Notice ID: d8d622a52cb74a03852f8f2e10d7e6e9Special NoticeArchived
J065--Laser Marking Systems Services
Archived on September 7, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 9:00 AM EDT
- Posted
- August 7, 2025
- Notice type
- Special Notice
Notice details
- Office
- 241-NETWORK CONTRACT OFFICE 01 (36C241)
- Last updated
- Nov 10, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 36C24125Q0737
- Notice ID
- d8d622a52cb74a03852f8f2e10d7e6e9
Description
Pre-Solicitation Notice for a sole source. This is not a solicitation. The Department of Veterans Affairs intends to negotiate a requirement with the Martin AIJS, 751 LynnesCV, Wadsworth, OH 44281. The applicable NAICS code is 811210 and PSC is J065. The authority for this action is FAR 13.106-1(b)(2): Only one Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements. Interested persons may contact the Contracting Specialist via email at ophelia.wilson@va.gov regarding this procurement. The determination to conduct a competitive procurement based on responses to this notice is solely within the discretion of the Contracting Officer. Background: The White River Junction VA Medical Center Sterile Processing Services (SPS) Department has purchased A NuTrace NUX-20 laser unit for the marking of surgical instrumentation. Per VHA 1116, SPS is to implement instrument tracking to the instrument level for all RMD, this contract will have four option years that will keep our laser in proper working condition and the facility compliant with our directives. This laser is not able to be maintained by HTM or the training provided as part of this package. NuTrace Laser Preventative Maintenance will serve the following primary functions: Base year- Laser Service Maintenance, service contract of a base year plus four option years that include PM Repairs, any mechanical repairs, on location specialist and any shipping cost/use of Loaner. Service Contract deliverables: - Any PM required including Filter changes - Any required repairs to laser (includes on location repairs) - Training -Up to 2 days per year. One certified trainer can come onsite, conduct audits of up to 15 trays per day and provide needed education and refresher training. - Daily support and troubleshooting. (Anything that can t be resolved over phone, an engineer comes on location) - 2 additional LIA certifications as needed. (New people get hired in the future to use your laser, they must complete to use laser independently) Place of Performance/Delivery Location: White River Junction VAMC: 215 North Main Street White River Junction, VT 05009 Vendor Responsibilities: Implementation services shall include the following: On-site installation coordination of all equipment and accessories. Meetings should be scheduled with site for implementation, initial deployment, and through the completion of the delivery. Materials shall be new equipment, parts, and accessories as specified in the purchase order. The vendor shall have the materials delivered to the job site in original equipment manufacturer (OEM) original unopened containers, clearly labeled with the OEM s name, equipment model and serial identification numbers, delivery order number, and VA purchase order number. If products do not meet criteria, site POC will contact the Vendor Project Manager for replacement of that equipment. The vendor is responsible for inventorying materials prior to delivery to VA sites to check for accuracy in quantity and part number. Must be verified by VA POC when delivered onsite Vendor shall provide upgrades during the renewal of an option or unless approved by the vendor. Upgrades will be for those pieces of equipment specifically identified by the vendor as they become available. Citations to pertinent laws, codes and regulations such as 44 U.S.C chapters 21, 29, 31 and 33; Freedom of Information Act (5 U.S.C. 552); Privacy Act (5 U.S.C. 552a); 36 CFR Part 1222 and Part 1228. Contractor shall treat all deliverables under the contract as the property of the U.S. Government for which the Government Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Contractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government IT equipment and/or Government records. Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected by the Freedom of Information Act. Contractor shall not create or maintain any records containing any Government Agency records that are not specifically tied to or authorized by the contract. The Government Agency owns the rights to all data/records produced as part of this contract. The Government Agency owns the rights to all electronic information (electronic data, electronic information systems, electronic databases, etc.) and all supporting documentation created as part of this contract. Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data. Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format [paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.] or state of completion [draft, final, etc.]. No disposition of documents will be allowed without the prior written consent of the Contracting Officer. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the agency records schedules. Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, this contract. The Contractor (and any sub-contractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information. Government Responsibilities: Each VA site is responsible for inventorying materials prior to acceptance of order. Each VA site shall identify and provide limited daily storage of vendor parts/supplies at the time of delivery. Each VA site shall reject items that do not conform to requirements above. Equipment shall be checked upon opening the packaging to ensure no damage occurred during shipment. If damage is observed, POC will contact Vendor Project Manager for replacement of that equipment.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
