GovChime
Notice ID: 6d5395c3933e49158a2765e26ec65058Combined Synopsis/Solicitation

R404--Boundary Survey of Property

Archived on October 11, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
4:00 PM UTC−04:00
Posted
July 31, 2024
Notice type
Combined Synopsis/Solicitation
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
NAICS
541330: Engineering Services
Agency
Department of Veterans Affairs

Notice details

Office
241-NETWORK CONTRACT OFFICE 01 (36C241)
Place of performance
Northampton VA Medical Center 421 North Main St. Leeds, MA 01053
Last updated
Dec 6, 2025

Identifiers

Solicitation number
36C24124Q0795
Notice ID
6d5395c3933e49158a2765e26ec65058

Description

1/24/2024 Combined Synopsis Solicitation Northampton VAMC Boundary Survey (i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. (ii) The solicitation number is 36C24124Q0795 and the solicitation is issued as a request for quotation (RFQ). (iii) A statement that the solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2023-01. (iv) This requirement is being issued as an open market, SDVOSB set-aside. The associated NAICS 541330 and small business size standard is $25.5 million. (v) The Government intends to award a firm-fixed price award to perform a boundary survey at the Northampton VAMC. Please see the attached Performance Work Statement for full requirement details. Please complete the Price Schedule below and submit with the quote submission. (vi) The Contractor shall provide all resources necessary to perform the boundary survey IAW the attached (Performance Work Statement). Please see the attached PWS for full requirement details. (vii) The Place of Performance is Northampton, Massachusetts as described per the (Performance Work Statement). (viii) Provision at 52.212-1, Instructions to Offerors -- Commercial, applies to this acquisition in addition to the following addenda s to the provision: 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998); 52.204-7 System for Award Management (OCT 2018); 52.204-16 Commercial and Government Entity Code Reporting (JUL 2016); 52.217-5 Evaluation of Options (JUL 1990); 852.252-70 Solicitation Provisions or Clauses Incorporated by Reference (JAN 2008) (ix) Provision at 52.212-2, Evaluation -- Commercial Items, applies to this requirement. Submission of Quotes: (1) Quotes shall be received on or before the date and time specified in Section (xv) of this solicitation. Note: Offers received after the due date and time shall not be considered. (2) Offerors shall submit their quotes electronically via email to carissa.sarazin@va.gov. (3) Quote Format: The submission should be clearly indexed and logically assembled in order of the evaluation criteria below. All pages of the quote shall be appropriately numbered and identified by the complete company name, date and solicitation number in the header and/or footer. Evaluation Process: Award shall be made to the best value, as determined to be the most beneficial to the Government. Please read each section below carefully for the submittals and information required as part of the evaluation. Failure to provide the requested information below shall be considered non-compliant and your quote could be removed from the evaluation process. Offeror quotes shall be evaluated under FAR Part 13.106-2(b) -- Evaluation of Quotations or Offers. Therefore, the Government is not obligated to determine a competitive range, conduct discussions with all contractors, solicit final revised quotes, and use other techniques associated with FAR Part 15. The Government shall award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation shall be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers: Price (Follow these instructions): Offeror shall complete Attachment 1 - Price Schedule, with offerors proposed contract line item prices inserted in appropriate spaces. Past Performance: Offeror shall utilize Attachment 2 Past Performance Worksheet to provide at least one (1) but no more than (3) references of work, similar in scope and size with the requirement detailed in the (Performance Work Statement). References may be checked by the Contracting Officer to ensure your company is capable of performing the Statement of Work. The Government also reserves the right to obtain information for use in the evaluation of past performance from any and all sources. Questions: Questions shall be submitted to the Contracting Officer in writing via e-mail. Oral questions are not acceptable due to the possibility of misunderstanding or misinterpretation. The cut-off date and time for receipt of questions is 05-Aug- 2024 by 4:00 PM EST. Questions received after this date and time may not be answered. Questions shall be answered in a formal amendment to the solicitation so all interested parties can see the answers. Technical: The offeror s quote shall be evaluated to determine if the organization has the experience and capabilities to provide the requested services IAW the (Performance Work Statement) in a timely efficient manner. Contractor shall demonstrate their corporate experience and approach to meet all requirements stated in the (Performance Work Statement). Contractor shall demonstrate that their technicians meet the qualification standards stated in the (Performance Work Statement). If you are planning to sub-contract some or all of this work, please provide the name and address(s) of all subcontractor(s) (if applicable) and a description of their planned subcontracting effort. SAM: Interested parties shall be registered in System for Award Management (SAM) as prescribed in FAR Clause 52.232-33. SAM information can be obtained by accessing the internet at www.sam.gov or by calling 1-866-606-8220. Interested parties not registered in SAM in sufficient time to meet the VA s requirement will be ineligible to receive a government contract. This determination will be at the discretion of the Contracting Officer. VISTA: The VA utilizes VISTA to issue a purchase order and liquidate invoices. Failure to register in VISTA may result in exclusion from the issuance of a VA contract. This determination will be at the discretion of the Contracting Officer. Interested parties with no prior VA contracts can request a Form 10091 at any time. (x) Please include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications -- Commercial Items, with your offer via the SAM.gov website or a written copy. (xi) Clause 52.212-4, Contract Terms and Conditions -- Commercial Items (OCT 2018), applies to this acquisition in addition to the following addenda s to the clause: 52.204-16 Commercial and Government Entity Code Maintenance (JUL 2016); 52.219-6 Notice of Total Small Business Set-Aside; 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013); 852.203-70 Commercial Advertising (MAY 2008); 852.232-72 Electronic Submission of Payment Requests (NOV 2018) Subcontracting Commitments - Monitoring and Compliance This solicitation includes VAAR 852.215-70, Service-Disabled Veteran-Owned and Veteran-Owned Small Business Evaluation Factors, and VAAR 852.215-71, Evaluation Factor Commitments. Accordingly, any contract resulting from this solicitation will include these clauses. The contractor is advised in performing contract administration functions, the CO may use the services of a support contractor(s) to assist in assessing contractor compliance with the subcontracting commitments incorporated into the Information Protection and Non-Disclosure and Disclosure of Conflicts of Interest Agreement to ensure the contractor's business records or other proprietary data reviewed or obtained in the course of assisting the CO in assessing the contractor for compliance are protected to ensure information or data is not improperly disclosed or other impropriety occurs. Furthermore, if VA determines any services the support contractor(s) will perform in assessing compliance are advisory and assistance services as defined in FAR 