GovChime
Notice ID: c5342039e680e8d8ab588b3d826a35d6Presolicitation

C--A/E Site Preparation Replacement for PET-CT, 642-CSI-122

Archived on November 20, 2018. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:00 AM UTC−05:00
Posted
September 19, 2018
Notice type
Presolicitation
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
NAICS
541310: Architectural Services
Agency
Department of Veterans Affairs

Notice details

Office
244-NETWORK CONTRACT OFFICE 4 (36C244)
PSC
C: ARCHITECT/ENGINEER SERVICES
Last updated
Sep 10, 2025

Identifiers

Solicitation number
36C24418R0673
Notice ID
c5342039e680e8d8ab588b3d826a35d6

Description

ACQUISITION INFORMATION: The Philadelphia Department of Veterans Affairs Medical Center located at 3900 Woodland Avenue is seeking professional Architect and Engineering (A&E) services for Project No. 642-CSI-122, Site Preparation to Replace PET-CT. This announcement is being issued in accordance with the Selection of Architects and Engineering firms (Public Law 92-582) and implemented in the Federal Acquisitions Regulations (FAR) Part 36. Architectural and Engineering (A&E) firms permitted by law to practice the professions of architecture or engineering are requested to send two copies of an SF 330 (8/2016 Edition) and CD from qualified and eligible firms classified as 100% SERVICE DISABLED VETERAN OWNED SMALL BUSINESS CONCERNS. Firms will be selected for negotiation based on demonstrated competence and qualifications for the required work. This is not a Request for Proposal and an award will not be made with this announcement. This announcement is a request for SF 330s from qualified firms that meet the professional and set aside requirements listed in this announcement. CORPORAL MICHAEL J. CRESCENZ DEPARTMENT OF VETERAN AFFAIRS MEDICAL CENTER UNIVERSITY & WOODLAND AVENUES PHILADELPHIA, PA 19104 A/E Scope of Work For Site Preparation to Replace PET-CT PROJECT NUMBER 642-CSI-122 WORK STATEMENT Construction Magnitude: $2,000,00.00 - $5,000,000.00 Bid Documents/Final Report Ready By: 220 days after NTP DESCRIPTION OF WORK Provide professional Architect and Engineering (A/E) services in order to develop construction documents to complete renovation for site prep of the replacement of existing Medical Equipment, PET CT equipment, at the Corporal Michael J. Crescenz Medical Center in Philadelphia Pennsylvania. Work to include modifications to normal and emergency power systems necessary for the new medical equipment, installation of lead shielding, renovation of structural support system for radiographic equipment, HVAC and plumbing systems and medical gas. The project will also include architectural finish upgrades necessary to support the equipment replacement including but not limited to walls, ceilings, floors and millwork. The scope of this project is to provide all the labor, materials, and equipment necessary to fully develop construction drawings and specification documents for the site preparation for replacement of medical equipment will include but not limited to the following: Modifications to normal and emergency power systems necessary for the new medical equipment. Installation of lead shielding. Renovation of structural support system for radiographic equipment. HVAC and plumbing systems and medical gas. Architectural finish upgrades necessary to support the equipment replacement including but not limited to walls, ceilings, floors and millwork. Provide a cost estimate for the construction costs associated with their final drawings and findings at required intervals. Work shall be phased to minimize or eliminate service outages. Provide an independent third party life safety review of drawings and specifications The A/E shall collaborate with Medical Center Staff to conduct a Pre-Construction Risk Assessment to determine the requirements for Infection Control, Interim Life Safety Measures, occupational safety and health, patient and public safety, security controls for physical and logical access, environmental controls, and limitations on vibration noise and disruptions to operations and utilities. The results of these assessments will be incorporated as part of construction documents. Provide commissioning of building systems/components in accordance with VA Directives and Guidance including all commissioning plan, inclusion of requirements in construction documents, verification of installation and performance of commissioned systems... The selected A/E firm will be required to collaborate with the Corporal Michael J. Crescenz Medical Center (CMC VAMC) and Office of Construction & Facilities Management Staff and VA Design Guides to determine structural, architectural, elevator, mechanical and electrical design requirements. The firm will also attend programming meetings with Medical Center Engineering staff. Drawings concerning the existing conditions will be provided to the selected A/E firm but are for reference only, until they have been verified by the selected AE design team. Any deviation between the drawings and actual conditions will be called out on the drawings and reported to the CMC VAMC Engineering Department. The selected A/E firm will also be responsible for providing a construction estimates of contract time and cost associated with their final drawings and specifications. THE SELECTED A/E FIRM SHALL ADHERE TO THE FOLLOWING GUIDELINES: Construction will be addressed in multiple phases to allow operations to continue during construction to the extent possible. Phasing will be determined and incorporated into the 35% design documents. Phasing must work within budget and allow the VA to continue operations with minimal interference. All designs shall be accomplished in accordance with VA guidelines and specifications, which are available on the Internet at http://www.cfm.va.gov/til/. A/E shall pay particular attention to NFPA, VA Handbook and VHA Directives. A/E is responsible for providing all services necessary for design of this project i.e. mechanical, electrical, sampling and monitoring, and control. Any major design deviations from these manuals should be discussed and approved by the Medical Center before the design is incorporated on the contract documents. SCHEDULE Design Duration is 220 Calendar Days from Notice of Proceed. Furthermore, AE Firm shall meet the following schedule, unless negotiated otherwise with VA CO and COR prior to award. Notice to Proceed  Initial Meeting With VA COR and End User 14 Days After Notice To Proceed Submission