Files (1)
- Download
36C24125Q0737.docx
19 KBAdded in Special Notice version 3Posted
Links (1)
- U.S. Department of Veterans Affairswww.va.govPosted
Lifecycle
- 3Version 3Special NoticeArchivedCurrent
J065--Laser Marking Systems Services
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Presolicitation Notice POC: Vance Farrell, email: vance.farrell@va.gov Set-Aside: To be determined Codes: PCS: J065 NAICS: 811210 Description: (i). Contractor shall provide equipment maintenance services for a NuTrace Laser System at the Amarillo VA Health Care System. Service agreement to include all labor, travel, preventive maintenance, corrective maintenance, replacement parts, technical support, software support, calibration, inspections, shipping, training, and associated services required to maintain the system in fully operational condition in accordance with OEM specifications. All replacement parts shall be new OEM-certified components fully compatible with the existing equipment. Anticipated base period of performance: 12/1/2026 11/30/2027. Contract or order will include four (4) one-year option periods. Address: 6010 Amarillo Blvd., West Amarillo, TX 79106-1990 (ii). NCO-17 anticipates awarding a firm-fixed price contract with an anticipated award date of 12/1/2026. (iv). All responsible sources may submit a quotation, bid, or proposal, as appropriate, which will be considered by the agency. NCO-17 intends to solicit only to those capable firms that respond to the notice. Capable firms must respond by the date and time set in the notice to be considered. | 95% | Pre-Solicitation | 11/24/2026 |
Notice of Intent to Sole-Source Requirement The Department of Veterans Affairs, Network Contracting Office (NCO) 10, intends to negotiate a sole source contract under Simplified Acquisition Procedures and the authority of FAR 6.302-1, Only one responsible source and no other supplies or services will satisfy agency requirements. The associated NAICS code for this is 811210 Electronic and Precision Equipment Repair and Maintenance [https://www.naics.com/search/]. The sole-source contract will be awarded to: Motek Medical B.V. Description of equipment requirements: Service Maintenance Agreement It is the Government's belief that only the proposed candidate possesses the required capabilities to successfully meet this requirement. It is the Government's intention to solicit and negotiate with only this source. This is not a solicitation or request for offers. No solicitation package is available. Any response to this notice must show clear and convincing evidence that demonstrates the ability to comply with the requirement and that competition would be advantageous to the Government. IAW FAR 5.207 all responsible sources may submit a capability statement, proposal, or quotation, which shall be considered by the agency. The Government will not pay for information submitted. A determination not to compete based on responses to this notice is solely within the discretion of the Government. All questions or responses to this intent to sole source must be emailed to Chad Kemper at chad.kemper@va.gov by 2PM EST. Friday, October 16, 2026. | 89% | Special Notice | 10/16/2026 |
Notice of Intent to Sole-Source Requirement The Department of Veterans Affairs, Network Contracting Office (NCO) 10, intends to negotiate a sole source contract under Simplified Acquisition Procedures and the authority of FAR 6.302-1, Only one responsible source and no other supplies or services will satisfy agency requirements. The associated NAICS code for this is 811210 Electronic and Precision Equipment Repair and Maintenance [https://www.naics.com/search/]. The sole-source contract will be awarded to: Motek Medical B.V. Description of equipment requirements: Service Maintenance Agreement It is the Government's belief that only the proposed candidate possesses the required capabilities to successfully meet this requirement. It is the Government's intention to solicit and negotiate with only this source. This is not a solicitation or request for offers. No solicitation package is available. Any response to this notice must show clear and convincing evidence that demonstrates the ability to comply with the requirement and that competition would be advantageous to the Government. IAW FAR 5.207 all responsible sources may submit a capability statement, proposal, or quotation, which shall be considered by the agency. The Government will not pay for information submitted. A determination not to compete based on responses to this notice is solely within the discretion of the Government. All questions or responses to this intent to sole source must be emailed to Chad Kemper at chad.kemper@va.gov by 2PM EST. Friday, October 16, 2026. | 89% | Special Notice | 10/16/2026 |
