Notice ID: 59e3cca50b1e46469749bc3a464b1579Special NoticeArchived
3590--Cable Televison Services
Archived on September 16, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM EDT
- Posted
- September 3, 2025
- Notice type
- Special Notice
- NAICS
- 334220: Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing
- Agency
- Department of Veterans Affairs
Notice details
- Office
- 245-NETWORK CONTRACT OFFICE 5 (36C245)
- Last updated
- Nov 8, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 36C24525Q0840
- Notice ID
- 59e3cca50b1e46469749bc3a464b1579
Description
This is a Special Notice of intent to award on a sole source basis. This is not a solicitation. The Department of Veterans Affairs intends to negotiate a requirement for cable television services for the Department of Veterans Affairs Medical Center Perry Point. The applicable NAICS code is 334220. The PSC/FSC is 3590. The authority for this action is FAR 13.106-1(b): Soliciting from a single source. Interested persons may provide capability statements to the Contracting Officer via email at Veronica.Dillard@va.gov regarding this procurement. The determination to conduct a competitive procurement based on responses to this notice is solely within the discretion of the Contracting Officer.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
Files (1)
- Download
36C24525Q0840.docx
23 KBAdded in Special Notice version 3Posted
Lifecycle
- 3Version 3Special NoticeArchivedCurrent
3590--Cable Televison Services
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The U.S. Army Contracting Command, Aberdeen Proving Ground (ACC-APG) on behalf of the Communications-Electronics Command Security Assistance Management directorate (CECOM SAMD) is issuing this Sources Sought notice as a means of conducting market research to identify potential sources having an interest in, industry technologies available and capability to fulfill FMS requirements.See the attached document for detailed information. Disclaimer: Place of Performance Location is TBD. For the purpose of being able to post this Sources Sought, Aberdeen Proving Ground is listed for now. This will be updated if a future requirement results from this action. All questions and comments must be in Word or Excel and must be sent to the email listed:emanuel.e.green3.civ@army.mil no telephone calls will be accepted. No office calls or one on one meetings shall be requested or held related to this RFI. The Government will not pay for any information received in response to this request, nor will the Government compensate any respondent for any costs incurred in developing the information provided to the Government. | - | Market Research | 11/23/2026 |
1.0 INTRODUCTION The Naval Air Systems Command (NAVAIR), PMA-209, located at Naval Air Station Patuxent River, Maryland, is seeking information from potential sources regarding a modular Software Defined Radio (SDR) for U.S. Navy and Marine Corps aircraft, designated the Next Generation Tactical Radio (NGTR). The NGTR is intended to support voice and data waveforms in the Very High Frequency (VHF) and Ultra High Frequency (UHF) bands, with operational capability extending up to 6 GHz. It will incorporate a modular High Assurance Device (HAD) to meet National Security Agency (NSA) cryptographic and Security Evaluation Requirements Document (SERD) requirements. Additionally, the NGTR is designed to serve as a form, fit, and function backwards-compatible replacement for aircraft currently equipped with the ARC-210 Generation 5 and Generation 6 radios. This Market Research tool is being used to identify potential and eligible firms, of all sizes, prior to determining the method of acquisition and issuance of a solicitation. The results of the Request for Information (RFI) will be utilized to determine if any Small Business Set-Aside opportunities exist. Additionally, this RFI is being used to gather constructive information from industry to improve the RFP. The following documents are attached to this RFI Notice: Attachment 1: NGTR RFI Performance Requirements - DRAFT Attachment 2: Program and Risk Feedback Matrix The following dates are anticipated time frames associated with this requirement: Estimated Industry Day: 2nd Quarter FY27 Estimated Draft RFP Release: 3rd Quarter FY 27 Estimated Final RFP Release: 4th Quarter FY 27 Estimated Award Date: 2nd Quarter FY 28 Target Fleet Delivery: Mid-2034 – Production-ready NGTR systems delivered to fleet locations for aircraft installation Primary Place of Performance: Contractor facility and as needed at government test sites and government facilities for meetings with NAVAIR and NSA. 2.0 DISCLAIMER THIS REQUEST FOR INFORMATION (RFI) IS FOR INFORMATIONAL PURPOSES ONLY. THIS IS NOT A REQUEST FOR PROPOSAL. IT DOES NOT CONSTITUTE A SOLICITATION AND SHALL NOT BE CONSTRUED AS A COMMITMENT BY THE GOVERNMENT. RESPONSES IN ANY FORM ARE NOT OFFERS AND THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. NO FUNDS ARE AVAILABLE TO PAY FOR PREPARATION OF RESPONSES TO THIS ANNOUNCEMENT. ANY INFORMATION SUBMITTED BY RESPONDENTS TO THIS REQUEST IS STRICTLY VOLUNTARY. 