Notice ID: f9d8d0f9b6b74e45ad5e1da7fae17a49Combined Synopsis/SolicitationArchived
J065--Temporary ADA Ramp Amendment 1
Archived on August 25, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM EDT
- Posted
- August 5, 2025
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Service-Disabled Veteran-Owned Small Business Set Aside
Notice details
- Office
- 245-NETWORK CONTRACT OFFICE 5 (36C245)
- Place of performance
- Department of Veterans Affairs Clarksburg VAMC Contract Office 1 Medical Center Dr, Clarksburg, 26301
- Last updated
- Nov 10, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 36C24525Q0668
- Notice ID
- f9d8d0f9b6b74e45ad5e1da7fae17a49
Description
The purpose of amendment 1 is to answer questions and extend RFQ close date. RFQ close date is changed from 8/6/25 1PM EST to 8/15/25 1PM EST. Q.1 What is the VA measurement for the ADA ramp? A.1 See picture and measurements. Q.2 Does site require a walking area? No, foot traffic will utilize the ramp, so a foot path is not needed. Q.3 If yes, Is the ramp positioned on the left side (container side) or the right (generator side)? NA Q.4 Are there any site dimensions or required ramp lengths available? See Q.1 answer. Q.5 Can you provide elevation or slope details for the ramp location? See Q.1 answer. Q.6 Are there any drawings, site photos, or diagrams available that show the ramp area? Yes, see page 4 on SOW for pictures.
Award Overview
Possible prior contract
Inferred, not confirmedInferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.
Vendor
I-2-I SOLUTIONS, INC.Contract end date
Mar 31, 2027
NAICS
236220
Agency
Department of Veterans Affairs
Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.
Contacts
Contracting Officer
Primary Contact
Stephanie.henderson3@va.gov
Stephanie.henderson3@va.gov
Documents
Files (4)
- Download
36C24525Q0668 RFQ AMEND1.pdf
812 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
36C24525Q0668_2.docx
33 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
36C24525Q0668 RFQ.pdf
802 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
36C24525Q0668_1.docx
14 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationArchived
J065--Temporary ADA Ramp
- 3Version 3Combined Synopsis/SolicitationArchivedCurrent
J065--Temporary ADA Ramp Amendment 1
- 6Version 6Award NoticeArchived
Type changed from Combined Synopsis/Solicitation to Award Notice
J065--Temporary ADA Ramp Amendment 002
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Replace Chillers in AHUs 1 & 2 558-22-172 | 54% | Awarded | Open |
STATEMENT OF WORK Project Number: 558-22-172 Replace Chillers for AHU 1 and 2 Scope: The scope of work shall generally consist of but not limited to the following: providing all labor, materials, tools, equipment, permits, testing, and reports required to complete the replacement of chillers that serves AHU 1 and 2 and associated equipment and structural upgrades as shown in the drawings and specifications. Construction Period - Pre-Construction Meeting: Contractor shall participate in and facilitate a Pre-Con in conjunction with the Contracting Officer, COR, A&E, and building stakeholders as needed. Contractor to hold weekly Construction Progress Meetings via Microsoft Teams or in-person and include the COR and CO as principal participants. Contractor provides Meeting Minutes within no less than 7 days following each Construction Progress Meeting. As-Built Drawing Submission: Provide Red-line drawings to A/E that include the contractor’s mark-ups in PDF formats. Hours of Operation and Phasing: Construction should be phased and timed such that: General Operation of the affected areas is not interrupted The facility operates on a 24-hour, 7 day per week schedule Contractor will conduct operations during 1st, 2nd and 3rd shifts such that minimal interruption of function occurs. 1st shift construction activities will be allowed with approval of the COR. Contractor to develop and coordinate phasing plan with input from staff and final approval of COR. Any construction work that necessitates a utility outage must be scheduled for the second shift or during the weekend. Please coordinate all shutdowns with the VA COR and submit a written shutdown request at least 20 days in advance of the proposed shutdown date. Storage: No storage of any material will be allowed on VA property unless approved by the COR. Period of Performance: Contractor shall complete this project no later than 270 days after issue of notice to proceed (NTP). Utility and System or Service Outages: No utility services such as water, gas, steam sewers or electricity, parking, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized in accordance with VA Lock-out Tag-out requirements. