Fire Suppression Sprinklers at Coatesville VAMC
Archived on August 11, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 10:00 AM EDT
- Posted
- July 22, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Service-Disabled Veteran-Owned Small Business Set Aside
- NAICS
- 811310: Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
- Agency
- Department of Veterans Affairs
Notice details
- Office
- 244-NETWORK CONTRACT OFFICE 4 (36C244)
- Place of performance
- Coatesville, Pennsylvania, 19320
- PSC
- H312: INSPECTION- FIRE CONTROL EQUIPMENT
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 36C24426Q0415
- Notice ID
- eadf4f80a21a4ec8b1c50fd9136b7f3a
Description
Amendment 0005
- Deleted requirements for CLINs 0003 and 0004. No other substantive changes, all other requirements remain unchanged.
Amendment 0004
- Changed the Site visit time on the 9th to 10:00AM EST
- Added attachment for contractors to provide notice of attendees: titled "Site Visit Information". Failure to submit this prior the Site Visit will result in admittance to tour the facilities- this will be strictly enforced.
Amendment 0003
-Delected Base and Option Years for "Program Management"
- Added: RFI Questions and Answers
-Added: Sprinkler Inspection Reports
Statement of Work
Five-Year Obstruction Inspection of Sprinkler System
Coatesville VA Medical Center
1. Scope
The contractor shall provide all labor, materials, equipment, and supervision required to perform the five-year obstruction inspection, testing, and maintenance of the facility’s sprinkler systems in accordance with NFPA (National Fire Protection Association’s) 25 and applicable codes. Work includes internal pipe assessments, valve inspections, FDC hydrostatic testing, hydrant flow testing, and replacement of sprinkler gauges.
2. Applicable Standards
All work shall comply with NFPA 25 (current edition) and VA policies and directives.
3. Requirements
The contractor shall perform all NFPA 25‑required internal inspections, obstruction investigations, fire department connection (FDC) hydrostatic tests, hydrant flow tests, and sprinkler gauge replacements. The contractor shall coordinate all required system shutdowns with the designated VA Point of Contact (POC), adhere strictly to all VA safety protocols, and ensure that all work is performed by properly qualified technicians. All work shall be completed within 30 calendar days of award and shall be conducted Monday through Friday during administrative hours (8:00 a.m. to 4:30 p.m.). No work shall be performed on weekends or Federal holidays. All contractor personnel shall wear visible company identification badges displaying both the company name and the employee’s name.
3.1. Building 1 Annual Inspection
The contractor shall perform an annual fire pump inspection in the attic of Building 1 to ensure the stability and integrity of primary VAMC campus location. Flow testing at 100% rated capacity. Measurements of the suction pressure, discharge pressure and flow rate. Manufacturer’s pump curve compared to the current pump performance curve. Documentation of all readings, to include voltage and amperage. Compare to specifications and any deviations requiring corrective action. All equipment evaluations, diagnosis of equipment deficiencies and malfunctions, inspection and acceptance, as well as documentation of all tasks and services provided shall be furnished by the Contractor to the Coatesville VAMC PoC.
3.2. Sprinkler System Maintenance & Internal Inspection
A 5-year internal inspection cycle of sprinkler systems will be performed at the Coatesville VAMC Campus. The sprinkler systems gauges will be replaced at the following Buildings: 1, 2, 3, 4, 6, 7, 8, 9, 38, 39, 57, 59, 69, 138 and 139. Building Maintenance will be spread over a 5 year period in which the contractor will have 30 calendar days to complete these services (maintenance, inspection and repairs) of each tranche of buildings. The schedules is as followed:
Base Year- Services for Buildings 1, 2, 3
Option Year 1- Services for Buildings 4, 6, 7
Option Year 2- Services for Buildings 8, 9, 38
Option Year 3- Services for Buildings 39, 57, 59
Option Year 4- Services for Buildings 69, 138, 139
Building maintenance will be grouped together with their respective contract years and will billed as one “job”. Each job shall include the following requirements: service, testing and inspection, maintenance, replacement of all necessary materials, and supplies. The contractor shall provide full maintenance services, including all adjustments, calibration, and tuning. As part of this service, the Contractor shall include diagnosis and evaluation of all equipment, any deficiencies, malfunctions, inspection and acceptance; as well as documentation of all tasks and services provided.
