C1DA--NRM-CONST 528-24-112 BUILDING 3 RENOVATIONS AND ADDITIONS
Archived on November 8, 2024. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 12:00 PM UTC−04:00
- Posted
- September 16, 2024
- Notice type
- Sources Sought
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- NAICS
- 541310: Architectural Services
- Agency
- Department of Veterans Affairs
Notice details
- Office
- 242-NETWORK CONTRACT OFFICE 02 (36C242)
- Place of performance
- Department of Veterans Affairs 3495 Bailey Ave, Buffalo, NY, 14215
- Last updated
- Dec 6, 2025
Identifiers
- Solicitation number
- 36C24224R0059
- Notice ID
- c24b6b77fb43436da4fd2e8872da982e
Description
Award Overview
Possible prior contract
Inferred, not confirmedInferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.
Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.
Contacts
Documents
No documents available.
Lifecycle
36C24224R0059- Market Research
Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)
- Market ResearchMay 7, 2024
C1DA--NRM-CONST 528-24-112 BUILDING 3 RENOVATIONS AND ADDITIONS
- Special NoticeMay 8, 2024
C1DA--NRM-CONST 528-24-112 BUILDING 3 RENOVATIONS AND ADDITIONS
- Market ResearchMay 9, 2024
C1DA--NRM-CONST 528-24-112 BUILDING 3 RENOVATIONS AND ADDITIONS
- 2×Special NoticeMay 9, 2024
C1DA--NRM-CONST 528-24-112 BUILDING 3 RENOVATIONS AND ADDITIONS
- 2×Market ResearchCurrentSep 16, 2024
C1DA--NRM-CONST 528-24-112 BUILDING 3 RENOVATIONS AND ADDITIONS
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Sources Sought Notice THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. THE GOVERNMENT WILL NOT PAY NOR REIMBURSE ANY COSTS ASSOCIATED WITH RESPONDING TO THIS REQUEST. THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. The Department of Veterans Affairs is seeking a qualified Architect-Engineering (AE) firm to provide Schematics, Design Development, Construction Documents, Technical Specifications, Construction Period Services, Site Visits, Cost Estimates, As-Built Documentation, and all other related information for Project 58A5-27-503 Project Design Replace Flat Roof at the Canandaigua VA Medical Center, 400 Fort Hill Avenue, Canandaigua, NY 14424. this project is to develop a conditions-report and design documents for replacing the existing flat roofs on buildings 4, 5, 6, 7, 8, 10, 36, 37, 118, and various connecting tunnels. The conditions report shall be prepared after a thorough investigation of the existing conditions with estimated costs and improvements. The following design will include all selected repairs and improvements from the conditions report that fit within VA construction budget. As part of the report and design effort, the existing conditions shall be tested and verified, including evaluation of the drainage, materiality, masonry, fall protection, equipment, ACM, insulation, and structural integrity. New work may include redesign / reconstruction of support structures, drainage, roof type change, and parapet wall restoration to ensure water intrusion and legacy issues are mitigated. In addition to repairs and modifications, all interior drainage piping shall be replaced minimum 10 from roof drain unless, otherwise discussed with VA for convenience or practical reasons or as needed due to conditions of ease or degradation. This requirement is being procured in accordance with the Brooks Act as implemented in FAR Subpart 36.6. Applicable NAICS code is 541330 and small business size standard of $25.5 Million. Magnitude of Construction is between $500,000 and $1,000,000. This is a 100% Service-Disabled Veteran Owned Small Business Set Aside. The anticipated award date of the proposed A-E Contract is on or before December 30, 2026. Potential contractors must be registered in SAM (www.sam.gov ) and are visible/verified/certified as SDVOSB in Dynamic Small Business Search (https://dsbs.sba.gov/search/dsp_dsbs.cfm) at time of submission of their qualifications in order to be considered for an award. In order to assure compliance with VAAR clauses, 852.219-75 VA Notice of Limitations on Subcontracting Certificate of Compliance for Services and Construction (NOV 2022) and 852.219-73 VA Notice to Total Set-Aside for Verified Service-Disabled Veteran-Owned Small Businesses (NOV 2022), all firms submitting a SF 330 for this notice are required to indicate what percentage of the cost of contract performance will be expended on the concerns employees and in which discipline(s) and percentage of cost of contract performance to be expended (and in what disciplines) by any other consultant/subcontractor or otherwise used small or large business entity(s). Any consultant/subcontractor or otherwise business entity(s) used must be identified by name, office location and size/type of business (i.e., SDVOSB, VOSB, 8(a), small, large, etc.). Failure to provide this information will deem the firm s SF 330 submittal as non-responsive and preclude further evaluation All A/E firms are advised that in accordance with VAAR 836.606-71 the total cost of the production and delivery of designs, plans, drawings and specifications shall not exceed six (6) percent of the estimate cost of construction. Other A-E fees are not included in the six (6) percent. Additionally, FAR Clause 52.236-22 (c) - Design Within Funding Limitation, will be applicable to this procurement action. SCOPE OF SERVICE REQUIRED Project no. 528A5-27-503: A/E Design Replace Flat Roof LOCATION Canandaigua VAMC, 400 Fort Hill Avenue Canandaigua, NY 14424 COST RANGE Magnitude of Construction is between $500,000.00 and $1,000,000.00 Estimated Construction Cost Range: $5,000,000. TYPE OF CONTRACT CONTEMPLATED The Department of Veterans Affairs is contemplating awarding a firm fixed price contract. DESIGN COMPLETION PERIOD: The Department of Veterans Affairs requires