Notice ID: 4e7f7a61f0bf86656cec664b92e90452Sources Sought

C--630A4-10-440 REPLACE PUMP STATION AND CONTROLS VAMC St. Albans, Jamaica, NY

Archived on November 25, 2018. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:00 AM UTC−05:00
Posted
July 24, 2018
Notice type
Sources Sought
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
NAICS
541310: Architectural Services

Notice details

Place of performance
VAMC St. Albans;179-00 Linden Blvd. & 179 Street;Jamaica, NY 11425 USA
PSC
C: ARCHITECT/ENGINEER SERVICES
Last updated
Dec 6, 2025

Identifiers

Solicitation number
36C24218R0595
Notice ID
4e7f7a61f0bf86656cec664b92e90452

Description

Page 3 of 3 Page 3 of 3 General The New York Harbor Healthcare System-St. Albans Campus is engaging in a short-list selection as defined in FAR 36.602-5(a) of an AE (SDVOSB) to complete design development, construction documents, construction period services and site visits for the Replace Pump Station and Controls project. SDVOSB Vendors with an SF-330 on file within the past twelve months are being considered. SDVOSB firms that have a working office within a 300 mile radius from VAMC St. Albans 179-00 Linden Blvd. & 179 Street Jamaica, NY 11425 may submit SF 330 s for consideration, to the Contracting Officer at Emily.Lindsey2@va.gov by 4:30 PM EST, August 27, 2018. Provide all necessary Architect/Engineer services to complete construction documents and specifications for the Replace Pump Station and Controls project at the New York Harbor Healthcare System- St Albans Campus.All designs will follow the VA design guidelines, and specifications for VA construction. The design will be completed in a manner such that the estimated construction cost is within the VA budget. It is not expected that any new space will be added to the existing building footprint. Scope of Work: 1. Provide all necessary Architect/Engineer services to complete construction documents and specifications for the Replace Pump Station and Controls project at the New York Harbor Healthcare System- St Albans Campus. 2. The A/E shall provide construction documents and specifications to replace all domestic water pumps, motor control center and controls located in the Pump House in Building #176. 3. The A/E shall perform a thorough study of the existing Pump House in order to determine the best type, size and capacity of new pumps to be installed. The A/E shall review the different pump options and systems available and provide a narrative of the positives and negatives for each system. The A/E shall provide a life cycle cost analysis to determine the most cost effective pump system for the facility. 4. The design includes modifing the existing piping, valves, pumps, mechanical & electrical connections, concrete pads, controls panel and building management system as required for the installation of the new pumps, motor control center and controls. The project design includes installing new electrical, mechanical, structural, associated piping, shut off valves, strainers, check valves, variable speed drives, controls and insulation for the new pumps. 5. The pump house controls shall be tied into the existing Building Management head end control system in Building 89 Engineering Service. The project design includes designing a conduit pathway to get the new controls from the Pump House Building 176 to the Building 89 Engineering Office BMS head end computer. The project design shall include upgrading the existing BMS controls system to the latest software version. The project design shall include developing a sequence of operations for the new pump house control system. 6. The A/E shall provide construction documents and specifications to replace all water pumps, motors, sensors and controls in building 89 on the ground floor. 7. The design shall include connecting the existing mono-chloramine system for treating legionnaire s disease into the new pumping system. 8. The project design shall include installing new water meters in the pump house to calculate flow rate and facility water consumption in gallons and report it to the existing BMS system. 9. The project design includes replacing the facility New Yok City Department of Environmental Protection water meters located at the main pump house Building 176 and the Baisley Boulevard pump house. The project design includes installing new check valves and back flow preventers for the new facility water meters. The new facility water meters shall be connected to the NYCDEP automated meter system. The new facility waters shall comply with the NYCDEP requirements. 10. All work shall conform to VA criteria and regulation. The project design shall comply with VA Plumbing Design Standards & Criteria, ASHRAE 90.1 and all applicable NFPA codes. 11. The A/E shall provide all A/E services necessary for preparation of complete construction documents and construction period services. Work includes verification of existing As-Built drawings, preparation of contract drawings & specifications, and detailed cost estimate. 12. The A/E shall provide complete contract drawings & specifications including demolition, architectural, plumbing, fire protection, structural and mechanical & electrical drawings for construction.. IV. The following must be incorporated into the A/E design: 1. Meet with VA Engineering and Pharmacy Staff to determine the exact functional requirements to be used for the design. 2. Recommend various options for the hospital personnel to evaluate. Options should include: completion time, phasing, noise, dust, infection control, construction cost, impact, feasibility and compliance with overall hospital objectives. 3. Provide all necessary site survey work to verify As-Built drawings and field conditions. 4. Provide construction period services and site visits. V. The A/E shall have all available As-Built drawings (it is the A/E s responsibility to verify the accuracy of said drawings): 1. Mechanical 2. Electrical 3. Architectural 4. Structural 5. Plumbing VI. Document reviews The A/E shall furnish and provide three (3) sets of drawings and specifications and detailed cost estimates at completion stages of schematic design, conceptual design, 30%, 60% and 100%. Provide three (3) sets of completed contract drawing and specifications for bidding purpose and three (3) copies of 100% detailed cost estimate. 1. Mylars and As-Built drawings: Contract originals shall be prepared on standard VA drawing sheets of Mylars using AutoCad (version 14 and 2012). The A/E shall provide one (1) set of Mylars drawings to the VA for record plans at the completion of design. The A/E shall incorporate all of the construction changes to the As-Built drawings at the completion of the construction and the A/E shall turn over the changes in the As-Built drawings to the VA. The following evaluation criteria will be used when reviewing submitted SF 330 data and will comprise the basis of information to be used by VAMC St. Albans for A/E evaluation and selection. Firms submitting SF 330 data for consideration must address each of the following criteria in the SF 330: Discussions will be held with the top ranking firms. These discussions will at a minimum include a verification of accuracy of the information within the SF 330 and a chance to provide any updated information. Responses to discussion items will be evaluated using the same factors outlined above. This procurement is set-aside for Service Disabled Veteran Owned Small Businesses (SDVOSB). The estimated construction cost for this project is between $1,000,000 and $5,000,000. The NAICS code for this procurement is 541310.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:36C24218R0595
  1. Market Research

Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)

  1. 2×
    Market ResearchCurrentJul 24, 2018

    C--630A4-10-440 REPLACE PUMP STATION AND CONTROLS VAMC St. Albans, Jamaica, NY

    Notice 4e7f7a61f0bf86656cec664b92e90452 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This procurement is restricted to Service Disabled Veteran Owned Small Business (SDVOSB) firms located within a 300 mile radius of the Battle Creek VA Medical Center, 5500 Armstrong Rd, Battle Creek, MI 49037. The mile restriction is in compliance with VAAR 805.207 (b). This requirement is being procured in accordance with the VAAR 836.606-73 as implemented in FAR Subpart 36.6. Description of work to be performed includes: Architect-Engineering services are required for Schematics, Design Development, Construction Documents, Technical Specifications, Construction Period Services, Site Visits, Cost Estimates, and all other related information for Project #515-14-123, Replace Fire Alarm System. The project will include design work for the preparation of 100% complete working drawings and contract documents using edited VA Master Specifications to complete the following: I. STATEMENT OF AE TASKS A. The AE shall furnish all services for a complete schematic design, design development, construction documents, bid documents, site visits, cost estimates, as-built documentation, and construction period services and all other related information for project 515-14-123 Replace Fire Alarm System for 30 buildings at the Battle Creek VA Medical Center in Battle Creek, MI. 1) Necessary site survey work such as verifying existing conditions, verifying record drawings, and verifying and analyzing utility systems shall be accomplished in conjunction with preparation of Schematic Design, and Design Development. 2) The A/E shall design a station wide fire monitoring system to be installed parallel to the existing system. Redundant monitoring: primary at building 25 and redundant at police department building 2. The system shall be designed to be monitored by wireless network including transmitters, receivers, and transceivers, including all permits, and FCC application for equipment frequency allocation. 3) The A/E shall evaluate each building to determine which field devices need to be added in accordance with current codes. 4) The AE will be required to attend in person (or Senior Delegate of AE) to pre-bid meetings, a pre-construction meeting, project construction meetings and a final inspection meeting. There will also be various construction site meetings that will require a representative of the AE. 5) AE will provide meeting notes / minutes for meetings and conference calls. 6) The A-E shall provide competent design and construction period services utilizing individuals who are adequately knowledgeable of the various design disciplines including but not limited to architectural and engineering of structural, mechanical, electrical, and special systems as required by the project. Changes in personnel from those who are proposed in negotiations, interviews, kick-off meeting, and/or A-E submission forms must be approved in writing. The registered individuals who will stamp the completed documents shall accomplish engineering design work. B. The AE shall provide cost estimation, project scheduling & phasing, bid period and construction period services as further described in the contract. Estimates shall have a full itemized line item breakout commensurate with the degree of design accomplished. At the Schematic Design phase, square foot estimates would be adequate. As the design progresses in detail, so the estimate would progress in detail. C. The AE shall provide bid documents in both hard paper copies and electronic format. Electronic format shall include AutoCAD and Microsoft Word/Excel as well as PDF format for all. Final PDF of the construction drawings shall include the professional stamp. D. AE shall design construction to phase and coordinate work to minimize disruptions to medical center operations. Outages shall be minimized and temporary conditions planned to maintain critical utility systems. Suitable space/access for mechanical room equipment maintenance must be maintained throughout construction. To keep the number of outages to a minimum, group common work. Phasing of interruptions shall be clearly indicated on the construction documents. E. A-E shall design within funding limitations. AE shall coordinate cost control measures with COR to design within funding limits. Cost control alternatives shall be explored in Design Development (DD's). The AE is required by national VA directive to include a 20% bid deduction. F. Review AE Quality Alerts from the TIL. Design completion timeframe of 190 days after receipt of the Notice to proceed. The A/E firm shall also be required to perform construction period services after award of the construction project contract. In accordance with FAR 36.204, the estimated magnitude of the resulting construction project is between $1,000,000 and $5,000,000. Qualifications (SF330) submitted by each firm for Project #515-14-123 for "Replace Fire Alarm System" will be reviewed and evaluated based on the following criteria: Prospective firms are required to address all selection criteria within submitted SF330 packages using additional pages as required and SF 330 submissions including any additional pages are not to exceed fifty (50) pages. Selection criteria shall be in accordance with Federal Acquisition Regulation (FAR) Part 36.602-1 and VA Acquisition Regulation (VAAR) Part 836.602-1 as follows: (1) Professional Qualifications: the qualifications of the individuals which will be used for these services will be examined for experience and education and their record of working together as a team. The specific disciplines which will be evaluated are architectural, engineering, and estimating. (2) Specialized Experience and Technical Competence: specific experience and technical skill in the type and scope of work required, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials. (3) Capacity to Accomplish the Work: the general work load