Notice ID: 94c9d96e092648cd86fc0de1d8077a49Award NoticeAwarded
Electrical Upgrades Phase I Design
Awarded on March 30, 2023. Full description on SAM.gov.
Awarded tounder 36C24423C0020 (source: SAM.gov award notice)• $254.0K
Overview
- Posted
- June 15, 2023
- Notice type
- Award Notice
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Notice details
- Place of performance
- Lebanon VA Medical Center 1700 S. Lincoln Avenue Lebanon, PA 17042
- Last updated
- Dec 4, 2025
- Award date
- Mar 30, 2023
- Award amount (SAM.gov award notice)
- $254.0K
Identifiers
- Solicitation number
- 36C24422R0169
- Notice ID
- 94c9d96e092648cd86fc0de1d8077a49
- Award number (PIID)
- 36C24423C0020
Description
Special Notice Special Notice Page 6 of 6 Special Notice *= Required Field Special Notice Page 1 of 6 This is to serve as a clarification for the factors the SF 330 will be evaluated against. Please refer to 36C24422R0169-1 for the scope of work. Common questions received can be found within 3624422R0169-2 Responses are due 9-23-22 1300 (1PM) EST This project will primarily include electric upgrades; however, interior work may be required to return building and facility systems to their pre-operational state that were removed, disabled, or altered during the electrical upgrades. The presolicitation states that for Capacity to Accomplish Work, the factor will evaluate the ability of the firm to, given their current projected workload and availability of their key personnel, to accomplish the project in the required time . It is expected that the firm will list their key personnel along with an estimation showing the percentage of time available that these personnel can dedicate to this project, as well as the estimation of other projects already scheduled that may affect the availability of the key personnel. Please follow the instructions found at Architect-Engineer Qualifications | GSA and in the presolicitation notice. The instructions on SF-330, Section F. Example Projects Which Best Illustrate Proposed Team s Qualifications For This Contract state to Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project. The VA has stated in Section B of the presolicitation notice that the board shall consider at least five, similar projects . Each offeror should submit at least five projects, but up to ten projects may be considered by the board. This announcement is for the selection of an Engineering Services (ES) Firm for Electrical Upgrades Phase I Design for the Department of Veterans Affairs, Lebanon VA Medical Center located in Lebanon, PA. The Government intends to award a single Firm Fixed Price Contract. All potential offerors must provide a SF 330 containing all required information listed below. The form format must be the General Services Administration SF 330 found on the website http://www.gsa.gov/portal/forms/download/116486 Forms Library. CONTRACT INFORMATION: The project consists of construction of electrical distribution improvements for the south and west areas of the campus. The contract award will incorporate the attached Statement of Work. Expected design services may require any combination of the following: Title I Site Investigation Services, Title I - Design Services, and Title II Construction Period Services. This contract is being procured in accordance with the Brooks Act as implemented in Federal Acquisition Regulation (FAR) Subpart 36.6, Veterans Administration Acquisition Regulation (VAAR) 836.6 and the Veterans Administration Acquisition Manual (VAAM) Part M836 . The firm will be selected for presentations based on demonstrated competence and qualifications for required work. This contract is set-aside 100% for Service Disabled Veteran Owned Small Business s (SDVOSB) capable of completing work under the North American Industrial Classification System (NAICS) code 541330. The small business standard is $22.5 million dollars. SUBMISSION REQUIREMENTS: Interested firms having the capabilities to perform this work must submit an electronic copies of Standard Form 330 (SF 330). Standard Forms 330 s must be received no later than 1:00 PM on September 23rd, 2022. The submittal packages are to be sent to the following: Email submission of the SF 330 are to be submitted to Elijah McIntosh at Elijah.mcintosh@va.gov Additionally, the submissions must include an insert detailing the following information placed at the front of the Submission. SAM Unique Identity Number Tax ID Number The E-mail address of the Primary Point of Contact. A printed copy of the firms VetBiz Registry. A copy of Errors and Omissions Insurance Policy for the SDVOSB Prime. A copy of the firm s Pennsylvania State Licensure for the SDVOSB Prime or a statement indicating how the provided drawings will be sealed by a PA licensed Engineer. A statement indicating what office the Engineering Services firm will utilize as its primary design office. Special Note: An Engineering Services Firm failing to provide any of the documentation detailed in the Pre-Solicitation Notice may be determined as Non-Responsive and may not be considered. Please note this is not a request for proposal. Eligible responses received will be evaluated and the most highly qualified will be compiled on a shortlist of candidates who will be contacted for an interview. For the evaluation, Professional Qualifications to Perform the Services Required, Specialized Experience and Technical Competence, Past Performance, and Experience in Construction Period Services are more important than the other three (3) factors and are of equal weight. The remaining three (3) factors are of equal weight among themselves. The following evaluation criteria shall be used to evaluate firms and determine the most highly qualified firm for possible contract award. Professional Qualifications to Perform the Services Required: This is intended to evaluate the personnel and their related qualifications. The key positions, at a minimum, should include Project Managers, Quality Assurance Manager, Architects, Structural Engineers, Electrical Engineers, Mechanical Engineers, Civil Engineers, Fire Protection Engineers, Environmental Engineers, and Interior Designers. Firm shall indicate whether these personnel have professional certifications in particular field, i.e. PE in Mechanical Engineering and the state(s) the individuals are licensed in. The evaluation board shall consider the specific experience and qualifications (i.e., education, training, registration, certifications, overall relevant experience, and longevity with the firm) of personnel proposed for assignment to the project, and their record of working together as a team when evaluating professional qualifications. The lead designer in each discipline must be registered but does not have to