2.101, Definitions, the support contractor(s) must also enter into an agreement with the contractor to protect proprietary information as required by FAR 9.505-4, Obtaining access to proprietary information, paragraph (b). The contractor is required to cooperate fully and make available any records as may be required to enable the CO to assess the contractor compliance with the subcontracting commitments. (xii) Clause at 52.212-5, Contract Terms and Conditions Required To Implement Statutes Or Executive Orders -- Commercial Items, applies to this acquisition and in addition to the following FAR clauses cited, which are also applicable to the acquisition: 52.204-10, 52.209-6, 52.219-6, 52.219-28, 52.222-3, 52.222-21, 52.222-26, 52.222-36, 52.222-50, 52.223-18, 52.232-33, 52.222-41, 52.222-43 (Wage Determination Applicable (Manchester 2015-4019 Rev 23 posted on beta.sam.gov) (xiii) All contract requirement(s) and/or terms and conditions are stated above. (xiv) The Defense Priorities and Allocations System (DPAS) and assigned rating are not applicable to this requirement. (xv) RFQ responses are due 12-Aug- 2024 by 4:00 PM EST. RFQ responses must be submitted via email to: carissa.sarazin@va.gov. Hand deliveries shall not be accepted. (xvi) The POC of this solicitation is carissa.sarazin@va.gov) ATTACHMENT 1 PRICE SCHEDULE ITEM NUMBER DESCRIPTION OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT 0001 0002 0003 0004 ALTA/NSPS Land Title Survey Install Survey Control Monument Install Survey Control Disk Topographic Survey 1.00 15.00 10.00 1 JB EA EA JB __________________ __________________ __________________ __________________ __________________ __________________ __________________ __________________ GRAND TOTAL __________________ ATTACHMENT 2 PAST PERFORMANCE WORKSHEET 1. Name of Contracting Activity, Government Agency, Commercial Firm or other Organization: 2. Contracting Activity Address: 3. Contract Number: 4. Date of Contract Award: 5. Beginning Date of Contract: 6. Completion Date of Contract: 7. Contract Value: 8. Type of Contract: 9a. Technical Point of Contact: 9b. Contracting Point of Contact: Name: Name: Title: Title: Address: Address: Telephone: Telephone: Email: Email: 10. Place of Performance: 11. Description of Work (Use a continuation sheet if necessary): 12. List any commendations or awards received: 13. List of Major Subcontractors: STATEMENT OF WORK Performance Work Statement Department of Veterans Affairs (VA) Medical Center, Leeds MA Boundary Survey of the Edward P. Boland Campus GENERAL The VA Central Western Mass. Edward P Boland Campus in Leeds, MA requires survey confirmation of the property owned by the VA. The original Tract was approximately 280 Acres and is now approximately 105. The VA has records of agreements/conveyances that may or may not have occurred/been recorded over the and is looking for confirmation of the property owned by the VA through a ALTA/NSPS Land Title survey. The Edward P. Boland campus also has a lot of construction going on and needs a survey control network installed to standardized and coordinate construction and records throughout the campus. A traverse through the control points installed is required and shall be submitted with the control point coordinates. The control network shall use the Massachusetts State Plane Coordinate System. Place of Performance: 421 N. Main St, Leeds MA PROJECT SCOPE OF WORK Item 1 Conduct an ALTA/NSPS LAND TITLE SURVEY 1 Lump Sum See Attachment 1 ALTA/NSPS LAND TITLE SURVEY Table A ALTA deliverables: Plat hard copy (min 24 x36 ) Plat digital copy Plat does not have to be recorded. Provide copies of all recorded conveyances, plats and deeds for 1922 to present. Item 2 Install Survey Control Monument 15 Each Furnish and install precast concrete monument 6 x6 x36 with 2.5 minimum Bronze Marker. Markers will be placed at locations agreed to with the COR. Include costs to traverse and balance the control point network. See Attachment 2 - Example Marker. Item 3 Install Survey Control Disk 10 Each Furnish and install a 2.5 minimum bronze marker on either a rebar base or in existing concrete. Rebar shall be a minimum of 2 long #5 bar. Concrete Install will be drilled and grouted into existing concrete. Include costs to traverse and balance the control point network. See Attachment 2 - Example Marker. Item 4 Topographic Survey of Property 1 Lump Sum This item is an add alternate for Items 5 and 15 of ALTA/NSPS LAND TITLE SURVEY Table A. Perform a topographic survey of the property, survey drones would be permitted for this task. The performance period for this work is 120 days from time of award, unless other time frames are approved in writing by the contracting office with no options to renew. Services will be performed during business hours 7:00am 4:30 pm. If work needs to be done off hours, it must be coordinated with the COR. There will be no unscheduled work during Federal Holidays. VHA Supplemental Contract Requirements for Combatting COVID-19 Contractor employees who work in or travel to VHA locations must comply with the following: Documentation requirements: If fully vaccinated, contractors shall show proof of vaccination. NOTE: Acceptable proof of vaccination includes a signed record of immunization from a health care provider or pharmacy, a copy of the COVID-19 Vaccination Record Card (CDC Form MLS- 319813_r, published on September 3, 2020), or a copy of medical records documenting the vaccination. If unvaccinated, contractors shall show negative COVID-19 test results dated within three calendar days prior to desired entry date. Test must be approved by the Food and Drug Administration (FDA) for emergency use or full approval. This includes tests available by a doctor s order or an FDA approved over-the-counter test that includes an affiliated telehealth service. Documentation cited in this section shall be digitally or physically maintained on each contractor employee while in a VA facility and is subject to inspection prior to entry to VA facilities and after entry for spot inspections by Contracting Officer Representatives (CORs) or other hospital personnel. Documentation will not be collected by the VA; contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information. Contractor employees are subject to daily screening for COVID-19 and may be denied entry to VA facilities if they fail to pass screening protocols. As part of the screening process contractors may be asked screening questions found on the COVID-19 Screening Tool. Check regularly for updates. Contractor employees who work away from VA locations, but who will have direct contact with VA patients shall self-screen utilizing the COVID-19 Screening Tool, in advance, each day that they will have direct patient contact and in accordance with their person or persons who coordinate COVID-19 workplace safety efforts at covered contractor workplaces. Contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information. Contractor must immediately notify their COR or Contracting Officer if contract performance is jeopardized due to contractor employees being denied entry into VA Facilities. For indefinite delivery contracts: Contractor agrees to comply with VHA Supplemental Contract Requirements for any task or delivery orders issued prior to this modification when performance has already commenced. American Land Title Association® (ALTA) National Society of Professional Surveyors (NSPS) Minimum Standard Detail Requirements For ALTA/NSPS Land Title Surveys Copyright 2021. All rights reserved. American Land Title Association and National Society of Professional Surveyors Page 10 of 10 MINIMUM STANDARD DETAIL REQUIREMENTS FOR ALTA/NSPS LAND TITLE SURVEYS (Effective February 23, 2021) Purpose - Members of the American Land Title Association® (ALTA) have specific needs, unique to title insurance matters, when asked to insure title to land without exception as to the many matters which might be