design and contract support services. The A/E shall deliver 100% bid documents in 255 calendar days from the Notice to Proceed (NTP). SELECTION CRITERIA DESCRIPTIONS The submitted SF-330s will be evaluated on the following criteria: This acquisition will be in accordance with FAR Part 36.602-1 and VAAR Part 836.602-1. The following evaluation criteria will be used to evaluate SF-330 technical proposals: The A/E must demonstrate its qualifications with respect to the published evaluation criteria for all services. Evaluation Criteria is of equal importance with an exception of criterion 1 and 7 which shall carry an additional weight multiplier of 1.5. Each criterion shall be rated out of a score of 1 to 10. Total possible score is 80. Specific evaluation criteria include: 1.Specialized experience and technical competence in the type of work required, including, roof replacements, structural repairs, drainage, temporary systems and investigative services. 2. Professional Qualifications necessary for performance of site surveys such as the one described within the SOW including qualified personnel and approach to this scope. 3. Capacity to accomplish the work in the required time. 4. Past Performance on contracts with Government agencies and private industry in terms of cost control, quality of work and compliance with performance schedules. 5. Specific experience and qualifications of personnel proposed for assignment to the project and their record of working together as a team. 6. Location in the general geographical area of the project and knowledge of the locality of the project; provided, that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project. 7. Specific examples of survey documents as described in the scope of work and approach to preparation of the documents as requested by the VA. 8. Record of significant claims against the firm because of improper or incomplete architectural and engineering services. Criterion 1 - Specialized experience and technical competence in the type of work required, including, roof replacements, structural repairs, drainage, temporary systems and investigative services. Offerors will be evaluated on specialized experience and technical competence in the performance of services similar to those anticipated under this contract with regard to: Experience with roofing systems. Experience with design of building drainage systems. Experience with specialized HVAC and electrical design for healthcare facilities. Experience in providing post construction award services (shop drawing review, as-built drawing and Quality Assurance Plan (QAP) preparation, construction inspection services, and Operating and Maintenance Manuals). Experience with government designs and construction. Experience with historic buildings, preservation, and alterations. Submission requirements: Provide a detailed write-up of how the firm has accomplished the requirement. In addition, provide up to five (5) projects completed or substantially completed within the past five (5) years that best illustrate specialized experience of the proposed team in the areas outlined above. Example projects shall note project s square footage. All projects provided in the SF-330 must be completed by the office/branch/regional office/individual team member actually proposed to manage and/or perform work under this contract. To enable verification, firms should include the DUNS number along with each firm name in the SF-330 Part 1, Section F Item 25 Firms from Section C Involved in this Project, block (1). Include a contract number or project identification number in block 21. Include an e-mail address and phone number for the point of contact in block 23(c). Include in the project description the contract period of performance, award contract value, current contract value, a summary of the work performed that demonstrates relevance to specialized experience as outlined above. If the contractor served as a subcontractor on a project, indicate the value of the work they provided towards the performance of the overall project. If a project was performed by a joint venture, and not all joint venture partners are on the team proposed for this contract, the offeror/team should specifically address the work performed by the joint venture partner offering/teaming on this contract. Likewise, if the offeror/team member worked as a subcontractor on a project, the description should clearly describe the work actually performed by the offeror/team member and the roles and responsibilities of each on the project, rather than the work performed on the project as a whole. If the project description does not clearly delineate the work performed by the entity/entities offering/teaming on this contract, the project could be eliminated from consideration. NOTE: If the Offeror is a joint venture, information should be submitted as a joint venture; however, if there is no information for the joint venture, information should be submitted for either joint venture partner, not to exceed a total of five (5) projects for this criterion. Projects shall be submitted on the SF-330. For submittal purposes, a task order on an IDIQ contract is considered a project, as is a stand-alone contract award. Do not list an IDIQ contract as an example of a completed project. Instead, list relevant completed task orders or stand-alone contract awards that fit within the definition above. Examples of project work submitted that do not conform to this requirement will not be evaluated. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being rated lower. All information for Criterion 1 should be submitted in Part 1, Section F of the SF-330. The Government WILL NOT consider information submitted in addition to Part 1, Section F in evaluating Criterion 1. Criterion 2 - Professional Qualifications necessary for performance of site surveys as the one described with the SOW including qualified personnel and approach to this scope. Offerors will be evaluated in terms of the qualifications, competence and experience of the key personnel and technical team proposed to accomplish this work. Key personnel are individuals who will have major contract or project management responsibilities and/or will provide unusual or unique expertise. Provide a balanced licensed and or certified workforce in the following disciplines Architecture, Structural, Mechanical, Electrical, Interior Design, Environmental services and Historic Preservation Submission requirements: Provide a detailed description of how the team has performed site surveys and would approach the survey for this project. In addition, provide resumes for all proposed key personnel. Resumes are limited to one page each and should cite project specific experience and indicate proposed role in this contract. Provide professional registration, certification, licensure and/or accreditation. Indicate participation of key personnel in example projects in the SF-330 Part 1 Section G. Criterion 3 - Capacity to accomplish the work in the required time. Firms/teams will be evaluated in terms of their ability to plan for and manage work under the contract and capacity to accomplish the work in the required time. Submission requirements: Describe the firm s ability to concurrently perform and manage multiple projects in different locations to meet aggressive schedules, multiple disciplines, and control costs and the firm s capacity to accomplish multiple projects simultaneously. Criterion 4 - Past Performance Offerors will be evaluated on past performance with Government agencies and private industry in terms of work quality, compliance with schedules, cost control, and stakeholder/customer satisfaction. Evaluating past performance and experience will include information provided in Past Performance Questionnaires (PPQs) or CPARS/ACASS for Criterion 1 projects and may include other information provided by the firm, customer inquiries, Government databases, and other information available to the Government including contacts with points of contact in other criteria. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being rated lower. NOTE: Past performance information for projects listed under Criterion 1. Submission requirements: SUBMIT A COMPLETED CPARS/ACASS EVALUATION FOR EACH PROJECT UNDER CRITERION 1. IF THERE IS NOT A COMPLETED CPARS/ACASS EVALUATION, the Past Performance Questionnaire (PPQ) included in this notice is provided for the offeror or its team members to submit to the client for each project the offeror includes under Criterion 1. Criterion 5 - Specific experience and qualifications of personnel proposed for assignment to the project and their record of working together as a team. Submission requirements: Offerors shall submit evidence of individuals experience and qualifications in their respective fields. Additionally, documentation must be provided to show these individuals have worked together as a team on previous projects and their role. (Completing Sections E, F, and G, on the SF-330 meets the documentation requirement). Furthermore, offerors shall describe the ability of the firm to manage, coordinate and work effectively with team members, both internal staff and consultants. Discuss the history of working relationships with team members, including joint venture partners where applicable. Criterion 6 - Location within a 400-mile radius to the design site (Canandaigua, NY) and knowledge of the location (Canandaigua, NY); provided, that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project. Provided that the application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the contract, firms/teams will be evaluated on the locations of their office or offices that will be performing the work under this contract. Submission requirements: Indicate firms/teams location, including main offices, branch offices and any subconsultants offices and demonstrate how this will be advantageous to the Government. Do not include office locations is no team members are to be working from or located at. Criterion 7 Specific examples of survey documents as described in the scope of work and approach to preparation of the documents as requested by the VA. Submission requirements: Offerors shall provide documentation written description and examples of firm s ability to perform. Criterion 8 - Record of significant claims against the firm because of improper or incomplete architectural and engineering services. Offerors with substantiated claims against the firm as a result of improper architectural and engineering services provided in the last three (3) years. Submission requirements: Records and any other documentation of substantiated claims highlighting improper or incomplete architectural engineering services against the firm within the last three (3) years. The SF-330 shall contain a statement affirming that there are no records of significant claims because of improper or incomplete architectural and engineering services. Evaluation Scoring Evaluation factors 1, 2, 3, 5, 7, and 8 will be evaluated 1-10 using the following adjectival ratings as follows: Outstanding (10): Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low. Good(7-9): Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low. Acceptable(4-6): Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is moderate. Marginal(1-3): Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high. Unacceptable(0): Proposal does not meet requirements and contains one or more deficiencies. Proposal is not awardable. The firm s proposal demonstrates a misunderstanding of the