, standards and specifications listed: ANSI, IEEE, ICEA, NETA, NEMA, NFPA, JCAHO and VA regulations. The contractor shall be responsible for supplying all portable power required to power up any and all test equipment necessary throughout these tests. The use of normal or emergency building power will not be allowed. The contractor shall be responsible for securing all manufacturers information, curves, data, procedures and any other information necessary to conduct specific tests on equipment and systems. Prior to beginning field-testing, the testing organization shall submit test procedures and a detailed test schedule to the Electrical Supervisor for each item of equipment to be field-tested. No testing is to be performed until after the test procedures and schedules have been approved. The contractor shall be responsible for all coordination between Dominion Virginia Power (if applicable), station supervisory personnel and test personnel for scheduling shut-downs, system tests and tests on system components. The V.A Medical Center Electrical Staff will be responsible for conducting the actual scheduled outages and reenergizing of circuits and components on V.A. premises and V.A. owned equipment only. Lockout/Tagout of this equipment will be performed jointly between the V. A. Medical Center Electricians and the Contractor. The contractor will be responsible for removal and replacement of any and all breakers needing to be tested. All breakers being removed will be properly reinstalled. Any and all conductors removed from a breaker will be properly terminated back to that breaker and any and all lugs will be properly torqued to manufacturers specifications. Testing shall commence and be completed within nine (9) consecutive days, beginning on a Saturday and ending on the following Sunday. The specific dates shall be coordinated with the COTR. All outages shall be scheduled with the COTR two weeks in advance of testing start date. Testing dates may change due to inclement weather, however, the COTR shall first be notified and approve any changes necessary. Contractor shall anticipate all work to be done after normal working hours. Outages will be scheduled at night between the hours of 5:00 p.m. and midnight and between the hours of 7:00 am and 5:00 p.m. on weekends. However the Contractor should be prepared to work longer hours should problems develop to assure restoration of power. Daytime hours, during the week, may be approved under certain circumstances if there is no impact to building occupants. This would be a rare instance, thus Contractor should anticipate overtime hours for all contract requirements. Equipment Repairs: Minor repairs shall include but not be limited to such items as loose bolts, loose or broken lugs, wiring terminals, heaters, malfunctioning targets, dirty/high resistance connections, etc and shall be corrected on site during testing if possible. Repair or replacement of larger items such as breakers shall also be performed during this outage if possible. However if parts are not readily available, these items will be repaired or replaced under a separate smaller outage and will be scheduled after parts or components are available. Contractor shall set aside a line item not to exceed $50,000 for repair or replacement parts with this contract. All repairs shall be invoiced under this line item at the conclusion of the contract. This amount is to be used for bidding purposes. However a materials breakdown will be required with the final invoice and Contractor shall be paid actual costs with appropriate mark up s up to $50,000 for parts. Contractor is not to exceed this amount without prior written approval of the Contracting Officer. Minimum Equipment Test Requirements: 5 KV AIR CIRCUIT BREAKERS 1. The breakers will be removed from their compartments. The compartments shall be cleaned and inspected. Shutters shall be cleaned, inspected, and tested for proper operation. The racking mechanisms shall also be cleaned, lubricated and tested for proper operation. 2. All cable termination s, both primary and secondary, shall he checked for signs of overheating, proper tightness and support. 3. All exposed bus connections shall be checked for signs of overheating and for proper tightness. 4. The arc chutes will be removed, cleaned and inspected. 5. The entire breaker and the mechanism will be inspected. 