of 35% Documents to VA COR 45 Days After Initial Meeting VA Comments to 35% Documents 14 Days After Reception of 35% Package Submission of 70% Documents to VA COR 60 Days After Reception of 35% Review Comments From VA VA Comments to 70% Documents 14 Days After Reception of 70% Package Submission of 100% Documents to VA COR 45 Days After Reception of 35% Review Comments From VA VA Comments to 100% Documents 14 Days After Reception of 100% Package Submission of Stamped and Sealed Documents to VA COR 14 Days After Reception of 35% Review Comments From VA SITE INVESTIGATION Make site visits as required to determine existing as-built conditions affecting this project. Information including drawings and other documentation provided to the A/E is used as reference only. A/E shall survey existing conditions including areas above, below and adjacent to the work sites that will be affected by the project. Investigation shall include but not limited to building structure, mechanical, plumbing, life safety, security and electrical systems. The A / E shall arrange for and oversee the performance of such investigations as he/she determines are required for the proper design of the project. Existing building systems shall remain operation at all times during construction. Auto CAD background drawings (if existing) will be provided by the VA upon request. The A/E shall field verify all dimensions, wall layouts, etc. GENERAL A/E firm shall have licensed professional architects/engineers for each engineering, safety, and architectural discipline. A/E shall be responsible to provide a complete bid package to the Contracting Officer consisting of plans (signed Mylar originals), specifications, cost estimates and their related information. Drawings shall be submitted in AutoCAD Release 2017 and PDF, specifications in Microsoft Word and PDF and cost estimate in Microsoft Excel. A complete bid package will be submitted on a CD-R or by alternate electronic method accessible by the COR. The contract drawings shall have a cover sheet, which shall include but not limited to the following information: Department of Veterans Affairs Logo Drawing Index AE Firm Name and Logo General Notes Signature Blocks for The Following: Executive Leadership Chief of End Service Chief of Facilities All drawings shall be scaled. Each professional discipline shall be separately designed and be sealed by the respective A/E. All design work shall be coordinated by the prime A/E, who shall be responsible for all field investigation, site surveys, measurements and engineering design calculations. The A/E shall assure compliance with and design according to all local, federal, Department of Veterans Affairs, OSHA Regulations, state laws, regulations, codes and ordinances. AE shall prepare specifications using the VA master specification. Plans shall be drawn using standard professional and acceptable engineering drafting skills, scales and standards. The A/E shall be responsible to provide and show in scale plans, elevations and details required to construct this project in which the prospective bidder is clear on the proposed intent and scope of work. A/E shall define and indicate on plans all new and existing conditions. A/E shall show, draw, locate, define, denote and detail all points of connection of new work to the existing. A/E shall plan, define, detail, draw and show on the contract documents exact routing of any new utility proposed for this project. A/E shall as part of this project, physically inspect each new routing, provide routings and/or rerouting of existing utilities to prevent any conflicts. BRAND NAME ONLY: Any Brand Name Products listed in specifications or drawings must be justified by spec writer and approved by Contracting Officer if under $500,000 or approved by the HCA if over $500,000. Justifications must include description setting forth those salient physical, functional, or other characteristics of the referenced product which are essential to the minimum needs of the Government. BRAND NAME OR EQUAL: Any Brand Name product in the drawings or specifications not listed in the Brand Name Only list provided and approved by the Government shall be followed by Or Equal . Construction solicitation documents shall list multiple acceptable brand name products and a description in the solicitation of the salient physical, functional, or other characteristics of the referenced products which are essential to the minimum needs of the Government. List of Brand Name Or Equal Products shall be submitted to CO for approval. ARCHITECTURAL Provide final ¼ scale plans for the proposed project. Plans should show partition revisions and repairs necessary to maintain life safety and egress from the area. Show all rooms, room numbers as provided by VAMC, corridors, electrical closets, mechanical shafts and spaces, plumbing fixtures, all vertical circulation. Provide all demolition plans for all items required for removal. The A/E firm shall provide an Infection Control Risk Assessment (ICRA) plan to protect staff and patients through the use of physical separation, negative pressurization of the construction site, etc. and coordinate with all trades. Provide 1/8" scale reflected ceiling plans for all areas including locations of types of ceiling systems (i.e. gypsum board, acoustic tile etc.) coordinated with electrical and plumbing items scheduled for installation. Provide a separate 1/8 scale Life Safety Plan for fire protection measures. Include smoke barrier partitions, fire partitions, fire alarm devices, fire extinguisher cabinets and exit patterns to demonstrate compliance with the applicable codes and the fire egress pattern. Provide a title sheet with drawing index listing all drawings in the complete set. If necessary, provide and edit list of symbols used for this project and appropriate general notes. Provide all details necessary to describe the installation requirements of the architectural elements (i.e. wall types, typical framing details, typical door details, etc.). A/E shall select all interior finishes and submit three (3) options to the CMCVAMC for approval. Provide room finishes as required by PG-18-14 Room Finishes, Door and Hardware Schedule . Provide 1/8 room finish plan and binder with samples of finishes selected. Coordinate plan with Specification section 090600 Interior / Exterior Finishes, Materials and Finish Schedule. INDUSTRIAL HYGIENE Provide Industrial Hygiene (IH) report evaluation the presence of asbestos