discoverable from survey and inspection, and which are not evidenced by the public records. For a survey of real property, and the plat, map or record of such survey, to be acceptable to a title insurance company for the purpose of insuring title to said real property free and clear of survey matters (except those matters disclosed by the survey and indicated on the plat or map), certain specific and pertinent information must be presented for the distinct and clear understanding between the insured, the client (if different from the insured), the title insurance company (insurer), the lender, and the surveyor professionally responsible for the survey. In order to meet such needs, clients, insurers, insureds, and lenders are entitled to rely on surveyors to conduct surveys and prepare associated plats or maps that are of a professional quality and appropriately uniform, complete, and accurate. To that end, and in the interests of the general public, the surveying profession, title insurers, and abstracters, the ALTA and the NSPS jointly promulgate the within details and criteria setting forth a minimum standard of performance for ALTA/NSPS Land Title Surveys. A complete 2021 ALTA/NSPS Land Title Survey includes: the on-site fieldwork required pursuant to Section 5, the preparation of a plat or map pursuant to Section 6 showing the results of the fieldwork and its relationship to documents provided to or obtained by the surveyor pursuant to Section 4, any information from Table A items requested by the client, and the certification outlined in Section 7. Request for Survey - The client shall request the survey, or arrange for the survey to be requested, and shall provide a written authorization to proceed from the person or entity responsible for paying for the survey. Unless specifically authorized in writing by the insurer, the insurer shall not be responsible for any costs associated with the preparation of the survey. The request must specify that an "ALTA/NSPS LAND TITLE SURVEY" is required and which of the optional items listed in Table A, if any, are to be incorporated. Certain properties or interests in real properties may present issues outside those normally encountered on an ALTA/NSPS Land Title Survey (e.g., marinas, campgrounds, mobile home parks, easements, leases, mineral interests, other non-fee simple interests). The scope of work related to surveys of such properties or interests in real properties should be discussed with the client, lender, and insurer, and agreed upon in writing prior to commencing work on the survey. When required, the client shall secure permission for the surveyor to enter upon the property to be surveyed, adjoining properties, or offsite easements. Surveying Standards and Standards of Care Effective Date - The 2021 Minimum Standard Detail Requirements for ALTA/NSPS Land Title Surveys are effective February 23, 2021. As of that date, all previous versions of the Minimum Standard Detail Requirements for ALTA/ACSM or ALTA/NSPS Land Title Surveys are superseded by these standards. Other Requirements and Standards of Practice - Many states and some local jurisdictions have adopted statutes, administrative rules, and/or ordinances that set out standards regulating the practice of surveying within their jurisdictions. In addition to the standards set forth herein, surveyors must also conduct their surveys in accordance with applicable jurisdictional survey requirements and standards of practice. Where conflicts between the standards set forth herein and any such jurisdictional requirements and standards of practice occur, the more stringent must apply. The Normal Standard of Care - Surveyors should recognize that there may be unwritten local, state, and/or regional standards of care defined by the practice of the prudent surveyor in those locales. Boundary - The boundary lines and corners of any property or interest in real property being surveyed (hereafter, the surveyed property or property to be surveyed ) as part of an ALTA/NSPS Land Title Survey must be established and/or retraced in accordance with appropriate boundary law principles governed by the set of facts and evidence found in the course of performing the research and fieldwork. Measurement Standards - The following measurement standards address Relative Positional Precision for the monuments or witnesses marking the corners of the surveyed property. Relative Positional Precision means the length of the semi-major axis, expressed in meters or feet, of the error ellipse representing the uncertainty in the position of the monument or witness marking any boundary corner of the surveyed property relative to the position of the monument or witness marking an immediately adjacent boundary corner of the surveyed property resulting from random errors in the measurements made in determining those positions at the 95 percent confidence level. Relative Positional Precision can be estimated by the results of a correctly weighted least squares adjustment of the survey. Alternatively, Relative Positional Precision can be estimated by the standard deviation of the distance between the monument or witness marking any boundary corner of the surveyed property and the monument or witness marking an immediately adjacent boundary corner of the surveyed property (called local accuracy) that can be computed using the full covariance matrix of the coordinate inverse between any given pair of points, understanding that Relative Positional Precision is based on the 95 percent confidence level, or approximately 2 standard deviations. Any boundary lines and corners established or retraced may have uncertainties in location resulting from (1) the availability, condition, history and integrity of reference or controlling monuments, (2) ambiguities in the record descriptions or plats of the surveyed property or its adjoiners, (3) occupation or possession lines as they may differ from the written title lines, or (4) Relative Positional Precision. Of these four sources of uncertainty, only Relative Positional Precision is controllable, although, due to the inherent errors in any measurement, it cannot be eliminated. The magnitude of the first three uncertainties can be projected based on evidence; Relative Positional Precision is estimated using statistical means (see Section 3.E.i. above and Section 3.E.v. below). The first three of these sources of uncertainty must be weighed as part of the evidence in the determination of where, in the surveyor s opinion, the boundary lines and corners of the surveyed property should be located (see Section 3.D. above). Relative Positional Precision is a measure of how precisely the surveyor is able to monument and report those positions; it is not a substitute for the application of proper boundary law principles. A boundary corner or line may have a small Relative Positional Precision because the survey measurements were precise, yet still be in the wrong position (i.e., inaccurate) if it was established or retraced using faulty or improper application of boundary law principles. For any measurement technology or procedure used on an ALTA/NSPS Land Title Survey, the surveyor must (1) use appropriately trained personnel, (2) compensate for systematic errors, including those associated with instrument calibration, and (3) use appropriate error propagation and measurement design theory (selecting the proper instruments, geometric layouts, and field and computational procedures) to control random errors such that the maximum allowable Relative Positional Precision outlined in Section 3.E.v. below is not exceeded. The maximum allowable Relative Positional Precision for an ALTA/NSPS Land Title Survey is 2 cm (0.07 feet) plus 50 parts per million (based on the direct distance between the two corners being tested). It is recognized that in certain circumstances, the size or configuration of the surveyed property, or the relief, vegetation, or