Notice ID: c0efeea60afc4b66be32f9689247db60Award NoticeAwarded
Z1DA--MINOR-CONST 528-811 CONSOLIDATE PRIMARY CARE 1st FLOOR PHASE 1
Awarded on September 26, 2024. Full description on SAM.gov.
Awarded tounder 36C24224C0136 (source: SAM.gov award notice)• $14.4M
Overview
- Posted
- September 26, 2024
- Notice type
- Award Notice
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of Veterans Affairs
Notice details
- Place of performance
- Department of Veterans Affairs Samuel S. Stratton VAMC 113 Holland Ave, Albany, 12208
- Last updated
- Dec 4, 2025
- Award date
- Sep 26, 2024
- Award amount (SAM.gov award notice)
- $14.4M
Identifiers
- Solicitation number
- 36C24224R0080
- Notice ID
- c0efeea60afc4b66be32f9689247db60
- Award number (PIID)
- 36C24224C0136
Description
RFI#2 The procedures for submittal of offers say to provide details of 3 similar projects from the last 3 years. Can this be bumped back to 5 years? VA will accept going back 5 years. Is it required that bidders complete the Bid Form listed as specification 00 41 13? If so, where should this be placed within the proposal? No, bid form in specification 00 41 13 is not required. Offerors shall submit the summary of proposal items on page three of the solicitation. Is it required that bidders complete the Summary of Proposal items beginning on page 3 of the solicitation document? Yes, offerors should quote a price on each item listed. A single award may be made on proposal item based on availability of funding in the event the offer exceeds the funds available. Is it a requirement that bidders complete the Construction Cost Estimate Breakdown which is specification 00 41 13.10? If it is, can this document please be provided in spreadsheet form to bidders? Yes, it is required and will be provided as an Excel template. In general, why are some FAR and VAAR incorporated by text whereas other are incorporated by reference into the solicitation? a. Supplemental provisions or clauses published in agency acquisition regulations shall be in full text and the prescription for the use of each shall be included. The solicitation explicitly says to submit the following documents: VETS-4212, Buy American, Limitations on Subcontracting, Annual Reps and Certs, and Violation of Arms Controls Treaties. Are there any other clauses that must be submitted because they are incorporated into the solicitation even though they aren t explicitly mentioned in the instructions on pages 7-9 of the solicitation? No, they are referenced in the instructions on page 9. Can it be confirmed that the superintendent, CQC system manager and SSHO all must be different individuals and that they all must be on-site? Do not need to be separate individuals, but the individual assigned for task(s) must have the qualifications for each of the requirements. This project is expected to have workers on multiple shifts. Since all three of these functions must be on site whenever workers are present, the VA expects multiple individuals assigned to this project. Will a security plan be required as a submittal for this project? A security plan is required. See Specification 01 00 00 Part 1.6. The security plan can be incorporated into the Safety plan. 010000 paragraph 1.13.C says that contractors should provide as-built drawings within 15 calendar days after each completed phase. Is this a specification the VA is going to follow? As-Builts shall be maintained current at all times, per specification 010000 Part 1.13. The intent is that the GC shall maintain at all times, red-line markup drawings showing all changes that deviate from the design documents. These As Built red-line markup drawings will be made available by the GC in the field for compliance as the project proceeds through construction and verified accurate by the VA COR at each phase. Formal final submittal to the VA at the end of the project. What does the VA expect to have submitted for specification 010000 paragraph 1.13.D? This is a specification that is in all VA projects but is never addressed/asked for? Does the use of Autodesk Construction Cloud make this an irrelevant paragraph? Autodesk Construction Cloud does not eliminate, reduce or otherwise alleviate specification requirements. All provisions in Specification 01 00 00 Part 1.13 will be enforced. The GC shall redline any changes made in the field that deviate from the approved shop drawings. The GC shall make the redline shop drawings available to the VA COR for checking and verification. Does the VA plan to hold contractors accountable to the exact wording of paragraph 1.14.A under specification 010000? Paragraph 1.14.C seems to imply that the requirements of this section are not firm. AE Response: Specification 01 00 00 Part 1.14.C will be enforced. Paragraph 1.14C identifies the Pre-Warranty Conference and should not be construed to imply that the requirements of section 1.14A are not firm. Does the VA want 010000 paragraph 1.14.F submitted as a submittal item? Yes. Which items does the VA require