3.0 PROGRAM BACKGROUND The NGTR system's goal is to develop a small form factor system compatible with existing and future U.S. Navy and Marine Corps aircraft that will support: Communications waveforms in the VHF, UHF frequency bands with support for waveforms up to 6GHz. Waveforms defined in Attachment 1. A Modular, Open architecture to support rapid capability integration and obsolescence upgrades including a modular High Assurance Device (HAD) that supports NSA cryptographic and SERD requirements. Zero Trust System security meeting applicable Risk Management Framework (RMF) controls. Minimal integration impact and modification requirements for existing and future U.S. Navy and Marine Corps aircraft platforms. 4.0 SPECIAL REQUIREMENTS AND REQUIRED CAPABILITIES The NGTR system is expected to meet the performance requirements defined in Attachment 1: “NGTR RFI Performance Requirements” - DRAFT. The NGTR Contractor is expected to meet the following qualifications: Have secure military software defined radios with embedded NSA certified cryptography. Have experience in agile and modular development and testing, incorporating customer feedback throughout the process. Have the ability to obtain Top Secret security clearances for employees and facility within 12 months of contract award, including the ability to support development and test up to the Top Secret level. Have experience in developing and producing UHF and VHF RF radios supporting military and non-military communications waveforms. Has experience in Model-Based Systems Engineering (MBSE). Have expertise and experience in reducing total life cycle support costs and utilizing predictive maintenance strategies to streamline repair procedures and reduce maintenance downtime. Have experience establishing, maintaining, and documenting a proactive DMSMS (Diminishing Manufacturing Sources and Material Shortages) and obsolescence programs. 5.0 ELIGIBILITY The applicable North American Industry Classification System (NAICS) code for this requirement is 334220 (Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing), with a Small Business Size Standard of 1,250 Employees. The Product Service Code (PSC) is 5821, (Radio and Television Communication Equipment, Airborne). Businesses of all sizes are encouraged to respond; however, each respondent must clearly identify their business size in their capabilities statement. Note: FAR 52.219-14 Limitation on Subcontracting requires a small business prime on a Set-Aside to perform at least 50% of the cost of contract performance. Small business primes may now count “first tier subcontracted” work performed by similarly situated entities as if it were performed by the prime itself. To assist in market research and determination of any applicable small business set-aside for this effort, small businesses interested in priming this effort and planning to use “similarly situated entities” to meet the Limitations on Subcontracting, are requested to identify: The name & CAGE Code of the specific firm(s) intending to partner/subcontract Their small business size status under the NAICS that as the prime, you would assign for their workshare. 6.0 SUBMISSION DETAILS To ensure a fair, orderly, and efficient evaluation process, all interested parties must adhere to the following submission guidelines: 6.1 Logistics and Deadlines Response Date: All submissions must be received no later than 2:00 PM EST on 14 December 2026. Questions Deadline: Clarifying questions regarding this RFI must be submitted via email no later than 10 business days prior to the response date. 6.2 Submission Method and Point of Contact (POC) Delivery: Submissions must be sent via Electronic-mail (Email) to the Contract Specialist, Sham Keswani, at sham.v.keswani.civ@us.navy.mil. Subject Line Format: The email subject line must read: NGTR RFI Response - [Company Name]. Inquiries: No phone calls will be accepted. All questions must be submitted via email to the Contract Specialist listed above. 