improvements on the surveyed property, will result in survey measurements for which the maximum allowable Relative Positional Precision may be exceeded in which case the reason shall be noted pursuant to Section 6.B.x. below. Records Research - It is recognized that for the performance of an ALTA/NSPS Land Title Survey, the surveyor will be provided with appropriate and, when possible, legible data that can be relied upon in the preparation of the survey. In order to complete an ALTA/NSPS Land Title Survey, the surveyor must be provided with the following: The current record description of the real property to be surveyed or, in the case of an original survey prepared for purposes of locating and describing real property that has not been previously separately described in documents conveying an interest in the real property, the current record description of the parent parcel that contains the property to be surveyed; Complete copies of the most recent title commitment or, if a title commitment is not available, other title evidence satisfactory to the title insurer; The following documents from records established under state statutes for the purpose of imparting constructive notice of matters relating to real property (public records): The current record descriptions of any adjoiners to the property to be surveyed, except where such adjoiners are lots in platted, recorded subdivisions; Any recorded easements benefitting the property to be surveyed; and Any recorded easements, servitudes, or covenants burdening the property to be surveyed; and If desired by the client, any unrecorded documents affecting the property to be surveyed and containing information to which the survey shall make reference. Except, however, if the documents outlined in this section are not provided to the surveyor or if non-public or quasi-public documents are otherwise required to complete the survey, the surveyor must conduct that research which is required pursuant to the statutory or administrative requirements of the jurisdiction where the surveyed property is located and that research (if any) which is negotiated and outlined in the terms of the contract between the surveyor and the client. Fieldwork - The survey must be performed on the ground (except as may be otherwise negotiated pursuant to Table A, Item 15 below). Except as related to the precision of the boundary, which is addressed in Section 3.E. above, features located during the fieldwork shall be located to what is, in the surveyor s professional opinion, the appropriate degree of precision based on (a) the planned use of the surveyed property, if reported in writing to the surveyor by the client, lender, or insurer, or (b) the existing use, if the planned use is not so reported. The fieldwork shall include the following: Monuments The location, size, character, and type of any monuments found during the fieldwork. The location, size, character, and type of any monuments set during the fieldwork, if item 1 of Table A was selected or if otherwise required by applicable jurisdictional requirements and/or standards of practice. The location, description, and character of any lines that control the boundaries of the surveyed property. Rights of Way and Access The distance from the appropriate corner or corners of the surveyed property to the nearest right of way line, if the surveyed property does not abut a right of way. The name of any street, highway, or other public or private way abutting the surveyed property, together with the width of the travelled way and the location of each edge of the travelled way including on divided streets and highways. If the documents provided to or obtained by the surveyor pursuant to Section 4 indicate no access from the surveyed property to the abutting street or highway, the width and location of the travelled way need not be located. Visible evidence of physical access (e.g., curb cuts, driveways) to any abutting streets, highways, or other public or private ways. The location and character of vehicular, pedestrian, or other forms of access by other than the apparent occupants of the surveyed property to or across the surveyed property observed in the process of conducting the fieldwork (e.g., driveways, alleys, private roads, railroads, railroad sidings and spurs, sidewalks, footpaths). Without expressing a legal opinion as to ownership or nature, the location and extent of any potentially encroaching driveways, alleys, and other ways of access from adjoining properties onto the surveyed property observed in the process of conducting the fieldwork. Where documentation of the location of any street, road, or highway right of way abutting, on, or crossing the surveyed property was not disclosed in documents provided to or obtained by the surveyor, or was not otherwise available from the controlling jurisdiction (see Section 6.C.iv. below), the evidence and location of parcel corners on the same side of the street as the surveyed property recovered in the process of conducting the fieldwork which may indicate the location of such right of way lines (e.g., lines of occupation, survey monuments). Evidence of access to and from waters adjoining the surveyed property observed in the process of conducting the fieldwork (e.g., paths, boat slips, launches, piers, docks). Lines of Possession and Improvements along the Boundaries The character and location of evidence of possession or occupation along the perimeter of the surveyed property, both by the occupants of the surveyed property and by adjoiners, observed in the process of conducting the fieldwork. Unless physical access is restricted, the character and location of all walls, buildings, fences, and other improvements within five feet of each side of the boundary lines observed in the process of conducting the fieldwork (see Section 5.E.iv. regarding utility poles). Trees, bushes, shrubs, and other vegetation need not be located other than as specified in the contract, unless they are deemed by the surveyor to be evidence of possession or occupation pursuant to Section 5.C.i. Without expressing a legal opinion as to the ownership or nature of the potential encroachment, the evidence, location, and extent of potentially encroaching structural appurtenances and projections observed in the process of conducting the fieldwork (e.g., fire escapes, bay windows, windows and doors that open out, flue pipes, stoops, eaves, cornices, areaways, steps, trim) by or onto adjoining property, or onto rights of way, easements, or setback lines disclosed in documents provided to or obtained by the surveyor. Buildings The location of buildings on the surveyed property observed in the process of conducting the fieldwork. Easements and Servitudes Evidence of any easements or servitudes burdening the surveyed property as disclosed in the documents provided to or obtained by the surveyor pursuant to Section 4 and observed in the process of conducting the fieldwork. Evidence of easements, servitudes, or other uses by other than the apparent occupants of the surveyed property not disclosed in the documents provided to or obtained by the surveyor pursuant to Section 4, but observed in the process of conducting the fieldwork if they are on or across the surveyed property (e.g., roads, drives, sidewalks, paths and other ways of access, utility service lines, utility locate markings (including the source of the markings, with a note if unknown), water courses, ditches, drains, telephone lines, fiber optic lines, electric lines, water lines, sewer lines, oil pipelines, gas pipelines). Surface indications of underground easements or servitudes on or across the surveyed property observed in the process of conducting the fieldwork (e.g., utility cuts, vent pipes, filler pipes, utility locate markings (including the source of the markings, with a note if unknown)). Evidence on or above the surface of the surveyed property observed ...