the warranty tags listed in 010000 paragraph 1.14.F for? Warranty Tags are required for all appropriate equipment. Warranty documentation is required for all warrantied items. In addition to warranty documentation, warranty tags are required on MEP equipment for maintenance purposes. Specific equipment requiring a warranty tag will be identified by the VA COR. Regarding 010000, paragraph 1.22, which addresses O&M documentation: Does paragraph A imply that O&M documentation is required only when specified in individual sections? For instance, 260923, paragraph 1.4.2, explicitly calls for manuals, while 260533, paragraph 1.4, does not mention manuals. Does this mean O&M documentation is not needed for 260533? O&M documentation is required as detailed in the various sections of the specifications AND as specified in 01 00 00, Part 1.22. Concerning 010000 paragraph 1.22.B, does the government want 4 hard copies and 1 compact disc of every O&M manual, or is a .pdf acceptable? Upload electronic copies to Autodesk Construction Cloud, and 2 hard copies are to be delivered. Concerning 010000 paragraph 1.22.C, does the government have a list of equipment they would like training on for this project, or should we assume that it is needed only where it is explicitly called for in individual specification sections? O&M documentation and training is required as detailed in the various sections of the specifications AND as specified in 01 00 00, Part 1.22. Concerning 010000 paragraph 1.29 does this paragraph indicate that the VA will not accept photographs taken by the contractor and submitted in a haphazard fashion? We just want to be certain that all contractors will be held to this specification s standards. All contractors shall abide and be held to the same requirements for photographic documentation. The GC must maintain a complete record of all stages and details of existing, as-built, progress and final conditions of construction. There is no requirement for using a professional photographer however the GC must submit electronic photos in a clear, high resolution, suitably lit, concise, and well-organized manner as determined by the VA COR. The photos are to be date, time stamped and categorized and identified in such a way to allow context and clear identification of relevant subject matter, and exact location. All photos shall be uploaded in Autodesk Construction Cloud application (Autodesk Build). Concerning 013323 paragraph 1.3.A, we realize this specification is written to provide wiggle room, but will the VA provide a submittal register that is all inclusive to the best of their ability only leaving off items that must be submitted due to inadvertent oversight? The VA will provide the initial submittal register in electronic format. However, as listed in 1.3 A, the GC is responsible for supplying all submittals required by the contract documents. Are 013323 paragraphs 1.6.D and E obsolete because of the use of Autodesk? Yes, these sections are not applicable. All submittals will be submitted and tracked through Autodesk Build. 013323, paragraph 1.8.A states that O&M documents must be submitted throughout the project. Although this specification has always existed, it has not been consistently followed on VA projects. Will this requirement be strictly enforced? Yes, this section will be enforced. We couldn't find any specification requiring a closeout binder that consolidates all O&M documents. Is the expectation to submit O&M documents per individual spec section within 30 days of equipment arrival and then resubmit reviewed documents as individual submittals? Or does the VA expect a final binder containing all O&M documentation at the project's end? If the latter, where is this requirement specified? Please follow 01 33 23 Part 1.8. For 014500 paragraph 1.3.A.1, please define the government s expectations for what they d like submitted as an Interim CQC Plan, CQC Plan and for Additional Requirements for DQC Plan. See Specification 01 45 00 for CQC requirements. DQC plan is not required. Will contractors be held accountable to provide the Environmental Protection Plan outlined in 015719 paragraph 1.4.A.1? Yes. Will contractors be held accountable to provide the demolition debris management plan called for in 017419 paragraph 1.5.B? Yes. Will contractors be held accountable to provide a Sustainability Action Plan called for in 018113 paragraph 1.5.B? Yes. Will contractors be held accountable to provide an IAQ Management Plan called for in 018113 paragraph 1.5.D? Yes. Will contractors be held accountable for providing the submittals called out in 018113 paragraph 1.5.G? Yes. Can it be confirmed that the VA will provide the commissioning agent for this project? Confirmed. Some specification sections, like 024100, do not include paragraphs listing required submittals. Can the VA confirm that submittals are only required where explicitly specified under a heading or subheading labeled 'Submittals'? If not, could you provide a list of