The Department of Veterans Affairs, Network Contracting Office (NCO) 6 on behalf of Richmond VA Medical Center is conducting Market Research through this Sources Sought notice to help determine the availability of qualified Businesses, capable of providing service for Performance Water Systems Service Agreement that meets the following requirements: The Contractor shall furnish all labor, transportation, parts, and expertise necessary to provide preventive maintenance and emergency (unscheduled) repair of machines of the located at the Richmond VAMC. Preventive Maintenance: Preventive Maintenance (PM) shall be performed by either the OEM, or a contractor certified by the OEM at intervals in accordance with the original equipment manufacturers (OEM) specifications. The contractor must provide documentation confirming current OEM certification and authorization to perform maintenance services. Contractor shall furnish any required PM kits, tools, manuals and materials needed to perform Preventative Maintenance. The contractor shall perform PM according to manufacturer s specifications. The contractor shall have written procedures to be followed and documented evidence that each piece of equipment has been inspected according to those procedures. Monthly Tasks: Replace sediment filters for CWP systems (two LD05 20 filters per visit). Replace sediment filters for each Marcor portable RO (GX05 10 per machine). Replace sediment filters for each AmeriWater Centurion RO cart (GX05 10 filter for each of 7 units). Inspect all equipment for proper function. Quarterly Tasks: Replace (2) 20 sediment filters for CWP systems. Replace (2) carbon block filters for each Millenium HX RO (2 systems). Replace (1) 10 sediment filter for each Millenium HX RO (2 systems). Provide chemicals to clean RO membranes on both CWP systems. Replace (1) GX05 10 filter for each of the 7 AmeriWater Centurion RO carts. Replace (2) 2.5 x 20 Chlorplus carbon blocks for 2 Centurion systems Attachment 1: Equipment List Manufacturer Equipment Name Model #: Serial #: Location: Acquisition Date Ameriwater Water Purification Systems Centurion CPM21019 2H Area 08/02/2023 Ameriwater Water Purification Systems Centurion CPM21020 2H Area 08/02/2023 Ameriwater Water Purification Systems Centurion CEN240015 2H Area 05/09/2024 Ameriwater Water Purification Systems Centurion CEN240013 2H Area 05/09/2024 Ameriwater Water Purification Systems Centurion CEN240009 2H Area 05/09/2024 Ameriwater Water Purification Systems Centurion CEN240012 2H Area 05/09/2024 Ameriwater Water Purification Systems Centurion CEN240007 2H Area 05/09/2024 Marcor Millenium HX 1369448 2H Area 09/07/2018 Marcor Millenium HX 1369426 2H Area 09/07/2018 Marcor CWP CWP 1369449 Water Room 04/01/2018 All respondents shall indicate/provide the following: Must demonstrate the ability to comply with the limitations on subcontracting in RFO 52.219-14 / VAAR 852.219-75, as applicable. In your capability statement, describe how your firm intends to comply with this limitation throughout performance. Is your company interested in providing a Federal Supply Schedule (FSS) quote or Open Market (indicate FSS contract #)? Identify any other companies owned (wholly or in-part) by the owners of this business who provide goods or services under the same or a related NAICS codes. Identify any other companies owned (wholly or in-part) by the owners of this business who provide goods or services that are registered under the same or a related NAICS code with the Center for Veterans Enterprise (CVE); Provide the certification type (SDVOSB/VOSB), Federal Identification Number, and state of incorporation for each. Whether or not your company has an active SAM registration and the companies Unique Entity Identifier. A copy of its capabilities statement. Failure to provide the above information may result in the potential offeror being considered incapable of meeting the VA s needs. If the contractor can provide the above items, the contractor shall provide a letter from the manufacturer stating they are an authorized distributor/licenser of their products. Failure to submit an authorized distributor letter shall result in the product(s) potentially offered to be considered grey market and shall not be considered technically acceptable. The capability statements received from this market research are for planning purposes only and will assist the Government in planning its acquisition strategy. This is strictly market research, and the Government will not entertain questions concerning this market research. The Government will not assume any costs incurred by the contractor in the preparation of responses. All responses shall be submitted in writing no later than November 23, 2026, at 5:00 PM EST to the attention of: Natasha.Hawkins@va.gov Please title the subject line for responses as: Performance Water Systems Service | 85% | Market Research | 11/23/2026 |