containing material and lead based paint within Building based on as-built record drawings, bulk sampling and site investigation. This report will be used to establish complete abatement plans in 1/8 scale. The IH shall be licensed to provide services in the City of Philadelphia. PLUMBING Provide demolition plans for fixtures and piping to be removed. Provide floor plan showing all plumbing fixtures and associated water, waste, etc. relocations necessary to support the installation of the new emergency distribution system. Plumbing lines should include all points of connection with the existing plumbing system. Provide details necessary to fully describe the installation requirements. Provide riser diagrams showing current conditions and any demolition and/or new work required in project FIRE PROTECTION Provide drawings to fully detail modifications to the existing fire sprinkler system necessary Plans shall be reviewed by a professional Fire Protection Engineer. MECHANICAL Provide mechanical cooling or ventilation systems where determined necessary due to equipment heat loads. Provide data that is the basis for the design; include design calculations, parameters and factors, reference source of all data. Include methods to be used in sizing ducts and piping. Provide duct and piping layouts plans. Show smoke and fire protection features of the HVAC system. Provide demolition plans for all HVAC systems and devices to be removed. Provide schedules for all HVAC equipment to be incorporated on the project Provide details necessary to fully describe the installation requirements of the HVAC systems selected. The HVAC design should be based on direct digital control (DDC) and connected to the existing Building Automated System (BAS). ELECTRICAL Provide basis for design, including basic assumptions and points of connection with existing electrical system. Provide all plans and details necessary including the replacement of automatic transfer switches, shunt-trip breakers, new feeders, etc. Provide updated single line diagrams for normal and emergency power. Provide lighting and power plans. Provide demolition drawings for all items to be removed and relocated. Provide calculations and analysis of voltage drop, overcurrent protection, selective coordination, and arc flash. Provide light fixture schedule and fixture detail drawings. Provide panel schedules for all new/existing panels incorporated on the project. Use equipment manufacturer s documents for basis of design. REVIEWS The AE shall lead a design development conceptual meeting (multiple if necessary) with Facilities Management Services and the End User shortly after the award of the contract to discuss scope, phasing, and existing conditions. AE shall provide meeting minutes to COR after each meeting. Formal Reviews: There will be three formal reviews; one each at the 35%, 70%, and 100% design completion stages. Further breakdown of what is required in each of the above mentioned is detailed below. The A/E shall supply two (2) full size copies of drawings, two (2) copies of specifications and two copies of cost estimates for each formal review. Documents shall be reviewed by the Government and sent back to A/E. The A/E shall incorporate any comments, notes or changes provided by VA into the next review package. In addition, the AE shall incorporate any comments, notes or changes provided at 100% review meeting into the construction documents and cost estimate. THIRTY FIVE PERCENT (35%) SCHEMATIC SUBMISSION DOCUMENTS WORKING DRAWINGS Specifications: Submit (2) copies of custom edited VA master specifications table of contents. Specification table of contents shall be tailored specifically via redlining for project, with any unnecessary specification sections determined to not apply to project redlined. Specification table of contents shall also be provided in Adobe Acrobat file format. Constructions Drawings: Provide (2) copies of plans showing all necessary alterations to existing areas affected by this project. Drawings should include demolition plans, arch plans, HVAC plans, plumbing plans, life safety plans, IRCA plans, electrical plans, control plans, security plans, and IT plans. Plans shall also be submitted in and Adobe Acrobat file format. AE shall also produce a report that will include: Identification of potential bid deducts for any project Recommended Phasing based on previous conversations with VA Document stating the dates, times, and location of all existing conditions surveyed. Names of surveyors shall be provided as will any and all field observations with AE recommendations Identification of any asbestos and lead with survey reports if applicable Estimates: Provide two copies of construction cost estimates with any and all potential bid deducts included. Estimates shall be divided by trade (labor, equipment, and material) Documents shall meet all applicable federal and state codes/requirements, including but not limited to OSHA, DER, EPA, NEC, and NFPA 101 Life Safety Code and shall meet the requirements of VA Program Guide PG-18-15. SEVENTY PERCENT (70%) DESIGN DEVELOPMENT SUBMISSION DOCUMENTS WORKING DRAWINGS AE shall provide report detailing the addressing and/or incorporation of any and all VA comments from 35% review into 70% drawings. Specifications: Submit (2) copies of marked-up VA master specifications for each section to be used in final specifications. Specifications shall be tailored specifically for project, with any unnecessary specification sections removed, spec writer notes deleted, and any and all editing (i.e. // marks or [ ] brackets) of specifications sections shall be completed with any missing information shall be inserted into said editing marks or brackets. AE shall provide a master submittal registry identifying all submittals, separated by specification section, required to be submitted by the contractor for review during construction as part of AE s 70% package. Specifications shall also be provided in Adobe Acrobat file format. Brand Name Only: A/E shall provide a list of any proposed Brand Name Only materials or equipment in project with individual justifications as part of 70% drawings for CO approval. Brand Name Or Equal: A/E shall provide a list of any proposed Brand Name Or Equal materials or equipment in project with individual justifications as part of 70% drawings for CO approval. Constructions Drawings: Provide (2) copies of plans showing all necessary alternations to existing areas affected by this