GovChime
Notice ID: 3f74e4dca9d64d17bdea185e8c29a0bcAward NoticeAwardedArchived

Z1DA--402-24-007 B200E Lobby Flooring

Awarded on November 5, 2025. Full description on SAM.gov.

Awarded tounder 36C24126C0002 (source: SAM.gov award notice)• $1.8M

Overview

Posted
November 5, 2025
Notice type
Award Notice
Set-aside
Service-Disabled Veteran-Owned Small Business Set Aside
NAICS
238330: Flooring Contractors
Agency
Department of Veterans Affairs

Notice details

Office
241-NETWORK CONTRACT OFFICE 01 (36C241)
Place of performance
Department of Veterans Affairs VAMC Togus 1 VA Center, Augusta, 04330
Last updated
Nov 6, 2026
First published
Last updated on SAM.gov
Award date
Nov 5, 2025
Award amount (SAM.gov award notice)
$1.8M

Identifiers

Solicitation number
36C24125R0098
Notice ID
3f74e4dca9d64d17bdea185e8c29a0bc
Award number (PIID)
36C24126C0002

Description

RFI Questions and Answers Lobby Floors Q1. The Specification 02 82 13.19 Asbestos Floor Tile and Mastic Abatement, page 02 82 11 1, B. Extent of Work: 2., states there is 4650sf of ACM flooring & mastic to be abated, the Statement of Work does not mention any ACBM abatement. Please clarify if there are any hazardous materials present which will require abatement. A1. The VA expects no asbestos abatement as part of this project. Q2. Will this project require a separate Project Superintendent and SSHO, or will a competent Project Superintendent be allowed to assume the duties of both positions? A2. Project Superintendent, if qualified, may hold both duties. Superintendent may not hold both SSHO and QA/QC duties. Q3. Will the rooms surrounding the proposed work areas be occupied during removal and replacement of the floors? A3. Rooms surrounding the proposed work areas will be occupied during removal and replacement of floors. Phasing will be required. Q4. Should the contractor factor in off hours work for the demolition phases of the contract? A4. Yes. See noise and vibration language within specifications. Q5. On page 8 of the solicitation, under Past Performance, it reads: 1. Offeror shall use the attached form titled Past Performance Questionnaire (see RFP Attachment 9) to obtain past performance information from at least two prior contracts However, Attachment 9 is missing from the original bid documents. We understand from previous solicitations that this is just a template, but we d like to confirm if there s a specific form the Government would like us to use. A5. There is no specific form, the attachment is just a template to use if you need to. Q6. Is it acceptable to submit previously completed PPQs from past projects, or do new PPQs need to be submitted? A6. Past performance should relevant and recent. Per the solicitation completed within 5 years and similar in scope and magnitude. Q7. Do projects presented for Past Performance and/or Experience need to be complete, or can they be ongoing and substantially complete (at least 50%)? A7. See above A6. Q8. If projects need to be complete, would an active multi-year contract such as a regional preventative maintenance and service contract or BPA with discrete, completed task orders be considered compliant and relevant, provided it includes scopes of work that are directly applicable to the solicitation? A8. Completed task orders are acceptable. Q9. Please clarify if a superintendent can be a dual hat to cover the requirements of SSHO? If no to the question, will the SSHO need to be full-time for this project? A9. Project Superintendent, if qualified, may hold both duties. Superintendent may not hold both SSHO and QA/QC duties. Q10. Please clarify if a superintendent can be a dual hat to cover the requirements of QA/QC? If no to the question, will the QA/QC need to be full time for this project? A10. Project Superintendent, if qualified, may hold both duties. Superintendent may not hold both SSHO and QA/QC duties. Q11. Can a superintendent be a triple hat to cover the requirements of SSHO and QA/QC? A11. No. Q12. The header dates of this SOW are dated 11/18/2022. Please confirm this is a 2025 SOW requirement. A12. The SOW attached to the RFP is the most recent. Q13. Please verify the GOV anticipates asbestos in this project, the SOW does not speak to asbestos however the specs do at Section 02 82 11. A13. The VA expects no asbestos abatement as part of this project. Q14. In the SOW page 1 of Section 6 2.1 indicates approximately 4,650 sqft of space, would you consider adding 52.211-18 Variation of quantity to this solicitation? A14. 52.211-18 only applies to IDIQ contracts. Q15. Page 6 of 6 #18 Attachments: Attachment #1 SOW Seasonal influenza with vaccines : VHA Directive 1192.01 speaks to Health Care Personnel, Page 8(p) VA Contracting Officers: This section implies, VA contracting officers responsible for on-site HCP contract will inform the contractors about this directive and its requirements. However, this project is not an on-site contract for HCP. Section C page 3, indicated that flu season is between Dec 1 through March 31, please validate that is not a mandatory requirement. A15. VA confirms this is not an on-site HCP contract. Q16. Is the use of temporary plastic wall panels (such as STARC panels) acceptable to meet ICRA requirements? A16. Construction barriers shall be hard barriers and must be completed in a manner that prevents dust release. Barriers must be effectively affixed to floor and ceiling (or floor/roof deck above) and secure from movement or damage. The VA accepts STARC panels. Q17. Was an asbestos test done of the floor? Do you know when the flooring was installed? A17. The VA does not anticipate any asbestos containing materials, testing was conducted in April 2024. We do not know when the flooring was installed.

Full description on SAM.gov

Award Overview

Award Number

36C24126C0002

Award Amount (SAM.gov award notice)

$1.8M

Award Date

Nov 5, 2025

Awardee

Awardee UEI

C7QRJTNKJM69

Awardee CAGE Code

7UFX2

Awardee Address

BOURNE, MA 02532-8305, MA

Original Solicitation

Notice ID: 3f74e4dca9d64d17bdea185e8c29a0bc

Posted Date: Nov 5, 2025

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Diane C. Davis
Contract Specialist

Documents

Files (1)

  • 36C24126C0002_1.docx

    13 KBAdded in Award Notice version 3Posted
    Download

Lifecycle

  1. 3
    Version 3Award NoticeArchivedCurrent

    Z1DA--402-24-007 B200E Lobby Flooring

    Notice 3f74e4dca9d64d17bdea185e8c29a0bc on SAM.gov

Other notices for this solicitation

  1. Market ResearchRelated noticeMay 15, 2025

    Y1DA--402-24-007 B200E Lobby Flooring

    Notice a34d532f0bd348389b6e353bc07bc0c5 on SAM.gov

  2. SolicitationRelated noticeJun 13, 2025

    Y1DA--402-24-007 B200E Lobby Flooring

    Notice 619337e1cc8f4b56a6feafc02015809c on SAM.gov

  3. SolicitationRelated noticeJun 27, 2025

    Y1DA--402-24-007 B200E Lobby Flooring

    Notice faa73cfbb49446c1bcd74ef0eb0136ad on SAM.gov

  4. SolicitationRelated noticeJul 7, 2025

    Y1DA--402-24-007 B200E Lobby Flooring

    Notice 8231ca4c48cd4035a8b65ed92882281b on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

36C24125R0098

Archive Date

Feb 12, 2026

Office Address

TOGUS, ME, 04330