and staffing capacity of the design office which will be responsible for the majority of the design and the ability to accomplish the work in the required time will be evaluated. (4) Past Performance: the past performance of the firm on contracts relevant in scope to the advertised project that were accomplished with the Department of Veterans Affairs, other Government agencies, and private industry in terms of cost control, quality of work, and compliance with performance schedules will be examined. Project past performance references older than 3 years will receive a lesser score than those references for projects accomplished within the past 3 years. (5) Location of Design Firm: the geographic proximity of each firm to the location of the VA Medical Center will be evaluated. This criterion will apply to the office from which the majority of the design services will be performed. Scoring will be based off of the proposed location of the prime contractor firm for this category. Scoring shall be as follows: within 75 miles - Excellent (Blue); 76-125 miles - Very Good (Green); 126-175 miles - Acceptable (Yellow); 176 - 225 miles - Marginal (Orange); 226 - 300 miles - Poor (Red). (6) Claims and Terminations: record of significant claims against the firm or terminated contracts because of improper or incomplete architectural and engineering services will be examined. (7) Reputation in A-E Community: reputation and standing of the firm and its principal officials with respect to professional performance, general management, and cooperativeness. (8) Specific experience and qualifications: of personnel proposed for assignment to the project and their record of working together as a team. FAILURE TO CLEARLY ADRESS ALL EIGHT LISTED EVALUATION CRITERIA AND INFORMATION REQUIRED BY THE SUBMISSION REQUIREMENTS BELOW MAY RESULT IN REJECTION OF SF330. The NAICS Codes for this procurement is 541310 Architectural Services and small business size standard of $7.5 Million. Award of a Firm Fixed Price contract is anticipated. Anticipated time for completion of design is approximately 190 calendar days including time for VA reviews. The A/E firm shall also be required to perform construction period services if award of a construction project contract is made. DATABASE REGISTRATION INFORMATION: VERIFICATION OF STATUS OF APPARENTLY SUCCESSFUL OFFEROR THIS ACQUISITION IS 100% SET-ASIDE FOR QUALIFIED SERVICE DISABLED VETERAN OWNED SMALL BUSINESS AE FIRMS IN COMPLIANCE WITH VAAR 852.219.10. ONLY BUSINESSES VERIFIED AND LISTED IN THE VENDOR INFROMATION PAGES DATABASE (http://www.vetbiz.gov) SHALL BE CONSIDERED. SYSTEM FOR AWARD MANAGEMENT (SAM): Federal Acquisition Registrations require that federal contractors register in the System for Award Management (SAM) database at www.sam.gov and enter all mandatory information into the system. Award cannot be made until the contractor has registered. Offerors are encouraged to ensure that they are registered in SAM prior to submitting their qualifications package. THE EXCLUDED PARTIES LIST SYSTEM (EPLS): To ensure that the individuals providing services under the contract have not engaged in fraud or abuse regarding Sections 1128 and 1128A of the Social Security Act regarding federal health care programs, the contractor is required to check the Excluded Parties List System (EPLS) located at www.sam.gov for each person providing services under this contract. Further the contractor is required to certify that all persons listed in the qualifications package have been compared against the EPLS list and are NOT listed. During the performance of this contract the Contractor is prohibited from using any individual or business listed on the List of Excluded Individuals/Entities. E-VERIFY SYSTEM: Companies awarded a contract with the federal government shall be required to enroll in E-Verify within 30 days of the contract award date. They shall also need to begin using the E-Verify system to confirm that all of their new hires and their employees directly working on federal contracts are authorized to legally work in the United States. E-Verify is an Internet-based system that allows an employer, using information reported on an employee's Form I-9, to determine the eligibility of that employee to work in the United States. There is no charge to employers to use E-Verify. (FAR 52.222-54) Qualified A-E firms are required to respond if interested by submitting one (1) original completed Standard Form 330 qualification package Parts I and II to include all consultants (form available on-line at: http://www.gsa.gov/portal/forms/download/116486) Must include in Part I Section H an organizational chart of the firm (excludes consultants) and a design quality management plan. Submission information incorporated by reference is not allowed. All submissions must be bound in some manner (spiral, wire, binder, etc.) and a CD copy of the Standard Form 330. Completed SF330s can be delivered to Battle Creek VA Medical Center, Attn: Craig Jenkins, Contract Specialist, NCO 10 West Contracting Office (90VC), Building 9, 5500 Armstrong Rd, Battle Creek, MI 49037, no later than 3:00 p.m. EDT, April 11, 2016. Outermost envelope or packaging shall clearly identify Solicitation number and project. Information shall be submitted via commercial express service. No hand carried deliveries. Telegraphic, email, and facsimile forms are prohibited. All submissions must be bound in some manner (spiral, wire, binder, etc.). Award of any resultant contract is contingent upon the availability of funds. No solicitation document is available and no other information pertaining to project scope, etc. is available at this time. Any request for assistance with submission or other procedural matters shall be submitted via email only (craig.jenkins@va.gov) telephone inquiries will not be honored. After the evaluation of SF330 submissions in accordance with the evaluation criteria, three or more of the most highly qualified firms will be chosen for interviews to present their approach to the design to arrive at selection of the number one firm for negotiations. The contract is anticipated to be awarded in JUNE/JULY 2016. The Government will not pay nor reimburse any costs associated with responding to this request. The Government is under no obligation to award a contract as a result of this announcement.