project. Drawings should include phasing, bid deducts if applicable, existing utilities, demolition plans, elevation sections and details, HVAC plan, plumbing plan, life safety plan, IRCA plan, controls plans, architectural plans, security plans, IT plans, electrical plans, single line diagrams, panel schedules and calculations. Drawing or drawings shall also be included showing all equipment to be installed on project as well as who will provide and who will install said equipment. Plans shall also be submitted in Adobe Acrobat file format. Preconstruction Risk Assessment: AE shall provide two (2) copies of initial Preconstruction Risk Assessment as required by MCM 138-41. Assessment shall also be provided in Microsoft Word and Adobe Acrobat file formats. ICRA: ICRA drawings shall be based on Preconstruction Risk Assessment and will show all walls, anti-rooms, and location of negative air exhaust for each phase. Abatement: Asbestos and Lead Abatement, if required, shall be included in 70% drawings. Phasing: 70% submission drawings shall include clearly delineated phasing lines on all architecture, mechanical, plumbing, electrical, and fire protection drawings Finishes: As part of 70% submission, contractor shall fully design 3 separate finish scheme options and provide samples of each to VA Interior Designer for review and approval. Bid Deducts: Bid Deducts shall be finalized based on VA 35% comments, be incorporated into the 70% design submission, and clearly delineated in drawings, specifications, and estimate. Third Party Life Safety Review: Contractor shall employ and utilize the services of a third party, independent life safety consultant to conduct a fire and life safety peer review of the project. A complete copy of consultant s report will be submitted as a part of the 75% design. Estimates: Provide two copies of construction cost estimates with any and all potential bid deducts included. Estimates shall be divided by phase, spec section and trade (labor, equipment, and material). Documents shall meet all applicable federal and state codes/requirements, including but not limited to OSHA, DER, EPA, NEC, and NFPA 101 Life Safety Code and shall meet the requirements of VA Program Guide PG-18-15. ONE HUNDRED (100%) PERCENT CONSTRUCTION DOCUMENT SUBMISSION DOCUMENTS WORKING DRAWINGS AE shall provide report detailing the addressing and/or incorporation of any and all VA comments from 70% review into 100% drawings. Specifications: Submit (2) copies of marked-up VA master specifications for each section to be used in final specifications. Specifications shall be tailored specifically for project, with any unnecessary specification sections removed, spec writer notes deleted, and any and all editing (i.e. // marks or [ ] brackets) of specifications sections shall be completed with any missing information shall be inserted into said editing marks or brackets. AE shall provide a finalized, master submittal registry identifying all submittals, separated by specification section, required to be submitted by the contractor for review during construction in an Excel Format as part of 100% package. Specifications shall also be provided in Adobe Acrobat and Microsoft Word file formats. Brand Name Only: A/E shall provide a list of any proposed Brand Name Only materials or equipment in project with individual justifications as part of 100% drawings for CO approval. Brand Name Or Equal: A/E shall provide a list of any proposed Brand Name Or Equal materials or equipment in project with individual justifications as part of 100% drawings for CO approval. Constructions Drawings: Provide (2) copies of plans showing all necessary alternations to existing areas affected by this project. Drawings should include phasing, bid deducts if applicable, existing utilities, demolition plans, completed elevation sections and details, HVAC, plumbing, life safety, IRCA, controls, architecture, security, IT, electrical, single line diagrams, panel schedules and calculations. Plans shall also be submitted in AutoCAD 2017 and Adobe Acrobat file formats. Preconstruction Risk Assessment: AE shall provide two (2) copies of final Preconstruction Risk Assessment. Assessment shall also be provided in Microsoft Word and Adobe Acrobat file formats. ICRA: ICRA drawings shall be based on Preconstruction Risk Assessment and will show all walls, anti-rooms, and location of negative air exhaust for each phase. Abatement: Final Asbestos Abetment design, if required, shall be included in 100% drawings. Phasing: 100% submission drawings shall include clearly delineated phasing lines on all architecture, mechanical, plumbing, electrical, and fire protection drawings Finishes: Contractor shall fully incorporate finishes as determined by VA Interior Designer during 70% design into 100% submission. Bid Deducts: Bid Deducts, if required, shall be incorporated into 100% design submission, and clearly delineated in drawings, specifications, and estimate. Third Party Life Safety Review: Contractor shall employ and utilize the services of a third party, independent life safety consultant to conduct a fire and life safety peer review of the project. A complete copy of consultant s report will be submitted as a part of the 100% design. Estimates: Provide two copies of construction cost estimates with any and all potential bid deducts included. Estimates shall be divided by phase, spec section and trade (labor, equipment, and material). Documents shall meet all applicable federal and state codes/requirements, including but not limited to OSHA, DER, EPA, NEC, and NFPA 101 Life Safety Code and shall meet the requirements of VA Program Guide PG-18-15. After incorporation of 100% review comments the A/E shall provide two (2) full size and one (1) half-size set of sealed construction plans stamped by design professionals, two (2) bound copies of final specifications, electronic version of specifications in Microsoft Word and Adobe Acrobat and drawings in AutoCAD 2017 format and Adobe Acrobat, and a report detailing how each comment from 100% review was addressed or incorporated. ESTIMATES The Engineering firm will make use of the construction budget to derive the 35%, 70%, 100%, and final construction cost estimates. All estimates shall be current as of the date of submission and escalated to the date of award as provided by the VA. Show unit quantity, unit measure, unit cost and total cost of labor and materials for each subheading, as required by VA FORM 10-6238, Estimate