Notice ID: 5bb7a500a4a347938167a6b79040e307Combined Synopsis/SolicitationArchived
J045--Newington Boiler Plant Steam Header Valves Extension
Archived on June 11, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 10:00 AM EDT
- Posted
- May 20, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Service-Disabled Veteran-Owned Small Business Set Aside
- NAICS
- 238220: Plumbing, Heating, and Air-Conditioning Contractors
- Agency
- Department of Veterans Affairs
Notice details
- Office
- 241-NETWORK CONTRACT OFFICE 01 (36C241)
- Place of performance
- VAMC Newington, Newington, Connecticut, 06516
- Last updated
- Oct 29, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 36C24126Q0475
- Notice ID
- 5bb7a500a4a347938167a6b79040e307
Description
VA Connecticut Healthcare System Newington Campus Header Deficiencies Corrections Work Page 2 of 2 Combined Synopsis Solicitation Newington VAMC - Boiler Plant Steam Header Valves (i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. (ii) The solicitation number is 36C24126Q0475 and the solicitation is issued as a request for quotation (RFQ). (iii) A statement that the solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2026-01. (iv) This requirement is being issued as a SDVOSB set-aside. The associated NAICS 238220 and small business size standard is $19 million. (v) The Government intends to award a firm-fixed price award for Newington Boiler Plant Steam Header Valves. Please see the attached Statement of Work for full requirement details. Please complete the Price Schedule below and submit with the quote submission. (vi) The Contractor shall provide all resources necessary to provide Backflow Repairs IAW the attached (Statement of Work). Please see the attached SOW for full requirement details. (vii) The Place of Performance is West Haven VAMC as described per the (Statement of Work). (viii) Provision at 52.212-1, Instructions to Offerors -- Commercial, applies to this acquisition in addition to the following addenda s to the provision: 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998); 52.204-7 System for Award Management (OCT 2018); 52.204-16 Commercial and Government Entity Code Reporting (JUL 2016); 52.217-5 Evaluation of Options (JUL 1990); 852.252-70 Solicitation Provisions or Clauses Incorporated by Reference (JAN 2008) (ix) Provision at 52.212-2, Evaluation -- Commercial Items, applies to this requirement. Submission of Quotes: (1) Quotes shall be received on or before the date and time specified in Section (xv) of this solicitation. Note: Offers received after the due date and time shall not be considered. (2) Offerors shall submit their quotes electronically via email to Nathan.Langone@va.gov. (3) Questions: Questions shall be submitted to the Contracting Officer in writing via e-mail. Oral questions are not acceptable due to the possibility of misunderstanding or misinterpretation. (4) Quote Format: The submission should be clearly indexed and logically assembled in order of the evaluation criteria below. All pages of the quote shall be appropriately numbered and identified by the complete company name, date and solicitation number in the header and/or footer. Evaluation Process: Award shall be made to the best value, as determined to be the most beneficial to the Government. Please read each section below carefully for the submittals and information required as part of the evaluation. Failure to provide the requested information below shall be considered non-compliant and your quote could be removed from the evaluation process. Offeror quotes shall be evaluated under FAR Part 13.106-2(b) -- Evaluation of Quotations or Offers. Therefore, the Government is not obligated to determine a competitive range, conduct discussions with all contractors, solicit final revised quotes, and use other techniques associated with FAR Part 15. The Government shall award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation shall be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers: Price (Follow these instructions): Offeror shall complete Attachment 1 - Price Schedule, with offerors proposed contract line item prices inserted in appropriate spaces. Past Performance: Offeror shall utilize Attachment 2 Past Performance Worksheet to provide at least one (1) but no more than (3) references of work, similar in scope and size with the requirement detailed in the (Performance Work Statement). References may be checked by the Contracting Officer to ensure your company is capable of performing the Statement of Work. The Government also reserves the right to obtain information for use in the evaluation of past performance from any and all sources. Technical: The offeror s quote shall be evaluated to determine if the organization has the experience and capabilities to provide the requested services IAW the (Performance Work Statement) in a timely efficient manner. Contractor shall demonstrate their corporate experience and approach to meet all requirements stated in the (Performance Work Statement). Contractor shall demonstrate that their technicians meet the qualification standards stated in the (Performance Work Statement). If you are planning to sub-contract some or all of this work, please provide the name and address(s) of all subcontractor(s) (if applicable) and a description of their planned subcontracting effort. SAM: Interested parties shall be registered in System for Award Management (SAM) as prescribed in FAR Clause 52.232-33. SAM information can be obtained by accessing the internet at www.sam.gov or by calling 1-866-606-8220. Interested parties not registered in SAM in sufficient time to meet the VA s requirement will be ineligible to receive a government contract. This determination will be at the discretion of the Contracting Officer. VISTA: The VA utilizes VISTA to issue a purchase order and liquidate invoices. Failure to register in VISTA may result in exclusion from the issuance of a VA contract. This determination will be at the discretion of the Contracting Officer. Interested parties with no prior VA contracts can request a Form 10091 at any time. (x) Please include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications -- Commercial Items, with your offer via the SAM.gov website or a written copy. (xi) Clause 52.212-4, Contract Terms and Conditions -- Commercial Items (OCT 2018), applies to this acquisition in addition to the following addenda s to the clause: 52.204-16 Commercial and Government Entity Code Maintenance (JUL 2016); 52.219-6 Notice of Total Small Business Set-Aside; 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013); 852.203-70 Commercial Advertising (MAY 2008); 852.232-72 Electronic Submission of Payment Requests (NOV 2018) Subcontracting Commitments - Monitoring and Compliance This solicitation includes VAAR 852.215-70, Service-Disabled Veteran-Owned and Veteran-Owned Small Business Evaluation Factors, and VAAR 852.215-71, Evaluation Factor Commitments. Accordingly, any contract resulting from this solicitation will include these clauses. The contractor is advised in performing contract administration functions, the CO may use the services of a support contractor(s) to assist in assessing contractor compliance with the subcontracting commitments incorporated into the Information Protection and Non-Disclosure and Disclosure of Conflicts of Interest Agreement to ensure the contractor's business records or other proprietary data reviewed or obtained in the course of assisting the CO in assessing the contractor for compliance are protected to ensure information or data is not improperly disclosed or other impropriety occurs. Furthermore, if VA determines any services the support contractor(s) will perform in assessing compliance are advisory and assistance services as defined in FAR 2.101, Definitions, the support contractor(s) must also enter into an agreement with the contractor to protect proprietary information as required by FAR 9.505-4, Obtaining access to proprietary information, paragraph (b). The contractor is required to cooperate fully and make available any records as may be required to enable the CO to assess the contractor compliance with the subcontracting commitments. (xii) Clause at 52.212-5, Contract Terms and Conditions Required To Implement Statutes Or Executive Orders -- Commercial Items, applies to this acquisition and in addition to the following FAR clauses cited, which are also applicable to the acquisition: 52.204-10, 52.209-6, 52.219-6, 52.219-28, 52.222-3, 52.222-21, 52.222-26, 52.222-36, 52.222-50, 52.223-18, 52.232-33, 52.222-41, 52.222-43 (Wage Determination Applicable (Manchester 2015-4019 Rev 23 posted on beta.sam.gov) (xiii) All contract requirement(s) and/or terms and conditions are stated above. (xiv) The Defense Priorities and Allocations System (DPAS) and assigned rating are not applicable to this requirement. (xv) RFQ responses are due May 27, 2026 by 10:00 AM EST. RFQ responses must be submitted via email to: Nathan.Langone@va.gov, Hand deliveries shall not be accepted. (xvi) The POC of this solicitation is Nathan.Langone@va.gov ATTACHMENT 1 PRICE SCHEDULE ITEM NUMBER DESCRIPTION OF SERVICES QUANTITY UNIT UNIT PRICE AMOUNT Base Boiler Plant Steam Header Valves 1.00 JB __________________ __________________ GRAND TOTAL __________________ ATTACHMENT 2 PAST PERFORMANCE WORKSHEET 1. Name of Contracting Activity, Government Agency, Commercial Firm or other Organization: 2. Contracting Activity Address: 3. Contract Number: 4. Date of Contract Award: 5. Beginning Date of Contract: 6. Completion Date of Contract: 7. Contract Value: 8. Type of Contract: 9a. Technical Point of Contact: 9b. Contracting Point of Contact: Name: Name: Title: Title: Address: Address: Telephone: Telephone: Email: Email: 10. Place of Performance: 11. Description of Work (Use a continuation sheet if necessary): 12. List any commendations or awards received: 13. List of Major Subcontractors: ATTACHMENT 3 STATEMENT OF WORK NEWINGTON BOILER PLANT HEADER DEFICIENCIES CORRECTION BACKGROUND VA manages and maintains the operation and condition of facility level boiler to set standards and does so through Directive 1810 as well as compliance to all applicable codes, regulation and guidance. It is the intent of this project to support and maintain the condition and operation of the facility level boilers in compliance through ongoing inspections, cleaning, service, proper operation, etc. JUSTIFICATION VA Connecticut Healthcare System Newington Campus operates a high-pressure steam Boiler Plant System. The current header system and its associated valves need assessment and replacements so that it can be assured to operate most effectively. These items and their corrections ensure that the boilers are operating to standard and in compliance with VA Directive 1810, codes, regulations, etc.. PLACE OF PERFORMANCE The place of performance for this contract is VA Connecticut Healthcare System, located at Newington Campus, 555 Willard Avenue, Newington, CT 06111. PERIOD OF PERFORMANCE The Contract Time Period of Performance is 45 days from the contract award and Notice to Proceed (NTP). QUALIFICATIONS To be considered eligible for consideration, potential bidders shall have a field service representative located within 100 miles of the Newington Campus of the VA Connecticut Healthcare System. The Service Provider acting as a Prime with subcontracted labor shall meet this requirement. The Bidders shall provide, upon request, documentation of certification/training on the specific equipment under the terms of this contract. The Bidders shall be qualified to perform work on steam distribution systems to include industrial boiler plant equipment and have completed prior steam distribution work and/or inspection projects for VA Connecticut Healthcare System. The Service Provider shall have a minimum of three (3) years of related scope and work experience with commercial and industrial steam boiler and steam boiler component installation and repairs as well as all aspects of inspections, cleaning, calibration, and testing in compliance with and clear understanding of relevant codes and regulations. The Service Provider and/or assigned project staff members shall have industry standard certifications and qualifications to include but not limited to current OSHA certification (10 hours minimum/ 30 hours preferred) and equivalent qualifications associated with requirements herein. The Service Provider shall submit documentation of technical training and certifications for personnel performing all work under the terms of this contract for review and acceptance prior to the start of work on site. The Service Provider/ welders shall be certified and possess R-stamp certification. The Service Provider will be responsible for complying with the VA Connecticut Healthcare System policies for confined space, Lock Out Tag Out, all equipment, supplies, and external support to safely enter the confined space to document and investigate existing conditions, determine quantities, and confirm scope of work. The Service Provider shall submit documentation on