requirement, and the approach fails to meet performance standards. The firm s proposal has major omissions and inadequate details to assure evaluators that the offeror has an understanding of requirement. The ratings identified below were used in the evaluation of Past Performance (Criterion 4): Substantial Confidence(10): Based on the offeror s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort. No doubt exists based on the offeror s past performance that they can satisfy the requirements of the contract. Satisfactory Confidence (7-9): Based on the offeror s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort. Little doubt exists based on the offeror s past performance that they could satisfy the requirements of the contract. Unknown Confidence (Neutral 5-6): No recent/relevant performance record is available, or the offeror s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. Limited Confidence (1-3): Based on the offeror s recent/relevant performance record, the Government has little expectation that the offeror will be able to successfully perform the required effort. Some doubt exists based on past performance that they could satisfy the terms and conditions of the contract. No Confidence (0): Based on the offeror s recent/relevant performance record, the Government has little expectations that the offeror will be able to successfully perform the required effort. Significant doubt exists based on the offeror s past performance that they can satisfy the requirements of the contract. Rating of criterion 6 shall be a score of 0 for outside of range and 10 for inside of range PLEASE NOTE: The AE Evaluation Board must be provided with complete and accurate information for ALL nine (9) evaluation factors above in order to rank as qualified and eligible firms. Therefore, the AE firm must expand upon, as it deems necessary, on any evaluation factor not well demonstrated or addressed with Part 1A to Part IG and Part II of the SF330. The AE firm shall use Part IH and/or use additional sheets to supplement/address all evaluation factors to clearly demonstrate its qualifications. LIMITATIONS 852.219-10 VA Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside (DEC 2009) (a) Definition. For the Department of Veterans Affairs, Service-disabled veteran-owned small business concern : (1) Means a small business concern: (i) Not less than 51 percent of which is owned by one or more service-disabled veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled veterans (or eligible surviving spouses); (ii) The management and daily business operations of which are controlled by one or more service-disabled veterans (or eligible surviving spouses) or, in the case of a service-disabled veteran with permanent and severe disability, the spouse or permanent caregiver of such veteran. (iii) The business meets Federal small business size standards for the applicable North American Industry Classification System (NAICS) code identified in the solicitation document; and (iv) The business has been verified for ownership and control and is so listed in the Small Business Pages database, (SBA s Small Business Search); (2) Service-disabled veteran means a veteran, as defined in 38 U.S.C. 101(2), with a disability that is service-connected, as defined in 38 U.S.C. 101(16). (b) General. (1) Offers are solicited only from service-disabled veteran-owned small business concerns. Offers received from concerns that are not service-disabled veteran-owned small business concerns shall not be considered. (2) Any award resulting from this solicitation shall be made to a service-disabled veteran-owned small business concern. (c) Agreement. A service-disabled veteran-owned small business concern agrees that in the performance of the contract, in the case of a contract for: (1) Services (except construction), at least 50 percent of the cost of personnel for contract performance will be spent for employees of the concern or employees of other eligible service-disabled veteran-owned small business concerns. (2) Supplies (other than acquisition from a nonmanufacturer of the supplies), at least 50 percent of the cost of manufacturing, excluding the cost of materials, will be performed by the concern or other eligible service-disabled veteran-owned small business concerns. (3) General construction, at least 15 percent of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other eligible service-disabled veteran-owned small business concerns; or (4) Construction by special trade contractors, at least 25 percent of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other eligible service-disabled veteran-owned small business concerns. (d) A joint venture may be considered a service-disabled veteran owned small business concern if (1) At least one member of the joint venture is a service-disabled veteran-owned small business concern and makes the following representations: That it is a service-disabled veteran-owned small business concern, and that it is a small business concern under the North American Industry Classification Systems (NAICS) code assigned to the procurement. (2) Each other concern is small under the size standard corresponding to the NAICS code assigned to the procurement; and (3) The joint venture meets the requirements of paragraph 7 of the explanation of Affiliates in 19.101 of the Federal Acquisition Regulation. (4) The joint venture meets the requirements of 13 CFR 125.15(b). (e) Any service-disabled veteran-owned small business concern (non-manufacturer) must meet the requirements in 19.102(f) of the Federal Acquisition Regulation to receive a benefit under this program. SUBMISSION REQUIREMENTS: Unless paper offers are specifically authorized in an individual solicitation, all responses to solicitations must be submitted