Work Sheet . All costs will include insurance, taxes and applicable subcontractors markup. Use wage rates that reflect current local wages. The latest Department of Labor wage survey available at the VA will be provided upon request. Price materials and equipment at the contractors buying level. Sales tax, when applicable, will be added to the material and equipment costs. Estimates should include an appropriate percentage for overhead and profit. Any project with an estimated construction cost of over five million dollars shall include a document providing a detailed evaluation of any potential deducts for VA approval. The deducts selected by the VA shall be identified and broken down in the construction cost estimate and delineated in the projects drawings and specifications. P. CONSTRUCTION PERIOD SERVICES Services during the construction phase of this project shall consist of: Review of contractor s submittals and shop drawings with recommendation to VA COR and CO. Reviews shall be returned to VA COR and CO within 15 calendar days of reception. If the scope of the required action is so extensive as to require more time, the A/E shall so notify the CO and COR, including information about the time needed to process the action. However, the A/E shall expedite delivery in every practicable way. Review of any or all contractors Requests For Information as required with recommendation provided to VA COR and CO. RFI response shall be provided to VA COR and CO within 4 calendar days of receipt. If the scope of the required action is so extensive as to require more time, the A/E shall so notify the CO and COR, including information about the time needed to process the action. However, the A/E shall expedite delivery in every practicable way. Design Deficiencies: Any redesign efforts, including site visits if necessary, required due to a design deficiency, errors, or omissions shall be completed by the AE at no additional cost to the VA. Revised drawings and specifications shall be provided to VA CO and COR as well as an estimate for the contractor to complete work detailed in revised documents. Said estimates will meet all requirements of Estimates Section of this contract. Cost Estimates: AE shall review and provide recommendation to VA CO & COR on each of the Construction Contractor s cost estimates. Recommendations shall include an independent breakdown of costs in detail, quantities, and unit prices and shall cover both additions and deductions of labor, materials, and equipment. AE shall attend Prebid/Preproposal Conference, Preconstruction Conference, and Biweekly Project Meetings during construction via phone conference. Inspections: AE shall attend all above ceiling and punchlist inspections for each phase of the project with a mandatory written field report submitted to the COR 5 calendar days after inspection unless indicated otherwise by COR. Site visits when requested by the VA, in accordance with the Engineering contract, each will be followed with a mandatory written field report submitted to the COR within 5 calendar days of the site visit. After completion of the project, AE shall provide a corrected, complete set of stamped plans showing any changes from the original design due to changes or as-built conditions from Contractor. Mylar reproducible plans and CD-R (or other electronic means) containing AutoCAD 2017 and Adobe Acrobat versions of the final, marked up drawings shall be received within 30 days of reception of Contractor s as-built drawings from COR. Provide the service of a certified Industrial Hygienist for monitoring and air sampling during the set-up and removal of asbestos and lead paint when applicable. Provide final report when complete. AE shall serve as or will provide a 3rd Party Commissioning Agent as necessary in project. The selected A/E firm shall adhere to the following guidelines: All designs shall be accomplished in accordance with VA guidelines and specifications, which are available on the Internet at http://www.cfm.va.gov/til/. A/E shall pay particular attention to USAF, NFPA, BOCA, VA Handbook and VHA Directives. A/E is responsible for providing all services necessary for design of this project i.e. mechanical, electrical, sampling and monitoring, and control. Any major design deviations from these manuals should be discussed and approved by the Medical Center before the design is incorporated on the contract documents. Estimates should include an appropriate percentage for overhead and profit. Evaluation Criteria: The A&E selection criteria for this acquisition are listed below: This document will help the evaluation board assign values to the following factors to determine the relative qualifications of the firms identified in the preselection process. Factors that must be considered: Professional qualifications Project Manager, Superintendent, Proposed Team (other firms and key personnel) Proposed Management Plan Team organization through both design and construction phases. Past performance/Previous Experience of Proposed Team List of 10 past projects (at least 3 with similar Scope of Work to listed project) as well as the proposed teams record of working together on listed past projects. Response Time To review Shop Drawings, RFI s, Change Order requests, Submittals, etc. Proposed Project Design Approach Primes design philosophy and anticipating potential problems and potential solutions. Project Control Techniques planned to control the schedule and costs. Personnel responsible for schedule and cost control. Estimating Effectiveness List of Estimates of the 10 most recent projects awarded. Compare the VA estimate to Primes proposed cost (both A/E and Construction costs). Knowledge of Location and Geographic Area Miscellaneous Experience & Capabilities Interior Design, CADD & other computer applications, value engineering & life cycle cost analyses, environmental & historic preservation considerations, energy conservation & new energy resources, and CPR & fast track construction. Awards Awards received for design excellence Insurance and Litigation type and amount of liability insurance carried and any litigation involvement over the last 5 years & their outcomes. Each factor is weighted evenly to the others. Contract Award Procedure: Interested A&E firms shall submit two (2) copies of the SF330 (8/2016 Edition) and a CD to the address below with the appropriate documentation. Cheryl A. Roberts, Contract Specialist Contracting Office, Rm 118 Wilmington V...