be registered in the particular state where the project is located .Professional engineering licensure is required; however Pennsylvania state licensure is not specifically required. If the PE is from a state that has a Reciprocity agreement with Pennsylvania and the PE has something in writing they meet Act 41 they can stamp and sign. Otherwise it must be a PA professional engineer stamping the drawings. They must possess a PA Architect License or meet the requirements of ACT 41 Registered Architect Licensure Requirements Snapshot (pa.gov). Specialized Experience and Technical Competence: This factor evaluates the experience of the firm and design team in completing projects requiring skills similar to those anticipated for this contract. This may include general renovation of medical center space to include architectural changes of walls, ceilings, floors, finishes, masonry, doorways including hardware, plumbing including storm sewer, sanitary, hot and cold water, Heating, ventilating, Air conditioning (HVAC) to include, package units, variable air and constant air volume terminals with reheat, Variable frequency drive air handlers, steam and condensate piping, primary and secondary electrical circuits, digital controls, fire protection to include sprinkle system, central fire and security alarms, audio paging systems, asbestos abatement and all work to return space to finished, functioning condition. Offerors will be evaluated on the team s demonstrated experience, performance, technical abilities, and relevant project work of similar scope, budget and complexity as the Statement of Work. For new construction, renovations, major modernizations, building additions, hospital design and VA projects. Experience providing drawings in 3D. The evaluation board shall consider at least five, similar projects and how well the proposal addresses technical capabilities in design quality management procedures, Computer-Aided Design and Drafting/Building Information Modeling, equipment resources, and laboratory requirements for the firm and any proposed subcontractors. Where appropriate, also evaluate their experience in energy conservation, pollution prevention, waste reduction and the use of recovered materials. The effectiveness of their proposed project team (including management structure, coordination of disciplines, subcontractors, and prior working relationships) should also be examined. NOTE: Extra consideration may be given for projects completed by the firm as the prime contractor and not as a subcontractor or projects completed by key personnel while employed by another firm. Past Performance: Past performance on contracts with Government agencies (Particularly Department of Veterans Affairs) and private industry in terms of cost control, quality of work and compliance with performance schedules. The evaluation board shall consider superior performance ratings on recently completed VA projects as well as the reputation and standing of the firm and its principal officials with respect to professional performance, general management, and cooperativeness. Also, consider, as appropriate, the record of significant claims against the firm because of improper or incomplete architectural and engineering services. Experience in Construction Period Services: Experience in construction period services to include professional field experience during the construction period, review of construction submittals, support in answering requests for information during the construction period, and support of construction contract changes to include drafting statements of work, and cost estimates. Offerors shall provide projects demonstrating experience in construction period services to include professional field inspections during the construction period, review of construction submittals, support in answering requests for information during the construction period, and support of construction contract changes to include drafting statements of work, and cost estimates. USE OF SMALL BUSINESSES The contractor shall provide a summary identifying the extent to which potential contractors identify and commit to the use of Service-Disabled Small Business, Veteran Owned Small Businesses, and other types of small businesses as subcontractors. Proposed subcontractors shall be identified by business type, SAM unique ID (SAM UID). Capacity to Accomplish Work: This factor evaluates the ability of the ES firm to, given their current projected workload and the availability of their key personnel, to accomplish the project in the required time. The evaluation board shall consider the volume of work awarded by VA during the previous twelve (12) months. Use data extracted from the Federal Procurement Data System. Consider the full potential value of any current indefinite delivery contracts that a firm has as well. Also, assess the available capacity of key disciplines to perform the work in the required time. Geographical Location: Location in the general geographic area of the project and knowledge of the locality of the project: This factor evaluates the response time from the ES firms design office to the location of work (Lebanon VAMC). The personnel identified as the design team staff are expected to work in the design office identified for evaluation of this factor. When evaluating location, the evaluation board shall consider knowledge of the locality separately from geographic proximity. Examples include knowledge of geological features, climatic conditions, or local construction methods that are unusual or unique as well as bidding and construction related to the key disciplines. This may include everything from supply, labor force, weather and seismic conditions, to the construction climate s impact on cost estimating. Service Disabled Veteran Owned Small Businesses must be registered and verified in the VetBiz Registry at time of SF 330 submittal. Visit www.vip.vetbiz.gov to complete your company registration. Additionally, any potential awardee must also be registered in the System For Award Management (SAM) at time of SF 330 submittal. Registration can be accomplished by visiting https://sam.gov. End of Document
Award Overview
Award Number
36C24423C0020
Award Amount (SAM.gov award notice)
$254.0K
Award Date
Mar 30, 2023
Awardee
Awardee UEI
J64CCTKLLM97
Awardee CAGE Code
6BGA4
Original Solicitation
Notice ID: 94c9d96e092648cd86fc0de1d8077a49
Posted Date: Jun 15, 2023
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $873.7KSigned Nov 3, 2026
- $603.7KSigned Oct 16, 2026
- $989.3KSigned Oct 14, 2026
- $330.0KSigned Oct 9, 2026
- $146.5KSigned Oct 8, 2026
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
36C24422R0169- Pre-Solicitation
- Awarded
This opportunity has been awarded.