69%
Pre-Solicitation04/11/2006
NOTICE OF INTENT TO SOLE SOURCE The Department of Veterans Affairs, Network Contracting Office (NCO) 17, intends to award a sole source, Firm-Fixed-Price (FFP) contract to Cox Design Associates, Inc., a certified Service-Disabled Veteran-Owned Small Business (SDVOSB). The requirement is to provide Architect/Engineer (A/E) Construction Period Services (CPS) for Project 674 19 101, Replace Boilers and Boiler Plant, located at the Temple VA Medical Center, 1901 Veterans Memorial Drive, Temple, TX 76504. The applicable NAICS code is 541310 Architectural Services, with a size standard of $12.5M. Cox Design Associates, Inc. previously completed the 100% design and construction documents for this project under a separate A/E contract. Construction is active, and the VA now requires continued CPS throughout the remaining construction period to ensure proper interpretation, adjustment, and execution of the original design intent. The required CPS includes but is not limited to: Construction submittal reviews; Responses to Requests for Information (RFIs); Preparation of supplemental instructions and design clarifications; Review of potential change orders; Attendance at site visits and weekly construction meetings; Oversight ensuring the Designer of Record (DOR) design is executed accurately. Cox Design Associates, Inc. possesses unique design knowledge and remains the Designer of Record (DOR). Any firm proposing to take over CPS responsibilities must demonstrate in writing how it would effectively and efficiently assume full responsibility for interpreting and administering another firm s design, including: Detailed knowledge of the design rationale, engineering decisions, and analysis, Ability to perform CPS within the same technical footprint as the DOR, Willingness to assume full liability for design interpretation, corrections, or changes that may arise during construction. Any prospective A/E firm asserting capability to meet this requirement may give a written notification to the Contracting Officer in the form of a capability statement, including an explanation of how the contractor would be able to effectively and efficiently operate in the same footprint as the A/E DOR. This procurement will be conducted under the authority of 41 USC §3304(a)(5), 38 U.S. Code § 8127(c), as implemented by RFO 6.103-5 (Authorized or Required by Statute). The requirement will be awarded using the non-competitive (sole-source) procedures authorized in VAAR 819.7008 (DEVIATION) for sole-source awards to certified SDVOSBs up to $5,000,000. A Justification & Approval (J&A) will be posted after award in accordance with FAR 6.301. THIS NOTICE IS NOT A REQUEST FOR COMPETITIVE PROPOSALS. No responses to this notice are requested. No solicitation will be issued. If a firm believes VA should not proceed with this sole-source action, it may submit a capability statement by 10:00 AM (Central Time), October 14, 2026, to: Ms. Makarim.Abdul Jabbar@va.gov Contracting Officer, NCO 17 Telephone inquiries will not be accepted. The VA will NOT reimburse any costs associated with responding to this notice. Information received will be used solely to determine whether a competitive procurement is appropriate. A determination not to compete the proposed contract will be made at the sole discretion of the Government.
64%
Pre-Solicitation10/14/2026
Sources Sought Notice THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. THE GOVERNMENT WILL NOT PAY NOR REIMBURSE ANY COSTS ASSOCIATED WITH RESPONDING TO THIS REQUEST. THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. The Department of Veterans Affairs is seeking a qualified Architect-Engineering (AE) firm to provide Schematics, Design Development, Construction Documents, Technical Specifications, Construction Period Services, Site Visits, Cost Estimates, As-Built Documentation, and all other related information for Project 58A5-27-503 Project Design Replace Flat Roof at the Canandaigua VA Medical Center, 400 Fort Hill Avenue, Canandaigua, NY 14424. this project is to develop a conditions-report and design documents for replacing the existing flat roofs on buildings 4, 5, 6, 7, 8, 10, 36, 37, 118, and various connecting tunnels. The conditions report shall be prepared after a thorough investigation of the existing conditions with estimated costs and improvements. The following design will include all selected repairs and improvements from the conditions report that fit within VA construction budget. As part of the report and design effort, the existing conditions shall be tested and verified, including evaluation of the drainage, materiality, masonry, fall protection, equipment, ACM, insulation, and structural integrity. New work may include redesign / reconstruction of support structures, drainage, roof type change, and parapet wall restoration to ensure water intrusion and legacy issues are mitigated. In addition to repairs and modifications, all interior drainage piping shall be replaced minimum 10 from roof drain unless, otherwise discussed with VA for convenience or practical reasons or as needed due to conditions of ease or degradation. This requirement is being procured in accordance with the Brooks Act as implemented in FAR Subpart 36.6. Applicable NAICS code is 541330 and small business size standard of $25.5 Million. Magnitude of Construction is between $500,000 and $1,000,000. This is a 100% Service-Disabled Veteran Owned Small Business Set Aside. The anticipated award date of the proposed A-E Contract is on or before December 30, 2026. Potential contractors must be registered in SAM (www.sam.gov ) and are visible/verified/certified as SDVOSB in Dynamic Small Business Search (https://dsbs.sba.gov/search/dsp_dsbs.cfm) at time of submission of their qualifications in order to be considered for an award. In order to assure compliance with VAAR clauses, 852.219-75 VA Notice