Notice ID: 1011910c749e425e8961fb1b3dae51ccAward NoticeAwardedArchived
Z1NE--Well Water Supply System P/M and Service - Northport VAMC
Awarded on June 23, 2026. Full description on SAM.gov.
Awarded tounder 36C24226P0714 (source: SAM.gov award notice)• $377.8K
Overview
- Posted
- June 23, 2026
- Notice type
- Award Notice
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 221310: Water Supply and Irrigation Systems
- Agency
- Department of Veterans Affairs
Notice details
- Office
- 242-NETWORK CONTRACT OFFICE 02 (36C242)
- Place of performance
- Department of Veterans Affairs Northport VA Medical Center, Northport, New York, 11768
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
- Award date
- Jun 23, 2026
- Award amount (SAM.gov award notice)
- $377.8K
Identifiers
- Solicitation number
- 36C24226Q0417
- Notice ID
- 1011910c749e425e8961fb1b3dae51cc
- Award number (PIID)
- 36C24226P0714
Description
36C24226Q0417 Responses to solicitation 36C24226Q0417 questions Question #1 Please provide detail for any equipment that is currently not operating properly or is off-line that requires immediate attention. Answer #1 None at this time.  Question #2 Please confirm that the VA is responsible for all non-consumable maintenance items (i.e. pumps, motors, spare parts, etc.) and the bidder is responsible for just the consumable items, such as oil and grease? Answer #2 The contractor shall supply all necessary supervision, labor, supplies, materials, equipment, tools and incidentals to compete the work. Question #3 The Scope Of Services on page 5 of 59 states All emergency repair(s) and/or services will be treated as a stand-alone service request independent from planned corrective maintenance work and will require prior approval from the Contracting Officer (CO). Should we assume that emergency repairs will not need to be completed during the emergency visit but will need to be quoted and repaired at a later date? Answer #3 The Northport VA Medical Center may request emergency repair(s) and/or services as needed and require prior approval from the Contracting Officer. Question #4 The Scope Of Services on page 12 of 59 states The contractor will keep sufficient types and quantities of materials and stock on hand to ensure practical, economical and continuous service. This includes an inventory of spare and repair parts and equipment. Is the contractor required to have the inventory of spare parts and equipment on site Day 1? If so, please provide a list of the required spare parts and equipment so they can be priced and included in our proposal Answer #4 The contractor should keep the common, routine materials and parts for your trade in stock and available, i.e. basic tools and accessories that are routinely needed to perform the trade.  The overall intent is to ensure the contractor can perform work without delays caused by waiting for standard tools or commonly used materials. The Northport VA Medical Center does not provide onsite storage facilities. Question #5  Section F Annual Inspection(s) Tank Evaluations (page 8 of 59) requires an annual inspection of the two (2) water storage facilities. Please provide the size of the storage facilities and location (i.e. are these the two clear wells that are outside of the water treatment facilities and location (i.e. are these the two clear wells that are outside of the water treatment facility)? Answer #5 Tank evaluations are for the clear well and the elevated water storage tank. The 25,000-gallon clear well tank is the located at the water treatment plant building 220 as pictured in attachment G. Please see attachment E for the location of the 300,000-gallon elevated water storage tank. Question #6 Is there a site visit? Answer #6 The attachments were provided in lieu of a site visit to enhance competition.
Award Overview
Award Number
36C24226P0714
Award Amount (SAM.gov award notice)
$377.8K
Award Date
Jun 23, 2026
Awardee
Awardee UEI
UT6VSP7H7XE5
Awardee CAGE Code
4BX96
Original Solicitation
Notice ID: 1011910c749e425e8961fb1b3dae51cc
Posted Date: Jun 23, 2026
Original Response Deadline: Not specified
Contacts
Contracting Officer
Primary Contact
Documents
Files (1)
- Download
36C24226Q0417_2.docx
22 KBAdded in Award Notice version 3Posted
Links (1)
- Department of Veterans Affairswww.va.govPosted
Lifecycle
- 3Version 3Award NoticeArchivedCurrent
Z1NE--Well Water Supply System P/M and Service - Northport VAMC
Other notices for this solicitation
- Pre-SolicitationRelated noticeMar 17, 2026
Z1NE--Well Water Supply System P/M and Service - Northport VAMC
- SolicitationRelated noticeMar 26, 2026
Z1NE--Well Water Supply System P/M and Service - Northport VAMC
- Pre-SolicitationRelated noticeMar 26, 2026
Z1NE--Well Water Supply System P/M and Service - Northport VAMC
- SolicitationRelated noticeApr 1, 2026
Z1NE--Well Water Supply System P/M and Service - Northport VAMC
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
FCC Yazoo City FY 2027 Water Treatment Services | 65% | Awarded | Open |
Area III MATOC vendor only. See the attached details. | 61% | Combined Synopsis | 08/13/2026 |
Water System Maintenance | 59% | Market Research | 11/06/2026 |
Saratoga National Cemetery is in need of Water Testing Services, which involves the collection and testing of water to maintain Government owned Water Purification System. -- H246 Re-Soliciting as 100% SB - Water Testing Services Base Contract FY23 Water Purification System Testing, Maintenance & Record Keeping Services: Furnish all parts, materials, labor, transportation, equipment and tools necessary to collect and test Re-Soliciting as a 100% Small Business Set Aside (SDVOSB, VOSB, and SB). Saratoga National Cemetery is in need of Water Testing Services, which involves the collection and testing of water to maintain Government owned Water Purification System. | 53% | Combined Synopsis | 04/10/2023 |
The Federal Bureau of Prisons (FBOP) and the Federal Correctional Institution Oxford located at 350 Elk Avenue, Oxford, Wisconsin, intend to make a single award to a responsible entity that will provide all necessary equipment, labor, materials, and incidentals to remove existing water softeners and install a new centralized water softener for the entire Institution. Awarded Contractor shall provide materials, labor, and equipment to remove existing water softeners, pipe through and install a new centralized water softener and all associated components. FCI Oxford currently has several commercial-grade water softeners which are failing to efficiently reduce water hardness and protect water systems, as well as connected equipment. The new centralized system should improve water quality, minimize calcium buildup, and extend the service life of plumbing infrastructure and appliances. The contractor would place a brine tank and softener to be installed at the water tower. Water would be treated right off the water main, therefore there would be no need for bagged salt to be brought in weekly. | 53% | Combined Synopsis | 12/04/2026 |
Additional Details
Solicitation Number
36C24226Q0417
Archive Date
Jul 3, 2026
Office Address
ALBANY, NY, 12208