technical training and certifications for personnel performing all work. The Contracting Officer (CO) and/or Contracting Officer s Representative (COR) specifically reserve the right to reject any of the Service Provider s personnel and refuse permission to work on the equipment outlined herein, based upon credentials provided. A mandatory pre-bid site visit is required. Bidders shall perform a pre-bid walkthrough at 8:30 a.m. on 05/13/2026 VACHS Newington CT. The meeting starts in the FMS Building/ Office for sign-in and for temporary day badge issuance, etc. Newington Campus - E Building 3, 3rd Floor SCOPE OF WORK The Service Provider shall furnish all labor, materials, equipment, tools, supervision, Safety considerations, LOTO procedures, clean up (daily and at the end of work with proper disposal of waste) and all incidentals to complete work for the services described in this document. The Service Provider shall submit a project schedule, work procedures, inspection procedures, testing procedures, all safety documentation, weld procedures, welders certifications, etc. for review and approval by VA Contracting Officer Representative (COR) and Safety Office before the start of work on site. If applicable, the Service Provider shall develop and submit an abatement plan including all personnel certifications and training records before the start of work on site. Normal scheduled work shall occur between the hours of; 7:00 a.m. and 5:00 p.m. Monday Friday as coordinated with COR. All off-normal scheduled work shall be communicated and coordinated with CO and COR a minimum of ten (10) working days prior to need. No work shall be performed on Federal Holidays unless an emergency status has been indicated and/or authorized by the Contracting Officer. US Federal Holidays: New Year s Day Martin Luther King Jr. Day President s Day Memorial Day Juneteenth Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day VA Connecticut Healthcare System West Haven Backflow Repairs Page 2 of 2 Description of Services: The project will include but not be limited to the following: Remove and replace valves as indicated in snip clips and per field review with Plant Supervisor and COR to verify count (x11), locations and setup. All Valves indicated to be replaced with new, Boiler #3 header valve to be replaced with new, blanked and LOTO. 9 valves only shall be provided by the facility. Contractor to procure x2 - 4 valves and all required hardware nuts, bolts, gaskets, etc. and install accordingly per code, regs. etc. General Site Information (valve locations): All elevated valves will be installed and set up with chain wheels and pull chains where access to valves are required from grade. Hammer blow chain wheels shall be installed to aid in opening and closing stuck valves. Chains shall be made safe for passage and will be set up, so they do not interfere with one another. All isolation of high-pressure steam lines required double inline valve installation (where only 1 may exist at this time). Review with Plant Supervisor and COR required locations. Insulation, flow indicators, labeling, color coding, tags, etc. Insulations for valve bodies with be serviceable type insulation that can be installed and removed with Velcro straps. In addition, the contractor shall: Check-in with the VACT Boiler Plant Supervisor at the start of each workday. Provide a final comprehensive report on repairs and testing of deficient devices. Performed and complete work per schedule that is approved in advance. Dates and times of work shall be coordinated between the Contractor and VA Contracting Officer to minimize impact on boiler plant operations. The Contract shall be completed within indicated days of the award. If any portion of the Contract cannot be completed within this period, the Contractor and VA Contracting Officer shall determine a reasonable period of performance for the specified portion within ten (10) Calander Days of award to modify for full compliance. The Service Provider shall schedule and coordinate all work with VA COR, Utilities Supervisor, and Boiler Plant Supervisor. All LOTO requests and procedures shall follow the VA Connecticut Healthcare System Medical Center Policy 138-075. Coordinate Hot Work permit requests with VA Connecticut Healthcare System Safety Office. Coordinate all placement and removal of Lock Out Tag Out devices for any energy sources with the VA COR/Maintenance & Operations. All Confined Space entries shall follow the VA Connecticut Healthcare System Standard Operating Procedure Confined Space SOP-SO-010. The VACHS confined space acknowledgement and permit is required to be completed by qualified individuals identified to perform entry into any confined space and will be coordinated with the VACHS Safety & Outage Coordinator and VACHS Safety Representative on site. Protect all equipment in place during replacement activities. Equipment considered necessary to accomplish all the work required by this contract includes but is not limited to equipment required for metal work, welding, inspection, testing, rigging & handling, de-watering, containment, and cleaning of any debris resulting from this work. In accordance with VHA Operational Alert and Guidance, NO cast iron fittings and pipe components (valves, steam traps, etc.) shall be used. Reference VHA Directive 1810(1) as amended on September 11, 2018: 5.a(1) and 5.b(1). ASTM A193 bolts shall be utilized and replace any ASTM A307 Bolts at locations of steam piping, flanges, gaskets, and other hardware where piping replacements are included within this scope of work. Reference Veterans Health Administration (VHA) Master Specifications for Hydronic Piping (Specification 23 22 13) and Steam and Condensate Heating Piping (Specification 23 22 13) where applicable. The repair of existing cast iron fittings or pipe components is permissible in specific instances but must be reported and coordinated with the CO and COR for approval before starting the work through submittal process with justification as necessary. All new steam and condensate lines shall be Schedule 80. All new steam and condensate lines that utilize valves to isolate or divert a medium shall be installed new as a double in series valve system (except for a drain line valve). Where the option exists to utilize welded vs threaded distribution, welded is the required option with connection to weld neck flanges and per use of metal jacketed gaskets. Alternate may be considered but not allowed unless authorized by the COR. Repairs and any modifications shall be in full compliance with American Society of Mechanical Engineers (ASME) and National Board Inspection Code (NBIC). The Service Provider shall perform an inspection report of all repairs, corrections, and testing with photographs and other documentation necessary to confirm information within the report. All welding work shall be completed by certified welders (submit certifications for review and acceptance to the COR prior to any work) and must possess R-stamp certification. All weld tests shall meet standard per code specifications ASME Section V requirements for nondestructive examination and ASME Section VIIII rules for construction of pressure vessel. Finish work shall include new insulation with R-factor and type to match existing, fiberglass with white paper wrap on lines, removable Velcro type fitting booths, color coded for medium, brass tags valves, medium labels on insulation and flow indicators. SUBMITTALS/DELIVERABLES The Service Provider shall furnish all submittal item documentations (with final dispositions) and final documentation report with all tests, photos, corrections made within fourteen (14) business days after work is completed. All submittals shall be provided to the VA O&M Section for Information Sharing Only and courtesy review. Proper equipment selection and timely procurement shall remain the responsibility of the Service Provider. The Service Provider shall furnish all material certifications for any replacement parts used. The Service Provider shall furnish a waste manifest as required. SPECIAL INSTRUCTIONS Service Provider Check-in: All employees of the Service Provider shall comply with VA Security Management Program and obtain permission from the VA Police for access to restricted and unauthorized access areas. Upon arrival, the Service Provider shall sign-in at FMS Office and receive a temporary identification badge prior to performing services at VA Connecticut Healthcare System. The Service Provider shall wear visible identification always displaying the name and company ID while on site. All site visits shall be coordinated with the VA COR or assigned POC. Per Directive 1805, smoking, vaping, and smokeless tobacco are prohibited on the grounds of VA facilities, including in vehicles. This Directive applies to all Service providers and their employees. No photography of VA premises is allowed without the written permission of the contracting officer. Patients and staff are not to be photographed at any time. Parking for Service Provider and employees shall be in designated areas only. The Service Provider shall coordinate with VA COR. The Service Provider shall confine all operations (including storage of materials) on government premises to areas authorized or approved by the VA Contracting Officer. The Service provider shall confine all operations (including storage of materials) on government premises to areas authorized or approved by the VA Contracting Officer. The Service provider shall hold and save the government, its officers, and agents, free and harmless from liability of any nature occasioned by the Service provider s performance. Working space and space available for storing materials shall be as determined by the COR. Workers are subject to the rules of the Medical Center applicable to their conduct. Execute work in such a manner as to reduce impacts with work being done by others. Billing: Provide COR with a report or statement of work completed and include statements with request for payment. The statement should include service completed and the date each service item was completed. Labor charges shall be billed hurly, and any unused labor totals will be credited back to the VA Medical Center on the next billing cycle, upon receipt of the service report. Safety Codes / Certification / Licensing: Environmental abatement work, if necessary and required per SOW, is to be performed by Service Provider under supervision and monitoring for the VA by a Certified Industrial Hygienist. If suspected ACM is discovered, reach out immediately to the VA Contracting Officer and Contracting Officer Representative. The Service Provider shall comply with all codes as described above, as well as codes customarily applied in VA construction jobs such as NFPA fire code, OSHA, VA Design Guides, etc. Labs used by the Service Provider shall be licensed as required by any applicable governing agencies, and their certifications and licenses shall be included in the reports. Travel: Service Provider and/or subcontractors will travel from their place of business to the VA Connecticut Healthcare System and park, access and/or work in authorized areas only. NARA Records Management Requirements The following standard items relate to records generated in executing this contract: Citations to pertinent laws, codes and regulations such as 44 U.S.C. Chapter 21, 29, 31, and 33; Freedom of Information Act (5 U.S.C. 552); Privacy Act (5 U.S.C. 552a); 36 CFR Part 1222 and Part 1228. The Contractor shall treat all deliverables under the contract as the property of the U.S. Government for which the Government Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. The Contractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government IT equipment and/or Government records. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected by the Freedom of Information Act. The Contractor shall not create or maintain any records containing any Government Agency records that are not specifically tied to or authorized by the contract. The Government Agency owns the rights to all data/records produced as part of this contract. The Government Agency owns the rights to all electronic information (electronic data, electronic information systems, electronic databases, etc.) and all supporting documentation created as part of this contract. The Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data. The Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format [paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.] or state of completion [draft, final, etc.]. No disposition of documents will be allowed without the prior written consent of the Contracting Officer. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage, or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the agency records schedules. The Contractor is required to obtain the Contracting Officer s approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under or relating to this contract. The Contractor (and any sub-contractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information.