of Limitations on Subcontracting Certificate of Compliance for Services and Construction (NOV 2022) and 852.219-73 VA Notice to Total Set-Aside for Verified Service-Disabled Veteran-Owned Small Businesses (NOV 2022), all firms submitting a SF 330 for this notice are required to indicate what percentage of the cost of contract performance will be expended on the concerns employees and in which discipline(s) and percentage of cost of contract performance to be expended (and in what disciplines) by any other consultant/subcontractor or otherwise used small or large business entity(s). Any consultant/subcontractor or otherwise business entity(s) used must be identified by name, office location and size/type of business (i.e., SDVOSB, VOSB, 8(a), small, large, etc.). Failure to provide this information will deem the firm s SF 330 submittal as non-responsive and preclude further evaluation All A/E firms are advised that in accordance with VAAR 836.606-71 the total cost of the production and delivery of designs, plans, drawings and specifications shall not exceed six (6) percent of the estimate cost of construction. Other A-E fees are not included in the six (6) percent. Additionally, FAR Clause 52.236-22 (c) - Design Within Funding Limitation, will be applicable to this procurement action. SCOPE OF SERVICE REQUIRED Project no. 528A5-27-503: A/E Design Replace Flat Roof LOCATION Canandaigua VAMC, 400 Fort Hill Avenue Canandaigua, NY 14424 COST RANGE Magnitude of Construction is between $500,000.00 and $1,000,000.00 Estimated Construction Cost Range: $5,000,000. TYPE OF CONTRACT CONTEMPLATED The Department of Veterans Affairs is contemplating awarding a firm fixed price contract. DESIGN COMPLETION PERIOD: The Department of Veterans Affairs requires design and contract support services. The A/E shall deliver 100% bid documents in 255 calendar days from the Notice to Proceed (NTP). SELECTION CRITERIA DESCRIPTIONS The submitted SF-330s will be evaluated on the following criteria: This acquisition will be in accordance with FAR Part 36.602-1 and VAAR Part 836.602-1. The following evaluation criteria will be used to evaluate SF-330 technical proposals: The A/E must demonstrate its qualifications with respect to the published evaluation criteria for all services. Evaluation Criteria is of equal importance with an exception of criterion 1 and 7 which shall carry an additional weight multiplier of 1.5. Each criterion shall be rated out of a score of 1 to 10. Total possible score is 80. Specific evaluation criteria include: 1.Specialized experience and technical competence in the type of work required, including, roof replacements, structural repairs, drainage, temporary systems and investigative services. 2. Professional Qualifications necessary for performance of site surveys such as the one described within the SOW including qualified personnel and approach to this scope. 3. Capacity to accomplish the work in the required time. 4. Past Performance on contracts with Government agencies and private industry in terms of cost control, quality of work and compliance with performance schedules. 5. Specific experience and qualifications of personnel proposed for assignment to the project and their record of working together as a team. 6. Location in the general geographical area of the project and knowledge of the locality of the project; provided, that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project. 7. Specific examples of survey documents as described in the scope of work and approach to preparation of the documents as requested by the VA. 8. Record of significant claims against the firm because of improper or incomplete architectural and engineering services. Criterion 1 - Specialized experience and technical competence in the type of work required, including, roof replacements, structural repairs, drainage, temporary systems and investigative services. Offerors will be evaluated on specialized experience and technical competence in the performance of services similar to those anticipated under this contract with regard to: Experience with roofing systems. Experience with design of building drainage systems. Experience with specialized HVAC and electrical design for healthcare facilities. Experience in providing post construction award services (shop drawing review, as-built drawing and Quality Assurance Plan (QAP) preparation, construction inspection services, and Operating and Maintenance Manuals). Experience with government designs and construction. Experience with historic buildings, preservation, and alterations. Submission requirements: Provide a detailed write-up of how the firm has accomplished the requirement. In addition, provide up to five (5) projects completed or substantially completed within the past five (5) years that best illustrate specialized experience of the proposed team in the areas outlined above. Example projects shall note project s square footage. All projects provided in the SF-330 must be completed by the office/branch/regional office/individual team member actually proposed to manage and/or perform work under this contract. To enable verification, firms should include the DUNS number along with each firm name in the SF-330 Part 1, Section F Item 25 Firms from Section C Involved in this Project, block (1). Include a contract number or project identification number in block 21. Include an e-mail address and phone number for the point of contact in block 23(c). Include in the project description the contract period of performance, award contract value, current contract value, a summary of the work performed that demonstrates relevance to specialized experience as outlined above. If the contractor served as a subcontractor on a project, indicate the value of the work they provided towards the performance of the overall project. If a project was performed by a joint venture, and not all joint venture partners are on the team proposed for this contract, the offeror/team should specifically address the work performed by the joint venture partner offering/teaming on this contract. Likewise, if the offeror/team member worked as a