- Pre-SolicitationAug 23, 2022
C1NZ--Electrical Upgrades Phase I-Design
- Special NoticeSep 7, 2022
C1NZ--595-23-1-5529-0001 | 595-21-104 Electrical Upgrades Phase I Design
- Pre-SolicitationSep 16, 2022
C1NZ--595-23-1-5529-0001 | 595-21-104 Electrical Upgrades Phase I
- AwardedCurrentJun 15, 2023
Electrical Upgrades Phase I Design
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
AMENDMENT A0001 Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice REQUEST FOR SF 330 36C25227Q0013 Project 578-27-003: Renovate A Section 1st Floor Bldg. 1 (AE) Design/Engineering Services SF-330 Package Due: October 30, 2026, at 1:00 p.m. CST (see details below) Points of Contact: Donita.Grace@va.gov INTRODUCTION: THIS IS A TOTAL 100% SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB) SET-ASIDE in accordance with Public Law 109-461. This is a Request for SF330s for Architect/Engineer (A/E) Design Services for Project Number 578-27-003: Renovate A Section 1st Floor Bldg. 1 (AE) at the Edward J. Hines VA Hospital in Hines, IL. THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. NO SOLICITATION PACKAGE WILL BE ISSUED via SAM.gov. A request for proposal will be issued directly to the top-rated firm for which negotiations will commence in accordance with FAR part 36. The anticipated A/E design services, to be awarded, will be procured in accordance with the Selection of Architects and Engineers Act (Public Law 92- 582), FAR Part 36.6 and VA Acquisition Regulation 836.6. Period of Performance: 449 Calendar Days Contract Type: Firm-Fixed-Price Estimated Magnitude of Construction: Between $10,000,000 and $20,000,000 NAICS Code: 541310 Size Standard: $12.5 Million SBA & SAM : in accordance with VAAR 819.7003, at the time of SF330 submission and prior to award of any contract, the offeror must represent to the contracting officer that it is a (1) SDVOSB eligible firm; (2) Small business concern under the North American Industry Classification System (NAICS) code assigned to the acquisition; and (3) SDVOSB listed as verified in SBA at: https://veterans.certify.sba.gov/ Additionally, all eligible firms must be registered and current in the System for Award Management (SAM) database to be evaluated and eligible for contract award. If the firm is not registered in SAM, you may register online at https://www.sam.gov. 1. PURPOSE: This Source Selection Plan (SSP) outlines the procedures that will be used to solicit architectural and engineering (AE) design services for Project 578-27-003 Renovate A Section on First Floor of Building 1. The goal of this project is to provide complete AE design services to renovate section A of the 1st floor of building 1. 2. ACQUISISTION DESCRIPTION: 2.1: RFI: A Request for Information shall be published to https://sam.gov whereby interested architect-engineering companies shall submit an SF330 package. This competitive procurement shall utilize a best value trade-off source selection process identified in FAR 15. 2.1.a: Source Selection Evaluation Board (SSEB): For the purpose of this acquisition, the SSEB will be same as the Technical Evaluation Board (TEB). 2.1.b: Below are the individual (TEB) evaluation criteria and ratings for the SF330s, listed in descending order of importance. FACTOR 1: SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE (30 Maximum Points) Subfactor 1A: Specialized Experience (15 Points). Subfactor 1B: Additional Experience (10 points). Subfactor 1C: Technical Competence (5 points). The A/E Firm shall demonstrate its specialized experience and technical competence in the design and construction period services for projects of similar size and complexity. Specialized project experience should include design of renovations to existing hospitals, renovations to buildings constructed prior to 1970 w/space constraints, design of Pathology Suites, and HVAC upgrades to existing hospitals. Additional experience includes mechanical, electrical, and structural engineering, architecture, interior design and finishes, physical security upgrades, building management systems/building automation systems (BMS/BAS), Computer-Aided Design and Drafting (CADD), critical path scheduling, fire protection, construction infection control protocols, design and installation of biological refrigeration and preservation systems, design and installation of vacuum tube transport systems, and project phasing and coordination in an active hospital setting. Offeror shall provide a minimum of three (3), and no more than five (5) recent and relevant Government and private experience projects similar in size, scope, and complexity, and experience with the type of projects/competence above. Relevant is defined as those task requirements identified in the Statement of Work. Recent is defined as services provided within the past seven (7) years with at least 50% of the Construction completed. At a minimum, include the following for each submitted project (if applicable): Project title, location, contract number, and detailed narrative describing the scope of services provided including the type of work performed by the offeror and its role in the project i.e., prime contract, Teaming Partner, or subcontractor. Project Owner, owner s point of contact including telephone number and email address. Services & Deliverables provided under the contract/task order Period of Performance, including start and completion dates for design and construction if applicable. Estimated cost of construction based on AE s design Final construction cost (or projected final construction cost if still underway) The percentage of total