Notice ID: ffc9b326317e439ca661d7143443f04bSolicitation
Z1DA--528A5-23-506 UPGRADE ACCESS CONTROLS STATION WIDE
Archived on December 7, 2023. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 AM UTC−05:00
- Posted
- October 24, 2023
- Notice type
- Solicitation
Notice details
- Office
- 242-NETWORK CONTRACT OFFICE 02 (36C242)
- Place of performance
- Canandaigua VA Medical Center 400 Fort Hill Avenue, Canandaigua, 14424
- Last updated
- Dec 6, 2025
Identifiers
- Solicitation number
- 36C24223B0048
- Notice ID
- ffc9b326317e439ca661d7143443f04b
Description
This Page left blank intentionally
Award Overview
Possible prior contract
Inferred, not confirmedInferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.
Contract end date
Oct 16, 2026
NAICS
238210
Agency
Department of Veterans Affairs
Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
36C24223B0048- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationSep 18, 2023
Z1DA--528A5-23-506 UPGRADE ACCESS CONTROLS STATION WIDE
- 2×SolicitationCurrentOct 4, 2023
Z1DA--528A5-23-506 UPGRADE ACCESS CONTROLS STATION WIDE
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Amendment A0004 This Amendment 0004 extends out due date. We are working on responses to a few additional RFIs and will publish the responses in Amendment A0005. VIRTUAL BID OPENING INFORMATION: 1) There will be no in-person public bid opening process. This will be conducted as a public virtual activity. 2) The virtual bid opening will be available to the public via Microsoft Teams at the following link and/or phone number: Join: https://teams.microsoft.com/meet/2473414420095?p=HOJS7WNgrbgMwvO73f (Meeting will be available to be accessed 10 min prior to bid opening) Meeting ID: 247 341 442 009 5 Passcode: ks79ub9w Dial-in by phone: 1-872-701-0185; Phone conference ID: 947 858 19# 3) IAW FAR 52.214-5 Submission of Bids and FAR 14.202-8 Electronic Bids; Bids shall be provided via email to the Contracting Officer at Lynn.VanderVelde@va.gov AND Ryan.McMillin@va.gov as follows: with Subject: 36C25226B0014 BIDS DUE: Vendor bids are due via email as shown above at 10:00 AM local time on December 1st. The virtual public bid opening will be held at 11:30 AM local time on December 1st at the link and/or the phone # provided above. ……..End of Amendment A0004…….. | 82% | Solicitation | 12/01/2026 |
CONSTRUCTION STATEMENT OF WORK Date: September 13, 2025 Project Number: 556-24-113 Project Name: Oil Transformer and Switch Enclosure Upgrade (GC) Location: Captain James A. Lovell FHCC 3001 Green Bay Rd, North Chicago, IL 60064 Part 1: Project Scope of Work Overview: Contractor shall provide all tools, materials, labor, quality assurance, and supervision for renovations resulting in a complete, compliant, and fully-functional project. Replace medium voltage oil-filled transformers that serve the following buildings on the James A. Lovell FHCC campus: 1, 3, 9, 11, 66, 137 and 187. Transformers have 4160 volt primary and 208/120 volt secondary. There are (4) transformers rated for 150 KVA, (2) transformers rated for 300 KVA and (1) transformer rated for 750 KVA. The 150 KVA transformer at building 3 will need to be relocated as well. Replace the electrical distribution switchboard at building 137. Replace the electrical distribution switchboard at building 3. Replace concrete pads for medium voltage oil filled transformers at buildings 9, 66, and 187. New transformer location at building 3 requires a new concrete pad as well. Install anti-ram rated bollards at all transformers. Part 2: Period of Performance: The following model presents the summary logic of the milestone sequence working backward from the delivery date of the longest lead time in the critical path to determine a mobilization date, and then forward from the delivery date of the longest lead time to completion of all work. Listed milestones and phases (calendar days): Notice To Proceed Day 0 Division 01 Submissions Completed Day 14 Division 01 VA Reviews Day 35 Division 02+ Submissions Day 50 Division 02+ VA Reviews Day 71 Longest Lead Item Procurement Day 72 (GC to determine and submit) VA review and GC revise schedule Day 93 Mobilize and Demo Day 94 (If all pre-construction submittals were approved) Pre-Longest Lead Item Construction Day 214 (GC to determine) Longest Lead Item Delivery Date Day 215 (GC to determine) Post Long-Lead Item Construction Day 335 (GC to determine) Construction Complete and Closeouts approved Day 356 Closeout (Contract end date) Day 357 Total: 357 days reflects an example workup of the plan. GC must submit the factory ship date commitment to VA and revise the Baseline Schedule to work forward and backward from that date to optimize the time in field (disruption of customer and reduction of GC costs). Part 3: Detailed Project Requirements: Project Objectives: Contractor is required to expedite