subcontractor on a project, the description should clearly describe the work actually performed by the offeror/team member and the roles and responsibilities of each on the project, rather than the work performed on the project as a whole. If the project description does not clearly delineate the work performed by the entity/entities offering/teaming on this contract, the project could be eliminated from consideration. NOTE: If the Offeror is a joint venture, information should be submitted as a joint venture; however, if there is no information for the joint venture, information should be submitted for either joint venture partner, not to exceed a total of five (5) projects for this criterion. Projects shall be submitted on the SF-330. For submittal purposes, a task order on an IDIQ contract is considered a project, as is a stand-alone contract award. Do not list an IDIQ contract as an example of a completed project. Instead, list relevant completed task orders or stand-alone contract awards that fit within the definition above. Examples of project work submitted that do not conform to this requirement will not be evaluated. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being rated lower. All information for Criterion 1 should be submitted in Part 1, Section F of the SF-330. The Government WILL NOT consider information submitted in addition to Part 1, Section F in evaluating Criterion 1. Criterion 2 - Professional Qualifications necessary for performance of site surveys as the one described with the SOW including qualified personnel and approach to this scope. Offerors will be evaluated in terms of the qualifications, competence and experience of the key personnel and technical team proposed to accomplish this work. Key personnel are individuals who will have major contract or project management responsibilities and/or will provide unusual or unique expertise. Provide a balanced licensed and or certified workforce in the following disciplines Architecture, Structural, Mechanical, Electrical, Interior Design, Environmental services and Historic Preservation Submission requirements: Provide a detailed description of how the team has performed site surveys and would approach the survey for this project. In addition, provide resumes for all proposed key personnel. Resumes are limited to one page each and should cite project specific experience and indicate proposed role in this contract. Provide professional registration, certification, licensure and/or accreditation. Indicate participation of key personnel in example projects in the SF-330 Part 1 Section G. Criterion 3 - Capacity to accomplish the work in the required time. Firms/teams will be evaluated in terms of their ability to plan for and manage work under the contract and capacity to accomplish the work in the required time. Submission requirements: Describe the firm s ability to concurrently perform and manage multiple projects in different locations to meet aggressive schedules, multiple disciplines, and control costs and the firm s capacity to accomplish multiple projects simultaneously. Criterion 4 - Past Performance Offerors will be evaluated on past performance with Government agencies and private industry in terms of work quality, compliance with schedules, cost control, and stakeholder/customer satisfaction. Evaluating past performance and experience will include information provided in Past Performance Questionnaires (PPQs) or CPARS/ACASS for Criterion 1 projects and may include other information provided by the firm, customer inquiries, Government databases, and other information available to the Government including contacts with points of contact in other criteria. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being rated lower. NOTE: Past performance information for projects listed under Criterion 1. Submission requirements: SUBMIT A COMPLETED CPARS/ACASS EVALUATION FOR EACH PROJECT UNDER CRITERION 1. IF THERE IS NOT A COMPLETED CPARS/ACASS EVALUATION, the Past Performance Questionnaire (PPQ) included in this notice is provided for the offeror or its team members to submit to the client for each project the offeror includes under Criterion 1. Criterion 5 - Specific experience and qualifications of personnel proposed for assignment to the project and their record of working together as a team. Submission requirements: Offerors shall submit evidence of individuals experience and qualifications in their respective fields. Additionally, documentation must be provided to show these individuals have worked together as a team on previous projects and their role. (Completing Sections E, F, and G, on the SF-330 meets the documentation requirement). Furthermore, offerors shall describe the ability of the firm to manage, coordinate and work effectively with team members, both internal staff and consultants. Discuss the history of working relationships with team members, including joint venture partners where applicable. Criterion 6 - Location within a 400-mile radius to the design site (Canandaigua, NY) and knowledge of the location (Canandaigua, NY); provided, that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project. Provided that the application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the contract, firms/teams will be evaluated on the locations of their office or offices that will be performing the work under this contract. Submission requirements: Indicate firms/teams location, including main offices, branch offices and any subconsultants offices and demonstrate how this will be advantageous to the Government. Do not include office locations is no team members are to be working from or located at. Criterion 7 Specific examples of survey documents as described in the scope of work and approach to preparation of the documents as requested by the VA. Submission requirements: Offerors shall provide documentation written description and examples of firm s ability to perform. Criterion 8 - Record of significant claims against the firm because of improper or incomplete architectural and engineering services. Offerors with substantiated claims against the firm as