cost resulting from changes due to AE omissions. To demonstrate technical competence, the offeror shall include narratives of how the firm addresses each of the following topics. Simply restating this list will not be sufficient. The management approach The coordination of disciplines and subcontractors Quality control procedures Familiarity with VA Design Guides/Manuals, Master Specifications and other applicable standards. FACTOR 2: PROFESSIONAL QUALIFICATIONS (20 Maximum Points) Subfactor 2A: Key Positions (15 Points). Subfactor 2B: SDVOSB Compliance (5 Points). The architects and engineers on the firm s staff representing the project or signing/stamping drawings in each discipline must possess a minimum of five (5) years of experience and are required to be licensed, registered, or certified by a U.S. state, the District of Columbia, or a U.S. territory. Provide professional license jurisdiction of issue and license numbers and/or proof of licensure. A resume for each of these key positions must be provided, corresponding with the title matching the disciplines listed for the project. At a minimum, the offeror must describe the professional qualifications and specific experience in the required disciplines within the past five (5) years. Key positions and disciplines required for this project include, but are not limited to: Project Manager Architect Mechanical Engineer Electrical Engineer Plumbing Engineer Structural Engineer Interior Designer The evaluation will consider education, certifications, training, registration, overall and relevant experience and longevity with the firm. Offer must include the following statement of SDVOSB compliance when submitting the personnel proposed to perform the work under this requirement: I [signatory authority] ______________________, [company] _____________________; certify that the team proposed to perform under this requirement demonstrates the capability of 50% SDVOSB performance in compliance of 48 CFR 852.219-10. FACTOR 3: PAST PERFORMANCE (20 Maximum Points) Subfactor 3A: Past Performance of projects identified in FACTOR 1. (15 Points). Subfactor 3B: Average Past Performance of all projects (5 Points). Provide CPARS data for all projects identified in FACTOR 1. For any project that does NOT have CPARS data available, a Past Performance Questionnaire (PPQ) is required to be submitted with the SF330. Please utilize the attached PPQ document. CPARS data and PPQs will not be included in the page count. All projects provided in the SF330 must be completed by the office/ branch/ individual team member performing the work under this contract. The following information must be clearly specified on each performance report: Contract/task order number Project title Prime firm Start date Completion date Offers shall only include CPARS data for the projects listed in FACTOR 1. The contracting officer shall directly retrieve CPARS reviews from www.CPARS.gov to determine average past performance of previous projects. Government Past Performance Information Systems may be accessed. Evaluating past performance and experience may include information provided by the firm, customer inquiries, Government databases, publicly available sources, and additional projects in CPARS. Failure to provide requested data, accessible points of contact or valid phone numbers could result in a firm being considered less qualified. FACTOR 4: QUALITY CONTROL (10 Maximum Points) Subfactor 4A: Management approach (5 Points). Subfactor 4B: Quality methodology (5 Points). The A/E Firm shall describe its management approach, regarding coordination of disciplines and subcontractors, familiarity of the prime firm and any key subcontractors with VA Design Guides/Manuals, Master Specifications, ASHRAE standards, NEC, and other applicable standards. A/E Firm shall also provide the following: Quality Control organization, and management structure. Methods and procedures for control and prevention of nonconformances during design, preconstruction, and construction. Methods and procedures for nonconformance remediation at all stages of project. Methods and procedures for control and prevention of cost, and schedule overruns. Summarized schedules for selected three previous design projects that show initial approved project schedule, and any updates to schedule with time extensions. Provide a narrative to describe reasons and justifications for any deviations from initial schedule. Summarized cost estimates for selected three previous design projects that show initial approved total project cost estimate, and any increases to initial cost estimates. Provide a narrative to describe reasons and justifications for any deviations from initial estimates. Describe any unforeseen conditions that arose during construction for your last three projects. Provide a narrative to describe how your firm assisted the project management team to correct those deficiencies, and any methods used to mitigate extra costs and increases in project schedule. FACTOR 5: CAPACITY (10 Maximum Points) Subfactor 5A: Capacity to complete work within required timeline (5 Points). Subfactor 5B: Resource management and project management (5 Points). The A/E Firm shall attest to its capacity to accomplish the work in the required time. The evaluation will consider the firm s ability to meet the schedule of the overall project, as well as the available capacity of personnel in key disciplines. The A/E Firm shall also provide the following: A list that shows the total number of design and project professionals who are currently employed at the firm with professional