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:36C24418R0673
  1. Pre-Solicitation

Formal solicitation typically follows within 30–60 days. (estimate)

  1. 2×
    Pre-SolicitationCurrentAug 22, 2018

    C--A/E Site Preparation Replacement for PET-CT, 642-CSI-122

    Notice c5342039e680e8d8ab588b3d826a35d6 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This procurement is restricted to Service Disabled Veteran Owned Small Business (SDVOSB) firms located within a 300 mile radius of the Battle Creek VA Medical Center, 5500 Armstrong Rd, Battle Creek, MI 49037. The mile restriction is in compliance with VAAR 805.207 (b). This requirement is being procured in accordance with the VAAR 836.606-73 as implemented in FAR Subpart 36.6. Description of work to be performed includes: Architect-Engineering services are required for Schematics, Design Development, Construction Documents, Technical Specifications, Construction Period Services, Site Visits, Cost Estimates, and all other related information for Project #515-14-123, Replace Fire Alarm System. The project will include design work for the preparation of 100% complete working drawings and contract documents using edited VA Master Specifications to complete the following: I. STATEMENT OF AE TASKS A. The AE shall furnish all services for a complete schematic design, design development, construction documents, bid documents, site visits, cost estimates, as-built documentation, and construction period services and all other related information for project 515-14-123 Replace Fire Alarm System for 30 buildings at the Battle Creek VA Medical Center in Battle Creek, MI. 1) Necessary site survey work such as verifying existing conditions, verifying record drawings, and verifying and analyzing utility systems shall be accomplished in conjunction with preparation of Schematic Design, and Design Development. 2) The A/E shall design a station wide fire monitoring system to be installed parallel to the existing system. Redundant monitoring: primary at building 25 and redundant at police department building 2. The system shall be designed to be monitored by wireless network including transmitters, receivers, and transceivers, including all permits, and FCC application for equipment frequency allocation. 3) The A/E shall evaluate each building to determine which field devices need to be added in accordance with current codes. 4) The AE will be required to attend in person (or Senior Delegate of AE) to pre-bid meetings, a pre-construction meeting, project construction meetings and a final inspection meeting. There will also be various construction site meetings that will require a representative of the AE. 5) AE will provide meeting notes / minutes for meetings and conference calls. 6) The A-E shall provide competent design and construction period services utilizing individuals who are adequately knowledgeable of the various design disciplines including but not limited to architectural and engineering of structural, mechanical, electrical, and special systems as required by the project. Changes in personnel from those who are proposed in negotiations, interviews, kick-off meeting, and/or A-E submission forms must be approved in writing. The registered individuals who will stamp the completed documents shall accomplish engineering design work. B. The AE shall provide cost estimation, project scheduling & phasing, bid period and construction period services as further described in the contract. Estimates shall have a full itemized line item breakout commensurate with the degree of design accomplished. At the Schematic Design phase, square foot estimates would be adequate. As the design progresses in detail, so the estimate would progress in detail. C. The AE shall provide bid documents in both hard paper copies and electronic format. Electronic format shall include AutoCAD and Microsoft Word/Excel as well as PDF format for all. Final PDF of the construction drawings shall include the professional stamp. D. AE shall design construction to phase and coordinate work to minimize disruptions to medical center operations. Outages shall be minimized and temporary conditions planned to maintain critical utility systems. Suitable space/access for mechanical room equipment maintenance must be maintained throughout construction. To keep the number of outages to a minimum, group common work. Phasing of interruptions shall be clearly indicated on the construction documents. E. A-E shall design within funding limitations. AE shall coordinate cost control measures with COR to design within funding limits. Cost control alternatives shall be explored in Design Development (DD's). The AE is required by national VA directive to include a 20% bid deduction. F. Review AE Quality Alerts from the TIL. Design completion timeframe of 190 days after receipt of the Notice to proceed. The A/E firm shall also be required to perform construction period services after award of the construction project contract. In accordance with FAR 36.204, the estimated magnitude of the resulting construction project is between $1,000,000 and $5,000,000. Qualifications (SF330) submitted by each firm for Project #515-14-123 for "Replace Fire Alarm System" will be reviewed and evaluated based on the following criteria: Prospective firms are required to address all selection criteria within submitted SF330 packages using additional pages as required and SF 330 submissions including any additional pages are not to exceed fifty (50) pages. Selection criteria shall be in accordance with Federal Acquisition Regulation (FAR) Part 36.602-1 and VA Acquisition Regulation (VAAR) Part 836.602-1 as follows: (1) Professional Qualifications: the qualifications of the individuals which will be used for these services will be examined for experience and education and their record of working together as a team. The specific disciplines which will be evaluated are architectural, engineering, and estimating. (2) Specialized Experience and Technical Competence: specific experience and technical skill in the type and scope of work required, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials. (3) Capacity to Accomplish the Work: the general work load and staffing capacity of the design office which will be responsible for the majority of the design and the ability to accomplish the work in the required time will be evaluated. (4) Past Performance: the past performance of the firm on contracts relevant in scope to the advertised project that were accomplished with the Department of Veterans Affairs, other Government agencies, and private industry in terms of cost control, quality of work, and compliance with performance schedules will be examined. Project past performance references older than 3 years will receive a lesser score than those references for projects accomplished within the past 3 years. (5) Location of Design