Notice ID: b15fb895e86f4a6ca2c958ed9ad5cab2Special Notice
J046--Water System Remedial & Preventative Maintenance
Archived on August 9, 2024. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM UTC−04:00
- Posted
- July 17, 2024
- Notice type
- Special Notice
- NAICS
- 811310: Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
- Agency
- Department of Veterans Affairs
Notice details
- Office
- 241-NETWORK CONTRACT OFFICE 01 (36C241)
- Last updated
- Dec 6, 2025
Identifiers
- Solicitation number
- 36C24124Q0730
- Notice ID
- b15fb895e86f4a6ca2c958ed9ad5cab2
Description
Page 1 of 2 Page 1 of The West Haven and Newington VA Medical Centers require continued remedial and preventative maintenance of reverse osmosis and deionized water systems used by various hospital departments. These departments include Dentistry, Pathology, Virology, Endoscopy, Dialysis, Sterile Processing Department (SPD), and Research Laboratories. Continued maintenance service ensures the water systems continue to operate as required by VA Directive 1116 Dated 2023, Management of Critical and Semi-Critical Reusable Medical Devices. In addition to continued maintenance for water systems at both VAMC campuses; the West Haven VA requires a new reverse osmosis system to support the blood lab. Currently the VHA Office of Healthcare Technology Management (HTM) supplements the Blood Labs RO requirement. VISN 1 blood lab capability at the West Haven VAMC is contingent on continued HTM support which is not indefinite. The blood lab requires its own dedicated reverse osmosis system to provide necessary lab capability on its own. Salient Characteristics Hydro RO/DI water purification system located in Newington and West Haven location are custom-designed pieces of equipment. Hydro, designs, builds and engineers every system tailored to the individual needs of each customer and uses proprietary methods in production, and as such is a sole source supplier for same. The DI tanks also follow a proprietary regeneration process and as such are a sole source supplier and owned by Hydro. This Special Notice is NOT a request for competitive proposals. Parties may identify their interest, accompanied by supporting literature, to the Contracting Officer no later than July 25th, 2024, Responses should be sent to Nathan.Langone@va.gov. Information received will be for the purpose of determining whether to conduct a competitive procurement. The determination to conduct a competitive procurement based on responses to this notice is solely within the discretion of the Contracting Officer.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
36C24124Q0730- Special NoticeCurrentJul 17, 2024
J046--Water System Remedial & Preventative Maintenance
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
SITE VISIT A site visit will be conducted on Monday, November 16, 2026, at 9:00 AM EST at the VA Medical Center, Manchester, 718 Smyth Road, Manchester, NH 03104. The purpose is to allow quoters to inspect the existing Eaton Powerware 9390 UPS, the installation location, access routes, and site conditions relevant to the UPS replacement and ongoing maintenance. Attendance is recommended but not required to submit a quotation. Quoters who do not attend are responsible for obtaining the information necessary to prepare a quote and will not be relieved of any contract obligation on the basis of not having attended. Quoters intending to attend the site visit shall notify Andrew Obrien, Deputy Chief of Facility Service, by email at Andrew.Obrien@va.gov, and CC Shawn Lawrence, Contract Specialist at Shawn.Lawrence@va.gov, no later than Thursday, November 12, 2026, at 5:00 PM EST. The email shall include the name, company, and citizenship of each attendee for facility access. Each attendee shall bring a valid government-issued photo ID and report to Facility Service in Building 6 upon arrival. Attendees shall comply with all facility safety, PPE, and security requirements. Statements made during the site visit do not change the solicitation. Any information that affects the solicitation will be furnished to all quoters only through a written amendment. Questions raised at the site visit should be submitted in writing per the instructions in 52.212-1 to receive a binding Government response. Quotation delivery: Submit quotations via email to Shawn.Lawrence@va.gov no later than November 26, 2026, at 5:00 PM EST. Questions regarding this solicitation shall be submitted in writing by email to the Point of Contact no later than 5:00 PM EST on November 19, 2026. | - | Combined Synopsis | 11/26/2026 |
| - | Awarded | Open | |