titles for each. Total number of projects in study or planning stages Total number of active design projects Total number of active construction phase services A list of personnel assigned to each of the above projects An analysis and report of available capacity of key personnel for immediate new work The respondent shall: Summarize its approach to staffing and company resource management For the key personnel on the proposed project team, tabulate their current and projected workload as percentages of their available individual capacity. List all work awarded to the A/E Firm by the VA during the previous 12 months, as well as any current indefinite delivery, indefinite quantity (IDIQ) contracts that it has. List the current stage and percentage of completion for non-IDIQ projects. A signed statement shall be provided stating that the firm acknowledges that prior to award of the contract, it is required to notify the Government of any changes in its capacity that could limit its ability to perform the work within the required time. FACTOR 6: GEOGRAPHIC LOCATION (5 Maximum Points) Location of the firm, as measured by the travel time (hours) between the Offeror s principal business location and Edward Hines, Jr. VAMC, Hines, IL. Architect must provide details of travel between their main office and Edward Hines Jr, VAMC Hines, IL. This includes but not limited to airport travel time, driving distance, etc. If the architect has a satellite location, the architect must provide details of a fully staffed and well-established satellite office. Leasing documentation may be requested. FACTOR 7: EXPERIENCE IN CONSTRUCTION PERIOD SERVICES (5 Maximum Points) The A/E Firm shall demonstrate its experience in providing Construction Period Services for hospital facilities, particularly in HVAC renovation projects. The respondent shall provide a narrative that describes the methods and procedures used to implement each of the following Construction Period Services tasks: Professional field inspections during the construction period, with descriptions of types of inspections provided, and methods used for inspections and reporting during each phase of construction Review of construction submittals Support in answering requests for information during the construction period Support of construction contract changes to include updated drawings, drafting statements of work, and cost estimates. Weekly construction meeting participation Closeout documents to include final inspections and as-recorded drawings. SECONDARY SELECTION CRITERION*: FACTOR 8: CLAIMS (-5 to 0 Maximum Points) Subfactor 8: Record of significant claims against the firm because of improper or incomplete architectural and engineering services. (-5 to 0 Points). * The secondary selection criterion is used as a tiebreaker, if necessary, in ranking the most highly qualified firms following the completion of discussions. The secondary selection criterion will not be applied when determining a firm s SF330 submission. 2.1.c: After TEB Individual Ratings of the SF330s are completed, the TEB shall convene and develop consensus ratings for the seven evaluation factors of the SF330s as defined above. COMMENT DESCRIPTION DEFINITIONS Strong point: Provides Merit/advantages to VA that increase the likelihood of successful contract performance. Weak point: Flaws/disadvantages that increase the likelihood of unsuccessful contract performance. 2.2.c: The eighth factor (Secondary Selection Criterion) will only be used if needed. The TEB shall provide a listing, in order of preference, of the firms considered most highly qualified to perform the work. The contracting officer shall issue a Request for Proposal (RFP) to the architect-engineer the TEB recommends for negotiations. 3. SOURCE SELECTION PROCESS: 3.1 SF330 Reviews: The board will review and evaluate the submitted SF330 s in accordance with the stated evaluation criteria to determine each individual offeror s ability and capability to perform the work required and confirmation of determination of responsibility per FAR 9.1. a) TECHNICAL EVALUATION BOARD SF330 INDIVIDUAL EVALUATIONS (1) Each board member will conduct an independent review and evaluation and complete an evaluation rating sheet for EACH SF330. Each category will be addressed with strengths or weaknesses noted. (2) The evaluation will be in accordance with the Evaluation Factors which are listed in the solicitation. b) TECHNICAL EVALUATION BOARD SF330 CONSENSUS (1) After each member has completed their independent evaluation, the Chairperson will discuss the evaluations with the entire team and assure each evaluation is complete. (2) During these discussions, the board will reach a consensus rating for each SF330 and document ratings using the consensus evaluation worksheets. The SF330 can be downloaded through the GSA Forms Library at: https://www.gsa.gov/forms-library/architect-engineer-qualifications. No Fax Responses will be accepted: personal visits for discussing this announcement will not be entertained or scheduled. Questions may be directed only by e-mail to Donita.Grace@va.gov. VA Primary Point of Contact: Donita Grace, NCO 12 Contract Specialist, Donita.Grace@va.gov. The page limit for SF330 s will be 30 pages max., any pages after 30 will not be considered. See attached document: P01 - SOW 578-27-003 Renovate A Section 1st Floor Bldg. 1 | 77% | Combined Synopsis | 11/16/2026 |
Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice REQUEST FOR SF 330 36C25227Q0013 Project 578-27-003: Renovate A Section 1st Floor Bldg. 1 (AE) Design/Engineering Services SF-330 Package Due: October 30, 2026, at 1:00 p.m. CST (see details below) Points of Contact: Donita.Grace@va.gov INTRODUCTION: THIS IS A TOTAL 100% SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB) SET-ASIDE in accordance with Public Law 109-461. This is a Request for SF330s for Architect/Engineer (A/E) Design Services for Project Number 578-27-003: Renovate A Section 1st Floor Bldg. 1 (AE) at the Edward J. Hines VA Hospital in Hines, IL. THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. NO SOLICITATION PACKAGE WILL BE ISSUED via SAM.gov. A request for proposal will be issued directly to the top-rated firm for which negotiations will commence in accordance with FAR part 36. The anticipated A/E design services, to be awarded, will be procured in accordance with the Selection of Architects and Engineers Act (Public Law 92- 582), FAR Part 36.6 and VA Acquisition Regulation 836.6. Period of Performance: 449 Calendar Days Contract Type: Firm-Fixed-Price Estimated Magnitude of Construction: Between $10,000,000 and $20,000,000 NAICS Code: 541310 Size Standard: $12.5 Million SBA & SAM : in accordance with VAAR 819.7003, at the time of SF330 submission and prior to award of any contract, the offeror must represent to the contracting officer that it is a (1) SDVOSB eligible firm; (2) Small business concern under the North American Industry Classification System (NAICS) code assigned to the acquisition; and (3) SDVOSB listed as verified in SBA at: https://veterans.certify.sba.gov/ Additionally, all eligible firms must be registered and current in the System for Award Management (SAM) database to be evaluated and eligible for contract award. If the firm is not registered in SAM, you may register online at https://www.sam.gov. 1. PURPOSE: This Source Selection Plan (SSP) outlines the procedures that will be used to solicit architectural and engineering (AE) design services for Project 578-27-003 Renovate A Section on First Floor of Building 1. The goal of this project is to provide complete AE design services to renovate section A of the 1st floor of building 1. 2. ACQUISISTION DESCRIPTION: 2.1: RFI: A Request for Information shall be published to https://sam.gov whereby interested architect-engineering companies shall submit an SF330 package. This competitive procurement shall utilize a best value trade-off source selection process identified in FAR 15. 2.1.a: Source Selection Evaluation Board (SSEB): For the purpose of this acquisition, the SSEB will be same as the Technical Evaluation Board (TEB). 2.1.b: Below are the individual (TEB) evaluation criteria and ratings for the SF330s, listed in descending order of importance. FACTOR 1: SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE (30 Maximum Points) Subfactor 1A: Specialized Experience (15 Points). Subfactor 1B: Additional Experience (10 points). Subfactor 1C: Technical Competence (5 points). The A/E Firm shall demonstrate its specialized experience and technical competence in the design and construction period services for projects of similar size and complexity. Specialized project experience should include design of renovations to existing hospitals, renovations to buildings constructed prior to 1970 w/space constraints, design of Pathology Suites, and HVAC upgrades to existing hospitals. Additional experience includes mechanical, electrical, and structural engineering, architecture, interior design and finishes, physical security upgrades, building management systems/building automation systems (BMS/BAS), Computer-Aided Design and Drafting (CADD), critical path scheduling, fire protection, construction infection control protocols, design and installation of biological refrigeration and preservation systems, design and installation of vacuum tube transport systems, and project phasing and coordination in an active hospital setting. Offeror shall provide a minimum of three (3), and no more than five (5) recent and relevant Government and private experience projects similar in size, scope, and complexity, and experience with the type of projects/competence above. Relevant is defined as those task requirements identified in the Statement of Work. Recent is defined as services provided within the past seven (7) years with at least 50% of the Construction completed. At a minimum, include the following for each submitted project (if applicable): Project title, location, contract number, and detailed narrative describing the scope of services provided including the type of work performed by the offeror and its role in the project i.e., prime contract, Teaming Partner, or subcontractor. Project Owner, owner s point of contact including telephone number and email address. Services & Deliverables provided under the contract/task order Period of Performance, including start and completion dates for design and construction if applicable. Estimated cost of construction based on AE s design Final construction cost (or projected final construction cost if still underway) The percentage of total cost resulting from changes due to AE omissions. To demonstrate technical competence, the offeror shall include narratives of how the firm addresses each of the following topics. Simply restating this list will not be sufficient. The management approach The coordination of disciplines and subcontractors Quality control procedures Familiarity with VA Design Guides/Manuals, Master Specifications and other applicable standards. FACTOR 2: PROFESSIONAL QUALIFICATIONS (20 Maximum Points) Subfactor 2A: Key Positions (15 Points). Subfactor 2B: SDVOSB Compliance (5 Points). The architects