planning and execution of this work, enabling the work to start and continue without interruptions caused by failure to procure long lead equipment and plan around the delivery dates This project is required to enable compliant and safe conditions for maintenance of electrical systems. GC and their consulting engineer to plan and execute a robust quality assurance plan and safety plan to prevent time and rework losses. List of AE Documents to be included in this Contract: See: 00 01 10 Table of Contents and the entire Project Manual See: 00 01 15 List of Drawing Sheets and the entire volume of drawings Pre-Bid Conference: VA shall schedule one pre-bid conference to be attended by prospective bidders to observe current conditions within the work area(s). Do not expect additional events to occur. The AE shall not attend the pre-bid event. No questions will be allowed during the event. All questions by all prospective contractors shall follow the RFI process described in the Solicitation. Prospective bidders shall not attempt to contact the AE or VA facilities engineering staff during the solicitation and bidding period. The AE and VA facilities engineering staff are instructed to ignore all such inquiries and report them to the VA Contracting Officer. All inquiries regarding this project shall be presented as complete and coherent Requests for Information (RFI) specifically citing design or specification sections, pages, paragraphs, notes, details, etc. to enable responses to RFI s. Follow the instructions provided by the Contracting Officer within the Solicitation regarding submission of RFI s. VA will post responses developed to enable all prospective bidders to receive the same information at the same time. | 81% | Solicitation | 09/09/2026 |
CONSTRUCTION STATEMENT OF WORK Date: September 13, 2025 Project Number: 556-24-113 Project Name: Oil Transformer and Switch Enclosure Upgrade (GC) Location: Captain James A. Lovell FHCC 3001 Green Bay Rd, North Chicago, IL 60064 Part 1: Project Scope of Work Overview: Contractor shall provide all tools, materials, labor, quality assurance, and supervision for renovations resulting in a complete, compliant, and fully-functional project. Replace medium voltage oil-filled transformers that serve the following buildings on the James A. Lovell FHCC campus: 1, 3, 9, 11, 66, 137 and 187. Transformers have 4160 volt primary and 208/120 volt secondary. There are (4) transformers rated for 150 KVA, (2) transformers rated for 300 KVA and (1) transformer rated for 750 KVA. The 150 KVA transformer at building 3 will need to be relocated as well. Replace the electrical distribution switchboard at building 137. Replace the electrical distribution switchboard at building 3. Replace concrete pads for medium voltage oil filled transformers at buildings 9, 66, and 187. New transformer location at building 3 requires a new concrete pad as well. Install anti-ram rated bollards at all transformers. Part 2: Period of Performance: The following model presents the summary logic of the milestone sequence working backward from the delivery date of the longest lead time in the critical path to determine a mobilization date, and then forward from the delivery date of the longest lead time to completion of all work. Listed milestones and phases (calendar days): Notice To Proceed Day 0 Division 01 Submissions Completed Day 14 Division 01 VA Reviews Day 35 Division 02+ Submissions Day 50 Division 02+ VA Reviews Day 71 Longest Lead Item Procurement Day 72 (GC to determine and submit) VA review and GC revise schedule Day 93 Mobilize and Demo Day 94 (If all pre-construction submittals were approved) Pre-Longest Lead Item Construction Day 214 (GC to determine) Longest Lead Item Delivery Date Day 215 (GC to determine) Post Long-Lead Item Construction Day 335 (GC to determine) Construction Complete and Closeouts approved Day 356 Closeout (Contract end date) Day 357 Total: 357 days reflects an example workup of the plan. GC must submit the factory ship date commitment to VA and revise the Baseline Schedule to work forward and backward from that date to optimize the time in field (disruption of customer and reduction of GC costs). Part 3: Detailed Project Requirements: Project Objectives: Contractor is required to expedite planning and execution of this work, enabling the work to start and continue without interruptions caused by failure to procure long lead equipment and plan around the delivery dates This project is required to enable compliant and safe conditions for maintenance of electrical systems. GC and their consulting engineer to plan and execute a robust quality assurance plan and safety plan to prevent time and rework losses. List of AE Documents to be included in this Contract: See: 00 01 10 Table of Contents and the entire Project Manual See: 00 01 15 List of Drawing Sheets