Award Overview
Possible prior contract
Inferred, not confirmedInferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.
Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.
Contacts
Contracting Officer
Primary Contact
Documents
Lifecycle
- 1Version 1Combined Synopsis/SolicitationArchived
J045--Newington Boiler Plant Steam Header Valves
- 3Version 3Combined Synopsis/SolicitationArchivedCurrent
J045--Newington Boiler Plant Steam Header Valves Extension
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Page 2 of 2 Combined Synopsis Solicitation West Haven VAMC Steam Station Replacement (i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. (ii) The solicitation number is 36C24127Q0058 and the solicitation is issued as a request for quotation (RFQ). (iii) A statement that the solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2026-05. (iv) This requirement is being issued as a SDVOSB set-aside. The associated NAICS 238220 and small business size standard is $16.5 million. (v) The Government intends to award a firm-fixed price award for Steam Station Replacement at West Haven VAMC. Please see the attached Performance Work Statement for full requirement details. Please complete the Price Schedule below and submit with the quote submission. (vi) The Contractor shall provide all resources necessary to provide Steam Station Replacement IAW the attached (PerformancevWork Statement). Please see the attached PWS for full requirement details. (vii) The Place of Performance is West Haven VAMC as described per the (Performance Work Statement). (viii) Provision at 52.212-1, Instructions to Offerors -- Commercial, applies to this acquisition in addition to the following addenda s to the provision: 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998); 52.204-7 System for Award Management (OCT 2018); 52.204-16 Commercial and Government Entity Code Reporting (JUL 2016); 52.217-5 Evaluation of Options (JUL 1990); 852.252-70 Solicitation Provisions or Clauses Incorporated by Reference (JAN 2008) (ix) Provision at 52.212-2, Evaluation -- Commercial Items, applies to this requirement. Site Visit: 950 Campbell Ave, West Haven CT 06516 Bidders shall perform a pre-bid walkthrough at 8:30 a.m. on November 14, 2026 and plan to meet in the Building 16 Boiler Plant at the VA Medical Center West Haven and report for a safety briefing. Bidders shall be responsible to comply with the VA Connecticut Healthcare System Medical Center Policy 138-075 for Lock-Out-Tag-Out and VA Connecticut Healthcare System Confined Space Entry Program SOP SO-010.   Please post and include MCP 138-075 Lock-Out-Tag-Out Policy and Confined Space Entry Program. Bidders are required to comply with this policy and SOP. Submission of Quotes: (1) Quotes shall be received on or before the date and time specified in Section (xv) of this solicitation. Note: Offers received after the due date and time shall not be considered. (2) Offerors shall submit their quotes electronically via email to tnauri.woodbridge@va.gov. (3) Quote Format: The submission should be clearly indexed and logically assembled in order of the evaluation criteria below. All pages of the quote shall be appropriately numbered and identified by the complete company name, date and solicitation number in the header and/or footer. Evaluation Process: Award shall be made to the best value, as determined to be the most beneficial to the Government. Please read each section below carefully for the submittals and information required as part of the evaluation. Failure to provide the requested information below shall be considered non-compliant and your quote could be removed from the evaluation process. Offeror quotes shall be evaluated under FAR Part 13.106-2(b) -- Evaluation of Quotations or Offers. Therefore, the Government is not obligated to determine a competitive range, conduct discussions with all contractors, solicit final revised quotes, and use other techniques associated with FAR Part 15. The Government shall award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation shall be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers: Price (Follow these instructions): Offeror shall complete Attachment 1 - Price Schedule, with offerors proposed contract line item prices inserted in appropriate spaces. Past Performance: Offeror shall utilize Attachment 2 Past Performance Worksheet to provide at least one (1) but no more than (3) references of work, similar in scope and size with the requirement detailed in the (Performance Work Statement). References may be checked by the Contracting Officer to ensure your company is capable of performing the Statement of Work. The Government also reserves the right to obtain information for use in the evaluation of past performance from any and all sources. Technical: The offeror s quote shall be evaluated to determine if the organization has the experience and capabilities to provide the requested services IAW the (Performance Work Statement) in a timely efficient manner. Contractor shall demonstrate their corporate experience and approach to meet all requirements stated in the (Performance Work Statement). Contractor shall demonstrate that their technicians meet the qualification standards stated in the (Performance Work Statement). If you are planning to sub-contract some or all of this work, please provide the name and address(s) of all subcontractor(s) (if applicable) and a description of their planned subcontracting effort. SAM: Interested parties shall be registered in System for Award Management (SAM) as prescribed in FAR Clause 52.232-33. SAM information can be obtained by accessing the internet at www.sam.gov or by calling 1-866-606-8220. Interested parties not registered in SAM in sufficient time to meet the VA s requirement will be ineligible to receive a government contract. This determination will be at the discretion of the Contracting Officer. VISTA: The VA utilizes VISTA to issue a purchase order and liquidate invoices. Failure to register in VISTA may result in exclusion from the issuance of a VA contract. This determination will be at the discretion of the Contracting Officer. Interested parties with no prior VA contracts can request a Form 10091 at any time. (x) Please include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications -- Commercial Items, with your offer via the SAM.gov website or a written copy. (xi) Clause 52.212-4, Contract Terms and Conditions -- Commercial Items (OCT 2018), applies to this acquisition in addition to the following addenda s to the clause: 52.204-16 Commercial and Government Entity Code Maintenance (JUL 2016); 52.219-6 Notice of Total Small Business Set-Aside; 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013); 852.203-70 Commercial Advertising (MAY 2008); 852.232-72 Electronic Submission of Payment Requests (NOV 2018) Subcontracting Commitments - Monitoring and Compliance This solicitation includes VAAR 852.215-70, Service-Disabled Veteran-Owned and Veteran-Owned Small Business Evaluation Factors, and VAAR 852.215-71, Evaluation Factor Commitments. Accordingly, any contract resulting from this solicitation will include these clauses. The contractor is advised in performing contract administration functions, the CO may use the services of a support contractor(s) to assist in assessing contractor compliance with the subcontracting commitments incorporated into the Information Protection and Non-Disclosure and Disclosure of Conflicts of Interest Agreement to ensure the contractor's business records or other proprietary data reviewed or obtained in the course of assisting the CO in assessing the contractor for compliance are protected to ensure information or data is not improperly disclosed or other impropriety occurs. Furthermore, if VA determines any services the support contractor(s) will perform in assessing compliance are advisory and assistance services as defined in FAR 2.101, Definitions, the support contractor(s) must also enter into an agreement with the contractor to protect proprietary information as required by FAR 9.505-4, Obtaining access to proprietary information, paragraph (b). The contractor is required to cooperate fully and make available any records as may be required to enable the CO to assess the contractor compliance with the subcontracting commitments. (xiii) All contract requirement(s) and/or terms and conditions are stated above. (xiv) The Defense Priorities and Allocations System (DPAS) and assigned rating are not applicable to this requirement. (xv) RFQ responses are due December 3, 2026 by 10:00 AM EST. RFQ responses must be submitted via email to: tnauri.woodbridge@va.gov. Hand deliveries shall not be accepted. (xvi) The POC of this solicitation is Tnauri.Woodbridge@va.gov) ATTACHMENT 1 PRICE SCHEDULE ITEM NUMBER DESCRIPTION OF SERVICES QUANTITY UNIT UNIT PRICE AMOUNT Base REPLACE BUILDING 2 STEAM STATION 1.00 JB __________________ __________________ GRAND TOTAL __________________ ATTACHMENT 2 PAST PERFORMANCE WORKSHEET 1. Name of Contracting Activity, Government Agency, Commercial Firm or other Organization: 2. Contracting Activity Address: 3. Contract Number: 4. Date of Contract Award: 5. Beginning Date of Contract: 6. Completion Date of Contract: 7. Contract Value: 8. Type of Contract: 9a. Technical Point of Contact: 9b. Contracting Point of Contact: Name: Name: Title: Title: Address: Address: Telephone: Telephone: Email: Email: 10. Place of Performance: 11. Description of Work (Use a continuation sheet if necessary): 12. List any commendations or awards received: 13. List of Major Subcontractors: ATTACHMENT 3 STATEMENT OF WORK STATEMENT OF WORK REPLACE BUILDING 2 STEAM STATION VA CONNECTICUT HEALTHCARE SYSTEM (VACHS) VA MEDICAL CENTER WEST HAVEN 950 CAMPBELL AVENUE WEST HAVEN, CT 06516 BACKGROUND VA Connecticut Healthcare System has identified existing steam pressure reducing stations that are currently non-functional and require complete replacement (like in kind) located in Building 2, Confined Space 15 within Mechanical Room G-139. JUSTIFICATION Steam station failure has been identified to be impacting inpatient and critical care areas during winter months. Heating restoration to critical patient care areas is essential to compliance with health and safety standards, patient care, and prevention of domestic and fire suppression piping failures. PLACE OF PERFORMANCE The place of performance for this contract is VA Connecticut Healthcare System, West Haven VA Medical Center located at 950 Campbell Avenue; West Haven, CT 06516. PERIOD OF PERFORMANCE The Contract Time Period of Performance will be 180 days upon contract award and Notice to Proceed (NTP). QUALIFICATIONS To be considered eligible for consideration, potential bidders shall have a field service representative located within 100 miles of the West Haven Campus of the VA Connecticut Healthcare System. Bidders shall provide upon request, documentation of certification/training on the specific equipment under the terms of this contract. Bidders shall be qualified to perform work on steam distribution systems to include industrial boiler plant equipment and have completed prior steam distribution work and/or inspection projects for VA Connecticut Healthcare System. Service Provider shall have a minimum of three (3) years of related scope and work experience with commercial and industrial steam boiler and steam boiler component installation and repairs as well as all aspects of inspections, cleaning, calibration, and testing in compliance with and clear understanding of relevant codes and regulations. Service Provider and/or assigned project staff members shall have industry standard certifications and qualifications to include but not limited to current OSHA 30 and OSHA 10 certification and equivalent qualifications associated with requirements herein. Service Provider shall submit documentation of technical training and certifications for personnel performing all work under the terms of this contract for review and acceptance prior to the start of work on site. Bidders shall be evaluated on past performance, technical capability, and financial capability to perform the requirements of this work. A full boiler plant steam outage will be conducted prior to the start of this work. Work is expected to be completed over the duration of two consecutive back to back boiler plant steam outages occurring Saturday 7:00 a.m. through Sunday 4:00 p.m. and will be coordinated between March 