and engineers on the firm s staff representing the project or signing/stamping drawings in each discipline must possess a minimum of five (5) years of experience and are required to be licensed, registered, or certified by a U.S. state, the District of Columbia, or a U.S. territory. Provide professional license jurisdiction of issue and license numbers and/or proof of licensure. A resume for each of these key positions must be provided, corresponding with the title matching the disciplines listed for the project. At a minimum, the offeror must describe the professional qualifications and specific experience in the required disciplines within the past five (5) years. Key positions and disciplines required for this project include, but are not limited to: Project Manager Architect Mechanical Engineer Electrical Engineer Plumbing Engineer Structural Engineer Interior Designer The evaluation will consider education, certifications, training, registration, overall and relevant experience and longevity with the firm. Offer must include the following statement of SDVOSB compliance when submitting the personnel proposed to perform the work under this requirement: I [signatory authority] ______________________, [company] _____________________; certify that the team proposed to perform under this requirement demonstrates the capability of 50% SDVOSB performance in compliance of 48 CFR 852.219-10. FACTOR 3: PAST PERFORMANCE (20 Maximum Points) Subfactor 3A: Past Performance of projects identified in FACTOR 1. (15 Points). Subfactor 3B: Average Past Performance of all projects (5 Points). Provide CPARS data for all projects identified in FACTOR 1. For any project that does NOT have CPARS data available, a Past Performance Questionnaire (PPQ) is required to be submitted with the SF330. Please utilize the attached PPQ document. CPARS data and PPQs will not be included in the page count. All projects provided in the SF330 must be completed by the office/ branch/ individual team member performing the work under this contract. The following information must be clearly specified on each performance report: Contract/task order number Project title Prime firm Start date Completion date Offers shall only include CPARS data for the projects listed in FACTOR 1. The contracting officer shall directly retrieve CPARS reviews from www.CPARS.gov to determine average past performance of previous projects. Government Past Performance Information Systems may be accessed. Evaluating past performance and experience may include information provided by the firm, customer inquiries, Government databases, publicly available sources, and additional projects in CPARS. Failure to provide requested data, accessible points of contact or valid phone numbers could result in a firm being considered less qualified. FACTOR 4: QUALITY CONTROL (10 Maximum Points) Subfactor 4A: Management approach (5 Points). Subfactor 4B: Quality methodology (5 Points). The A/E Firm shall describe its management approach, regarding coordination of disciplines and subcontractors, familiarity of the prime firm and any key subcontractors with VA Design Guides/Manuals, Master Specifications, ASHRAE standards, NEC, and other applicable standards. A/E Firm shall also provide the following: Quality Control organization, and management structure. Methods and procedures for control and prevention of nonconformances during design, preconstruction, and construction. Methods and procedures for nonconformance remediation at all stages of project. Methods and procedures for control and prevention of cost, and schedule overruns. Summarized schedules for selected three previous design projects that show initial approved project schedule, and any updates to schedule with time extensions. Provide a narrative to describe reasons and justifications for any deviations from initial schedule. Summarized cost estimates for selected three previous design projects that show initial approved total project cost estimate, and any increases to initial cost estimates. Provide a narrative to describe reasons and justifications for any deviations from initial estimates. Describe any unforeseen conditions that arose during construction for your last three projects. Provide a narrative to describe how your firm assisted the project management team to correct those deficiencies, and any methods used to mitigate extra costs and increases in project schedule. FACTOR 5: CAPACITY (10 Maximum Points) Subfactor 5A: Capacity to complete work within required timeline (5 Points). Subfactor 5B: Resource management and project management (5 Points). The A/E Firm shall attest to its capacity to accomplish the work in the required time. The evaluation will consider the firm s ability to meet the schedule of the overall project, as well as the available capacity of personnel in key disciplines. The A/E Firm shall also provide the following: A list that shows the total number of design and project professionals who are currently employed at the firm with professional titles for each. Total number of projects in study or planning stages Total number of active design projects Total number of active construction phase services A list of personnel assigned to each of the above projects An analysis and report of available capacity of key personnel for immediate new work The respondent shall: Summarize its approach to staffing and company resource management For the key personnel on the proposed project team, tabulate their current and projected workload as percentages of their available individual capacity. List all work awarded to the