6. The entire operating mechanism will be thoroughly cleaned, lubricated and exercised. 7. All of the interior components of the circuit breaker will be thoroughly cleaned. 8. The contacts and current carrying assemblies will be inspected for burning, pitting, arcing, worn fingers, garter springs etc. 9. The contacts will be cleaned and anti-oxidant grease will be applied to the breaker s main contacts. 10. The breaker contact resistance will be measured and recorded. 11. An insulation resistance test will be performed and results recorded. 12. The breaker will then be closed manually to ensure proper closing and trip operations. 13. Any and all interlocks will be checked and proper operation will be verified. 14. The breaker will be electrically operated when test stands are available, or the breaker will be operated from its cubicle, if the system allows. 15. All indicating devices such as lights, flags, switches etc. shall be tested for proper operation. Any that are not operating properly shall be repaired at that time if possible. 16. All heat strips throughout the enclosure shall be made operational, by repair or replacement, prior to completion of inspection. ENCLOSED AIR BREAK SWITCHES (MEDIUM VOLTAGE) 1. After shutdown, the entire switch mechanism will be cleaned and inspected. 2. The switch contacts will be checked for proper alignment. Anti-oxidant grease will be applied to the main contacts. 3. The switch s arcing contacts will be checked for the proper opening sequence relative to the main contacts. 4. The switch s operating mechanism will be inspected for wear and proper operation. The entire mechanism will be cleaned and lubricated. All interlocks will be tested and proper operation will be verified. 5. Fuses will be inspected; size and type will be recorded. 6. All phase isolation barriers will be cleaned, and the barriers will be checked for contamination and corona damage. 7. All insulators will be cleaned and visually inspected for cracks and chips. 8. All exposed bus and cable connections will be checked for proper tightness and for evidence of overheating, burning or tracking. 9. All lightning arrestors will be cleaned and inspected for broken or damaged porcelain and subjected to an insulation resistance test. Results shall be recorded. 10. All ground connections will be inspected and repaired if found to be inadequate. 11. Contact resistance and insulation resistance tests will be performed, where possible, and the results recorded. 12. All heat strips throughout the enclosure shall be made operational, by repair or replacement, prior to completion of inspection. OIL-FILLED TRANSFORMERS 1. The transformers will be inspected for leaks, poor seals and or gaskets, and for proper oil levels. 2. The transformer tank and its cooling fins will be inspected for rust, chipped paint, dents, and proper connection to ground. 3. All of the bushings will be cleaned, inspected for cracks and or chips. proper tightness. and evidence of overheating. 4. All gauges and alarm devices will he inspected, recorded and reset where applicable. 5. Insulation resistance tests of each transformer winding will he performed, where possible and the results recorded. 6. Turns ratio test shall be performed and recordings documented. 7. The oil will be sampled and tested in accordance with ASTM procedures. All sampling devices used will be new, clean and sealed with thread sealant. Drip pans shall be installed under all the valves prior to any oil removal. The contractor will clean up any and all oil lost during sampling. DRY-TYPE TRANSFORMERS 1. Check enclosure for dents, loose bolts, proper ventilation, anchoring and grounding. 2. The inside of the transformer shall be cleaned and all electrical terminations will be checked for signs of overheating and proper tightness. 3. Insulation resistance tests of each transformer winding will be performed, where possible and the results recorded. 4. Turns ratio test shall be performed and recordings documented. SWITCHGEAR AND STRUCTURE 1. After power shutdown, the entire switchgear interior will be thoroughly cleaned. 2. Exposed bus connections will be checked for proper tightness. 3. All of the bus insulators will be thoroughly cleaned and visually inspected for cracks and chips. 4. All control switches, auxiliary relays, and devices will be cleaned, lubricated (if applicable), and checked for proper operation. 