electronically as described below. Responses submitted in a paper form are unacceptable. Failure to comply with this requirement may jeopardize the possibility of receiving an award due to noncompliance with the submission requirements. EMAIL SUBMISSION REQUIREMENTS Interested firms having the capabilities to perform this work must submit: ONE (1) ELECTRONIC SF 330, including Parts I and II, and attachments (if any) to idalia,algarin@va.gov no later than 12PM, Eastern Standard Time (EST) on November 13, 2026. Submittals received after the date and time identified will not be considered. The submittal will be date and time stamped by the Microsoft Email system and will be the official record of receipt for the submission. All SF 330 submissions shall be clearly indicated in subject line, displaying the solicitation number and project number and title (abbreviated and shortened is okay). Submission is to be no more than a total of fifty (50) pages; size of emails is not to exceed 10 megabytes (MB). If more than one email is sent, please number emails in subject lines as 1 of 2, 2 of 2 etc. All SF 330 submissions must include the following information either on the SF 330 or by accompanying document: Cover Page with Solicitation Number, Project Number and Title Table of Contents Copy of valid state registration for each lead designer Copy of current https://veterans.certify.sba.gov/ SDVOSB/VOSB certification DUNS Number Cage Code Tax ID number Email address and Phone number (including the area code) of the Primary Point of Contact. | - | Market Research | 11/13/2026 |
1. The purpose of this amendment to Sources Sought notice 36C24226R0116, posted 08/13/2026 for the Renovate A214-A217 for New MRI, Albany VAMC project (528A8-CSI-806), is to respond to vendor questions. Question 1: On page 11 of the solicitation, it reads, "Submission is to be no more than a total of fifty (50) pages." We request that this 50 page limit not include the requested attachments such as the signed 852.219-73, copies of licenses, and CPARs and PPQs. Please clarify? Answer 1: The page limit only applies to part 1 of SF330 submissions, part 2 and supporting documentation are not subject to the page limit. Question 2: On page 7 of the solicitation, it reads, "To be rated “ACCEPTABLE” for this evaluation factor, the A/E firm must be within 400 miles from the prime contractor’s main office or official satellite office to the Stratton VA Medical Center, 113 Holland Avenue, Albany, NY 12208." Would you waive this requirement and if not, will a firm who is outside the mileage be non-compliant or can it still be considered for this opportunity? Answer 2: Not having an office within 400 miles of the facility does not preclude your firm from being considered for this award. It is the second lowest weighted evaluation factor, so it has little impact on the overall evaluation. Question 3: Would you extend the due date in light of the NAICS change and the recent holiday? Answer 3: No. All other information remains unchanged. | - | Market Research | 09/14/2026 |
Modification 2 to Presolicitation Notice 36C25527R0007, P/N 657-27-209JB, Project Title: Renovate Building 1 and 53 Main Lobbies. This modification provides answers to RFIs received, revised evaluation criteria and revised supplement B per below RFIs. The SF330 submission due date is extended from November 10, 2026 to November 16, 2026. RFIs Received with VA Responses in blue text: Construction Budget questions: Is that the Estimated Cost of Construction or the maximum for the A/E Design Fee? Estimated Cost of Construction If the $949,026 is the construction budget, this appears low in today's environment given that over 6,000 SF needs to be renovated. Can the VA please re-evaluate this budget and provide an update? The construction budget that was originally used in the supplement B pre-solicitation notice is incorrect. A revised supplement B is attached, changing the construction cost estimate from $949,026 to $725,873. The Construction budget is set and cannot be changed until the design process is underway. Key Personnel questions: The Presolicitation Notice lists: Supervisory, Fire Protection Engineer, Certified Professional Industrial Hygienist, and Life Safety Engineer. The Statement of Work and Supplement B list: Communications (voice/data), Interior Design, VPIH, Plumbing (including fire protection), and a 3rd Party Fire Protection Review. Questions: Which positions require resumes in Section E? What is the intended role of "Supervisory"? Per the SOW & Supplement B the following positions require resumes: Project Manager, Architectural, Mechanical, Electrical, Communication (voice data) Plumbing (Including Fire Protection), Structural, Interior Design, VPIH, Cost Estimator and a 3rd Party Fire Protection Review. Project manager is Supervisory Industrial Hygienist/Asbeston Project Designer: Question: Is an ABIH Certified Industrial Hygienist (CIH) acceptable for this position, and does a CIH satisfy the requirement for the VPIH and the state-accredited Asbestos Project Designer? If these must be separate individuals, should both be identified in the SF330? A CIH satisfies the requirement for the VPIH and the state-accredited Asbestos Project Designer. They can be the same individual. Site Visit: Supplement B, page 6, Section III.6.g: the A/E "shall meet with the COR at the proposed project site" prior to submitting a response Presolicitation Notice, page 4: "Personal visits to discuss this announcement will not be allowed" and only "the most highly rated firm must physically come to the site" before pricing Question: Please confirm that no site visit is required before the SF330 submission. No site visit is required prior to SF330 submission. Laboratory and Special Room Rquirements: Presolicitation Notice, page 7, Evaluation Criteria 2, Specialized Experience and Technical Competence: "laboratory requirements for the firm" Supplement B, page 18, Section B6.II.1: "floor plans of special rooms such as the endoscopy suite, recovery room, etc." Questions: Neither a laboratory nor an endoscopy suite or recovery room appears in the project scope. Do any of these requirements apply to this project? These requirements do not apply to this project. Can the VA please release updated and corrected documents? The evaluation criteria 2 will be changed to remove laboratory requirements for the firm and the COR will revise Supplement B to remove the endoscopy suite and recovery room from the Supplement B. | - | Pre-Solicitation | 11/16/2026 |
