GovChime
Notice ID: 6dda17a1e8694fa4a086f9145de5cf1fAward NoticeAwarded

Z1DA--528A7-23-105 REPLACE ROOF 43

Awarded on December 12, 2023. Full description on SAM.gov.

Awarded tounder 36C24224C0029 (source: SAM.gov award notice)• $217.2K

Overview

Posted
December 12, 2023
Notice type
Award Notice
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
NAICS
238190: Other Foundation, Structure, and Building Exterior Contractors
Agency
Department of Veterans Affairs

Notice details

Place of performance
DEPARTMENT OF VETERANS AFFAIRS SYRACUSE VA MEDICAL CENTER 800 IRVING AVE, SYRACUSE, 13210
Last updated
Sep 9, 2025
Award date
Dec 12, 2023
Award amount (SAM.gov award notice)
$217.2K

Identifiers

Solicitation number
36C24223B0045
Notice ID
6dda17a1e8694fa4a086f9145de5cf1f
Award number (PIID)
36C24224C0029

Description

RFIs Please verify the requirement that the Competent Person(s) must have taken or retaken their OSHA 30 Hour within the past 5 years. We will accept a 30-hour OSHA Construction Safety certificate, with their resume. Is parking available for contractors on-site? There will be a Construction Materials Laydown and Dumpster space allowed for the contractor, see the Laydown and Roof Access Options PowerPoint attached (one option or the other, not both). There will not be any additional parking spaces allowed for the contractor(s). Is there a lay-down area designated for this project? There will be a Construction Materials Laydown and Dumpster space allowed for the contractor, see the Laydown and Roof Access Options PowerPoint attached (one option or the other, not both). There will not be any additional parking spaces allowed for the contractor(s). Is there a designated area where we can stage a dumpster near this roof at the Main Entrance? There will be a Construction Materials Laydown and Dumpster space allowed for the contractor, see the Laydown and Roof Access Options PowerPoint attached (one option or the other, not both). There will not be any additional parking spaces allowed for the contractor(s). Will we have access to the Main Entrance circle to stage dumpsters, equipment, etc.? The circle must remain operational for the Veterans Administration, DAV and other organizational vehicles, the contractor must maintain safe construction operations concurrently during regular business hours. Will we be allowed to close of sections of the Front Entrance circle to allow for removing material from the roof, staging material on the roof, etc.? If so, please confirm if this can be done during regular business hours or if there will be time restrictions to do this. The circle must remain operational for the Veterans Administration, DAV and other organizational vehicles; the contractor must maintain safe construction operations concurrently during regular business hours. Front page of the drawings indicate intent is for construction in the summer of 2023 . Since summer has passed, is the intent for spring of 2024? Yes, the work will commence in spring 2024. It was observed during the walk-thru there is an existing roof leak near the expansion joint where the concrete roof deck meets the metal decking roof. This area is currently under construction with new finish materials being installed. If this roof work isn t to be done until the spring, is there any requirement to try and locate this leak & repair before the winter? If so, please clarify requirements. Yes, this area should be repaired as soon as possible to prevent damage to new construction. If work isn t going to be performed until the spring of 2024, will the government compensate for any material cost changes between now and then? No. Bidders are required to bid accordingly. Due to volatile material price fluctuations and unpredictability of the market, will the government agree to pay for Stored Materials on this project to avoid price increases post bid? Documentation of material invoice/packing slips, photo, and insurance backup information for each relevant charge would be provided. If material prices increase post award, will the government pay for those increases provided proof of increase is provided? No. Bidders are required to bid accordingly. Can the Economic Price Adjustment FARR clause be added to this contract due to continued fluctuations in material prices? No. Will the government agree to material increase cost adjustment requests (change orders) for suppliers for products subject to long submittal review periods, long lead times and/or general post-bid issues & delays? No. Bidders are required to bid accordingly. Is all lightning protection to be new or are we to re-use existing? New, not re-used. Is new flashing to be Blue or Silver/Grey to match new front entrance canopy? Match the existing color on each section. 11- Is all roof demolition debris going to need to come thru the facility/elevator, or will we have access to the oversize parking are to hoist materials onto and off? See the Laydown and Roof Access Options PowerPoint attached (one option or the other, not both).

Full description on SAM.gov

Award Overview

Award Number

36C24224C0029

Award Amount (SAM.gov award notice)

$217.2K

Award Date

Dec 12, 2023

Awardee

Awardee UEI

SKGTKZNAHHX3

Original Solicitation

Notice ID: 6dda17a1e8694fa4a086f9145de5cf1f

Posted Date: Dec 12, 2023

Original Response Deadline: Not specified

Contacts

Documents

No documents available.

Lifecycle

Solicitation:36C24223B0045
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. Pre-SolicitationSep 11, 2023

    Z1DA--528A7-23-105 REPLACE ROOF 43

    Notice 5b324f08771b450d9a45f343b6b6c8ac on SAM.gov

  2. 2×
    SolicitationOct 3, 2023

    Z1DA--528A7-23-105 REPLACE ROOF 43

    Notice e9ebf49a722c479587eb0ede57479df2 on SAM.gov

  3. AwardedCurrentDec 12, 2023

    Z1DA--528A7-23-105 REPLACE ROOF 43

    Notice 6dda17a1e8694fa4a086f9145de5cf1f on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

36C24223B0045

Archive Date

Jan 11, 2024

Office Address

ALBANY, NY, 12208