all submittals the VA expects that are not clearly defined under such headings? The contractor is responsible for the Submittal Register. The VA will provide the initial submittal register in electronic format. However, as listed in 1.3 A, the GC is responsible for supplying all submittals required by the contract documents. Paragraphs like 1.4.E in spec section 051200 require certificates confirming that each product complies with the specifications. This requirement appears in multiple spec sections. Is this a submittal the government expects from contractors? If so, could the government provide a more detailed explanation of what is required, beyond the guidance in 013323, paragraph 1.2.G? Yes, these typical submittals are required. A letter from the installer on their company letterhead is common. 083616.13 paragraph 1.3.E is an example of a submittal that rarely if ever is expected by the VA. Is this submittal required? If it is, is the VA asking for a letter from the manufacturer? Yes, and a letter from the manufacturer on their letterhead is sufficient. Is O&M data required for section 117300? The individual specification does not mention the need for O&M data. If it is required, could you specify which section and paragraph indicate this requirement? IMPORTANT: The patient lift equipment will be purchased separately by the VA and is not part of this contract and therefore the GC is not responsible for the O&M data for this item. The GC is responsible for the design and installation of the support structure for the lift system, coordinated with the VA s vendor. See Detail B5 on drawing S-503 for the patient lift system support structure and notes referencing the design and installation requirements. A submittal is required for the design of the support structure. Are hard copies of submittals required for specification 211313 or is a .pdf acceptable? All submittals shall be submitted electronically through Autodesk Construction Cloud. Are O&M documents required for 211313? If they are, what paragraph requires them? Yes, per spec section 211313 paragraph 1.4.6.c Are there any submittals specifically required under specification 220511? While paragraph 1.4 discusses submittals, it seems more like a set of instructions for submissions in individual specification sections for Division 22. Additionally, paragraph 1.4.B adds confusion by mentioning labeling items submitted under this section. Could you clarify whether there are any submittals expected directly under 220511? Yes. Submittals are required in this section. 1.4A gives instruction how the submittals submitted for this section should be in accordance with section 01 33 23. 1.4B is the naming convention of how the submittals should be sent in. All submittals should be sent in with same or similar naming convention. Section number, section name, applicable paragraph identification. 220511 1.4, I and J. Coordinated shop drawings. 220511 1.4, K. Rigging plan, if applicable. 220511 2.8, B and C. ID tags for all division 22 items can be submitted under this label. 220511 2.8, E. Valve tags and valve lists. 220511 2.11. Pipe and equipment supports can be submitted under this label. Note that the requirements of 130541 Seismic Restraint for Non-Structural Components still applies. Important note: all items submitted under other division 22 specs must ALSO be fully compliant with this specification. Does the government expect contractors to follow specification 220511 paragraph 1.4.F? Yes. What is meant by 220511 paragraph 1.4.H? The section defines the specifications to submit the list materials/equipment. However, as long as all items listed are properly submitted, the Albany VA is fine with these items being submitted under 220511. Does the government expect a submittal for 220511 paragraph 1.4.K? If rigging is needed for any division 22 equipment, then a rigging plan must be submitted. What does 220511, paragraph 1.4.K, apply to? Does it imply that all Division 22 specification sections require O&M data submissions, even if not explicitly stated in the specific sections? For example, is an O&M manual required for 220519, even though paragraph 1.4 of 220519 doesn t mention it? This question appears to apply to 220511, 1.4, paragraph L. Submit in accordance with 01 00 00 per Instructions. Does paragraph 1.4.M of spec 220511 apply since the commissioning agent is not a subcontractor of the GC? The Commissioning Agent will have access to Autodesk Build, which will satisfy this requirement. Does paragraph 1.5.G of 220511 apply to all of division 22 or only to 220511? FAR clause 52.246-21 applies to the entire contract. Paragraph 1.7.B of 220511 requires the submission of reviewed copies of O&M data. However, specifications like 220519, 220711, and 221400 don t explicitly require the initial submission of O&M data but do reference compliance with paragraph 1.7 of 220511. How are contractors expected to follow paragraph 1.7 of 220511 by submitting reviewed O&M documents if they weren