5. All disconnect switches will be cleaned, lubricated, adjusted and an anti-oxidant grease applied to the contacts. 6. The lightning arrestors will be cleaned and subjected to an insulation resistance test. Results will be recorded. 7. An insulating resistance test of the bus will be performed. Results will be recorded. LOW VOLTAGE AIR CIRCUIT BREAKERS 1. Each breaker will have its inspection covers removed and the breaker will be thoroughly cleaned. 2. All contact surfaces will be cleaned to assure maximum conductance. 3. Anti-oxidant grease will be applied to the breaker s main contacts. 4. Mechanisms will be checked and lubricated. The mechanical operation will be verified. 5. A current equal to 90 and 110 percent of the breaker s trip coil setting will be applied to verify proper pick-up of the tripping mechanism. 6. Primary injection testing shall be performed in order to verify that all long-time, short time, instantaneous and ground fault set points are properly set. Those that are not shall be properly adjusted and retested. Units will be tested by passing multiples of their ratings through each phase of the breaker. The resultant trip-times will be recorded. 7. Contact resistance will be measured and contacts will be adjusted, where possible, for maximum surface contact and pressure. Value of contact resistance tests will be recorded. 8. An insulation resistance test will be performed from each pole to the other two poles and to ground, and the values recorded. 9. On draw out breakers, the breaker carriage and racking mechanism will be cleaned and lubricated. OIL DISCONNECT SWITCHES 1. The switch mechanism will be opened where applicable. 2. The switch contacts will he inspected and cleaned where applicable. 3. The switch s operating mechanism will he visually and manually inspected for wear, operation, binding and then cleaned and lubricated. 4. The switch s insulating fluid will be sampled. tested and fluid levels returned to normal. 5. The complete unit will then be reassembled and tested for proper operation. 6. The contractor will clean up any and all oil lost during sampling. 7. Insulation resistance tests will be performed where accessible and results recorded. MOLDED CASE CIRCUIT BREAKERS (ELECTRICAL TEST) 1. Each molded case circuit breaker will be inspected in its enclosure for proper installation. 2. The covers of breakers, which are removable, will be removed. 3. The interior and exterior of the breaker will then be thoroughly cleaned. 4. The breaker will be inspected for burning, overheating, wear, proper alignment and general condition. 5. Primary injection testing shall be performed in order to verify that all of the manufacturers curve characteristics; such as long time pick-up and delay, short time pick-up and delay, ground fault pickup and delay and instantaneous pick-up points, are all properly set. Those that are not shall be properly adjusted and retested. 6. Contact resistance will be measured and the results recorded. 7. An insulation resistance test will be performed and the results recorded. 8. The breakers with instantaneous trip units, with a cable connection capability, will be tested. 9. The breaker s trip time will then be compared to the manufacturer s characteristic curve. MOLDED CASE CIRCUIT BREAKERS (MECHANICAL TESTS) 1. The molded case circuit breakers will be inspected in their enclosures for proper installation. 2. The covers of breakers, which are removable, will be removed. 3. The interior and exterior of the breaker will then be thoroughly cleaned. The breaker will be inspected for burning, overheating, wear, proper alignment and general condition. 4. The breaker will be mechanically exercised and lubricated. 5. Mechanically trip all circuit breakers equipped with push to test capabilities 6. Where possible, contact and insulation resistance will be measured. Results will be recorded. PROTECTIVE RELAYS 1. Relays in draw-out cases will be removed from the case and thoroughly inspected, cleaned and tested. 2. The disks, target rockers and similar moving parts will be inspected. 3. The interiors of draw-out cases will be cleaned, the covers cleaned and the gaskets inspected. 4. The relays will then be electrically tested with current or voltage as required in accordance with the manufacturer s procedures. Relays with characteristic curves will be tested at three tap or pick-up multiples (of found settings). 