Please be advised that the submission deadline for SF 330 has been extended from November 13, 2026, to November 20, 2026, at 2:00 PM EST. Responses to the RFIs are currently being prepared and will be posted prior to the revised due date. | - | Market Research | 11/20/2026 |
AMENDMENT A0001 Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice REQUEST FOR SF 330 36C25227Q0013 Project 578-27-003: Renovate A Section 1st Floor Bldg. 1 (AE) Design/Engineering Services SF-330 Package Due: October 30, 2026, at 1:00 p.m. CST (see details below) Points of Contact: Donita.Grace@va.gov INTRODUCTION: THIS IS A TOTAL 100% SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB) SET-ASIDE in accordance with Public Law 109-461. This is a Request for SF330s for Architect/Engineer (A/E) Design Services for Project Number 578-27-003: Renovate A Section 1st Floor Bldg. 1 (AE) at the Edward J. Hines VA Hospital in Hines, IL. THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. NO SOLICITATION PACKAGE WILL BE ISSUED via SAM.gov. A request for proposal will be issued directly to the top-rated firm for which negotiations will commence in accordance with FAR part 36. The anticipated A/E design services, to be awarded, will be procured in accordance with the Selection of Architects and Engineers Act (Public Law 92- 582), FAR Part 36.6 and VA Acquisition Regulation 836.6. Period of Performance: 449 Calendar Days Contract Type: Firm-Fixed-Price Estimated Magnitude of Construction: Between $10,000,000 and $20,000,000 NAICS Code: 541310 Size Standard: $12.5 Million SBA & SAM : in accordance with VAAR 819.7003, at the time of SF330 submission and prior to award of any contract, the offeror must represent to the contracting officer that it is a (1) SDVOSB eligible firm; (2) Small business concern under the North American Industry Classification System (NAICS) code assigned to the acquisition; and (3) SDVOSB listed as verified in SBA at: https://veterans.certify.sba.gov/ Additionally, all eligible firms must be registered and current in the System for Award Management (SAM) database to be evaluated and eligible for contract award. If the firm is not registered in SAM, you may register online at https://www.sam.gov. 1. PURPOSE: This Source Selection Plan (SSP) outlines the procedures that will be used to solicit architectural and engineering (AE) design services for Project 578-27-003 Renovate A Section on First Floor of Building 1. The goal of this project is to provide complete AE design services to renovate section A of the 1st floor of building 1. 2. ACQUISISTION DESCRIPTION: 2.1: RFI: A Request for Information shall be published to https://sam.gov whereby interested architect-engineering companies shall submit an SF330 package. This competitive procurement shall utilize a best value trade-off source selection process identified in FAR 15. 2.1.a: Source Selection Evaluation Board (SSEB): For the purpose of this acquisition, the SSEB will be same as the Technical Evaluation Board (TEB). 2.1.b: Below are the individual (TEB) evaluation criteria and ratings for the SF330s, listed in descending order of importance. FACTOR 1: SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE (30 Maximum Points) Subfactor 1A: Specialized Experience (15 Points). Subfactor 1B: Additional Experience (10 points). Subfactor 1C: Technical Competence (5 points). The A/E Firm shall demonstrate its specialized experience and technical competence in the design and construction period services for projects of similar size and complexity. Specialized project experience should include design of renovations to existing hospitals, renovations to buildings constructed prior to 1970 w/space constraints, design of Pathology Suites, and HVAC upgrades to existing hospitals. Additional experience includes mechanical, electrical, and structural engineering, architecture, interior design and finishes, physical security upgrades, building management systems/building automation systems (BMS/BAS), Computer-Aided Design and Drafting (CADD), critical path scheduling, fire protection, construction infection control protocols, design and installation of biological refrigeration and preservation systems, design and installation of vacuum tube transport systems, and project phasing and coordination in an active hospital setting. Offeror shall provide a minimum of three (3), and no more than five (5) recent and relevant Government and private experience projects similar in size, scope, and complexity, and experience with the type of projects/competence above. Relevant is defined as those task requirements identified in the Statement of Work. Recent is defined as services provided within the past seven (7) years with at least 50% of the Construction completed. At a minimum, include the following for each submitted project (if applicable): Project title, location, contract number, and detailed narrative describing the scope of services provided including the type of work performed by the offeror and its role in the project i.e., prime