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:36C24124Q0795
  1. Combined Synopsis
  1. Combined SynopsisCurrentJul 31, 2024

    R404--Boundary Survey of Property

    Notice 6d5395c3933e49158a2765e26ec65058 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Introduction Network Contracting Office 1 (NCO 1), supporting VA New England Healthcare System (VISN 1), is seeking potential sources for an upcoming requirement for Architect and Engineering Services as described in the attached statement of work. THIS NOTICE IS NOT A REQUEST FOR QUALIFICATION STATEMENTS (SF330). This notice is a market research tool and has not been set-aside for any small business category, but the notice is issued to determine appropriate set-aside categories. Responses to this notice, in conjunction with other Government market research resources, will be used by the contracting officer to determine the applicable socio-economic set-aside for the procurement. Failure to respond to this notice will not impact consideration of architect and engineer firms (or joint ventures) which otherwise meet set-aside requirements and submit responses to the follow-up public announcement. Once the appropriate set-aside is determined, a separate public announcement requesting qualification statements (SF330s) will be publicized on Contract Opportunities in accordance with 40 U.S. Code § 1101 and FAR 36.102. General Project Description and NAICS Synopsis of required services (See attachment for full statement of work): provide Architect/Engineer (AE) services to evaluate existing conditions, propose corrective measures, and design a construction project at the VA Maine Health Care System (Togus) in accordance with this scope of work. Scope will include Type A services only with design complete to 35%. AE Part I Investigative Services/Schematic Design/Other Related Services shall include site visits, field investigation, studies and user interviews to prepare drawings, and cost estimates for all facets of work and disciplines/trades to repair Chiller 3 to a condition where it will operate as designed. Design should also include fixes for the reported cooling and oil leaks. This procurement for Architect & Engineering services is assigned NAICS 541330 Engineering Services which has a SBA size standard of $22.5 million in average revenue. Information Sought The Government requests a letter of interest (or similar document) with responses to the following: 1. State your firm name (as it appears in SAM.gov), Unique Entity Identifier (UEI) number, and socio-economic status of the firm (i.e. verified SDVOSB, WOSB, SB, large business). 2. Provide a brief narrative on the firm s experience, providing services similar to those described in the attached statement of work. 3. What would be the expected make-up of the firm s team in terms of socio-economic categories and estimated percentage of work to be completed by your firm and each subcontractor? If the procurement is set-aside for any category of small business, generally fifty percent of more of the work would need to be performed by the contractor or a similarly situated subcontractor in terms of percentage of cost. For instance, if set-aside for service-disabled veteran-owned small business (SDVOSB), 50% or more of the contract would need to be performed by verified SDVOSBs no other small business categories would count towards the percentage. If set-aside for small business, 50% of the contract would be required to be performed by small businesses which would include performance by a verified SDVOSB because they are also a small business. If the procurement is not set-aside and reaches certain dollar thresholds, the Government would negotiate an acceptable subcontracting plan to utilize small business concerns. 4. A brief statement of overall interest in the project and capability of performing the work in conjunction with ongoing projects. 5. Any additional capabilities statements or other documentation that you feel will assist the Government in performing market research and determining the appropriate set-aside. Submission Instructions Interested parties are requested to submit the requested information not later than November 20, 2026, to Diane C. Davis via email to diane.davis2@va.gov. Please include 36C24127R0009 Sources Sought Response in the title of the email. the response burden to this notice is expected to be light; lengthy responses are not expected but no maximum page count is assigned. Please keep responses below 7MB or send multiple emails appending to the email subject 1 of n as appropriate. Please contact Diane Davis at the email address above with any questions. Attachments
-Market Research11/20/2026
SPECIAL NOTICE FOR QUALIFICATIONS (SF 330) NAICS Code: 541330 Engineering Services (Small Business size standard $25.5M) A. INTRODUCTION: The VA Central Western Massachusetts Healthcare System (CWM HCS) plans to build and install a new elevator tower at Building 25 on the Leeds Campus. This project will correct a FCA deficiency. Provide all professional architectural and engineering (A/E) Part One Services (also known as Design Phase Type A & Type B Services) necessary to develop complete drawings, specifications, and cost estimates associated with building a new elevator tower at Building 25 and Part Two Services (also known as Construction Period Services Type C). The intent of this project includes but is not limited to: Evaluate existing elevator pit slab for buildings 1, 2, 3, 4, 5, 6, 7, 8, 12, 16, 20, and 26 and design an elevator pit sump pump with oil interceptor. Design plumbing of oil water separator to sanitary sewer. See acceptable conceptual design attached. This conceptual design shall be validated. This shall be used to minimize and inform design efforts. Identify and address any issues or conflicts as necessary. If the elevator tower appearance is different than the conceptual design, conduct a Section 106 Historical Submission Report for VA to file with Massachusetts State Historical Preservation Office, by a Professional Historic Preservation Consultant. Existing report will be made available to the highest rated A/E firm. Conduct code compliance reviews (NFPA, ABAAS, VA Design Manuals, etc.) and integrate findings into design for compliance. Where conflicts exist between VA adopted codes and standards and the documents on the TIL, the A/E shall bring this to the attention of the VA. The resolution of the conflict shall be made by the authority having jurisdiction for VA to ensure consistency department wide. The A/E shall provide all services required to prepare documents and reports consistent with the VA s project team goals as prioritized during preliminary project meetings, field surveys and studies. The A/E shall determine existing conditions, severity of deficiencies, if any previous deficiencies have been corrected and to identify any conditions which may have previously been unreported. Cost estimates shall be