t initially required? In contrast, 220512, paragraph 1.4.E, does call for O&M documents and references 220511, paragraph 1.7, making it clear that reviewed O&M documents can be provided. Could you please clarify this discrepancy? The point here is that the O&M Manuals for the originally submitted equipment should not be submitted blindly if there are changes during construction. Include the price of updating the manuals in the contract modification negotiation. Ensure only updated O&M Manuals are submitted as as-builts. Is any O&M information needed for 230711? None is listed within the individual spec section. I ve never seen insulation come with an O&M Manual. If you submit on something unusual that does, please provide it. Specification 233400 does not explicitly require as-built documentation in accordance with 230511, paragraph 1.7, but it does mandate the submission of O&M documentation per paragraph 1.4.G of 233400. In contrast, a specification like 232223 clearly calls for both O&M documentation (paragraph 1.3.E) and as-built documentation (paragraph 1.5). Does this imply that no as-built documentation is required per 230511 for 233400? If it is required, why is it not explicitly mentioned, as it is in 232223? 230511 requires coordinated shop drawings for all HVAC systems and does require as-builts. This governs all of division 23. What document is the past Performance Evaluation Questionnaire Do we use the Attachment #1 GENERAL CONTRACTOR PREVIOUS EXPERIENCE FORM, the EXHIBIT B PAST PERFORMANCE QUESTIONNAIRE, or is it a third document? If the latter, please provide. a. Please use the PAST PERFORMANCE QUESTIONNAIRE. Is the four-page limit per project or is that the overall page limit for the Factor 2: Past Performance section? a. The overall page limit for factor two. 47. In the original bid s Amendment 4 dated 6/12/24, the Government released the Architect s Addendum 1 dated 5/30/24. This included a summary of changes, eight affected drawings, and six affected specifications. As of Amendment 3 dated 8/14/24, none of these revisions appear to have been reissued as part of 36C24224R0080. a. Architect s Addendum is attached to this amendment. 48. GC300 states, THIS SCHEDULE MUST INCLUDE EACH PHASE BROKEN OUT TO SHOW: A. 2 WEEKS MINIMUM FOR VA TO MOVE PERSONNEL OUT OF THE PHASE AREA. Please confirm if this is limited to the two Phase 1 and Phase 2 phases or to each of the 28-task area sub-phases unless otherwise noted? The note references phases that require major movement of personnel out of an area prior to work commencing. Task 1B (logistics move to the 7C wing) requires the minimum 2-week allowance. There are tasks (which are 1P, 1Q, prep for 2A) that specifically identify a 2-day duration with one week prior notice. See phasing notes on GC-300 for these tasks. 49. GC300 states, 13. UNLESS OTHERWISE NOTED - ALL WORK MUST BE COMPLETED IN A TASK AREA, INSPECTIONS, COMMISSIONING AND PUNCH LISTS CLOSED OUT, PRIOR TO TURNING THAT AREA OVER TO THE VA FOR USE AND MOVING TO THE NEXT AREA. Please confirm minimum duration in working days for VA testing activities. Ans. Testing requirements identified in the contract are ongoing during construction and cannot be defined with a specific number of days. The VA and GC work together to plan testing and minimize impact on the schedule. Please confirm minimum duration in working days for VA inspection activities including production of punch list and review of punch list for these 28-task area phases . Ans. VA inspects contract work daily and will identify an ongoing work list of deficiencies to be corrected by the GC as the task area work progresses. However, before allowing the GC to move on to the next task, the VA will need to inspect, create a punchlist, and inspect again after corrective work is done and accepted before considering the work complete. There will be several days required for these VA tasks. Therefore, please build 90 days into the schedule for all VA inspection and punch list activities. Note this does not included days needed for the GC to work on the punch list corrections. Will the VA require an inspection activity after or only specific phases? Please specify so that this can be built appropriately into the overall schedule. Ans. The VA will inspect all phases and stages of the construction. The VA and GC must work together to schedule required testing and facilitate the progress of the construction. Providing sufficient lead time to schedule the 3rd party tester for special inspection activities (steel welding, spray-on fireproofing of structural steel, etc.) will expedite the schedule. Does the VA also require the two-week VA personnel relocation activity to commence AFTER the completion of each phase/inspection activity or can that begin in advance and timed so that construction efforts can immediately commence in the next area once the first is accepted by the VA? Ans. The two-week VA personnel relocation in task 1B commences after 1A is completed and accepted.