The Joseph M. Cleland Atlanta VAMC anticipates a requirement to provide Replacement Dental Vacuum Pump services. This contract is 30 days After Receipt of Order (ARO) and will be Firm-Fixed Priced (FFP). The performance will occur at the Contractor s location and Government furnished property will not be provided. All interested vendors are invited to provide information to contribute to this market survey/sources sought including commercial market information. THIS IS NOT A SOLICITATION ANNOUNCEMENT. This is a sources sought synopsis only. Questions should be submitted by email to terri.hudson@va.gov. Provide only the requested information below. The purpose of this synopsis is to gain knowledge of potential qualified sources and their size classifications (Full and Open Sources Sought Notice), relative to NAICS 811210. POTENTIAL SOURCES SHALL PROVIDE THE FOLLOWING INFORMATION IN THEIR RESPONSE: 1) Company name, address, phone number, primary contact(s), e-mail address, NAICS code(s), business size (i.e., small/large), size classification and UEI Number. 2) Provide a Statement of Capability that demonstrates the offeror's past performance in providing this type of service. 3) Submit Capability Statements via email to terri.hudson@va.gov by November 10, 2026. Responses should be received no later than 10:00 CST. 4) If a site visit is conducted, the REQUEST FOR QUOTE will give the date, time and address. NO CAPABILITY STATEMENTS MAY BE SUBMITTED AFTER November 10, 2026. AT THIS TIME NO SOLICITATION EXISTS. (DO NOT REQUEST A COPY OF THE SOLICITATION). A FUTURE NOTICE WILL BE POSTED WHEN THE SOLICITATION WILL BE RELEASED. 5) Disclaimer and Important Notes: This notice does not obligate the Government to award a contract or otherwise pay for the information provided in response. The Government reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate. Any organization responding to this notice should ensure that its response is complete and sufficiently detailed to allow the Government to determine the organization's qualifications to perform the work. Respondents are advised that the Government is under no obligation to acknowledge receipt of the information received or provide feedback to respondents with respect to any information submitted. After a review of the responses received, a pre-solicitation synopsis and solicitation may be published in Federal Business Opportunities. However, responses to this notice will not be considered adequate responses to a solicitation. 6) No proprietary, classified, confidential, or sensitive information should be included in your response. The Government reserves the right to use any non-proprietary technical information in any resultant solicitation(s). STATEMENT OF WORK Dental Vacuum Pump Replacement 1. Project Overview This project addresses replacement of dental vacuum pumps, fluid separators, and associated components at Ft McPherson Medical/Dental Clinic, Building 125. Scope includes replacement of defective pumps, defective fluid separation, defective amalgam separation, and defective control panels. Ensure all installations are compatible with existing pipes and equipment to remain. All work shall comply with VA Design Manuals. Work shall result in a complete and working dental vacuum system. Work shall include training of VA clinicians, maintenance, and logistics personnel. Provide system schematics, operators manual, and warranty manual. Work shall be accepted by signature of VA Engineering Staff before closing out. 2. Equipment Information and Access Dental Vacuum System: Location: Fort McPherson VA Building 125, 1701 Hardee Ave. SW, Atlanta GA On-Site Measurement and Verification Required: Comprehensive manufacturer records or as-built dimensions for existing Dental Vacuum System are not readily available. Therefore, the Contractor shall perform an on-site survey to obtain all necessary measurements for work requirements. No equipment is to be ordered, and no work shall begin until field-verified dimensions are submitted and approved by VA Engineering Department. The Contractor is responsible for coordinating measurement activities with facility engineering and ensuring all site-specific constraints are factored into submittals and planning. 3. Equipment History and Impacts The existing AirTech Dental Vacuum System has exhibited multiple pump and oral fluid storage failures over the last two years. The system exhibits signs of antiquation and inferior design. The components of the existing system differ from current market standards and may result in undesired storage condition of biohazardous fluid. Undesired fluid storage presents environmental concern and costly breakdown of system components. These failures have resulted in multiple Dental Clinic Outage and patient treatment interruptions at Fort McPherson. 4. Scope of Work 0. Replace existing fluid separators All fluid separation equipment shall include water washdown All fluid separation equipment shall include high fluid level alarm 0. Replace existing pumps All pumps shall be capable of 7inHg, 60cfm airflow each All pumps shall include vibration isolation All pumps shall operate at a constant volume with vacuum breaker relief 0. Replace existing amalgam separator 0. Replace all integrated and defective accessories 0. Repair all system piping, wiring, and conduit 0. System shall include schedule timer System shall include hand override for power-up when off-schedule. 0. Provide training for VA clinicians, maintenance, and logistics personnel. 