01, 2027 and May 31, 2027 and with a 30 day notice. Mandatory Pre Bid: Bidders shall perform a pre-bid walkthrough at 8:30 a.m. on November 14, 2026 and plan to meet in the Building 16 Boiler Plant at the VA Medical Center West Haven and report for a safety briefing. Bidders shall be responsible to comply with the VA Connecticut Healthcare System Medical Center Policy 138-075 for Lock-Out-Tag-Out and VA Connecticut Healthcare System Confined Space Entry Program SOP SO-010. During the pre-bid site visit, each bidder shall thoroughly inspect the work area and familiarize themselves with all existing conditions affecting the work. At minimum, bidders shall verify: Existing steam pipe sizes. Existing 1/3 and 2/3 station pipe sizes. Existing regulator sizes. Existing valve sizes. Existing flange sizes, types, ratings, and configurations. Existing strainer sizes and configurations. Existing safety relief valve sizes and configurations. Existing pressure gauge arrangements. Existing condensate and drip piping. Existing support arrangements. Existing piping elevations. Available straight-pipe distances upstream and downstream of regulators. Existing cross tee configuration. Available physical space for the new steam station arrangement. Access into and out of the pit/crawl space. Confined-space access conditions. Rigging requirements. Material handling requirements. Removal path for demolished materials. Installation path for new materials and equipment. Working clearances. Existing interference with piping, structure, ductwork, electrical, equipment, or other utilities. Equipment access requirements. Existing insulation. Existing asbestos-containing or suspect materials. Flanges containing square-head bolts. Existing pipe supports and structural attachment points. Required temporary supports. Required permanent supports. Required access for future service and adjustment. Pressure gauge visibility from outside the pit/crawl space. Conditions affecting off-hours work. Conditions affecting the scheduled steam shutdown. All pipe sizing, valve sizing, equipment sizing, dimensions, elevations, quantities, access requirements, and existing conditions shall be field verified by the bidder prior to submitting their proposal. Dimensions, sizes, and quantities contained within this Scope of Work are intended to describe the general work and shall not relieve the bidder from field verification. The bidder s submission of a proposal shall constitute acknowledgement that the bidder has inspected the existing conditions, understands the location and complexity of the work, and has included the work reasonably apparent or discoverable during the site visit within their bid price. All Confined Space Entries shall be in compliance with the VA Connecticut Healthcare System Standard Operating Procedure Confined Space SOP-SO-010. Work shall be conducted during WHEN hours. A dedicated steam outage will be scheduled to perform this work to be included. SCOPE OF WORK The Service Provider shall furnish all labor, materials, equipment, tools, supervision, and incidentals to complete work for the services described in this document. The intent of this Scope of Work is to provide a complete turnkey installation. The Service Provider shall furnish all labor, supervision, engineering/coordination, materials, equipment, tools, rigging, temporary protection, safety equipment, permits, testing, startup, commissioning, disposal, and incidental work required to compete the installation whether or not every individual fitting, component, support, connection, or accessory is specifically identified within this Scope of Work. The Service Provider shall submit a project schedule, work procedures, inspection procedures, testing procedures, all safety documentation, weld procedures, welder s certifications, etc. for review and approval by VA Contracting Officer Representative and Safety Office before work commences on site. Description of Services: Service Provider shall schedule and coordinate all work with VA COR, Utilities Supervisor, and Boiler Plant Supervisor. All LOTO request and procedures shall be in compliance with the VA Connecticut Healthcare System Medical Center Policy 138-075. Coordinate Hot Work permit requests with VA Connecticut Healthcare System Safety Service. Coordinate all placement and removal of Lock Out Tag Out devices for any energy sources with the VA COR/Maintenance & Operations. All Confined Space Entries shall be in compliance with the VA Connecticut Healthcare System Standard Operating Procedure Confined Space SOP-SO-010. Coordinate Hot Work Permit with VA Connecticut Healthcare System Occupational Health/Safety Service. Complete Infection Control Risk Assessment (ICRA) and coordinate with COR and Medical Center Infection Prevention for approval. Furnish and install required barrier(s) as required per the Infection Control Risk Assessment (ICRA). Protect all equipment in place during replacement activities. In accordance with VHA Operational Alert and Guidance, NO cast iron fittings and pipe components (valves, steam traps, etc.) shall be used. Reference VHA Directive 1810(1) as amended on September 11, 2018: 5.a(1) and 5.b(1). ASTM A193 bolts shall be utilized and replace any ASTM A307 Bolts at locations of steam piping, flanges, gaskets, and other hardware where piping replacements are included within this scope of work. Reference Veterans Health Administration (VHA) Master Specifications for Hydronic Piping (Specification 23 22 13) and Steam and Condensate Heating Piping (Specification 23 22 13) where applicable. Repair of existing cast iron fittings or pipe components is permissible in specific instances but must be reported and coordinated with the CO and COR for approval before starting the work through submittal process with justification as necessary. All new steam and condensate line shall be Schedule 80. All new steam and condensate lines that utilize valves to isolate or divert a medium shall be installed new as a double in series valve system. Where the option exists to utilize welded vs threaded. Tag all existing and new valves and label new piping and components replaced as part of this scope of work. Service provider shall perform all acceptance testing. Facilities Management Service shall designate a staff member to witness acceptance testing of all components and completed work. Service provider shall clean up work area and all debris. Service provider shall provide a complete, fully operational, code-compliant replacement of the existing 1/3 and 2/3 steam pressure reducing stations located within the existing crawl space in Building 2 at the West Haven VA Medical Center. Existing Conditions: The existing steam pressure reducing stations are currently non-functional and require complete replacement. Known existing conditions include: Existing 2-inch steam pressure reducing station is non-functional. Existing 2-1/2-inch steam pressure reducing station is non-functional. Both existing steam regulators are to be replaced. Existing steam stations are not presently installed in accordance with the required regulator manufacturer's piping arrangement. Existing cross tee is leaking and shall be removed and replaced. Existing pressure gauge arrangement does not allow convenient observation from outside the pit/crawl space. Existing downstream safety relief valves shall be replaced. Existing flanged connections utilizing square-head bolts have been identified as containing or potentially containing asbestos-containing material. Work is located within a restricted-access pit/crawl-space environment. These descriptions are not intended to represent every existing field condition. The bidder is responsible for identifying additional conditions that are visible, reasonably apparent, or reasonably discoverable during the mandatory pre-bid walk. Steam Pressure Reducing Station Replacement: Service provider shall remove existing 1/3 and 2/3 steam pressure reducing stations as required to accommodate the new installation. Service provider shall furnish and install new pressure reducing stations serving the exiting steam system. Remove existing steam regulators. Remove associating piping necessary to properly rebuild the stations. Remove the leaking cross tee. Remove existing components that prevent compliance with manufacturer required piping arrangements. Furnish and install new steam regulators. Furnish and install new upstream and downstream piping. Furnish and install new fittings and tees. Furnish and install new flanges, gaskets, and flange bolting. Furnish and install unions or breakable connections where appropriate. Furnish and install strainers where required. Furnish and install isolation valves where required by the station configuration. Furnish and install condensate/drip provisions where required. Furnish and install required pipe supports. Modify or replace of existing pipe supports as required. Furnish and install temporary support of existing piping during demolition and installation. Reconnect all existing steam piping. Furnish and install all miscellaneous piping modifications necessary for the completed installation. Steam stations shall be installed in accordance with the selected steam regulator manufacturer s current installation requirements. The contractor shall verify and provide the manufacturer s required: Upstream straight-pipe distance. Downstream straight-pipe distance. Valve arrangement. Strainer arrangement. Pressure sensing arrangement. Drip-leg arrangement. Condensate removal provisions. Gauge locations. Bypass configuration, if required. Regulator orientation. Service clearances. Maintenance clearances. Safety relief requirements. Existing conditions shall not be used as justification for installing the new regulators contrary to manufacturer requirements. Where existing piping must be reconfigured to meet manufacturer requirements, the required reconfiguration shall be included in the base bid. Equipment and Pipe Sizing: All equipment and piping sizes shall be verified prior to bidding and again prior to procurement. The contractor shall verify: Existing pipe sizes. Required regulator inlet size. Required regulator outlet size. Required regulator capacity. Required steam pressure. Required downstream pressure. Required steam flow. Safety valve capacity. Safety valve set pressure. Strainer sizing. Valve sizing. Flange pressure class. Pipe schedule. Applicable steam pressure and temperature ratings. The contractor shall provide steam regulators properly sized for the actual system operating conditions. The contractor shall not assume that the existing regulator size is automatically the correct replacement size. Where required, the successful bidder shall coordinate with the regulator manufacturer or authorized representative to confirm the proper regulator selection. Manufacturer Requirements Prior to installation, the contractor shall provide manufacturer documentation demonstrating that the proposed steam regulators are suitable for the application. The completed station shall comply with all manufacturer requirements. Pressure Gauges Provide new pressure gauge arrangements servicing the steam pressure reducing stations. Pressure gauges shall be located and piped so that normal operating pressures can be clearly viewed from outside confined space number 15 without requiring personnel to enter the confined space for routine pressure observation. Steam-rated gauge. Gauge siphon. Isolation valve. Piping and fittings. Supports. Identification. Appropriate protection from damage. Gauge piping shall be securely supported and arranged so that it does not create an obstruction or interfere with access. Gauge locations shall be coordinated and approved prior to final installation. Safety Relief Valves Remove and replace the existing downstream steam safety relief valves associated with the pressure reducing stations. Provide new safety relief valves properly selected and sized for the actual system conditions. The contractor shall verify: Required relieving capacity. Inlet pressure. Downstream operating pressure. Safety valve set pressure. Valve inlet size. Valve outlet size. Discharge pipe size. Required discharge arrangement. Safety valves and discharge piping shall comply with applicable codes, VA requirements, and manufacturer requirements. Modify, replace, extend, support, or reconnect the existing safety valve discharge piping as necessary for a complete installation. The