Award Overview
Award Number
36C24224C0136
Award Amount (SAM.gov award notice)
$14.4M
Award Date
Sep 26, 2024
Awardee
Awardee UEI
MUDPMKWH76B8
Awardee CAGE Code
5VSS8
Original Solicitation
Notice ID: c0efeea60afc4b66be32f9689247db60
Posted Date: Sep 26, 2024
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $7.8KSigned Sep 3, 2026
- $13.0KSigned Aug 12, 2026
- $465.4KSigned Jul 22, 2026
- $1.1MSigned Jul 9, 2026
- —Signed Jun 30, 2026
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
36C24224R0080- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- Pre-SolicitationJul 29, 2024
Z1DA--MINOR-CONST 528-811 CONSOLIDATE PRIMARY CARE 1st FLOOR PHASE 1
- 5×SolicitationAug 13, 2024
Z1DA--MINOR-CONST 528-811 CONSOLIDATE PRIMARY CARE 1st FLOOR PHASE 1
- AwardedCurrentSep 26, 2024
Z1DA--MINOR-CONST 528-811 CONSOLIDATE PRIMARY CARE 1st FLOOR PHASE 1
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
****** THIS IS A PRE-SOLICITATION NOTICE ONLY ****** This is a public synopsis of a forthcoming solicitation in accordance with FAR 36.213-2. This is NOT a solicitation, and no solicitation documents are currently publicly available. This pre-solicitation notice is a continuation for Solicitation Number 36C24226B0059, Project Number 632-23-112, for the Replace Roofs and Repair Facades Buildings 6 and 7 at the Northport VA Medical Center located at 79 Middleville Road, Northport, NY 11768. 36C24227B0010 should be referenced going forward. This project will be 100% Service-Disabled Veteran Owned Small Business Set-Aside (SDVOSB). Competition for this procurement is restricted to verified SERVICE-DISABLED VETERAN OWNED SMALL BUSINESS (SDVOSB) Contractors. The SDVOSB must be a small business under the relevant NAICS code and must be registered and verified in SBA's Small Business Search (https://search.certifications.sba.gov/) and https://www.sam.gov. The NAICS code for this procurement is 236220, Commercial and Institutional Building Construction, size standard: $45 million. IAW VAAR 852.219-10, the VIP-listed SDVOSB. Prospective Contractor will not pay more than 85% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, to firms that are not VIP-listed SDVOSBs. The magnitude of construction for this project is between $5,000,000 and $10,000,000. SCOPE OF WORK: The Scope of Work shall generally consist of, but not limited to the following: The Department of Veterans Affairs (VA), NCO 2, Northport VA Medical Center, is seeking highly qualified construction firms to perform full roof replacement and repair of historical brick and stone facades at Building 6 and Building 7. Building 6 is fully occupied, and work will be phased in four stages to limit impact to one side of the building at a time. Building 7 is mostly vacant except for the basement level, and work can be completed in a single phase while maintaining protected exit access from the basement. The project includes complete roof replacement at both buildings, including flashing, fascia boards and trim, soffits, drip edges, underlayment, and shingles, along with replacement of deteriorated roof sheathing where required. Facade work includes repair of distressed brick masonry (cracking, spalling, bowing, and mortar deterioration), repointing to match existing mortar, replacement of damaged cast stone water table sections and windowsills, and stripping, cleaning, and refinishing or replacing window lintel support angles. Additional work includes reconstruction of the main entrance stair and support walls at Building 7, replacement of storm drainage and site drainage systems including new yard drains, catch basins, and underground piping with associated regrading and landscape restoration, and abatement of asbestos-containing materials as indicated on the drawings. PROJECT COMPLETION: Contractor to start immediately after receiving the Notice to Proceed and complete required work in 400 calendar days. Prospective contractors must be registered at https://www.sam.gov in accordance with 38 CFR Part 74 and VAAR 819.70 to be eligible for award. There will be a site visit held for this project and all prospective bidders are strongly encouraged to attend. Details of the site visit will be included in the solicitation document. It is anticipated that the solicitation will be issued on/about November 06, 2026. Information for Bid details, Specifications, Drawings and Contract Forms will be available in electronic format only at: https://www.sam.gov. All interested parties (subs & primes) should register for a user account which lets you save searches, follow changes to opportunities, and join interested vendor lists, and verified as a SDVOSB in SBA's Small Business Search (https://search.certifications.sba.gov/) at the time of offer submission and before award of this procurement. To preserve the integrity of the procurement process, all questions must be submitted in writing to Katrina Crawford, Contract Specialist, via email at katrina.crawford1@va.gov. | - | Pre-Solicitation | 11/06/2026 |
| - | Awarded | Open | |