prepared to reflect the cost of replacing the component in a standalone project (i.e., not as part of another project) and all costs including but not limited to asbestos removal if required, special field conditions and/or temporary equipment needed during the construction. Provide a Qualified Elevator Inspector during Construction Services to certify elevator. Also provide Part Two A/E Services (also known as Construction Period Services Type C) A/E Part Two Services of this design project (also known as Construction Period Services) includes responding to construction contractor Requests For Information (RFIs) during the solicitation (solicitation support) and construction phases of the construction project, attendance at post-award and commissioning kick off construction project conferences, review of construction material submittals and shop drawings, attendance at weekly teleconference construction meetings, approximately 1 site visits per month during active construction (both scheduled and emergent) to ensure compliance with the design drawings and specifications, preparation of site visit reports, coordination with project commissioning requirements/QEI inspection, review of any construction project modifications for cost and technical acceptability, attendance and participation during the pre-final inspection and final acceptance inspection, preparation of the punch list and preparation of record drawings of the completed construction project based on the construction contractor s as-built drawings. The A/E shall prepare a submittal log to be utilized by the VA during construction period services and maintain a RFI log. B. CONTRACT INFORMATION: The VA Medical Center Central Western Massachusetts located in Leeds, MA has a requirement for a Firm Fixed Price contract to provide professional A/E services for the 631-21-011 Building 25 Elevator Design project. The magnitude of construction is between $2,000,000 and $5,000,000. Prospective firms are reminded they must certify that in accordance with VAAR 852.219-75, VA Notice of Limitations on Subcontracting-Certificate of Compliance for Services and Construction (JAN 2023) (DEVIATION), in the case of a contract for services (except construction), the contractor will not pay more than 50% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219-73 or certified VOSBs listed in the SBA certification database as set forth in 852.219- 74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 50% subcontract amount that cannot be exceeded. Other direct costs may be excluded to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service as set forth in 13 CFR 125.6. SF330 packages shall address how each firm anticipates meeting this criteria. This requirement is in accordance with the Selection of Architects and Engineers as implemented in Subpart 36.202 of the RFO and Subpart M836.102 of the VA Procurement Manual. All submissions will be evaluated in accordance with the evaluation criteria. A "short list" of the three most highly rated after initial source selection will be chosen for negotiations of a contract award. The Government will not pay, nor reimburse, any costs associated with responding to this request. The Government is under no obligation to award a contract as a result of this announcement. Respondents are put on notice that firm(s) selected by the Selection Authority will be required to submit a Fixed Price Proposal on the VA Form 6298 to include labor, overhead, profit, and other costs for this project for negotiation by the Contracting Officer prior to contract award. The negotiated agreement will be incorporated into the resulting contract. C. THIS IS NOT A REQUEST FOR PROPOSAL: This is a request for SF 330s only. Any requests for a solicitation will not receive a response. No material will be issued, and no solicitation package or bidder/plan holder list will be issued. D. PROJECT INFORMATION: Provide all professional architectural and engineering (A/E) services necessary to develop complete drawings, specifications, cost estimates, construction schedules, project phasing, investigations, site visits and construction period services associated with the 631-21-011 Building 25 Elevator Design at the VAMC Central Western Massachusetts HCS, Leeds, MA 01053. E. EVALUATION SELECTION CRITERIA: Each respondent s SF 330 submittal package will be evaluated in accordance with RFO 36.202 procedures. The selection criteria, in descending order of importance will be as follows: 1. Specialized Experience/Technical Competence 2. Professional Qualifications 3. Past Performance F. SELECTION CRITERIA DESCRIPTIONS: The selection criteria descriptions (1 through 3) are provided below in descending order of importance. Specialized Experience/Technical Competence Provide five (5) recent and relevant projects related to the Statement of Work with a similar magnitude (magnitude of construction for the design is between $2,000,000 and $5,000,000) that demonstrates experience with VA Design Requirements or equivalent with significant existing condition renovation. A minimum of three (3) projects should be for comprehensive designs of new elevator builds. Projects should detail the design manual requirements and required equipment for effective operation of an elevator, HVAC, and other necessary mechanical systems. Projects should also detail working with end users and reviewing manufacturer equipment. A minimum of two (2) projects should be for comprehensive designs for exterior historical renovations that took place in the Commonwealth of Massachusetts. These projects should detail the applicable regulation governing historical reviews, explain the process, and demonstrate an understanding of and adherence to the requirements. Recency is defined as performance occurring within five (5) years of the date of this notice. If current projects are provided, these projects must have begun one (1) year prior to the issuance of this notice. Projects that have not been in performance for one (1) year will not be considered. Relevancy is defined as performance of work on projects that are similar in scope to the type of project anticipated under the resultant contract. This factor evaluates the amount of experience and technical competence the firm has in designing similar types of projects. Respondents must provide five (5) recent and relevant projects; any project provided in addition to the five are not required and will not be considered if provided. The following information is required for all projects provided under this criteria any material missing the following requested information will be assessed a deficiency: Contract/Task Order Number Project Title Location Prime Firm with % of self-performed work Subconsultants Start and Completion dates If project is not yet complete, identify the current phase/stage of the project. Fully completed projects will carry more weight than projects still in design Cost of Construction Description