9905-- Exterior Building Signage - REPLACES 36C24123Q0517

Overview

Response deadline
4:30 PM UTC−04:00
Posted
May 16, 2023
Notice type
Combined Synopsis/Solicitation
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Sole Source (FAR 19.14)

Notice details

Office
241-NETWORK CONTRACT OFFICE 01 (36C241)
Place of performance
VA Central Western Massachusetts Medical Center Exterior Building Signage, Leeds, MA, 01053
Last updated
Dec 6, 2025

Identifiers

Solicitation number
36C24123Q0613
Notice ID
f45ba7b52926411bb493259df5775815

Description

The purpose of this amendment is to list questions and answers pertaining to the solicitation. To Extend the due date to May 24, 2023. The following questions/answers for the Signage: How many site visits are required? We would suggest the following: Agree, this is acceptable. Visit 1 - Kick-off meeting / initial site survey Mid-June 2023 Visit 2 Second site survey between DD and CD submittals to validate proposed sign locations and gather any other needed info Visit 3 Installation kick-off/installation (installation may require multiple trips) Visit 4 Post-installation punch survey Visit 5 Punch execution Are these the deliverable milestones? Yes. Exact time frames of deliverables can be discussed and agreed upon in the kick-off meeting to meet a March install Schematic Design (SD) 1st SD Submission presenting a few rough draft concepts due June 30th (VA returns comments on July 14th) 2nd SD Submission due August 4st (VA returns comments on August 21st) 3rd SD submission (if needed) Time frame to be determined. Design Development (DD) Construction Document (CD) Product Fabrication Installation March 2024 Punch list April 2024 Punch install May 2024 What are the deliverable requirements for each submittal? For example, does the VA want electronic documents for each submittal, or are hard copies and electronic copies to be provided? If so, how many sets for each submittal? Electronic documents for all milestones and two hard copies of the CD s. Electronic documents are fine for the schematic design and design development. Is the area of work limited to the Edward P. Boland VA Medical Center located at 421 North Main Street, Leeds MA 01053, or are any of the buildings in-scope located elsewhere? Just the Edward P. Boland VA Medical Center Campus in Leeds. What is the period of performance? Contract close-out is May 31st 2024 All other terms and conditions remain unchanged.

Full description on SAM.gov

Award Overview

Possible prior contract

Inferred, not confirmed

Inferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.

Contract end date

Sep 30, 2024

NAICS

339950

Agency

Department of Veterans Affairs

Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:36C24123Q0613
  1. Combined Synopsis
  1. 3×
    Combined SynopsisCurrentApr 25, 2023

    9905-- Exterior Building Signage - REPLACES 36C24123Q0517

    Notice f45ba7b52926411bb493259df5775815 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

36C24123Q0613

Archive Date

Jun 23, 2023

Office Address

TOGUS, ME, 04330