Firm: the geographic proximity of each firm to the location of the VA Medical Center will be evaluated. This criterion will apply to the office from which the majority of the design services will be performed. Scoring will be based off of the proposed location of the prime contractor firm for this category. Scoring shall be as follows: within 75 miles - Excellent (Blue); 76-125 miles - Very Good (Green); 126-175 miles - Acceptable (Yellow); 176 - 225 miles - Marginal (Orange); 226 - 300 miles - Poor (Red). (6) Claims and Terminations: record of significant claims against the firm or terminated contracts because of improper or incomplete architectural and engineering services will be examined. (7) Reputation in A-E Community: reputation and standing of the firm and its principal officials with respect to professional performance, general management, and cooperativeness. (8) Specific experience and qualifications: of personnel proposed for assignment to the project and their record of working together as a team. FAILURE TO CLEARLY ADRESS ALL EIGHT LISTED EVALUATION CRITERIA AND INFORMATION REQUIRED BY THE SUBMISSION REQUIREMENTS BELOW MAY RESULT IN REJECTION OF SF330. The NAICS Codes for this procurement is 541310 Architectural Services and small business size standard of $7.5 Million. Award of a Firm Fixed Price contract is anticipated. Anticipated time for completion of design is approximately 190 calendar days including time for VA reviews. The A/E firm shall also be required to perform construction period services if award of a construction project contract is made. DATABASE REGISTRATION INFORMATION: VERIFICATION OF STATUS OF APPARENTLY SUCCESSFUL OFFEROR THIS ACQUISITION IS 100% SET-ASIDE FOR QUALIFIED SERVICE DISABLED VETERAN OWNED SMALL BUSINESS AE FIRMS IN COMPLIANCE WITH VAAR 852.219.10. ONLY BUSINESSES VERIFIED AND LISTED IN THE VENDOR INFROMATION PAGES DATABASE (http://www.vetbiz.gov) SHALL BE CONSIDERED. SYSTEM FOR AWARD MANAGEMENT (SAM): Federal Acquisition Registrations require that federal contractors register in the System for Award Management (SAM) database at www.sam.gov and enter all mandatory information into the system. Award cannot be made until the contractor has registered. Offerors are encouraged to ensure that they are registered in SAM prior to submitting their qualifications package. THE EXCLUDED PARTIES LIST SYSTEM (EPLS): To ensure that the individuals providing services under the contract have not engaged in fraud or abuse regarding Sections 1128 and 1128A of the Social Security Act regarding federal health care programs, the contractor is required to check the Excluded Parties List System (EPLS) located at www.sam.gov for each person providing services under this contract. Further the contractor is required to certify that all persons listed in the qualifications package have been compared against the EPLS list and are NOT listed. During the performance of this contract the Contractor is prohibited from using any individual or business listed on the List of Excluded Individuals/Entities. E-VERIFY SYSTEM: Companies awarded a contract with the federal government shall be required to enroll in E-Verify within 30 days of the contract award date. They shall also need to begin using the E-Verify system to confirm that all of their new hires and their employees directly working on federal contracts are authorized to legally work in the United States. E-Verify is an Internet-based system that allows an employer, using information reported on an employee's Form I-9, to determine the eligibility of that employee to work in the United States. There is no charge to employers to use E-Verify. (FAR 52.222-54) Qualified A-E firms are required to respond if interested by submitting one (1) original completed Standard Form 330 qualification package Parts I and II to include all consultants (form available on-line at: http://www.gsa.gov/portal/forms/download/116486) Must include in Part I Section H an organizational chart of the firm (excludes consultants) and a design quality management plan. Submission information incorporated by reference is not allowed. All submissions must be bound in some manner (spiral, wire, binder, etc.) and a CD copy of the Standard Form 330. Completed SF330s can be delivered to Battle Creek VA Medical Center, Attn: Craig Jenkins, Contract Specialist, NCO 10 West Contracting Office (90VC), Building 9, 5500 Armstrong Rd, Battle Creek, MI 49037, no later than 3:00 p.m. EDT, April 11, 2016. Outermost envelope or packaging shall clearly identify Solicitation number and project. Information shall be submitted via commercial express service. No hand carried deliveries. Telegraphic, email, and facsimile forms are prohibited. All submissions must be bound in some manner (spiral, wire, binder, etc.). Award of any resultant contract is contingent upon the availability of funds. No solicitation document is available and no other information pertaining to project scope, etc. is available at this time. Any request for assistance with submission or other procedural matters shall be submitted via email only (craig.jenkins@va.gov) telephone inquiries will not be honored. After the evaluation of SF330 submissions in accordance with the evaluation criteria, three or more of the most highly qualified firms will be chosen for interviews to present their approach to the design to arrive at selection of the number one firm for negotiations. The contract is anticipated to be awarded in JUNE/JULY 2016. The Government will not pay nor reimburse any costs associated with responding to this request. The Government is under no obligation to award a contract as a result of this announcement.
-Pre-Solicitation04/11/2006
The purpose of this amendment is to extend the due date to 11-15-2026 at 10:00 AM EST, to update the Wilmington Seed Order Statement of Work, and to answer vendors’ questions.
-Combined Synopsis11/15/2026