and the entire volume of drawings Pre-Bid Conference: VA shall schedule one pre-bid conference to be attended by prospective bidders to observe current conditions within the work area(s). Do not expect additional events to occur. The AE shall not attend the pre-bid event. No questions will be allowed during the event. All questions by all prospective contractors shall follow the RFI process described in the Solicitation. Prospective bidders shall not attempt to contact the AE or VA facilities engineering staff during the solicitation and bidding period. The AE and VA facilities engineering staff are instructed to ignore all such inquiries and report them to the VA Contracting Officer. All inquiries regarding this project shall be presented as complete and coherent Requests for Information (RFI) specifically citing design or specification sections, pages, paragraphs, notes, details, etc. to enable responses to RFI s. Follow the instructions provided by the Contracting Officer within the Solicitation regarding submission of RFI s. VA will post responses developed to enable all prospective bidders to receive the same information at the same time. | 81% | Solicitation | 09/01/2026 |
This is a presolicitation notice pursuant to FAR 5.201, announcing an upcoming competitive solicitation for a firm-fixed-project construction project. Network Contracting Office 20 (NCO 20), supporting the Veterans Affairs Southern Oregon Rehabilitation Center and Clinics (VA SORCC) located in White City, OR anticipates releasing a Request for Proposals in the upcoming months of Fiscal Year 2027. This notice synopsizes the requirement but is not a solicitation or otherwise a request for pricing. This does not commit the Government to issue the solicitation or award a contract. The RFP, if released, will be posted on Contract Opportunities located on SAM.gov only under the identifier 36C26027R0027. Interested parties are invited to follow this identifier to receive updates. The RFP will be a total set-aside for Service-Disabled Veteran-Owned Small Businesses. It is anticipated to result in the award of one (1) firm-fixed-price contract for the entire scope of work. The scope of work will be to remove existing lighting and install new, more energy efficient lighting in various locations across campus. More information will be provided in the RFP, if released. This requirement will be subject to the Buy American Act and the VA Limitations on Subcontracting. For questions- please contact Helen.Woods@va.gov cc Alan.Perez@va.gov. | 80% | Pre-Solicitation | 11/03/2026 |
Amendment to a Previous Combined Solicitation Page 1 of Amendment to a Previous Combined Solicitation Page 3 of 3 Amendment to a Previous Combined Solicitation *= Required Field Amendment to a Previous Combined Solicitation Page 1 of 3 Modification to correct the construction cost magnitude to between $1,000,000.00 and $2,000,000.00. The Department of Veterans Affairs (VA), Jesse Brown VA Medical Center, Chicago, IL 60612 has a need for construction services for Security Upgrades. Contractor shall provide all design plans, tools, materials, components, labor, quality assurance, and supervision in accordance with construction documents, drawings and specifications to complete the required construction services. The principal components of work include: Installation and integration of security cameras; and Providing access control/physical security renovations. Period of Performance is 335 calendar days from issuance of notice to proceed. The construction cost magnitude range is between $1,000,000.00 and $2,000,000.00. Pursuant to Public Law 109-461, this solicitation is set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) firms. In accordance with VAAR 819.7003(b), at the time of submission of bids, and prior to award of any contracts, the offeror must represent to the contracting officer that it is: SDVOSB eligible vendor IAW VAAR Subpart 819.70; Small business concern under the NAICS code assigned to this acquisition; and Certified SDVOSB/VOSB listed in the SBA certification database at https://search.certifications.sba.gov/(see 13 CFR 128). The North American Industry Classification Code (NAICS) for this procurement is 238210; size standard $19.0 Million applies. The solicitation will be issued on or about 8/1/2026 with the bid opening date and time will be communicated in the solicitation. The bidder is responsible to monitor and download any amendments from Contact Opportunities at https://sam.gov/contracting which may be issued to this solicitation. The primary Point of Contact for this requirement is Misty L. Gates, Contract Specialist. Ms. Gates may be reached by email at Misty.Gates1@va.gov | 80% | Pre-Solicitation | 09/03/2026 |
Additional Details
Solicitation Number
36C24223B0048
Archive Date
Dec 7, 2023
Office Address
ALBANY, NY, 12208