contractor shall include all piping modifications required between the new safety valves and the existing approved discharge termination. Cross Tee Replacement Remove the existing leaking cross tee. Provide new steam-rated piping and fittings necessary to eliminate the existing leaking tee and provide a permanent repair. The bidder shall verify the existing tee size, orientation, connections, and piping arrangement during the mandatory pre-bid walkthrough. All associated piping modifications required to complete this work shall be included. Pipe Supports Provide all new or modified supports required for the new piping arrangement. Supports shall be suitable for steam service and shall account for: Pipe weight Valve weight Regulator weight Strainer weight Safety valve weight Thermal expansion Operating loads Maintenance loads Existing equipment shall not be improperly used as a pipe support. Any temporary supports necessary during demolition and installation shall be included. Insulation Remove existing insulation as necessary to perform the work. Provide new insulation at all disturbed or newly installed piping after successful testing and startup. New insulation shall match the applicable VA specification requirements for steam service. All damaged insulation associated with the contractor s work shall be repaired or replaced. Asbestos Abatement Existing flanged connections utilizing square-head bolts have been identified as Potential Asbestos Containing Material (PACM). Bidders shall make proper required abatement notification(s), obtain required permit(s) and licensed asbestos abatement professional and VPIH services for air quality monitoring to perform removal of flanges with PACM. Wrap existing flanges for removal and wet cut existing piping on each side of flange to dismantle in-tact flange. Dispose of flanges as ACM. Abatement work shall meet State of Connecticut and local jurisdiction requirements for Asbestos Abatement. Rigging and Material Handling: The contractor shall include all rigging and material handling required to remove existing equipment and install new equipment. The bidder shall determine the appropriate means and methods during the pre-bid inspection. Restrictions associated with equipment access or material movement that are visible or reasonably discoverable during the pre-bid walk through shall be included in the bid. Testing: Following installation, test all newly installed or modified piping and equipment in accordance with applicable codes, VA specifications, and manufacturer requirements. Testing shall include as applicable: Pressure testing Leak testing Flange inspection Valve inspection Regulator inspection Gauge verification Safety valve verification Repair any leaks or deficiencies associated with the new work at no additional cost to the government. Startup and Commissioning: Following completion of the installation: Start the steam system in coordination with the VA Maintenance & Operations Supervisor and Boiler Plant Supervisor. Verify proper regulator operation. Adjust regulators to the required operating pressures. Set the 1/3 station. Set the 2/3 station. Verify proper transition and operation between the two regulators where applicable. Verify downstream pressures. Verify gauge readings. Verify valve operation. Verify safety valve installation. Verify proper condensate drainage. Inspect all new piping and connections for leakage. Make final adjustments required for proper system operation. The steam station shall not be considered complete until both stations are demonstrated to be operational and accepted by the VA COR and Contracting Officer. VA Specifications and Code Compliance: All materials and workmanship shall comply with the applicable VA project specifications, including applicable VA Division 23 requirements, as identified by the project scope. Materials: All materials shall be new unless specifically approved otherwise. Materials shall be properly rated for steam service, system pressure, system temperature and applicable pressure class. Substitutions shall not be made without approval. Demolition and Disposal Remove all demolished and discarded materials associated with this work from the project site. Dispose of materials legally at an approved facility and furnish a waste manifest as required by Local, Federal, and VA requirements and regulations. The work area shall be broom-clean and free of construction debris following completion. Protection of Existing Conditions: The contractor shall protect all existing facilities, equipment, piping, structure, and finishes adjacent to the work. Any damage caused by the contractor shall be repaired at the contractor s expense. The bidder shall include reasonable temporary protection required to perform the work. Bidder Responsibility for Complete Scope: The bidder is responsible for providing a complete turnkey price based on: This Scope of Work Mandatory Site Inspection Existing Field Conditions Applicable VA Requirements Applicable Codes Manufacturer installation requirements Proper methods of constructing assemblies associated with the Scope of Work. The bidder shall include all miscellaneous and incidental work reasonably required to provide a complete and operational installation. The absence of an individual fitting, spool piece, support, gasket, bolt, valve, connection, accessory, rigging item, or similar incidental component from the written Scope of Work shall not constitute grounds for additional compensation when that item is reasonably necessary to complete the described work. Bid Clarifications and Exceptions: Any ambiguity, discrepancy, conflict, unusual condition, or concern identified by a bidder shall be submitted in writing prior to bid submission to the VA Contracting Officer. Any requested exclusions or exceptions shall be clearly identified in the bid. Failure to identify an exception shall indicate that the bidder has included the requirement within their base price. The successful bidder shall not rely upon assumptions that contradict conditions observable during the mandatory site walk or the requirements contained in this Scope of Work. SUBMITTALS/DELIVERABLES Service provider shall furnish all submittal item documentation with final dispositions and final documentation report with all tests, photos, and work completed within 10 business days following completion of work. Service provider shall furnish all material certifications for any replacement parts used. Service provider shall furnish a waste manifest as required. SPECIAL INSTRUCTIONS All service provider personnel, sub-service providers and representatives visiting VA sites will be required to sign in upon arrival at Building 15 and/or retain a temporary VA badge. Each visiting individual be required to enter their name, their company s name, VA project title, reason for visit, and the times of arrival and departure. Arrangements for after normal hour working site visits must be made in advance and during normal working hours. General: The Contracting Officer reserves the right to terminate any services, without payment for services completed, if such services are not needed or are not being adequately completed. Approved Plans and Permits: Prior to the start of work, submit to VA copies of all required permits. Site Visits: Day to day project administration will be performed by the COR. Periodic reviews, tests, and other field observation by the Government are not to be interpreted as superintendence nor as resulting in any approval of the service provider s apparent progress toward meeting the Government s objectives; but are intended to discover any information that the Contracting Officer may be able to call to the service provider s attention to prevent costly misdirection of effort. The service provider shall remain responsible for constructing, operating, and maintaining the site in full accordance if the requirements of this solicitation. The service provider shall provide VA with a copy of all inspection reports for inspections conducted by local, regional, and state code authorities from the start of work through issuance of the certificate of completion. The service provider shall develop and provide to the VA the following: Safety Plan: The service provider shall produce work in accordance with the latest editions of all applicable DVA guidelines (e.g. Construction Standards, Master Specifications, Standard Details, Special Design Criteria to meet Hospital Joint Commission (JCAHO) requirements), NFPA, Federal and State codes pertinent to the project scope. All applicable personnel on site are required to obtain an Occupational Safety and Health Administration (OSHA) 10 hour construction certification, and the site competent person for the service provider must obtain an OSHA 30 hour construction certification. Per VA Directive 1805, smoking vaping, and smokeless tobacco are prohibited on the grounds of VA facilities, including in vehicles. This Directive applies to all Service providers and their employees. No photography of VA premises is allowed without written permission of the contracting officer. Patients and staff are not to be photographed at any time. Parking for Service provider and its employees shall be in designated areas only. Service provider to coordinate with COR. The Service provider shall confine all operations (including storage of materials) on government premises to areas authorized or approved by the VA Contracting Officer. The Service provider shall hold and save the government, its officers, and agents, free and harmless from liability of any nature occasioned by the Service provider s performance. Working space and space available for storing materials shall be as determined by the COR. Workers are subject to the rules of the Medical Center applicable to their conduct. Execute work in such a manner as to reduce impacts with work being done by others. Billing: Provide COR with a report or statement of work completed and include statements with request for payment. Statement should include service completed and the date each service item was completed. Labor charges shall be billed hourly, and any unused labor totals will be credited back to the VA Medical Center on the next billing cycle, upon receipt of the service report. Safety Codes / Certification / Licensing: Environmental abatement work, if necessary, is to be performed by Service provider under supervision and monitoring for the VA by a Certified Industrial Hygienist. The Service provider shall comply with all codes as described above, as well as codes customarily applied in VA construction jobs such as NFPA fire code, OSHA, VA Design Guides, ASME, Manufacturer Requirements, etc. Labs used by the service provider shall be licensed as required by any applicable governing agencies, and their certifications and licenses shall be included in the reports. The C&A requirements do not apply and a Security Accreditation Package is not required. NARA Records Management Requirements The following standard items relate to records generated in executing this contract: Citations to pertinent laws, codes and regulations such as 44 U.S.C. Chapter 21, 29, 31, and 33; Freedom of Information Act (5 U.S.C. 552); Privacy Act (5 U.S.C. 552a); 36 CFR Part 1222 and Part 1228. Contractor shall treat all deliverables under the contract as the property of the U.S. Government for which the Government Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Contractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government IT equipment and/or Government records. Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected by the Freedom of Information Act. The Contractor shall not create or maintain any records containing any Government Agency records that are not specifically tied to or authorized by the contract. The Government Agency owns the rights to all data/records produced as part of this contract. The Government Agency owns the rights to all electronic information (electronic data, electronic information systems, electronic databases, etc.) and all supporting documentation created as part of this contract. The Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data. The Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format [paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.] or state of completion [draft, final, etc.]. No disposition of documents will be allowed without the prior written consent of the Contracting Officer. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage, or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the agency records schedules. The Contractor is required to obtain the Contracting Officer s approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under or relating to this contract. The Contractor (and any sub-contractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information. | - | Combined Synopsis | 12/03/2026 |