a result of improper architectural and engineering services provided in the last three (3) years. Submission requirements: Records and any other documentation of substantiated claims highlighting improper or incomplete architectural engineering services against the firm within the last three (3) years. The SF-330 shall contain a statement affirming that there are no records of significant claims because of improper or incomplete architectural and engineering services. Evaluation Scoring Evaluation factors 1, 2, 3, 5, 7, and 8 will be evaluated 1-10 using the following adjectival ratings as follows: Outstanding (10): Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low. Good(7-9): Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low. Acceptable(4-6): Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is moderate. Marginal(1-3): Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high. Unacceptable(0): Proposal does not meet requirements and contains one or more deficiencies. Proposal is not awardable. The firm s proposal demonstrates a misunderstanding of the requirement, and the approach fails to meet performance standards. The firm s proposal has major omissions and inadequate details to assure evaluators that the offeror has an understanding of requirement. The ratings identified below were used in the evaluation of Past Performance (Criterion 4): Substantial Confidence(10): Based on the offeror s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort. No doubt exists based on the offeror s past performance that they can satisfy the requirements of the contract. Satisfactory Confidence (7-9): Based on the offeror s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort. Little doubt exists based on the offeror s past performance that they could satisfy the requirements of the contract. Unknown Confidence (Neutral 5-6): No recent/relevant performance record is available, or the offeror s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. Limited Confidence (1-3): Based on the offeror s recent/relevant performance record, the Government has little expectation that the offeror will be able to successfully perform the required effort. Some doubt exists based on past performance that they could satisfy the terms and conditions of the contract. No Confidence (0): Based on the offeror s recent/relevant performance record, the Government has little expectations that the offeror will be able to successfully perform the required effort. Significant doubt exists based on the offeror s past performance that they can satisfy the requirements of the contract. Rating of criterion 6 shall be a score of 0 for outside of range and 10 for inside of range PLEASE NOTE: The AE Evaluation Board must be provided with complete and accurate information for ALL nine (9) evaluation factors above in order to rank as qualified and eligible firms. Therefore, the AE firm must expand upon, as it deems necessary, on any evaluation factor not well demonstrated or addressed with Part 1A to Part IG and Part II of the SF330. The AE firm shall use Part IH and/or use additional sheets to supplement/address all evaluation factors to clearly demonstrate its qualifications. LIMITATIONS 852.219-10 VA Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside (DEC 2009) (a) Definition. For the Department of Veterans Affairs, Service-disabled veteran-owned small business concern : (1) Means a small business concern: (i) Not less than 51 percent of which is owned by one or more service-disabled veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled veterans (or eligible surviving spouses); (ii) The management and daily business operations of which are controlled by one or more service-disabled veterans (or eligible surviving spouses) or, in the case of a service-disabled veteran with permanent and severe disability, the spouse or permanent caregiver of such veteran. (iii) The business meets Federal small business size standards for the applicable North American Industry Classification System (NAICS) code identified in the solicitation document; and (iv) The business has been verified for ownership and control and is so listed in the Small Business Pages database, (SBA s Small Business Search); (2) Service-disabled veteran means a veteran, as defined in 38 U.S.C. 101(2), with a disability that is service-connected, as defined in 38 U.S.C. 101(16). (b) General. (1) Offers are solicited only from service-disabled veteran-owned small business concerns. Offers received from concerns that are not service-disabled veteran-owned small business concerns shall not be considered. (2) Any award resulting from this solicitation shall be made to a service-disabled veteran-owned small business concern. (c) Agreement. A service-disabled veteran-owned small business concern agrees that in the performance of the contract, in the case of a contract for: (1) Services (except construction), at least 50 percent of the cost of personnel for contract performance will be spent for employees of the concern or employees of other eligible service-disabled veteran-owned small business concerns. (2) Supplies (other than acquisition from a nonmanufacturer of the supplies), at least 50 percent of the cost of manufacturing, excluding the cost of materials, will be performed by the concern or other eligible service-disabled veteran-owned small business concerns. (3) General construction, at least 15 percent of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other eligible service-disabled veteran-owned small business concerns; or (4) Construction by special trade contractors, at least 25 percent of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other eligible service-disabled veteran-owned small business concerns. (d) A joint venture may be considered a service-disabled veteran owned small business concern if (1) At least one member of the joint venture is a service-disabled veteran-owned small business concern and makes the following representations: That it is a service-disabled veteran-owned small business concern, and that it is a small business concern under the North American Industry Classification