5. The targets and seal-in units of all relays will be tested to assure proper operation. 6. The relay circuit will be tested to assure that the relay will respond to primary voltages or currents as appropriate. 7. Test tripping of circuit breakers will be performed where an outage can be arranged. INSTRUMENTATION CALIBRATION 1. Examine all devices for damage and wire connection tightness. 2. Perform a calibration test on all meters using a standard and power supply to determine accuracy at each cardinal point. 3. On meters supplied with transducers, the calibration will be performed from the transducer. 4. All instrument multipliers will be verified. 5. Meter selector switches will be inspected for proper application and operation. WATT HOUR METER CALIBRATION 1. Visual and mechanical inspection: Examine all devices for mechanical or electrical damage and wire connection tightness. Check conditions of meter face and face gaskets. 2. Electrical tests: Check calibration of all meters at five points using full scale test instruments. Calibrate watt-hour meters to one-half percent (0.5%). Verify all instrument multipliers. Meter selector switches will be inspected for proper application and operation. TRANSFORMER & CIRCUIT BREAKER INSULATING OIL The insulating fluids will be sampled and tested from each oil-filled device. Sample containers will be new, sealed and opened only immediately prior to filling. Sampling of oils will be accomplished in accordance with ASTM D-923 and sampling of askarels will be done in accordance with D-1809. The oil samples will be returned to the laboratory and tested for the following: TEST DESIGNATION TEST METHOD 1. Color/Visual ASTM Dl 500-D2 1 29/D 1524 2. Dielectric Breakdown ASTM D877 3. Neutralization Number ASTM D974 4. Specific Gravity ASTM D1298 5. Moisture Content ASTM D1533 6. Dissolved Gas in Oil Analysis (500k VA and up) Required Qualifications of Testing Organization and Personnel: The testing firm shall be an independent testing organization, which can function as an unbiased testing authority, professionally independent of any manufacturer, or supplier of equipment or systems evaluated by the testing firm. The testing firm shall meet the criteria for full membership or be a full member company of the InterNational Electrical Testing Association. Proof of this membership is to be included with the proposal package. The testing organization that is employed under this contract shall have been regularly engaged in the testing of electrical materials, devices, installations and systems for a minimum of five years. Proof of this experience is to be included with the proposal package. All work under this contract shall be performed under the supervision of the testing organization s Professional Engineer who will be available to discuss any and all procedures used to test, survey, report and service the equipment required under this contract. Testing, inspection, calibration and adjustments shall be performed by Field Engineers/Technicians certified by the National Institue for Certification in Engineering Technologies (NICET) and/or the International Electrical Testing Association (NETA) and have a minimum of five years of experience inspecting, testing and calibrating electrical distribution equipment, systems and devices. Proof of experience is to be included with the proposal package. The testing organization shall only utilize field engineers and technicians who are regularly employed by the firm or testing service. The testing organization shall submit the names, certification numbers and resumes of the Registered Professional Engineer, the lead Field Engineer/Technician and all other Field Engineers/Technicians who will be performing tests and inspections under this contract. This information is to be included with the proposal package. Test assistants and apprentices may be assigned to the project as assistants to certified Engineers/Technicians at a ratio not to exceed one certified Engineer/Technician to one non-certified assistant or apprentice. The testing organization shall have a calibration program, which assures that all test instruments are calibrated in accordance with the International Electrical Testing Association (NETA). The accuracy shall be directly traceable to the National Institute of Standards and Technology (NIST). Up to date