3.3. Miscellaneous Maintenance Repairs
Each repair shall include all service, testing and inspection. The Contractor shall provide all parts, materials, supplies, labor, supervision, tools, shipping, travel, and equipment necessary to resolve the deficiency or malfunction.
4. Deliverables
Contractor shall submit inspection reports to the VA POC within five business days after work completion. Reports must document inspection findings, deficiencies, photographic evidence where required, and recommended corrective actions.
5. Government Responsibilities
The VA POC will provide access to equipment, coordinate fire watch procedures if needed, and review contractor-submitted documentation.
6. References
The VA Fire Protection Design Manual (Attachment A) and the Fire Safety Guidebook (Attachment B) are the guidelines supporting this requirement.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (26)
- Download
36C24426Q0415 0005.docx
234 KBAdded in Combined Synopsis/Solicitation version 9Posted - Download
Site Visit Information 07-9-2026.docx
19 KBAdded in Combined Synopsis/Solicitation version 6Posted - Download
36C24426Q0415 0004.docx
127 KBAdded in Combined Synopsis/Solicitation version 6Posted - Download
RFI Q and As.docx
15 KBAdded in Combined Synopsis/Solicitation version 5Posted - Download
36C24426Q0415 0003.docx
126 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
SPKLR9-2026 Blank.xlsx
15 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
SPKLR69-2026.xlsx
15 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
SPKLR138E-2026 Blank.xlsx
24 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
SPKLR7-2026 Blank.xlsx
15 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
SPKLR38-2026 Blank.xlsx
15 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
SPKLR57-2026 Blank.xlsx
16 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
SPKLR139-2026.xlsx
14 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
SPKLR59-2026.xlsx
15 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
SPKLR4-2026 Blank.xlsx
15 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
SPKLR39-2026 Blank.xlsx
14 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
SPKLR8-2026 Blank.xlsx
15 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
SPKLR6-2026.xlsx
16 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
SPKLR138-2026 Blank.xlsx
15 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
SPKLR3-2026 Blank.xlsx
17 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
SPKLR2-2026 Blank.xlsx
15 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
SPKLR1-2026 Blank.xlsx
15 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
36C24426Q0415 0002.docx
126 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
36C24426Q0415 0001.docx
126 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
36C24426Q0415.docx
125 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
852.219-75 MUST SIGN AND RETURN WITH PROPOSAL.pdf
117 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
SCA 2015-5791 Rev 31.pdf
47 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationArchived
Fire Suppression Sprinklers at Coatesville VAMC
- 2Version 2Combined Synopsis/SolicitationArchived
Fire Suppression Sprinklers at Coatesville VAMC
- 3Version 3Combined Synopsis/SolicitationArchived
Fire Suppression Sprinklers at Coatesville VAMC
- 4Version 4Combined Synopsis/SolicitationArchived
Fire Suppression Sprinklers at Coatesville VAMC
- 5Version 5Combined Synopsis/SolicitationArchived
Fire Suppression Sprinklers at Coatesville VAMC
- 6Version 6Combined Synopsis/SolicitationArchived
Fire Suppression Sprinklers at Coatesville VAMC
- 9Version 9Combined Synopsis/SolicitationArchivedCurrent
Fire Suppression Sprinklers at Coatesville VAMC
- 11Version 11Award NoticeArchived
Type changed from Combined Synopsis/Solicitation to Award Notice
Fire Suppression Sprinklers at Coatesville VAMC
Similar Opportunities
Additional Details
Solicitation Number
36C24426Q0415
Archive Date
Aug 11, 2026
Office Address
PITTSBURGH, PA, 15215