A/E Firm by the VA during the previous 12 months, as well as any current indefinite delivery, indefinite quantity (IDIQ) contracts that it has. List the current stage and percentage of completion for non-IDIQ projects. A signed statement shall be provided stating that the firm acknowledges that prior to award of the contract, it is required to notify the Government of any changes in its capacity that could limit its ability to perform the work within the required time. FACTOR 6: GEOGRAPHIC LOCATION (5 Maximum Points) Location of the firm, as measured by the travel time (hours) between the Offeror s principal business location and Edward Hines, Jr. VAMC, Hines, IL. Architect must provide details of travel between their main office and Edward Hines Jr, VAMC Hines, IL. This includes but not limited to airport travel time, driving distance, etc. If the architect has a satellite location, the architect must provide details of a fully staffed and well-established satellite office. Leasing documentation may be requested. FACTOR 7: EXPERIENCE IN CONSTRUCTION PERIOD SERVICES (5 Maximum Points) The A/E Firm shall demonstrate its experience in providing Construction Period Services for hospital facilities, particularly in HVAC renovation projects. The respondent shall provide a narrative that describes the methods and procedures used to implement each of the following Construction Period Services tasks: Professional field inspections during the construction period, with descriptions of types of inspections provided, and methods used for inspections and reporting during each phase of construction Review of construction submittals Support in answering requests for information during the construction period Support of construction contract changes to include updated drawings, drafting statements of work, and cost estimates. Weekly construction meeting participation Closeout documents to include final inspections and as-recorded drawings. SECONDARY SELECTION CRITERION*: FACTOR 8: CLAIMS (-5 to 0 Maximum Points) Subfactor 8: Record of significant claims against the firm because of improper or incomplete architectural and engineering services. (-5 to 0 Points). * The secondary selection criterion is used as a tiebreaker, if necessary, in ranking the most highly qualified firms following the completion of discussions. The secondary selection criterion will not be applied when determining a firm s SF330 submission. 2.1.c: After TEB Individual Ratings of the SF330s are completed, the TEB shall convene and develop consensus ratings for the seven evaluation factors of the SF330s as defined above. COMMENT DESCRIPTION DEFINITIONS Strong point: Provides Merit/advantages to VA that increase the likelihood of successful contract performance. Weak point: Flaws/disadvantages that increase the likelihood of unsuccessful contract performance. 2.2.c: The eighth factor (Secondary Selection Criterion) will only be used if needed. The TEB shall provide a listing, in order of preference, of the firms considered most highly qualified to perform the work. The contracting officer shall issue a Request for Proposal (RFP) to the architect-engineer the TEB recommends for negotiations. 3. SOURCE SELECTION PROCESS: 3.1 SF330 Reviews: The board will review and evaluate the submitted SF330 s in accordance with the stated evaluation criteria to determine each individual offeror s ability and capability to perform the work required and confirmation of determination of responsibility per FAR 9.1. a) TECHNICAL EVALUATION BOARD SF330 INDIVIDUAL EVALUATIONS (1) Each board member will conduct an independent review and evaluation and complete an evaluation rating sheet for EACH SF330. Each category will be addressed with strengths or weaknesses noted. (2) The evaluation will be in accordance with the Evaluation Factors which are listed in the solicitation. b) TECHNICAL EVALUATION BOARD SF330 CONSENSUS (1) After each member has completed their independent evaluation, the Chairperson will discuss the evaluations with the entire team and assure each evaluation is complete. (2) During these discussions, the board will reach a consensus rating for each SF330 and document ratings using the consensus evaluation worksheets. The SF330 can be downloaded through the GSA Forms Library at: https://www.gsa.gov/forms-library/architect-engineer-qualifications. No Fax Responses will be accepted: personal visits for discussing this announcement will not be entertained or scheduled. Questions may be directed only by e-mail to Donita.Grace@va.gov. VA Primary Point of Contact: Donita Grace, NCO 12 Contract Specialist, Donita.Grace@va.gov. The page limit for SF330 s will be 30 pages max., any pages after 30 will not be considered. See attached document: P01 - SOW 578-27-003 Renovate A Section 1st Floor Bldg. 1 | 77% | Combined Synopsis | 10/30/2026 |
71% | Awarded | Open | |
*= Required Field Combined Synopsis/Solicitation Notice Remediate Reserve Center UST Project UPDATED SUBMISSION REQUIREMENTS: SF 330 submittals shall be sent electronically via email to the attention of Kristopher Tolar and Christopher McDevitt. Standard Forms 330 s must be received no later than 4:00 PM on September 21, 2026. The submittal packages are to be sent via email to the following: Attention: Kristopher Tolar Email: Kristopher.tolar@va.gov Attention: Christopher McDevitt Email: Christopher.McDevitt@va.gov Subject Line: Solicitation 36C24426R0124 SF 330 Submittal | 71% | Combined Synopsis | 09/21/2026 |
70% | Awarded | Open |
Additional Details
Solicitation Number
36C24422R0169
Archive Date
Aug 15, 2023
Office Address