NOTICE OF INTENT TO SOLE SOURCE TO MC MACHINERY SYSTEMS COMBINED SYNOPSIS/SOLICITATION NOTICE: Requirement Title: Mitsubishi Plunge &Wire EDM Corrective Maintenance at Portsmouth Naval Shipyard Solicitation Number: N3904026Q5223 Quote Response Deadline: 3/4/2026, 5:00 PM POC: Lisa Fielding, Contracts Officer, lisa.a.fielding.civ@us.navy.mil GENERAL INFORMATION: 1. This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. 2. The Portsmouth Naval Shipyard intends to award a firm-fixed-price purchase order on a sole source basis to MC Machinery Systems for the corrective maintenance of one (1) Mitsubishi Plunge EDM and one (1) Mitsubishi Wire EDM. The Government intends to solicit and negotiate with only one source under the authority of FAR 6.103-1, "Only one responsible source and no other supplies or services will satisfy agency requirements." The Government has determined that MC Machinery Systems is the only source reasonably available to perform the required services, as the Statement of Work requires work to be performed by a manufacturer-certified technicians using only manufacturer-approved parts and software. 3. This solicitation incorporates by reference the provisions and clauses of the Federal Acquisition Regulation (FAR) and the Defense Federal Acquisition Regulation Supplement (DFARS) that are in effect on the date of this solicitation's issuance. It is the contractor's responsibility to be familiar with the applicable provisions and clauses. The authoritative sources for the most current regulations are: FAR: The official FAR website, which reflects the ongoing "Revolutionary FAR Overhaul" (RFO): https://www.acquisition.gov/far-overhaul DFARS: The official DoD Class Deviations website, which contains the most recent updates to the DFARS: https://www.acq.osd.mil/dpap/dars/dfars_far_overhaul_class_deviations.html 3. This solicitation is being issued as a: Request For Quotation (RFQ) 4. This acquisition is for a: Other Than Full and Open Competition (sole source to MC Machinery Systems) 5. North American Industry Classification System Code (NAICS): 811310 6. The size standard is: 12.5 million REQUIREMENT INFORMATION: The Portsmouth Naval Shipyard requests the following: The contractor shall provide all personnel, equipment, tools, materials, and supervision necessary to perform corrective maintenance on one (1) Mitsubishi Plunge EDM and one (1) Mitsubishi Wire EDM, as detailed in the attached Statement of Work (Attachment 1). Required Period of Performance: Work in the Base period shall commence within four (4) weeks of contract award and be completed within eight (8) weeks of contract award. Place of Performance: Portsmouth Naval Shipyard, Kittery, ME, 03904 METHOD OF PROPOSAL SUBMISSION: Offeror shall submit quote directly to the Contracts Officer at lisa.a.fielding.civ@us.navy.mil For the Intended Sole Source (MC Machinery Systems) Submit a quote that includes the following: A total firm-fixed-price (FFP) for all corrective maintenance work described in the SOW. A separate schedule of fully burdened labor rates, by labor category, to be used for any potential unscheduled or emergency repairs. A proposed fixed pass-through markup rate for materials and parts required for unscheduled repairs. Confirmation of the ability to meet the period of performance and all security requirements. Company name, address, CAGE code, and UEI number. Vendors must be registered in the System for Award Management (SAM) database to be considered for award. Registration is free and can be completed on-line at http://www.sam.gov/. All responsible sources may submit a capability statement, proposal, or quotation, which shall be considered by the agency. ATTACHMENTS Attachment 1 Statement of Work (SOW) Attachment 2 - Work Request Form Attachment 3 - Wage Determination Attachment 4 - ID Proofing Docs Attachment 5 - Field Report CDRL A002 | - | Combined Synopsis | 03/04/2026 |
Fire Suppression System Maintenance and Kitchen Exhaust Cleaning Richard L Roudebush VA Medical Center 1481 West 10th Street, Indianapolis, Indiana 46202 Additional service location: 9045 East 59th Street, Building 402, Indianapolis, Indiana 46216 The Contractor shall maintain the identified fire suppression systems in a serviceable condition, remove grease accumulation from the complete identified kitchen exhaust systems, and maintain the Building 402 grease trap. The Contractor shall provide all labor, supervision, transportation, tools, access equipment, routine maintenance materials, cleaning supplies, waste handling, testing, service labels, and documentation required by this PWS. The recurring scope includes five kitchen fire suppression systems and five Kidde IND-21 Hazmat dry chemical systems, with monthly inspections of all ten systems, semiannual maintenance and service certification, and annual maintenance tasks. All five hoods require quarterly exhaust inspections and complete interior and exterior cleaning. The Building 402 grease trap requires quarterly inspection, pump-out, and cleaning. Appendix A identifies equipment and locations; Appendix B states service quantities, deliverables, and performance standards. The prime Contractor remains responsible for all subcontracted work and for submitting complete records directly to the COR. A kitchen cleaning report does not document fire suppression system maintenance, monthly suppression inspections, or grease-trap service; each service shall have its own identifiable record. | - | Solicitation | 12/01/2026 |
RFQ to follow this announcement. | - | Pre-Solicitation | 12/01/2026 |
Additional Details
Solicitation Number
36C24124Q0730
Archive Date
Aug 9, 2024
Office Address
TOGUS, ME, 04330