contract, Teaming Partner, or subcontractor. Project Owner, owner s point of contact including telephone number and email address. Services & Deliverables provided under the contract/task order Period of Performance, including start and completion dates for design and construction if applicable. Estimated cost of construction based on AE s design Final construction cost (or projected final construction cost if still underway) The percentage of total cost resulting from changes due to AE omissions. To demonstrate technical competence, the offeror shall include narratives of how the firm addresses each of the following topics. Simply restating this list will not be sufficient. The management approach The coordination of disciplines and subcontractors Quality control procedures Familiarity with VA Design Guides/Manuals, Master Specifications and other applicable standards. FACTOR 2: PROFESSIONAL QUALIFICATIONS (20 Maximum Points) Subfactor 2A: Key Positions (15 Points). Subfactor 2B: SDVOSB Compliance (5 Points). The architects and engineers on the firm s staff representing the project or signing/stamping drawings in each discipline must possess a minimum of five (5) years of experience and are required to be licensed, registered, or certified by a U.S. state, the District of Columbia, or a U.S. territory. Provide professional license jurisdiction of issue and license numbers and/or proof of licensure. A resume for each of these key positions must be provided, corresponding with the title matching the disciplines listed for the project. At a minimum, the offeror must describe the professional qualifications and specific experience in the required disciplines within the past five (5) years. Key positions and disciplines required for this project include, but are not limited to: Project Manager Architect Mechanical Engineer Electrical Engineer Plumbing Engineer Structural Engineer Interior Designer The evaluation will consider education, certifications, training, registration, overall and relevant experience and longevity with the firm. Offer must include the following statement of SDVOSB compliance when submitting the personnel proposed to perform the work under this requirement: I [signatory authority] ______________________, [company] _____________________; certify that the team proposed to perform under this requirement demonstrates the capability of 50% SDVOSB performance in compliance of 48 CFR 852.219-10. FACTOR 3: PAST PERFORMANCE (20 Maximum Points) Subfactor 3A: Past Performance of projects identified in FACTOR 1. (15 Points). Subfactor 3B: Average Past Performance of all projects (5 Points). Provide CPARS data for all projects identified in FACTOR 1. For any project that does NOT have CPARS data available, a Past Performance Questionnaire (PPQ) is required to be submitted with the SF330. Please utilize the attached PPQ document. CPARS data and PPQs will not be included in the page count. All projects provided in the SF330 must be completed by the office/ branch/ individual team member performing the work under this contract. The following information must be clearly specified on each performance report: Contract/task order number Project title Prime firm Start date Completion date Offers shall only include CPARS data for the projects listed in FACTOR 1. The contracting officer shall directly retrieve CPARS reviews from www.CPARS.gov to determine average past performance of previous projects. Government Past Performance Information Systems may be accessed. Evaluating past performance and experience may include information provided by the firm, customer inquiries, Government databases, publicly available sources, and additional projects in CPARS. Failure to provide requested data, accessible points of contact or valid phone numbers could result in a firm being considered less qualified. FACTOR 4: QUALITY CONTROL (10 Maximum Points) Subfactor 4A: Management approach (5 Points). Subfactor 4B: Quality methodology (5 Points). The A/E Firm shall describe its management approach, regarding coordination of disciplines and subcontractors, familiarity of the prime firm and any key subcontractors with VA Design Guides/Manuals, Master Specifications, ASHRAE standards, NEC, and other applicable standards. A/E Firm shall also provide the following: Quality Control organization, and management structure. Methods and procedures for control and prevention of nonconformances during design, preconstruction, and construction. Methods and procedures for nonconformance remediation at all stages of project. Methods and procedures for control and prevention of cost, and schedule overruns. Summarized schedules for selected three previous design projects that show initial approved project schedule, and any updates to schedule with time extensions. Provide a narrative to describe reasons and justifications for any deviations from initial schedule. Summarized cost estimates for selected three previous design projects that show initial approved total project cost estimate, and any increases to initial cost estimates. Provide a narrative to describe reasons and justifications for any deviations from initial estimates. Describe any unforeseen conditions that arose during construction for your last three projects. Provide a narrative to describe how your firm assisted the project management team to correct those deficiencies, and any methods used to mitigate extra costs and increases in project schedule. FACTOR 5: CAPACITY (10 Maximum Points) Subfactor 5A: Capacity to complete work within required timeline (5 Points). Subfactor 5B: Resource management and project management (5 Points). The A/E Firm shall attest to its capacity to accomplish the work in the required time. The evaluation will consider the firm s ability to meet the schedule