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without the Medical Center Director’s prior knowledge and written approval. The contractor shall submit a request to interrupt any such services to COR, in writing, 20 days in advance of proposed interruption. General Requirements The contractor’s employees shall not enter the work site without appropriate badges and identification. They may also be subject to inspection of their personal effects when entering or leaving the project site. Execute work to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied jointly by patients or medical personnel, and Contractor’s personnel, except as permitted by COR where required by limited working space. Means of Egress: Do not block existing egress for occupied buildings, including paths from exits to roads per NFPA 101 and VA requirements. Minimize disruptions and coordinate with COR. All buildings will be occupied during performance of work. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical Center operations will continue during the installation period. Hot Work: Perform and safeguard hot work operations in accordance with NFPA 241 and NFPA 51B. Coordinate with COR. Obtain permits from facility Safety Manager at least 48 hours in advance. New work shall be installed and connected to existing work neatly, safely and professionally. Contractor to coordinate periodic VA inspection to ensure satisfactory workmanship of GC and Subcontractors. Any portion of the VAMC that is disturbed or damaged shall be replaced or repaired to its prior condition. The contractor is required to notify the COR upon arrival and departure of personnel at the work site every day work is performed during the execution of this project. END OF SCOPE OF WORK | 54% | Solicitation | 08/27/2026 |
PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, INSURANCE, BONDS, AND SERVICES ASSOCIATED WITH THE CONVERSION OF B. 504 (LRC) WAREHOUSE TO OFFICE SPACE AT FORT BUCHANAN, PR.THIS IS A RENOVATION PROJECT THAT INCLUDES, BUT NOT LIMITED TO: DEMOLITION: ALUMINUM AND GLASS DOORS, FIXED FRAMES WITH GLASS, ALUMINUM WINDOWS, EXISTING METAL COILING DOORS, HOLLOW METAL DOOR AND FRAMES, EXISTING REFLECTING CEILING, GYPSUM BOARD WALLS, RESTROOM. RENOVATION: SEAL WINDOWS AND DOORS OPENINGS, NEW WOOD DOORS AND HOLLOW METAL FRAMES, NEW STORE FRONT COMMERCIAL HOLLOW METAL AND ALUMINUM- GLASS DOORS, INSTALL NEW SINGLE HUNG ALUMINUM AND GLASS WINDOWS, CONSTRUCTION OF NEW DRYWALLS/ CEMENT BOARD, CONSTRUCTION OF NEW ACOUSTICAL CEILING, CONSTRUCTION OF NEW RESTROOMS (MALE AND FEMALE). ALL WORK WILL BE COMPLETED IN ACCORDANCE WITH THE STATEMENT OF WORK. The scope of work is detailed in the attached Performance Work Statement (PWS).This acquisition is a 100% Woman-Owned Small Business (WOSB) Set-Aside. The associated North American Industrial Classification System (NAICS) code for this procurement is 236220 with a small business size standard of $45,000,000.00.Period of performance: 210 days from Notice to Proceed (NTP).A site visit for this solicitation is scheduled for June 30, 2026 at 1:00 PM EST. All companies interested in attending the site visit must submit the names and relevant identifying information of their designated personnel in advance. Please submit all site visit attendance information via email to harvey.odom.civ@army.mil and felix.r.marrero2.civ@army.mil.Additionally, all Requests for Information (RFIs) or questions regarding this solicitation must be submitted in writing via the PIEE Module no later than July 3, 2026 at 5:00 PM EST. IMPORTANT NOTICE REGARDING QUESTIONS: Only registered PIEE users may ask questions.***UPDATE ? July 16, 2026 Please be advised that the solicitation closing date has been extended to July 23, 2026, at 1:00 PM AST.***Instructions for how to access the bid opening can be found in the attached file Building 504 Renovation Bid Opening*** | 49% | Awarded | Open |
PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, INSURANCE, BONDS, AND SERVICES ASSOCIATED WITH THE CONVERSION OF B. 504 (LRC) WAREHOUSE TO OFFICE SPACE AT FORT BUCHANAN, PR.THIS IS A RENOVATION PROJECT THAT INCLUDES, BUT NOT LIMITED TO: DEMOLITION: ALUMINUM AND GLASS DOORS, FIXED FRAMES WITH GLASS, ALUMINUM WINDOWS, EXISTING METAL COILING DOORS, HOLLOW METAL DOOR AND FRAMES, EXISTING REFLECTING CEILING, GYPSUM BOARD WALLS, RESTROOM. RENOVATION: SEAL WINDOWS AND DOORS OPENINGS, NEW WOOD DOORS AND HOLLOW METAL FRAMES, NEW STORE FRONT COMMERCIAL HOLLOW METAL AND ALUMINUM- GLASS DOORS, INSTALL NEW SINGLE HUNG ALUMINUM AND GLASS WINDOWS, CONSTRUCTION OF NEW DRYWALLS/ CEMENT BOARD, CONSTRUCTION OF NEW ACOUSTICAL CEILING, CONSTRUCTION OF NEW RESTROOMS (MALE AND FEMALE). ALL WORK WILL BE COMPLETED IN ACCORDANCE WITH THE STATEMENT OF WORK. The scope of work is detailed in the attached Performance Work Statement (PWS).This acquisition is a 100% Woman-Owned Small Business (WOSB) Set-Aside. The associated North American Industrial Classification System (NAICS) code for this procurement is 236220 with a small business size standard of $45,000,000.00.Period of performance: 210 days from Notice to Proceed (NTP).A site visit for this solicitation is scheduled for June 30, 2026 at 1:00 PM EST. All companies interested in attending the site visit must submit the names and relevant identifying information of their designated personnel in advance. Please submit all site visit attendance information via email to harvey.odom.civ@army.mil and felix.r.marrero2.civ@army.mil.Additionally, all Requests for Information (RFIs) or questions regarding this solicitation must be submitted in writing via the PIEE Module no later than July 3, 2026 at 5:00 PM EST. IMPORTANT NOTICE REGARDING QUESTIONS: Only registered PIEE users may ask questions.***UPDATE ? July 16, 2026 Please be advised that the solicitation closing date has been extended to July 23, 2026, at 1:00 PM AST.***Instructions for how to access the bid opening can be found in the attached file Building 504 Renovation Bid Opening***27 JULY 2026 ABSTRACT OF OFFERS POSTED | 49% | Special Notice | Open |
PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, INSURANCE, BONDS, AND SERVICES ASSOCIATED WITH THE CONVERSION OF B. 504 (LRC) WAREHOUSE TO OFFICE SPACE AT FORT BUCHANAN, PR.THIS IS A RENOVATION PROJECT THAT INCLUDES, BUT NOT LIMITED TO: DEMOLITION: ALUMINUM AND GLASS DOORS, FIXED FRAMES WITH GLASS, ALUMINUM WINDOWS, EXISTING METAL COILING DOORS, HOLLOW METAL DOOR AND FRAMES, EXISTING REFLECTING CEILING, GYPSUM BOARD WALLS, RESTROOM. RENOVATION: SEAL WINDOWS AND DOORS OPENINGS, NEW WOOD DOORS AND HOLLOW METAL FRAMES, NEW STORE FRONT COMMERCIAL HOLLOW METAL AND ALUMINUM- GLASS DOORS, INSTALL NEW SINGLE HUNG ALUMINUM AND GLASS WINDOWS, CONSTRUCTION OF NEW DRYWALLS/ CEMENT BOARD, CONSTRUCTION OF NEW ACOUSTICAL CEILING, CONSTRUCTION OF NEW RESTROOMS (MALE AND FEMALE). ALL WORK WILL BE COMPLETED IN ACCORDANCE WITH THE STATEMENT OF WORK. The scope of work is detailed in the attached Performance Work Statement (PWS).This acquisition is a 100% Woman-Owned Small Business (WOSB) Set-Aside. The associated North American Industrial Classification System (NAICS) code for this procurement is 236220 with a small business size standard of $45,000,000.00.Period of performance: 210 days from Notice to Proceed (NTP).A site visit for this solicitation is scheduled for June 30, 2026 at 1:00 PM EST. All companies interested in attending the site visit must submit the names and relevant identifying information of their designated personnel in advance. Please submit all site visit attendance information via email to harvey.odom.civ@army.mil and felix.r.marrero2.civ@army.mil.Additionally, all Requests for Information (RFIs) or questions regarding this solicitation must be submitted in writing via the PIEE Module no later than July 3, 2026 at 5:00 PM EST. IMPORTANT NOTICE REGARDING QUESTIONS: Only registered PIEE users may ask questions.***UPDATE ? July 16, 2026 Please be advised that the solicitation closing date has been extended to July 23, 2026, at 1:00 PM AST.***Instructions for how to access the bid opening can be found in the attached file Building 504 Renovation Bid Opening*** | 49% | Solicitation | 07/23/2026 |
Additional Details
Solicitation Number
36C24525Q0668
Archive Date
Aug 25, 2025