of the project in sufficient detail and clearly document how it is relevant to the scope of this project Professional Qualifications Professional qualifications necessary for satisfactory performance of required services. The A/E firm will be evaluated according to their ability to demonstrate the following: education; training; registration; overall and relevant experience; and longevity with the firm of key management and technical personnel. Firms shall provide brief resumes of proposed team members who will specifically serve as the project managers and designers of record, as well as of other relevant team members or subcontractor team members who will perform technical tasks under this contract. Subcontractor team member resumes shall indicate their record of working together with the prime contractor. The minimum required disciplines are Architecture, Structural, Mechanical (HVAC and Plumbing), Electrical, Fire Protection, Interior Design, Elevator Consultant, Cost Estimator. The Designers of Record shall perform and direct the design within their respective discipline and shall sign and seal the drawings. All Designers of Record must be professionally registered in their discipline, and this must be shown on their resume. Each resume shall include a minimum of three (3) specific completed projects that best illustrate the individual team members experience in their technical field relevant to this project scope; any project provided in addition to the three (3) will not be evaluated as part of this criteria. Past Performance Firms will be evaluated for past performance on recent and relevant contracts with Government agencies (emphasis on VA work) and private industry in terms of cost control, professional performance, general management, cooperativeness, quality of work, compliance with performance schedule, and a record of significant claims against the firm due to improper or incomplete A/E services (references required). The evaluation may consider Past Performance information regarding predecessor companies, key personnel who have relevant experience, or subcontractors that will perform major or critical aspects of the requirement when such information is relevant to this acquisition. Past Performance information on contracts not listed by the offeror may also be evaluated. The Government may contact references and contact parties other than those identified by the offeror, and information received may be used in the evaluation of the offeror s Past Performance. While the Government may elect to consider data obtained from other sources, the burden of providing current, accurate, and complete Past Performance information rests with the offeror. The Government reserves the rights to obtain and evaluate Past Performance information from any source it deems appropriate. Respondents with no previous past performance shall state so when addressing the selection criteria. Documentation supplied should detail firms ability to work with government entities and design standards or similar relevant experience with other entities. The following information is required for evaluation of past performance: The A/E firm shall submit past performance evaluations (from CPARS if experience was on a Government contract) for projects provided under Evaluation Criteria 1, Specialized Experience/Technical Competence. In addition to the past performance evaluations the firm shall provide owner points of contact for each project listed to include name, title, telephone number, e-mail, contract number, project name, project description, and start and completion dates. Recency is defined as performance occurring within five (5) years of the date of this notice. If current projects are provided, these projects must have begun one (1) year prior to the issuance of this notice. Projects that have not been in performance for one (1) year will not be considered. Relevancy is defined as performance of work on projects that are similar in scope to the type of project anticipated under the resultant contract. If there is no CPARS data available, Past Performance Questionnaires (PPQs) will be accepted. Please utilize the attached PPQ document. PPQs shall be submitted to the CO not later than the closing date for receipt of the SF 330s. Email PPQs to Brian.Kelly@va.gov. The subject line shall state 36C24126Q0518 Past Performance for (Name of Company) Project 631-21-011 . NOTE: A/E Firms must not review the Past Performance Questionnaire prior to submission. They must be submitted by the client/evaluator directly to the CO. Firms should follow up and encourage references to get the questionnaires to the CO in a timely manner. Do not include copies of the letters or questionnaires in the SF 330 package. Note: We recommend you contact every reference listed and let them know we may contact them for information. Their timely replies would be appreciated. G. QUESTIONS AND COMMENTS: a. Questions and comments regarding this notice must be submitted by email only to the Contracting Officer, Brian Kelly at Brian.Kelly@va.gov. b. Oral questions will not be answered. c. The deadline for questions is November 20, 2026, at 1:00PM EST. H. SF 330 SUBMITTAL PACKAGE PAGE INSTRUCTIONS: a. SF 330 submittal packages, including Past Performance Questionnaires, shall be submitted no later than 4:00PM EST on December 7, 2026. Respondents are responsible for ensuring SF330 submittal packages, any revisions, and modifications are submitted by this time. b. Qualified A/E firms are required to submit ONE (1) electronic copy via email to Brian Kelly at Brian.Kelly@va.gov. If the file is too large to send via email, the offeror may send multiple emails with multiple files (See Self-Service Microsoft Exchange: Email Sending Limits (va.gov) regarding file size). SF 330 forms are available at: https://www.gsa.gov/forms#SF c. Submission of information incorporated by reference is not allowed. d. Prospective firms shall address all selection criteria factors within their submitted SF 330 package. e. Submissions are limited to 65 pages. i. Absolutely no photographs shall be submitted. ii. Title pages and tables of contents, if applicable, are excluded from the page count limitation. iii. Pages submitted in excess of the limitations specified in this Notice will not be evaluated by NCO 1. f. Telephone or fax inquiries will not be accepted. I. SF 330 PACKAGE CONTENTS: a. The SF 330 submittal packages shall consist of a completed SF 330, specific information addressing each of the seven selection criteria described in this Notice. b. Respondents are required to meet all requirements in addition to those identified as selection criteria. c. SF 330 submittal packages not consistent with the requirements and selection criteria of this notice may be determined unacceptable and removed from consideration. d. Any SF 330 submittal package, modification, or revision, that is received after the exact time specified for receipt is late and