Install Chill Water System Filtration & Steam Condensate | - | Awarded | Open |
RFQ 36C24827Q0061 Amendment No. 1 This amendment is hereby issued to provide responses to questions and requests for information submitted by vendors, provide a revised PWS to address a correction on Boiler #2 description, as well as an updated Price/Cost Schedule reflecting the corrected description. Description of Boiler #2 contained on PWS and associated Line Items (LINs) of Price/Cost Schedule is hereby changed to read: Boiler Unit Number 2 (Local identifier): Fire tube steam boiler manufactured by York-Shipley; Serial number 96-19937-H-11618 The due date for Quote Submittal is changed from November 6, 2026, to November 10, 2026 at 10 AM AST. All other sections of the solicitation remain unchanged. RESPONSES TO QUESTIONS RECEIVED: Q1. Semiannual Safety-Device Testing: VHA Directive 1810, Appendix A, Section 2(a), establishes that safety devices requiring semiannual testing are ordinarily tested once annually by VA medical facility personnel and once annually by a qualified testing contractor, unless an alternative arrangement is approved. Does the Government require the contractor to perform both semiannual testing events under this solicitation? If so, has the alternative testing arrangement received the required approval? VACHS Boiler Plant personnel will perform the required semiannual safety-device testing. The Contractor shall perform the safety-device testing required under the PWS during its scheduled annual inspection and testing services. Q2. Monthly Safety Device Testing: PWS Section V(Q) includes safety-device tests for which the VHA Boiler and Associated Plant Safety Device Testing Manual establishes monthly testing frequencies, including primary and auxiliary low-water cutoffs, high- and low-water alarms, and the main flame-scanner flame-out test. Does the Government require the contractor to perform these tests monthly throughout the contract period, or will VACHS personnel continue performing the monthly tests while the contractor performs the scheduled maintenance and safety-device testing services? VACHS Boiler Plant personnel will perform the required monthly safety-device testing. Q3. Frequency of Nondestructive Testing, Component Replacement and Engineering Evaluations: PWS Sections V(I), V(L), V(U), V(V), and V(W) establish requirements involving component replacement, nondestructive testing (NDT), pressure-vessel inspections, and engineering evaluations, including ultrasonic thickness measurements, magnetic-particle examinations, and assessments of maximum allowable working pressure (MAWP) and remaining useful life. However, VHA Directive 1810, Appendix B, Table 2, establishes different inspection frequencies depending on the activity. For example, annual boiler inspections are required, whereas internal deaerator weld examinations using wet magnetic-particle testing are required at six-year intervals. Clarify the following: a. Nondestructive Testing: Are ultrasonic thickness measurements and magnetic-particle examinations required annually for each boiler and the deaerator, or are these examinations required only when indicated by inspection findings, equipment conditions, or established inspection intervals? The scope of this requirement applies to the Boilers only. b. Deaerator Weld Examination: Is the six-year internal deaerator weld examination required during the base contract period or any of the option years? If so, please identify the date of the most recent examination and the next scheduled examination. Not applicable. This service is cover under another service contract c. Engineering Evaluations: Are MAWP calculations, remaining-useful-life assessments, and deterioration-rate evaluations required annually for each boiler, deaerator, and condensate return tank, or only when inspection findings or equipment conditions warrant such evaluations? Not applicable. This service is not covered under this requirement. d. Component Replacement: Are component replacements identified in the PWS mandatory during each annual maintenance period, regardless of condition, or are replacements required only when inspection or testing establishes a deficiency, except where the PWS expressly requires replacement? Mandatory parts to be replaced annually during annual maintenance, regardless of its conditions: Sight glass with new seals, Compress air belt, oil filters, air filter, water gasket seal kits and fire side gaskets seal kit. e. Firetube Inspection Methods and Waterside Deterioration: PWS Section V(U) references fiberoptic inspection of boiler tubes, while Section V(V) establishes ultrasonic thickness measurement requirements. In a firetube boiler, fiberoptic examination from inside a tube primarily evaluates its fireside surface and does not directly establish the condition of the exterior waterside surface, where corrosion and pitting may occur. Please clarify whether the Government requires fiberoptic visual examination, ultrasonic thickness measurements, or additional examination methods capable of evaluating tube-wall deterioration affecting either surface. The Government requires the inspection methods specified in the Performance Work Statement (PWS). Fiberoptic inspection and ultrasonic thickness testing are complementary requirements, and both shall be performed. f. Boiler Tube Quantities and Technical Documentation: For each boiler, please identify the total number of firetubes, nominal tube diameter, original wall thickness or gauge, and applicable tube specifications. Please provide, if available, manufacturer drawings, tube-layout diagrams, pressure-vessel drawings, or other technical documentation identifying the shell, tube arrangements, tube sheets, and applicable pressure-retaining components, so that offerors can quantify the inspection scope. The Government has provided all available identifying information and that quotes/offers should be based on the PWS requirements and field verification. g. Extent of Tube Examination and Sampling Requirements: Does the Government require examination and wall-thickness measurements of every firetube in each boiler, or is an engineer-justified representative sampling program acceptable? If sampling is permitted, please identify any minimum sample quantity or percentage, prescribed examination locations, acceptance criteria, and requirements for expanding the examination when initial results reveal pitting, corrosion, thinning, or other deterioration. May the qualified inspecting engineer establish and justify the sampling methodology based on equipment condition, applicable standards, and inspection findings? The Government does not require examination or ultrasonic thickness measurements of every firetube. The Performance Work Statement requires inspection of a representative number of tubes and ultrasonic thickness testing of representative samples, with additional testing of areas exhibiting indications of corrosion, erosion, or other deterioration. The Contractor's Qualified Professional Inspector may establish and justify the sampling methodology using professional engineering judgment and applicable industry standards, provided the inspection is sufficient to assess equipment condition and support all required findings, calculations, and recommendations. h. Boiler shell examination and engineering certification: Please identify the required extent of ultrasonic thickness measurements and other nondestructive examinations of boiler shells, tube sheets, and other applicable pressure-retaining components. For the MAWP, deterioration-rate, and remaining-useful-life evaluations required by the PWS, does the Government require a formal report signed and sealed by a licensed Professional Engineer? Please identify any specified inspection coverage, minimum-thickness criteria, engineering standards, or historical thickness data to be used. Must the engineering determinations address the complete boiler pressure vessel, including firetubes and shell, or only components examined under the prescribed inspection program? The Government requires ultrasonic thickness testing of representative samples and all areas exhibiting signs of corrosion, erosion, or other deterioration. PWS does not prescribe specific inspection coverage percentages, minimum thickness criteria, historical thickness data, or a requirement for a signed and sealed Professional Engineer report. The Contractor shall use applicable ASME Code requirements, inspection findings, and professional judgment to perform the required MAWP, deterioration-rate, and remaining-life evaluations and document the results in the final report. Q4. The PWS incorporates maintenance, inspection, and testing requirements applicable to the deaerator (DA) and condensate return tank (CRT), as established by VHA Directive 1810 and the VHA Boiler and Associated Plant Safety Device Testing Manual. However, the solicitation provides pricing contract line items (CLINs) only for the three steam boilers and does not identify the DA and CRT equipment specifications. To establish the equipment covered by the contract and prepare an accurate firm-fixed-price quotation, please clarify the following: a. Identify the manufacturer, model, serial number, and quantity of each DA and CRT included within the contractual scope of work. b. Provide the vessel capacity, design pressure, normal operating pressure, and applicable ASME identification or nameplate information for each DA and CRT. c. Provide, if available, the applicable manufacturer maintenance instructions, equipment data sheets, and relevant drawings identifying the installed DA and CRT configurations. d. Should offerors allocate the costs associated with DA and CRT maintenance, inspection, and testing among the three existing boiler CLINs, or will the Government establish separate CLINs for these services? Not applicable. This service is not covered under this requirement. Q5. PWS Section V(I) requires the contractor to replace, calibrate, and test boiler steam safety valves, with calibration and/or testing performed onsite. The VHA Boiler and Associated Plant Safety Device Testing Manual also establishes testing requirements applicable to boiler, deaerator, and pressure-reducing valve (PRV) downstream safety valves. To determine the complete scope of testing, calibration, and replacement services and prepare an accurate firm-fixed-price quotation, please clarify the following: a. Identify the total number of steam safety valves included within the contractual scope of work, specifying their installed locations, including those associated with each steam boiler, the deaerator tank, and downstream of the steam pressure-reducing valve (PRV). Review the VHA Boiler and Associated Plant Safety Device Testing Manual for guidelines and for typical safety devices equipment in a Boiler. b. For each safety valve, provide the manufacturer, model, nominal inlet and outlet sizes, serial number or other identification, and applicable ASME/National Board certification information. Review the VHA Boiler and Associated Plant Safety Device Testing Manual for guidelines and for typical safety devices equipment in a Boiler. c. Identify the set pressure (psig), rated steam discharge capacity (lb/hr), and applicable pressure and temperature ratings for each valve. The Government does not have verified safety valve set pressures, steam discharge capacities, or pressure/temperature ratings available for distribution under this solicitation. Offerors shall base their quotes/offers on the requirements of PWS and the identified boiler equipment. Verification of valve nameplate data and equipment ratings shall be performed during the inspection and testing activities required under the contract. d. Please confirm whether each of the three steam boilers is equipped with two safety valves, reportedly set at 130 psig and 135 psig, respectively, and whether the deaerator system includes one safety valve installed on the tank and another downstream of the PRV. Please