calibration labels shall be visible on all the test equipment or that equipment will not be allowed to be used under this contract. Equipment List: The following equipment needs to be added or removed for 2023: 148 HE panel (add) New MRI (add) OR HE Panel (add) Building 159 (remve breakers but keep transformer) Building 152 (remove) will need to add new gear associated with building 44 B1dg# Equipment Type Quantity Rating 11O/11OA Switchgear Structure Medium Voltage Switches 2 Medium Voltage Fuse Panels 2 Transformer 500 KVA (pad mount) Transformer 1000 KVA (pad mount) 1 Transformer 1500 KVA (pad mount) 1 11OA ED Switchboard Square D Volt Meter 1 KWH Meter 1 Ammeter 1 Molded Case w/ Micrologic (main) 1 1000 Amp Molded Case w/ Micrologic 1 450 Amp Molded Case 1 400 Amp Molded Case 3 225 Amp Molded Case 1 200 Amp Molded Case 1 175 Amp Molded Case 3 150 Amp Molded Case 3 110 Amp Molded Case 1 100 Amp Molded Case 1 70 Amp Transformer 300 KVA (dry type) 1 ER Switchboard Square D Molded Case w/ Micrologic 1 1000 Amp Molded Case 1 600 Amp Molded Case 2 400 Amp Molded Case 1 300 Amp Molded Case 2 225 Amp Molded Case 1 200 Amp Molded Case 2 150 Amp Molded Case w/Micrologic 1 150 Amp Molded Case w/Micrologic 4 110 Amp Molded Cade w/Micrologic 1 600 Amp MPD1 (one) Switchboard Square D Volt Meter 1 KWH Meter 1 Ammeter 1 Rack In Breaker (main) 1 2000 Amp Molded Case w/Micrologic 1 1000 Amp Molded Case w/Micrologic 3 300 Amp Molded Case w/Micrologic 1 250 Amp Molded Case w/Micrologic 1 225 Amp Molded Case w/Micrologic 1 200 Amp Molded Case w/Micrologic 14 150 Amp Molded Case w/Micrologic 2 125 Amp Molded Case w/Micrologic 4 100 Amp MPD2 (two) Switchboard Square D Volt Meter 1 KWH Meter 1 Ammeter 1 Rack In Breaker (main) 1 4000 Amp Molded Case w/Micrologic 6 400 Amp Molded Case w/Micrologic 1 225 Amp Molded Case w/Micrologic 3 200 Amp Molded Case w/Micrologic 12 150 Amp Molded Case w/Micrologic 1 125 Amp Molded Case w/Micrologic 2 100 Amp 11OB Switchgear Structure Medium Voltage Switches 3 Medium Voltage Fuse Panels 3 Transformer 1000 KVA 3 Switchboard 1(one) G.E. Plug-ins Molded Case TQL 1 100 Amp Molded Case TQL 1 400 Amp Molded Case TQL 4 600 Amp Molded Case TQL 1 2000 Amp Molded Case TQL 1 1000 Amp Switchboard 2 (two) G.E. Plug-ins Molded Case TQL 4 600 Amp Molded Case TQL 2 800 Amp Molded Case TQL 1 2000 Amp Switchboard 3 (three) G.E. Plug-ins Molded Case TQL 2 225 Amp Molded Case TQL 2 300 Amp Molded Case TQL 4 400 Amp Molded Case TQL 1 600 Amp Molded Case TQL 1 2000 Amp Emergency Panel Board 1 (one) HE Molded Case TQL 2 250 Amp Molded Case TQL 3 600 Amp Molded Case TQL 2 800 Amp Molded Case TQL 1 1200 Amp 146 Switchgear Structure G.E. Load Interrupter Switch 1 Medium Voltage Fuse Panel 1 Transformer 1500 KVA 1 Switchboard G.E. AV-Line Volt Meter 1 Ammeter 1 Ground Break System 1 AKW Breaker (main) 1 2000 Amp Versatrip Breaker 1 600 Amp Versatrip Breaker 1 300 Amp Versatrip Breaker 1 150 Amp 116 Switchgear Structure Medium Voltage Switches 2 Medium Voltage Fuse Panels Transformer 500 KVA (pad mount) 1 Transformer 150 KVA (pad mount) 1 Switchboard Square D Voltmeter 1 KWH Meter 1 Ammeter 1 Molded Case (main) 1 2000 Amp Molded Case 4 400 Amp Molded Case 2 225 Amp Molded Case 9 200 Amp Molded Case 3 150 Amp Molded Case 2 30 Amp 148 Switchgear Structure G.E. Load Interrupter Switch 1 Medium Voltage Fuse Panel 1 Transformer 1000 KVA (pad mount) 1 Switchboard G.E. AV-Line Voltmeter 1 KWH Meter 1 Ammeter 1 Power Break Breaker (main) 1 1200 Amp Power Break Breaker (auto transfer) 1 200 Amp Versatrip Breaker 3 600 Amp Versatrip Breaker 6 300 Amp Versatrip Breaker 1 400 Amp 129 Switchgear Structure Transformer 300KVA (pad mount) 1 Switchboard Square D Voltmeter 1 KWH Meter 1 Ammeter 1 Molded Case (main) 1 1200 Amp Molded Case 3 400 Amp Molded Case 1 600 Amp Molded Case 1 300 Amp Molded Case 2 225 Amp Molded Case 1 150 Amp Molded Case 1 100 Amp 15 Switchgear Structure Medium Voltage Switches 1 Medium Voltage Fuse Panels 1 Transformer 300 KVA 1 Switchboard Square D Volt Meter 1 KWH Meter 1 Ammeter 1 Molded Case (main) 1 600Amp Molded Case 1 300 Amp Molded Case 1 225 Amp Molded Case 1 150 Amp Molded Case 2 100 Amp Molded Case 4 50 Amp 159 Switchgear Structure Transformer 150 KVA (pad mount) 1 Switchboard Square D Volt Meter 1 KWH Meter 1 Ammeter 1 Molded Case (main) 1 1200 Amp Molded Case 2 800 Amp Molded Case 2 225 Amp Molded Case 2 150 Amp Molded