will not be considered unless the contracting officer determines that accepting the late submittal would not unduly delay the acquisition; and there is acceptable evidence to establish that it was received at NCO 1 installation designated for receipt of submittal packages and was under NCO 1 s control prior to the time set for receipt of submittal packages; or it was the only submittal package received. J. SF 330 PACKAGE PREPARATION: a. Qualified A/E firms are required to submit ONE (1) electronic copy via email to Brian Kelly at Brian.kelly@va.gov. SF 330 forms are available online at: https://www.gsa.gov/forms#SF. b. Electronic copy shall be in searchable PDF format of the SF 330. c. A cover sheet should be included, clearly marked with the Respondent's name, complete address with 9-digit zip code, phone number, e-mail address, UEI number, date of response, title and notice identification. d. A table of contents shall be provided for ready reference to sections and figures. e. SF 330 submittal packages shall be consistent with the following structure and formatted accordingly: SF 330 PART I CONTRACT SPECIFIC QUALIFICATIONS 1. Sections A through D 2. Section E 3. Section F 4. Section G 5. Section H 6. Section I 7. Other additional information and attachments SF 330 PART II GENERAL QUALIFICATIONS (Note: Respondents shall clearly label additional information and attachments). K. FAR and VAAR: The FAR, VAAR, and VAAM citations referenced in this Special Notice can be accessed via the following links: FAR https://www.acquisition.gov/ VAAR https://www.va.gov/oal/library/vaar/index.asp VAAM https://www.va.gov/oal/library/vaam/
-Special Notice12/07/2026
-AwardedOpen
Modification 2 to Presolicitation Notice 36C25527R0013 This modification provides answers to RFIs received and revised the evaluation criteria to be used for this project. RFIs Received for Project # 657A5-24-108, Replace Medium Voltage Feeder 3 and Transformers 1. Factor 4 Past Performance / Section F Project Eligibility  The solicitation states that projects submitted for past performance consideration must have completed both design and construction, and that projects not constructed will not be considered. Would the VA consider accepting relevant electrical infrastructure studies or assessments in Section F, particularly those involving medium-voltage distribution systems and feeder evaluations, that demonstrate directly applicable technical expertise but did not result in construction? We prefer to keep it as projects that were designed AND constructed. Since this is a construction project and not a study, we want projects that have been finished to be used for past performance criteria.  2. Factor 2 Specialized Experience and Technical Competence / Laboratory Requirements  Factor 2 references the firm's technical capabilities in design quality management procedures, CADD/BIM, equipment resources, and laboratory requirements. Given that the project scope primarily involves medium-voltage electrical feeder and transformer replacements, could the VA clarify the applicability of laboratory requirements to this project? We respectfully request that this criterion be removed from the evaluation requirements, as it does not appear directly relevant to the stated scope of work. Laboratory requirements were deleted. Please see revised evaluation criteria below.  3. Request for Submission Deadline Extension Given the technical scope of the project and the level of detail required to address the evaluation criteria, we respectfully request a one-week extension of the SF330 submission deadline, from November 10, 2026, to November 17, 2026. This additional time would allow interested firms to prepare comprehensive qualifications packages that fully address the solicitation requirements. SF330 submission due date extended from 11/10/2026 to 11/172026. End of RFIs.
-Pre-Solicitation11/17/2026
NAICS is 541330 - Engineering Services and small business size standard of $25.5. ___________________________________________________________________________________________________ The purpose of this announcement is for market research only. No solicitation will be posted at this time. The Department of Veterans Affairs NCO 15 Contracting Office and John Cochran (JC) VA Medical Center, 915 N Grand Blvd, St. Louis MO. 63106, seeks capabilities information on interested vendors to provide AE Services for design completion for project. The responding interested offerors are requested to provide procurement capabilities from licensed professional architects and engineers currently registered in the state of Missouri or in a state of which Missouri has recognized the engineering license. The specific disciplines which will be evaluated are Architects, Civil Engineer, Mechanical Engineers, Electrical Engineers, Structural Engineers, Industrial Hygienists, Estimators, CAD operators, Project Managers, LEED Consultant, Fire Protection Engineer, and Interior Designer at the medical center. The North American Industry Classification system (NAICS) code for this acquisition is 541330 - Engineering Services and small business size standard of $25.5. PSC: C1DA Magnitude of Construction Project between $500,000 and $1,000,000. Project Intent: A/E Firm shall provide all necessary design and construction period of services for subject project. The VA St. Louis Health Care System, John Cochran Division, will prepare existing space for a new Interventional Radiology equipment in Room A261. This project will renovate the area of the current equipment and reconfigure the area to properly utilize all of the features of the new unit. Work includes demolition of walls, ceilings, flooring and utilities. Existing exam, control and equipment room will be reconfigured to support new equipment needs. New construction includes walls, ceilings, flooring, doors, lead shielding, lights, power, data, phone, systems, new AHU system to support HVAC design guidelines, to allow the vendor to install the new equipment. Project will require assessment of existing lead shielding. Scope to focus on refreshing space instead of a full reconstruction. Responses must be received by 6:00 PM CST on November 05, 2025, via e-mail to the Contracting Officer at Gislaine.Dorvil@va.gov. PLEASE REFERENCE "SOURCES SOUGHT: Project 657-27-207JC Prepare Site for Interventional Radiology Equipment Room A261" IN THE SUBJECT LINE. Respondents will not be contacted regarding their submission or information gathered because of this Sources Sought notice. Interested firms shall be required to respond to additional announcements separately from this announcement without further notice from the Government when posted to the Contract Opportunities website at https://sam.gov/. The Contract Opportunities website is the only official site to obtain these documents.
-Market Research11/05/2026

Additional Details

Solicitation Number

36C24124Q0795

Archive Date

Oct 11, 2024

Office Address

TOGUS, ME, 04330