identify any additional safety valves included within the contractual scope. Each of the three boilers is equipped with two steam safety valves with nominal set pressures of 130 psig and 135 psig, respectively. The contractual scope includes the inspection, testing, calibration, and evaluation of these boiler safety valves and associated boiler safety devices identified in the PWS. The deaerator system and its associated safety valves are not included within the scope of this contract. Offerors shall base their quotations on the solicitation requirements. Verification of installed equipment, valve nameplate data, and operating condition shall be performed during contract execution. e. Does PWS Section V(I) require replacement of all existing boiler steam safety valves during each annual maintenance period, regardless of their condition, or is replacement required only when a valve fails inspection or testing? Please also clarify whether any replacement requirement applies to the deaerator and PRV downstream safety valves. The Government's intent is to inspect, test, and calibrate the boiler steam safety valves. Replacement is required only when a safety valve cannot be successfully calibrated, fails testing, or is otherwise determined to be defective or unserviceable. This requirement applies to the boiler steam safety valves within the scope of the PWS. f. Please identify whether the Government requires onsite testing and certification of all applicable safety valves, including the boiler, deaerator, and PRV downstream valves, and whether any valves must be removed for shop testing, repair, or recertification. The Government requires testing and calibration of the boiler safety valves in accordance with the PWS. Valve removal, shop testing, repair, recertification, or replacement shall only be required when a valve cannot be successfully tested, calibrated, or is otherwise determined to be defective or unserviceable. The PWS does not specifically require testing, certification, removal, repair, or replacement of deaerator or downstream PRV safety valves. g. Please provide an equipment schedule or existing valve inventory, if available, identifying the specifications and locations of all safety valves included within the contract. The Government does not have an equipment schedule or valve inventory available for distribution under this solicitation. The boiler scope includes six (6) steam safety valves total, consisting of two (2) safety valves per boiler with nominal set pressures of 130 psig and 135 psig. Offerors shall base their quotations on the solicitation requirements. Verification of valve specifications, nameplate data, and exact locations shall be performed during contract execution. Q6. The solicitation identifies the manufacturers and serial numbers of the three steam boilers; however, the Performance Work Statement does not identify whether the boilers and their associated systems remain in their original equipment manufacturer (OEM) configurations or have undergone subsequent alterations, modifications, equipment replacements, or retrofits. Clarify the following: a. Whether any of the three boilers have undergone modifications or alterations from their original OEM configurations, including replacement or retrofitting of the original burner assemblies. b. For each boiler with modifications or retrofits, identify the manufacturer, model, and configuration of the replacement equipment and describe the extent of the alterations necessary to integrate that equipment into the existing boiler system. c. Identify all additional, replacement, or modified components associated with such alterations, including, but not limited to, fuel pumps, fuel-pressure regulating or throttling valves, fuel-train components, piping arrangements, combustion controls, burner management systems, safety interlocks, instrumentation, electrical controls, and associated auxiliary equipment. d. Identify any additional equipment or components installed as part of these modifications that are included within the maintenance, inspection, calibration, testing, or repair requirements of the current PWS. e. Where the installed equipment differs from the original OEM configuration, identify the applicable manufacturer maintenance and testing requirements and provide, if available, current as-built drawings, equipment schedules, control diagrams, operating sequences, and documentation of the modifications. The Government does not have modification records, as-built drawings, equipment schedules, control diagrams, or other documentation available for distribution under this solicitation. Offerors shall base their quotations on the equipment identified in the PWS and the requirements specified therein. Any existing field modifications, retrofits, equipment replacements, or deviations from the original OEM configuration shall be identified and documented by the Contractor as part of the inspection, testing, and evaluation activities required under the contract Q7.PWS Section V(B) requires inspections, testing, and calibrations to comply with the written recommendations of the equipment manufacturers, the VHA Boiler and Associated Plant Safety Device Testing Manual, and applicable NFPA 85 requirements. The Superior Boiler manufacturer s maintenance instructions prescribe certain daily, weekly, and monthly operational and functional checks, as well as semiannual fireside cleaning and associated maintenance activities. However, VHA Directive 1810, Appendix B, Table 3B, establishes an annual fireside-cleaning frequency for high-pressure steam boilers. The Directive also distinguishes routine boiler-plant operational duties from inspections and testing that must be performed by qualified contractors. Please clarify the following: a. Are the daily, weekly, and monthly manufacturer-recommended operational and functional checks required to be performed by the contractor at the specified frequencies, or will these activities remain the responsibility of VACHS boiler-plant personnel? Daily, weekly, and monthly operational and functional checks identified in the manufacturer's operating and maintenance manuals are considered routine boiler plant operational activities and shall remain the responsibility of VACHS boiler plant personnel. The Contractor is not required to perform recurring daily, weekly, or monthly operational checks at the frequencies specified by the manufacturer unless such services are specifically included in the approved maintenance schedule developed under this contract. b. Does the Superior Boiler manufacturer s semiannual fireside-cleaning recommendation require the contractor to perform two complete fireside-cleaning services annually, rather than the single annual fireside-cleaning service established by VHA Directive 1810, Appendix B, Table 3B, or is one annual fireside-cleaning service sufficient to satisfy the contractual requirements? Contractor shall perform one comprehensive fireside cleaning and inspection annually in accordance with the PWS requirements and applicable VHA guidance. If, during the course of inspection or operation, conditions are identified that warrant additional cleaning, the Contractor shall document the condition and provide recommendations to the COR for review and consideration. c. Are other manufacturer-recommended maintenance activities exceeding the frequencies established by VHA Directive 1810 required to be performed by the contractor, or will the contractor s responsibilities be limited to the maintenance, inspections, calibrations, and safety-device testing specifically scheduled under the PWS? The Contractor shall comply with the maintenance, inspection, calibration, testing, evaluation, and reporting requirements specifically identified in the PWS. Manufacturer recommendations should be utilized as part of the Contractor's technical evaluation and execution of the required services. However, the contract does not require the Contractor to perform additional recurring maintenance activities at frequencies exceeding those established in the PWS unless specifically directed by the Government or otherwise determined to be necessary based on observed equipment condition. Q8. With reference to PWS Section V(O), will the Government provide an inventory of the installed boiler plant instrumentation requiring periodic calibration, including pressure gauges, thermometers, pressure and temperature transmitters, oxygen analyzers, and other applicable measuring and control devices? No. The Government will not provide an instrumentation inventory. Offerors shall base their quotations on the requirements of PWS, including calibration of all applicable measuring and control devices associated with the boiler systems. Verification and identification of installed instrumentation shall be performed during contract execution. Q9. If available, please identify each instrument s equipment location, manufacturer, model, measuring range, quantity, calibration frequency, and applicable acceptance tolerances. The Government does not have this information available for distribution under this solicitation. Offerors shall base their quotation on the requirements of the PWS. The Contractor shall identify the installed instrumentation requiring calibration and perform the required calibration, testing, and documentation in accordance with the manufacturer s recommendations and applicable industry standards. Q10. Clarify whether the contractor is responsible for replacing instruments that fail calibration or are determined to be defective, and whether such replacements are included in the firm-fixed-price maintenance scope or authorized separately as corrective work. The Contractor shall identify and document any instruments found to be defective or unable to be successfully calibrated and shall notify the COR. Replacement of defective instruments is not included in the firm-fixed-price maintenance scope and, if required, will be addressed separately by the Government Q11. Please confirm whether the boiler plant currently has an installed propane/combustible gas leak detection system, including the number and location of detectors, manufacturer and model, associated control panels, audible/visual alarms, and any connections to the boiler burner-management or fuel-gas safety-shutdown systems. The boiler plant is equipped with a propane/combustible gas detection alarm system. However, the gas detection system is independent of the boilers and their burner management systems and does not automatically initiate boiler shutdown or fuel shutoff functions. Q12. Please clarify whether the contractor is responsible for: a. Periodic inspection, calibration, and functional testing of the gas detectors. Limited to the detector that is part of the boiler safety or combustion control system that is specifically within the scope of the PWS. b. Verification of alarm setpoints and detector response. Only for those that are part of the equipment specifically covered by the PWS. c. Functional testing of associated alarms, gas shutoff valves, and boiler shutdown interlocks, where installed. The Contractor shall perform testing of safety devices, alarms, shutoff valves, and interlocks specifically identified in PWS Section V(Q). d. Replacement of defective or expired sensors or detectors. No. Replacement of defective, failed, expired, or obsolete gas detectors or sensors is not included in the firm-fixed-price scope of this contract. Any deficiencies identified during the performance of the work shall be documented and reported to the COR. Recommended corrective actions shall be provided for Government review. e. Providing calibration certificates and documented functional-test results. Calibration certificates and test results shall be provided for equipment and instruments calibrated and tested under the scope of the PWS. The Contractor shall document all testing, calibration, and inspection activities in the required service reports. If these services are required, please identify the applicable testing and calibration frequencies and whether replacement components are included in the firm-fixed-price maintenance scope or addressed separately as corrective work. See responses above for each one. Q13. Is this a brand-new contract, or is there an incumbent performing the services? If not brand new, please provide current/previous contract number? This is a follow-on contract being procured as a competitive set-aside