0. Provide system schematics 0. Provide operators manual Provide warranty manual Utility Outage, Safety, and Infection Control Submit a Utility Outage Request Form to VA Engineering Service at least 10 business days in advance and obtain written approval for all planned interruptions (electrical and hydronic) from the VA Engineering department prior to scheduling outages. Any work that shall be completed within the clinical footprint, shall be done during off hours to minimize impact to patient care. Strict adherence to Lock-Out/Tag-Out (LOTO) requirements for all energy sources throughout the course of work, with full documentation submitted for VA records. Comply with all VA and OSHA site safety protocols (including PPE, daily housekeeping, and mandatory orientation). Perform full Risk Assessment in coordination with VA Infection Control and Safety staff. The forms and requirements shall be approved before any work can take place. This shall implement and maintain all required barriers, negative air systems, and infection prevention measures specified in the PCRA. Secure written VA approval for all shutdowns or disruptions to critical clinic operations. 6. Work Schedule, Period of Performance and Access Restrictions 6.1.0 Regular Patient Care Hours: Major construction activities, including but not limited to demolition, equipment removal and installation, noisy work, disruptions to heating/cooling, or any work likely to cause patient or staff discomfort shall not be performed during the facility's regular patient care hours, defined as Monday through Friday, 8:00 a.m. to 4:30 p.m. Permitted Work Outside Regular Hours: All such major work shall be scheduled for after-hours (before 8:00 a.m. or after 4:30 p.m.), weekends, or designated federal holidays, unless otherwise approved in writing by the VA. Minor Work During Patient Care Hours: Low-impact activities (e.g., site layout, barrier/protection installation, documentation, off-site fabrication, administrative tasks, or other work not affecting staff/patient comfort or building functionality) may occur during regular patient care hours with prior VA approval. Advance Notice and Scheduling: The Contractor shall provide the VA Contracting Officer s Representative (COR) with a minimum of ten (10) business days written notice prior to commencing any after-hours or weekend work. Schedules shall be coordinated with VA facility operations to ensure clinical and safety needs are met. Holidays and Federal Closures: No work shall be scheduled or performed during federal holidays or unplanned federal facility closures unless specifically authorized in writing by the VA COR. Federal holidays include New Year s Day, Martin Luther King Jr. Day, Presidents' Day, Memorial Day, Juneteenth National Independence Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas Day. Period of Performance: TBD Emergency Work: In cases where emergency response is required to prevent immediate hazards or mitigate critical outages, the Contractor shall immediately notify the VA COR and facility staff. Emergency work, when authorized by the VA, may proceed during patient care hours if necessary for life safety or system protection. Exceptions: Any exception to these work hours and access restrictions shall be requested by the Contractor in writing and approved in advance by the VA COR. The request shall outline the justification and include a plan to minimize patient and staff impact. Responsibility for Coordination: The Contractor is responsible for integrating this schedule into all planning, coordinating with facility engineering and clinical teams, and maintaining continuous protection of patient care and comfort. 7. Compliance with VA Design and Construction Standards All work and deliverables shall comply with the most current: VA HVAC Design Manual VA Master Construction Specifications VA Mechanical Design Guides VA Plumbing Design Manual VA Electrical Design Manual VA Fire Protection Design Manual VA Physical Security Design Manual PCRA Requirements VA Commissioning Process Manual Any deviation from these standards requires written approval from VA COR. 8. Deliverables & milestones Deliverable Description Due Date Site Measurement Report Contractor field-verifies and documents all critical dimensions and access limitations for existing equipment to remain, piping, rigging, and clearance. Before equipment submittals/ordering Inspection Reports / Replacement Schedule Valves, actuators, freeze stats, pumps, return fan; identified/replaced Prior to and post install Utility Outage Request Approval Documented VA approval for planned shutdowns Before affected work LOTO Documentation Proof of lock-out/tag-out procedures Prior to shutdown PCRA/ICRA Documentation Approved risk assessments and controls Before mobilization Humidifier Product Proposal/Cut Sheets Proposed equipment and justification Prior to submittal approval Return Fan Compatibility/Replacement Report Report verifying synchronization with new supply fan, or submittal for replacement if required Prior to installing supply fan system Commissioning Report Third-party validation of operation At completion Warranty Certification Documentation of warranty coverage At closeout Training Record Staff training documentation At turnover 9. Point of Contact Primary: Daryl Lewis Daryl.lewis3@va.gov Back-up: Anthony Blake Anthony.blake@va.gov Veterans Affairs Medical Center 1701 Hardee Avenue, SW Building 125, Atlanta, GA 30310 If there are further measurements, clarifications, or site access needs, Contractor shall promptly coordinate with VA facility engineering. | 85% | Pre-Solicitation | 11/10/2026 |
Additional Details
Solicitation Number
36C24125Q0737
Archive Date
Sep 7, 2025