of the overall project, as well as the available capacity of personnel in key disciplines. The A/E Firm shall also provide the following: A list that shows the total number of design and project professionals who are currently employed at the firm with professional titles for each. Total number of projects in study or planning stages Total number of active design projects Total number of active construction phase services A list of personnel assigned to each of the above projects An analysis and report of available capacity of key personnel for immediate new work The respondent shall: Summarize its approach to staffing and company resource management For the key personnel on the proposed project team, tabulate their current and projected workload as percentages of their available individual capacity. List all work awarded to the A/E Firm by the VA during the previous 12 months, as well as any current indefinite delivery, indefinite quantity (IDIQ) contracts that it has. List the current stage and percentage of completion for non-IDIQ projects. A signed statement shall be provided stating that the firm acknowledges that prior to award of the contract, it is required to notify the Government of any changes in its capacity that could limit its ability to perform the work within the required time. FACTOR 6: GEOGRAPHIC LOCATION (5 Maximum Points) Location of the firm, as measured by the travel time (hours) between the Offeror s principal business location and Edward Hines, Jr. VAMC, Hines, IL. Architect must provide details of travel between their main office and Edward Hines Jr, VAMC Hines, IL. This includes but not limited to airport travel time, driving distance, etc. If the architect has a satellite location, the architect must provide details of a fully staffed and well-established satellite office. Leasing documentation may be requested. FACTOR 7: EXPERIENCE IN CONSTRUCTION PERIOD SERVICES (5 Maximum Points) The A/E Firm shall demonstrate its experience in providing Construction Period Services for hospital facilities, particularly in HVAC renovation projects. The respondent shall provide a narrative that describes the methods and procedures used to implement each of the following Construction Period Services tasks: Professional field inspections during the construction period, with descriptions of types of inspections provided, and methods used for inspections and reporting during each phase of construction Review of construction submittals Support in answering requests for information during the construction period Support of construction contract changes to include updated drawings, drafting statements of work, and cost estimates. Weekly construction meeting participation Closeout documents to include final inspections and as-recorded drawings. SECONDARY SELECTION CRITERION*: FACTOR 8: CLAIMS (-5 to 0 Maximum Points) Subfactor 8: Record of significant claims against the firm because of improper or incomplete architectural and engineering services. (-5 to 0 Points). * The secondary selection criterion is used as a tiebreaker, if necessary, in ranking the most highly qualified firms following the completion of discussions. The secondary selection criterion will not be applied when determining a firm s SF330 submission. 2.1.c: After TEB Individual Ratings of the SF330s are completed, the TEB shall convene and develop consensus ratings for the seven evaluation factors of the SF330s as defined above. COMMENT DESCRIPTION DEFINITIONS Strong point: Provides Merit/advantages to VA that increase the likelihood of successful contract performance. Weak point: Flaws/disadvantages that increase the likelihood of unsuccessful contract performance. 2.2.c: The eighth factor (Secondary Selection Criterion) will only be used if needed. The TEB shall provide a listing, in order of preference, of the firms considered most highly qualified to perform the work. The contracting officer shall issue a Request for Proposal (RFP) to the architect-engineer the TEB recommends for negotiations. 3. SOURCE SELECTION PROCESS: 3.1 SF330 Reviews: The board will review and evaluate the submitted SF330 s in accordance with the stated evaluation criteria to determine each individual offeror s ability and capability to perform the work required and confirmation of determination of responsibility per FAR 9.1. a) TECHNICAL EVALUATION BOARD SF330 INDIVIDUAL EVALUATIONS (1) Each board member will conduct an independent review and evaluation and complete an evaluation rating sheet for EACH SF330. Each category will be addressed with strengths or weaknesses noted. (2) The evaluation will be in accordance with the Evaluation Factors which are listed in the solicitation. b) TECHNICAL EVALUATION BOARD SF330 CONSENSUS (1) After each member has completed their independent evaluation, the Chairperson will discuss the evaluations with the entire team and assure each evaluation is complete. (2) During these discussions, the board will reach a consensus rating for each SF330 and document ratings using the consensus evaluation worksheets. The SF330 can be downloaded through the GSA Forms Library at: https://www.gsa.gov/forms-library/architect-engineer-qualifications. No Fax Responses will be accepted: personal visits for discussing this announcement will not be entertained or scheduled. Questions may be directed only by e-mail to Donita.Grace@va.gov. VA Primary Point of Contact: Donita Grace, NCO 12 Contract Specialist, Donita.Grace@va.gov. The page limit for SF330 s will be 30 pages max., any pages after 30 will not be considered. See attached document: P01 - SOW 578-27-003 Renovate A Section 1st Floor Bldg. 1 | - | Combined Synopsis | 11/16/2026 |
Additional Details
Solicitation Number
36C24224R0059
Archive Date
Nov 8, 2024
Office Address
ALBANY, NY, 12208