GovChime
Notice ID: d9ccbd384e1543fda50bca2113b5eb9cCombined Synopsis/Solicitation

6110--689-26-3-4807-0126: Replace Variable Frequency Drive Units (VA-26-00053945)

Archived on July 8, 2026. Original response deadline: . Full description on SAM.gov.

Description

Amendment No.: 0002 Solicitation No.: 36C24126Q0551 Date: June 16, 2026 Purpose of Amendment The purpose of this amendment is to provide responses to questions submitted regarding the solicitation. As a result of these questions and responses, the response due date will be extended to June 23, 2026 at 10am. Question: Please clarify if a superintendent can be a dual hat to cover the requirements of SSHO? Answer: This is not construction, this is a professional services contract. Construction management is not required. A site superintendent is not required for professional services contracts. Applicable persons performing certified labor shall meet OSHA requirements for the applicable work area and work being performed where qualified personnel perform equipment start up and verification.   Question: If no to the question above, will the SSHO need to be full-time for this project? Answer: This is not construction, this is a professional services contract. Construction management is not required. A site superintendent is not required for professional services contracts. Applicable persons performing certified labor shall meet OSHA requirements for the applicable work area and work being performed where qualified personnel perform equipment start up and verification.   Question: Please clarify if a superintendent can be a dual hat to cover the requirements of QA/QC? Answer: This is not construction, this is a professional services contract. Construction management is not required. A site superintendent is not required for professional services contracts. Applicable persons performing certified labor shall meet OSHA requirements for the applicable work area and work being performed where qualified personnel perform equipment start up and verification.   Question: If no to the question above, will the QA/QC need to be full time for this project? Answer: Personnel performing startup of equipment should be those with the qualifications necessary to the specific equipment. Please submit appropriate installation report(s) as required along with equipment warranties. Question: Can a superintendent be a triple hat to cover the requirements of SSHO and QA/QC? Answer: This is not construction, this is a professional services contract. Construction management is not required. A site superintendent is not required for professional services contracts. Applicable persons performing certified labor shall meet OSHA requirements for the applicable work area and work being performed where qualified personnel perform equipment start up and verification.   Question: Please confirm if tax should be included in our proposal? Answer: This is not construction, this is a professional services contract. Construction management is not required. A site superintendent is not required for professional services contracts. Applicable persons performing certified labor shall meet OSHA requirements for the applicable work area and work being performed where qualified personnel perform equipment start up and verification.   Question: Advise what is the ICRA Level required for the areas of the VFDs. Answer: This question has been addressed previously. The contractor is responsible for determining any applicable tax obligations, incorporating into proposals as necessary. The VA cannot provide tax advice or make tax determinations on behalf of the contractor. Question: Is the use of temporary plastic wall panels (such as STARC panels) acceptable to meet ICRA requirements? Answer: The VFD's are in multiple mechanical spaces throughout the facility. There's no single ICRA level that applies to all locations. The Contractor shall coordinate with the government prior to commencing work in each area as the ICRA requirements will be determined based on the specific location, adjacent patient care activities, and scope of work. Question: Confirm project work hours. Can work be completed during normal work hours? Answer: The acceptability of temporary containment systems. Cannot be determined generically for this project. Requirements will vary based on specific work location activities and ICRA requirements. Question: Will shutdowns be required to be done during off hours or weekends? Answer: Normal business hours no off time schedule is required. Question: Description of Services line 4 states to coordinate with FMS for BMS controls connections to VFDs. Advise if BMS controls connections, programming setup, and integration to BMS are by the VA. Is the contractor to only coordinate schedule and activities? Answer: Connection is to be made by contractor. Programming setup, and integration to BMS are by the VA.  The contractor to only coordinate schedule and activities with VA.

Full description on SAM.gov

Overview

Agency:
Department of Veterans Affairs
Office:241-NETWORK CONTRACT OFFICE 01 (36C241)
Posted:June 16, 2026
NAICS:238220: Plumbing, Heating, and Air-Conditioning Contractors
Last Updated:Aug 21, 2026
PSC:6110: ELECTRICAL CONTROL EQUIPMENT
Set-Aside:Service-Disabled Veteran-Owned Small Business Set Aside
Type:Combined Synopsis/Solicitation
Place of Performance:VA Connecticut Healthcare System West Haven VA Medical Center, West Haven, CT, 06516

Award Overview

Possible prior contracts

Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).

Contacts

Contracting Officer

Primary Contact

Yolanda Rankin
Contract Specialist

Documents

Select documents to download

Showing 3 of 3 items

Document
Source
Agency
Posted Date
File Size
Actions
Combined Synopsis/SolicitationVETERANS AFFAIRS, DEPARTMENT OFJun 16, 202664.71 KB
Combined Synopsis/SolicitationVETERANS AFFAIRS, DEPARTMENT OFJun 16, 202626.94 KB
Combined Synopsis/SolicitationVETERANS AFFAIRS, DEPARTMENT OFJun 16, 202617.87 KB

Lifecycle

Solicitation:36C24126Q0551
  1. Combined Synopsis
  1. 3×
    Combined SynopsisCurrentJun 3, 2026

    6110--689-26-3-4807-0126: Replace Variable Frequency Drive Units (VA-26-00053945)

    Notice d9ccbd384e1543fda50bca2113b5eb9c on SAM.gov

Similar Opportunities

Title
Phase
Agency
NAICS
Set Aside
Posted
Deadline
Location

Additional Details

Solicitation Number

36C24126Q0551

Archive Date

Jul 8, 2026

Office Address

TOGUS, ME, 04330