Case 1 100 Amp 151 Switchgear Structure Transformer 300 KVA (pad mount) 1 Switchboard Square D Voltmeter 1 KWH Meter 1 Ammeter 1 Molded Case (main) 1 1000 Amp Molded Case 2 600 Amp Molded Case 2 225 Amp 152 Switchgear Structure Medium Voltage Switches 3 Medium Voltage Fuse Pane1 1 Transformer O KVA (pad mount) 1 Switchboard Square D Volt Meter 1 KWH Meter 1 Ammeter 1 Molded Case (main) 1 2000 Amp Molded Case 2 800 Amp Molded Case 3 400 Amp Molded Case 1 225 Amp Molded Case 3 200 Amp Molded Case 1 30 Amp 154 Switchgear Structure Transformer 750 KVA (pad mount) 1 Switchboard Arrow Hart Volt Meter 1 KWH Meter 1 Ammeter 1 Molded Case 1 800 Amp Molded Case 2 700 Amp Molded Case 1 600 Amp 155 Switchgear Structure Transformer 500 KVA (pad mount) 1 Switchboard Arrow Hart Volt Meter 1 KWH Meter 1 Ammeter 1 Molded Case 2 600 Amp 156 Switchgear Structure Transformer 750 KVA (pad mount) 1 Switchboard Square D Volt Meter 1 KWH Meter 1 Ammeter 1 Molded Case (main) 1 2000 Amp Molded Case 1 1000 Amp Molded Case 2 400 Amp Molded Case 1 350 Amp Molded Case 3 200 Amp Molded Case 2 60 Amp Molded Case 1 40 Amp Molded Case 1 30 Amp 158 Switchgear Structure Medium Voltage Switches 1 Medium Voltage Fuse Panels 1 135 Switchgear Structure Medium Voltage Switches 1 Medium Voltage Fuse Panels 1 Transformer 500 KVA (pad mount) 1 Switchboard Square D Molded Case (main) 1 800 Amp Molded Case 1 400 Amp Molded Case 1 300 Amp Molded Case 2 200 Amp Molded Case 1 100 Amp Molded Case 1 90 Amp Molded Case 2 40 Amp Molded Case 1 30 Amp Molded Case 1 15 Amp 137 Switchgear Structure Transformer 750 KVA (pad mount) 1 Switchboard ITE Voltmeter 2 KWH Meter 2 Ammeter 2 Rack In Breaker (main) 1 2500 Amp Rack In Breaker 3 800 Amp Rack In Breaker 4 400 Amp Rack In Breaker 10 225 Amp Rack In Breaker 1 200 Amp Rack In Breaker 1 40 Amp 139 Switchgear Structure Medium Voltage Vault 1 Rack In Breaker (ITE 5kV) 10 Time Overcurrent Relays 32 Voltmeter 10 Ammeter 10 Control and Instrument Switches 9 144 Switchgear Structure Molded Case 1 800 Amp Molded Case 1 400 Amp 113 Switchgear Structure (Eaton) Molded Case Breaker 7 225 Amp Molded Case Breaker 1 600 Amp Molded Case Breaker 2 400 Amp Molded Case Breaker 3 200 Amp Transformer 112.5KVA (pad mounted) 1 Transformer 30KVA (suspended) 2 Transformer 75KVA (suspended) 1 Transformer 15KVA (suspended) 1 Formal Reports: The testing organization shall submit three copies of the Comprehensive Inspection and Testing report (through the Prime Contractor if applicable) to the COTR within 30 calendar days following the conclusion of testing. The report shall be itemized by building and shall include, at a minimum, complete nameplate data, age, maximum loading in amperes (where applicable), and the condition as found and as modified for each piece of equipment and device tested. Notification in writing shall be submitted immediately to the COTR upon completion of testing for any equipment or component deemed to be in a critical state including recommendations for corrective action. A Registered Professional Engineer shall make certification. | - | Solicitation | 11/10/2026 |
Amendment 0005 - Cancellation of Bids Prior to Bid Opening Please note that solicitation #36C77626B0020 is related to the Sources Sought notice # 36C77626Q0137 which serves as the presolicitation. In accordance with 15 USC 644, this project is a competitive small business set aside. This project is located at: Brooklyn VA Medical Center 800 Poly Place Brooklyn, NY 11209 Please see attachements for additional details on this procurement. | - | Solicitation | 11/24/2026 |
This Presolicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Items, as supplemented with additional information included in this notice. The Presolicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2024-02 published in the Federal register December 22, 2023. This solicitation is for a Small Business Set-Aside. The associated North American Industrial Classification System (NAICS) code for this procurement is 238210 (Electrical Contractors and Other Wiring Installation Contractors) with a small business size standard of $19 Million Dollars. The FSC/PSC is J061 (Maintenance, Repair, and Rebuilding of Equipment-Electric Wire and Power Distribution Equipment). | - | Pre-Solicitation | 11/10/2026 |
Additional Details
Solicitation Number
36C24122Q1208
Archive Date
Dec 17, 2022
Office Address
TOGUS, ME, 04330