This pre-solicitation notice is to inform potential offerors that the Albany NY VA Medical Center will be posting a solicitation (36C24227B0006) on or about November 6th, 2026, to provide all labor, materials, tools, equipment, and supervision necessary to complete the Consolidate Primary Care Reception project(528A8-22-814). This project includes the construction services for second part of the Consolidate Primary Care (CPC) projects phase 1 that will continue to consolidate the primary care units currently located on the 1st, 4th, and 8th floors in Building 1 of the Albany VA Medical Center campus: blue, red, and silver teams respectively along with all relevant and necessary functions. The three primary care units are being combined on the first-floor core of the Albany VAMC. Also included is the relocation of the Agent Cashiers office in the existing space. In this phase, a new reception area shall be built to accommodate six (6) Medical Support Assistants (MSA) desks and a waiting lobby at the Albany VA Medical Center 113 Holland Avenue, Albany NY 12208. It has been determined that there are qualified firms in accordance with Public Law 109-461 that are capable of performing under NAICS Code 236220, "COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION", with a size standard of $45M. Therefore this procurement is 100% set-aside for Service Disabled Veteran Owned Small Businesses. The estimated construction value of this project is between $1,000,000.00 and $5,000,000.00. Information regarding the scheduled site visit will be stated in the Solicitation. Bid bonding will be required to respond to this IFB once released. OBTAINING SOLICITATION MATERIAL Solicitation materials consisting of the Information for Proposal Details, Specifications, Drawings and Contract Forms will be available on http://www.sam.gov in electronic format only. These should be available on or about November 6th, 2026. An Offeror's mailing list, list of interested parties and/or list of attendees at site visits WILL NOT be prepared nor distributed by the Contract Specialist. SOLICITATION AMENDMENTS: Amendments to the solicitation will be posted at http://www.sam.gov. Paper copies of the amendments will NOT be individually mailed. No other notification of amendments will be provided. Offerors are reminded that they are responsible for obtaining and acknowledging all amendments to this solicitation and attaching to their bid. All bids and correspondence will be by email only to the Contracting Officer: Michael.Spivack@va.gov. | - | Pre-Solicitation | 11/06/2026 |
Bid Log - Northport Chiller - Public | - | Special Notice | Open |
Presolicitation Notice Presolicitation Notice Page 3 of 3 Pre Solicitation Notice *=Required Field Presolicitation Notice Page 1 of 3 DESCRIPTION Presolicitation Notice Presolicitation Notice Page 4 of 4 *=Required Field Presolicitation Notice Page 1 of 4 Page 1 of Page 1 of This pre solicitation notice is to inform potential offerors that Bath, NY VA Medical Center will be posting a solicitation (36C24227B0004) on or about October 28, 2026, for Replace Flooring RM140 B76. All work is to be performed at the Bath, NY VA Medical Center. General scope of work includes: The general scope of this project is to the replace the existing flooring in Building 76, Rooms 140 and 140A, based on the design documents provided. Additionally, the project encompasses electrical modifications to support the X-ray equipment, including extending power conduits and cables, installing new power switches, providing equipment structural support, and other related work as indicated in the design drawings. As Building 76 operates as a fully functional medical center, work hours may be restricted, and off-hours work may be necessary to ensure uninterrupted hospital operations, as directed by the Contracting Officer s Representative (COR). The contractor shall complete all work within 60 days of receiving the Notice to Proceed. The Bath VAMC requires a Contractor to perform the construction work necessary to accomplish this goal. The Contractor shall provide all supervision, labor, services, tools, equipment, and materials required to perform work. Work under this effort is fully described in the project drawings and specifications. Additional administrative and management related requirements are described throughout this document. A brief overview of the construction work will be included with SOW in the solicitation. It has been determined that there are enough qualified Service-Disabled Veteran Own Small Business (SDVOSB) firms that are capable of performing under NAICS Code 236220 Commercial and Institutional Building Construction with a size standard of $45.0M. Therefore, this procurement is 100% set-aside for SDVOSB. The magnitude of the project is between $25,000 and $100,000. Information regarding the scheduled site visit will be stated in the Solicitation. Bid bonding will be required to respond to this IFB once released. It is anticipated that this contract will be awarded o/a November 2026. OBTAINING SOLICITATION MATERIAL Solicitation materials consisting of the information for bid details, specifications, drawings, and contract forms will be available on http://www.sam.gov in electronic format only. Should be available on or about June 2026. SOLICITATION AMENDMENTS: Amendments to the solicitation will be posted at http://www.sam.gov. Paper copies of the amendments will NOT be individually mailed. No other notification of amendments will be provided. Bidders are reminded that they are responsible for obtaining and acknowledging all amendments to this solicitation by the time of bid opening. Once the solicitation is released, bids will be accepted electronically only, due to ongoing safety concerns regarding the COVID -19 pandemic. Please send all correspondence or inquiries by email only to the Contracting Officer. Contact Information: Idalia Algarin, Contracting Officer at Idalia.Algarin@va.gov | - | Pre-Solicitation | Open |
Additional Details
Solicitation Number
36C24224R0080
Archive Date
Nov 25, 2024
Office Address