for SDVOSB verified vendors. Latest contract number is 36C24822P0298. This information is publicly available on Federal Procurement Data System (FPDS) at www.sam.gov and/or US Spending at https://www.usaspending.gov/ Current contractor information may be requested and disclosed under Freedom of Information Act (FOIA) in accordance with 38 Code of Federal Regulations (CFR) 1.553(b). The VA accepts FOIA requests submitted via email. Email must be sent to SAJFOIA@va.gov , for additional information about FOIA regulations and procedures, please visit www.foia.va.gov Q14. PWS V.I requires the contractor to "replace, calibrate and test the steam safety valves." Must the safety valves be replaced every year, or only if they fail testing? Please provide the number, size and set pressure of the safety valves on each boiler. The intent of PWS Section V.I is to ensure that all steam safety valves are properly inspected, calibrated, tested, and capable of performing their intended safety function in accordance with applicable codes, standards, and manufacturer requirements. PWS does not require the automatic annual replacement of steam safety valves solely based on the passage of time. Safety valves shall be evaluated, calibrated, and tested as part of the required services. Replacement shall be required if a valve fails testing, cannot be properly calibrated, exhibits deficiencies affecting safe or reliable operation, or is otherwise determined to be unsuitable for continued service. The Government does not have the number, size, or pressure data for all installed safety valves readily available at this time. The Contractor shall verify the installed safety valve configuration, including quantity, size, capacity, set pressure, and condition, as part of the required inspection and assessment services and shall document this information in the inspection report. Any safety valves identified as deficient or requiring replacement shall be immediately reported to the COR, along with recommendations for corrective action. Q15. Please provide the horsepower, design pressure and fuels (natural gas, No. 2 fuel oil, LPG pilot) for each of the three boilers. Boiler #1; Size: 300HP; Boiler Operating Pressure: 110 psi Boiler #2; Size: 250HP; Boiler Operating Pressure: 110 psi Boiler #3; Size: 300HP; Boiler Operating Pressure: 110 psi Q16. Does the annual NDT scope in PWS V.V and V.W (ultrasonic thickness grid, magnetic particle testing, MAWP and remaining-life calculations) apply to the deaerator and condensate tanks every year, or only in certain contract years? The NDT requirements identified in PWS Sections V.V and V.W apply to the boilers and associated equipment within the scope of this contract. The deaerator (DA) and condensate receiver tank (CRT) inspections, testing, NDT evaluations, MAWP calculations, and remaining life assessments are covered under a separate service contract and are not included within the scope of this requirement. Q17. Will a site visit be offered before the closing date? If so, please provide the date, time and point of contact. Site Visit will not be conducted at this time. Prepare and submit Quotes/Offers at your best terms based on the information contained in the RFQ. Q18. Is there an incumbent contract for this requirement? If so, please provide the contract number. See Q13 response above. Q19. Replace Safety Valve: Will the cost of new Valves be covered by the site? Replacement shall be required if a valve fails testing, cannot be properly calibrated, exhibits deficiencies affecting safe or reliable operation, or is otherwise determined to be unsuitable for continued service. Q20. Replace Gage Glass: Will new Gage cost be covered by the site? No. The cost of replacement gage glasses shall be included in the Contractor's quotation and contract pricing. Q21. Cleaning - Will Gaskets be provided by the Site or Contractor? No. The cost of replacement gage glasses shall be included in the Contractor's quotation and contract pricing. Q22. Testing - How often will Non-Destructive Testing be required? Annually, once over the 5-year period? Additionally, will NB Inspector be required on-site during Non-Destructive Testing? See Q16 response above. Q23. When was the last maintenance and testing done on each boiler? Boiler #1: February 2026 Boiler #2: December 2025 Boiler #3: June 2026 Q24. Is there a set maintenance and testing schedule? In accordance with PWS Section IV.J and Sections V.19 and V.20, the Contractor shall develop and submit a detailed schedule for the required inspections, testing, calibrations, and maintenance activities in coordination with the PM/COR. Q25. Will an on-site visit be required as soon as the contract is awarded and the contractor can align a technician to be on site? An immediate on-site visit upon contract award is not required by the PWS. However, the Contractor shall coordinate with the PM/COR and provide the required advance notice in accordance with the contract requirements prior to performing any inspection, testing, calibration, or maintenance activities. Following contract award, the Government anticipates coordinating a kickoff meeting and scheduling activities with the Contractor to facilitate execution of the work. The timing of any on-site visit shall be mutually coordinated between the Contractor and the PM/COR, taking into consideration boiler plant operations, facility needs, personnel availability, and the requirement that no more than one boiler be removed from service at a time. Q26. There is a detailed description of what is required for testing the boilers but not for maintenance. a. What is the maintenance schedule? Daily, monthly, quarterly, yearly? The Contractor shall perform the maintenance, inspections, testing, calibrations, and assessments required by the PWS during each contract year. The specific schedule for execution of the work shall be developed by the Contractor and coordinated with the PM/COR in accordance with PWS Sections IV.J, V.19, and V.20. The contract does not require the Contractor to perform daily, weekly, or monthly routine operational checks unless specifically identified in the PWS. b. Does the VA have an in-house technician that will be providing daily checks, and then the contractor for this contract does quarterly and yearly maintenance and testing? VACHS personnel perform the routine operation and monitoring of the boiler plant, including day-to-day operational activities. The Contractor's responsibilities under this contract are limited to the preventive maintenance, inspections, testing, calibrations, safety-device testing, evaluations, and reporting specifically required by the PWS. Q27. The CLN structure is currently set up as 1 all-inclusive price. What should be included in that price? a. What parts, if any, is the contractor expected to furnish? The Contractor shall furnish all labor, materials, consumables, tools, instrumentation, and equipment necessary to perform the services required by the PWS. This includes replacement parts and materials specifically identified in the PWS, such as gage glasses, gaskets, air compressor belts, refractory patching materials, and other consumable items necessary to complete the required maintenance, testing, and inspection activities. Repairs or major component replacements identified during the inspection process that are not specifically required by the PWS shall be documented and reported to the COR for review and disposition. b. Is there a certain number of hours of labor time that the VA would like us to include? If one contractor budgets 50 hours of labor while another budgets for 25 hours of labor, their pricing will vary drastically. This is a performance-based services acquisition, the Government expects Offerors to thoroughly review the PWS and submit their best quotation/offer based on their experience, and commercial practices. Offerors shall independently determine the labor resources necessary to perform complete preventive maintenance, inspection, testing, calibration, evaluation, and reporting service for each boiler in accordance with the PWS, applicable codes and standards, manufacturer recommendations, and VA requirements. The Government's expectation is that each boiler receives a complete maintenance and testing service as required by the contract. The maintenance activities will be scheduled throughout the year and coordinated with the PM/COR to avoid disruption to facility operations. c. How many visits are required per year? Same as labor, 1 contractor may budget 2 trips, and another contractor may budget 12 trips. This is a performance-based requirement, the Government has not established a minimum or maximum number of site visits. Offerors shall determine the number of visits necessary to perform all contract requirements and shall include all associated costs in their proposed price. The Contractor shall develop and coordinate the work schedule in accordance with the PWS. The Contractor is responsible for identifying the resources and site visits necessary to successfully perform the required services. d. Are we to include pricing for emergency work? Labor, parts, boiler rental in case of a catastrophic failure? No, PWS/SOW is for maintenance and testing, as described following applicable manufacturer recommendations. Q28. Are there any active and known problems or deficiencies with the boilers? Page 10 of the solicitation states The service required must restore steam boiler units back in service as described in the manufacturer s manual . If a boiler has a known problem, we will need to know what that is to accurately bid the project. If it is a simple part replacement, it may only cost $100 for parts and 2 hours of labor. If the boiler needs a new motor, that would most likely be thousands of dollars and at least 2 full days of labor. The Government does not maintain a list of known deficiencies and does not warrant the condition of any boiler, component, or ancillary equipment beyond the information provided in the solicitation. The Contractor is responsible for evaluating the condition of the boilers and associated equipment as part of the inspection, testing, maintenance, and assessment services required by the PWS. The intent of the requirement stating that the boilers be restored to service in accordance with manufacturer recommendations is to ensure that the Contractor performs the specified maintenance, testing, calibrations, inspections, and adjustments necessary to verify operational readiness and identify conditions affecting performance and reliability. Any deficiencies identified during performance shall be documented and promptly reported, together with the Contractor's recommendations for repair, replacement, or other corrective action. Repairs or major component replacements not specifically required by the PWS are not included in this contract and shall be addressed separately by the Government, as appropriate. Q29. Is an on-site SSHO or Superintendent required? Must the be directly employed by the contractor? If the awarded contractor use a subcontractor, could the SSHO/Sup be employed by the sub? The Contractor shall be responsible for providing adequate supervision and safety oversight necessary to perform the work safely and in compliance with all applicable federal, state, local, VA, OSHA, and facility safety requirements. The Contractor shall ensure that personnel performing the work possess the qualifications and certifications required by the PWS. Q30. Are there any geographic or linguistic requirements? Examples: Must the contractor turn in a Spanish and English copy of all reports? Must the on-site technician be fluent in Spanish? Must the on-site technician be a resident of Puerto Rico? No, all reports are to be turned in English, as English is the Federal Government official business language. Being able to communicate in Spanish may be beneficial but it is not required. There is no residency requirement, is up to the Contractor to determine the best approach based on their experience. Performance shall comply with the required frequency and required response time as per PWS/SOW. | - | Combined Synopsis | 11/10/2026 |
RFQ 36C26327Q0060 Amendment 0002 Questions and Answers for solicitation posting | - | Combined Synopsis | 11/10/2026 |
Amendment to cancel requirement. See SF 30 | - | Solicitation | 11/04/2026 |
Additional Details
Solicitation Number
36C24126Q0475
Archive Date
Jun 11, 2026
Office Address