This is a combined synopsis/solicitation for commercial services prepared in accordance with part 12 of Federal Acquisition Regulation (FAR). This announcement constitutes the only solicitation; quotes are being requested and a separate written solicitation will not be issued. This Solicitation is issued as a Request for Quote (RFQ), and the solicitation number is 36C24426Q0969. This notice incorporates provisions and clauses in effect through Federal Acquisition Circular (FAC) 2026-01 effective 13 March 2026, and the Veterans Affairs Acquisition Regulations (VAAR). The complete text of any of the clauses and provisions may be accessed in full text at FAR | Acquisition.GOV. This acquisition is set aside for Service Disable Veteran Owned Small Business (SDVOSB)concerns. The Government reserves the right to make a single award, multiple awards, no awards as a result of this solicitation. The Government may determine that it is in its best interest to make awards to more than one quoter. The NAICS code is 541380 Testing Laboratories and Services and the Product Service Code (PSC) is H365 Inspection Medical, Dental, and Veterinary Equipment and Supplies. The business size standard is $19 Million. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. Solicitation number 36C24426Q0969 is issued with the possibility of an Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for Radiation Safety Officer and Physicist duties at Pittsburgh, Erie, Butler, Coatesville, Wilkes Barre, Altoona, Wilmington, Philadelphia, and Lebanon VA Medical Centers. Typical task orders under this contract will range from $1,500.00 to $250,000.00 with a maximum task order limit of $350,000.00. The duration of this MATOC shall be five (5) years, unless the $6,000,000.00 ceiling is met before. If a contractor is not awarded a task order of at least $1,500.00 during the terms of the contract, the contractor will be paid the guaranteed minimum amount of $1,500.00, at the end of the contract. The Seed Service Task Order may be awarded to one contractor who is awarded one of the MATOC contracts: Project 460-27-1-132-0001, Wilmington Radiation Safety Officer/Physicists Services. Complete instructions for submitting a response to this solicitation and applicable provisions and clauses are found in 36C24426Q0969. All quoters are advised to pay careful attention to the quote submission instructions as there are very specific instructions as what is required to be provided. Quoters will be evaluated based on their quoted response to the seed task order for radiation safety officer and radiation physicist services at the Wilmington VAMC. This seed project serves as a representative sample task and will be used to assess each quoter's technical capability, staffing approach, and understanding of the requirements applicable to the overall MATOC scope. Award of the MATOC will be based on this evaluation, with the seed project not guaranteed as an awarded task order. The period of performance (POP) is estimated to be 11/15/2026 11/14/2031. Should issuance of the IDIQ occur on a different date, the performance period will be adjusted accordingly. Any award resulting from this solicitation will be issued on a Standard Form 1449. NOTE: To receive an award resulting from this solicitation, offerors MUST be registered in the System for Award Management (SAM) database. Registration may be done online at: www.acquisition.gov or www.sam.gov. Any questions or concerns regarding this solicitation should be forwarded in writing via e-mail to the contract specialist, Matthew Wright at matthew.wright6@va.gov. No questions will be answered after 21 October 2026, 10:00 AM EST. Point of Contact Matthew Wright Contract Specialist Services 3 (Medical Equipment Maintenance Services) Department of Veterans Affairs/Network Contracting Office 4 Matthew.wright6@va.go
-Combined Synopsis10/31/2026
This is a combined synopsis/solicitation for commercial services prepared in accordance with part 12 of Federal Acquisition Regulation (FAR). This announcement constitutes the only solicitation; quotes are being requested and a separate written solicitation will not be issued. This Solicitation is issued as a Request for Quote (RFQ), and the solicitation number is 36C24426Q0969. This notice incorporates provisions and clauses in effect through Federal Acquisition Circular (FAC) 2026-01 effective 13 March 2026, and the Veterans Affairs Acquisition Regulations (VAAR). The complete text of any of the clauses and provisions may be accessed in full text at FAR | Acquisition.GOV. This acquisition is set aside for Service Disable Veteran Owned Small Business (SDVOSB)concerns. The Government reserves the right to make a single award, multiple awards, no awards as a result of this solicitation. The Government may determine that it is in its best interest to make awards to more than one quoter. The NAICS code is 541380 Testing Laboratories and Services and the Product Service Code (PSC) is H365 Inspection Medical, Dental, and Veterinary Equipment and Supplies. The business size standard is $19 Million. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. Solicitation number 36C24426Q0969 is issued with the possibility of an Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for Radiation Safety Officer and Physicist duties at Pittsburgh, Erie, Butler, Coatesville, Wilkes Barre, Altoona, Wilmington, Philadelphia, and Lebanon VA Medical Centers. Typical task orders under this contract will range from $1,500.00 to $250,000.00 with a maximum task order limit of $350,000.00. The duration of this MATOC shall be five (5) years, unless the $6,000,000.00 ceiling is met before. If a contractor is not awarded a task order of at least $1,500.00 during the terms of the contract, the contractor will be paid the guaranteed minimum amount of $1,500.00, at the end of the contract. The Seed Service Task Order may be awarded to one contractor who is awarded one of the MATOC contracts: Project 460-27-1-132-0001, Wilmington Radiation Safety Officer/Physicists Services. Complete instructions for submitting a response to this solicitation and applicable provisions and clauses are found in 36C24426Q0969. All quoters are advised to pay careful attention to the quote submission instructions as there are very specific instructions as what is required to be provided. Quoters will be evaluated based on their quoted response to the seed task order for radiation safety officer and radiation physicist services at the Wilmington VAMC. This seed project serves as a representative sample task and will be used to assess each quoter's technical capability, staffing approach, and understanding of the requirements applicable to the overall MATOC scope. Award of the MATOC will be based on this evaluation, with the seed project not guaranteed as an awarded task order. The period of performance (POP) is estimated to be 11/15/2026 11/14/2031. Should issuance of the IDIQ occur on a different date, the performance period will be adjusted accordingly. Any award resulting from this solicitation will be issued on a Standard Form 1449. NOTE: To receive an award resulting from this solicitation, offerors MUST be registered in the System for Award Management (SAM) database. Registration may be done online at: www.acquisition.gov or www.sam.gov. Any questions or concerns regarding this solicitation should be forwarded in writing via e-mail to the contract specialist, Matthew Wright at matthew.wright6@va.gov. No questions will be answered after 21 October 2026, 10:00 AM EST. Point of Contact Matthew Wright Contract Specialist Services 3 (Medical Equipment Maintenance Services) Department of Veterans Affairs/Network Contracting Office 4 Matthew.wright6@va.go
-Combined Synopsis10/31/2026
-Special Notice09/18/2026

Additional Details

Solicitation Number

36C24418R0673

Archive Date

Nov 20, 2018

Office Address