Systems (NAICS) code assigned to the procurement. (2) Each other concern is small under the size standard corresponding to the NAICS code assigned to the procurement; and (3) The joint venture meets the requirements of paragraph 7 of the explanation of Affiliates in 19.101 of the Federal Acquisition Regulation. (4) The joint venture meets the requirements of 13 CFR 125.15(b). (e) Any service-disabled veteran-owned small business concern (non-manufacturer) must meet the requirements in 19.102(f) of the Federal Acquisition Regulation to receive a benefit under this program. SUBMISSION REQUIREMENTS: Unless paper offers are specifically authorized in an individual solicitation, all responses to solicitations must be submitted electronically as described below. Responses submitted in a paper form are unacceptable. Failure to comply with this requirement may jeopardize the possibility of receiving an award due to noncompliance with the submission requirements. EMAIL SUBMISSION REQUIREMENTS Interested firms having the capabilities to perform this work must submit: ONE (1) ELECTRONIC SF 330, including Parts I and II, and attachments (if any) to idalia,algarin@va.gov no later than 12PM, Eastern Standard Time (EST) on November 13, 2026. Submittals received after the date and time identified will not be considered. The submittal will be date and time stamped by the Microsoft Email system and will be the official record of receipt for the submission. All SF 330 submissions shall be clearly indicated in subject line, displaying the solicitation number and project number and title (abbreviated and shortened is okay). Submission is to be no more than a total of fifty (50) pages; size of emails is not to exceed 10 megabytes (MB). If more than one email is sent, please number emails in subject lines as 1 of 2, 2 of 2 etc. All SF 330 submissions must include the following information either on the SF 330 or by accompanying document: Cover Page with Solicitation Number, Project Number and Title Table of Contents Copy of valid state registration for each lead designer Copy of current https://veterans.certify.sba.gov/ SDVOSB/VOSB certification DUNS Number Cage Code Tax ID number Email address and Phone number (including the area code) of the Primary Point of Contact.
59%
Market Research11/13/2026
Modification 2 to Presolicitation Notice 36C25527R0007, P/N 657-27-209JB, Project Title: Renovate Building 1 and 53 Main Lobbies. This modification provides answers to RFIs received, revised evaluation criteria and revised supplement B per below RFIs. The SF330 submission due date is extended from November 10, 2026 to November 16, 2026. RFIs Received with VA Responses in blue text: Construction Budget questions: Is that the Estimated Cost of Construction or the maximum for the A/E Design Fee? Estimated Cost of Construction If the $949,026 is the construction budget, this appears low in today's environment given that over 6,000 SF needs to be renovated. Can the VA please re-evaluate this budget and provide an update? The construction budget that was originally used in the supplement B pre-solicitation notice is incorrect. A revised supplement B is attached, changing the construction cost estimate from $949,026 to $725,873. The Construction budget is set and cannot be changed until the design process is underway. Key Personnel questions: The Presolicitation Notice lists: Supervisory, Fire Protection Engineer, Certified Professional Industrial Hygienist, and Life Safety Engineer. The Statement of Work and Supplement B list: Communications (voice/data), Interior Design, VPIH, Plumbing (including fire protection), and a 3rd Party Fire Protection Review. Questions: Which positions require resumes in Section E? What is the intended role of "Supervisory"? Per the SOW & Supplement B the following positions require resumes: Project Manager, Architectural, Mechanical, Electrical, Communication (voice data) Plumbing (Including Fire Protection), Structural, Interior Design, VPIH, Cost Estimator and a 3rd Party Fire Protection Review. Project manager is Supervisory Industrial Hygienist/Asbeston Project Designer: Question: Is an ABIH Certified Industrial Hygienist (CIH) acceptable for this position, and does a CIH satisfy the requirement for the VPIH and the state-accredited Asbestos Project Designer? If these must be separate individuals, should both be identified in the SF330? A CIH satisfies the requirement for the VPIH and the state-accredited Asbestos Project Designer. They can be the same individual. Site Visit: Supplement B, page 6, Section III.6.g: the A/E "shall meet with the COR at the proposed project site" prior to submitting a response Presolicitation Notice, page 4: "Personal visits to discuss this announcement will not be allowed" and only "the most highly rated firm must physically come to the site" before pricing Question: Please confirm that no site visit is required before the SF330 submission. No site visit is required prior to SF330 submission. Laboratory and Special Room Rquirements: Presolicitation Notice, page 7, Evaluation Criteria 2, Specialized Experience and Technical Competence: "laboratory requirements for the firm" Supplement B, page 18, Section B6.II.1: "floor plans of special rooms such as the endoscopy suite, recovery room, etc." Questions: Neither a laboratory nor an endoscopy suite or recovery room appears in the project scope. Do any of these requirements apply to this project? These requirements do not apply to this project. Can the VA please release updated and corrected documents? The evaluation criteria 2 will be changed to remove laboratory requirements for the firm and the COR will revise Supplement B to remove the endoscopy suite and recovery room from the Supplement B.
58%
Pre-Solicitation11/16/2026
Please be advised that the submission deadline for SF 330 has been extended from November 13, 2026, to November 20, 2026, at 2:00 PM EST. Responses to the RFIs are currently being prepared and will be posted prior to the revised due date.
58%
Market Research11/20/2026

Additional Details

Solicitation Number

36C24218R0595

Archive Date

Nov 25, 2018