6.3 Format and Structure Instructions Page Limit: Submissions must not exceed ten (10) pages total (excluding the Program and Risk Feedback Matrix in Section 7.0). Page Size & Margins: Standard 8.5 x 11-inch pages with 1-inch margins. Font: Times New Roman, font size of not less than 10 point. Document Type: Adobe PDF format. Classification: No classified information shall be submitted in response to this RFI. 6.4 Required Content Your submission package must include the following structured sections: Cover Page / Company Profile: Company Name, Address, CAGE Code, DUNS/UEI, Business Size Status under NAICS 334220, and designated Points of Contact (POC) including names, phone numbers, and email addresses. Capabilities Statement: A detailed narrative addressing your ability to meet the special requirements and required capabilities outlined in Section 4.0. Program and Risk Feedback: Completed responses to the targeted questions and the structured feedback matrix outlined in Section 7.0. 6.5 Proprietary Data and Information Handling All data received in response to this RFI that is marked or designated as corporate or proprietary will be fully protected from any release outside the Government. Any information or materials provided in response to this RFI Notice will not be returned. The Government is not committed nor obligated to pay for the information provided, and no basis for claims against the Government shall arise resulting from responses to this RFI Notice. 7.0 PROGRAM AND RISK FEEDBACK The Government is actively seeking constructive industry feedback to refine the NGTR program structure, technical requirements, and acquisition strategy. Industry Feedback Disclaimer: We actively encourage vendors to challenge our assumptions, highlight potential program risks, and suggest alternative approaches. Candid feedback regarding the feasibility of our timeline, scope, or technical requirements is highly valued and will not negatively impact your evaluation in any future procurement processes. 7.1 Targeted Feedback Questions Please provide direct, concise answers to the following questions within your submission: Program Scope & Feasibility: Based on the draft performance requirements (Attachment 1), are there any requirements that you view as overly restrictive, technologically unfeasible, or drivers of unnecessary cost? Timeline Realism: Reviewing our anticipated milestones Final RFP in FY27, Award in FY28, and a target fleet delivery of production-ready systems by mid-2034), is this timeline realistic for a system of this complexity? Please address the timeline required for development, environmental testing, platform integration, and NSA cryptographic certification. Cryptographic & Security Integration: What are the primary technical and certification risks associated with integrating a modular High Assurance Device (HAD) to meet NSA cryptographic and SERD requirements within the proposed form factor? Obsolescence & DMSMS: What proactive strategies do you recommend the Government incorporate into the contract structure to best incentivize long-term DMSMS management and minimize life cycle support costs? 7.2 Program and Risk Feedback Matrix Please utilize the attached structured template to document specific risks, scope concerns, or program improvements: | - | Pre-Solicitation | 12/14/2026 |
DISCLAIMER THIS INDUSTRY DAY ANNOUNCEMENT IS FOR INFORMATIONAL PURPOSES ONLY. THIS IS NOT A REQUEST FOR PROPOSAL (RFP), REQUEST FOR INFORMATION (RFI), OR SOLICITATION. THIS SPECIAL NOTICE IS BEING UTILIZED IAW FAR PART 10 MARKET RESEARCH TO DETERMINE THE AVAILABILITY AND CAPABILITY OF INDUSTRY TO PROVIDE GROUP 1 AND GROUP 2 UNMANNED AIRCRAFT SYSTEM (UAS) TRAINING, MISSION PLANNING, MISSION REHEARSAL, SIMULATION, AND QUALIFICATION MANAGEMENT SYSTEMS AND TO INFORM POTENTIAL FUTURE ACQUISITION STRATEGIES. THE GOVERNMENT IS NOT OBLIGATED TO AND WILL NOT PAY FOR ANY INFORMATION RECEIVED FROM INTERESTED PARTIES AS A RESULT OF THIS ANNOUNCEMENT. THIS DOES NOT CONSTITUTE A SOLICITATION AND SHALL NOT BE CONSTRUED AS A COMMITMENT BY THE GOVERNMENT. RESPONSES IN ANY FORM ARE NOT OFFERS AND THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. NO FUNDS ARE AVAILABLE TO PAY FOR PREPARATION OF RESPONSES, CAPABILITY BRIEFS, TRAVEL, LODGING, PARTICIPATION IN THIS INDUSTRY DAY, OR ANY OTHER COSTS ASSOCIATED WITH THIS ANNOUNCEMENT. ANY INFORMATION SUBMITTED BY RESPONDENTS IS STRICTLY VOLUNTARY. FAILURE TO PARTICIPATE IN THIS INDUSTRY DAY WILL NOT PREVENT A COMPANY FROM PARTICIPATING IN ANY FUTURE MARKET RESEARCH EFFORT, REQUEST FOR INFORMATION (RFI), TECHNICAL DEMONSTRATION, OR COMPETITIVE ACQUISITION RELATED TO GROUP 1 AND GROUP 2 UAS TRAINING, MISSION PLANNING, MISSION REHEARSAL, SIMULATION, AND QUALIFICATION MANAGEMENT SYSTEMS. NO TELEPHONE RESPONSES WILL BE ACCEPTED. INTRODUCTION The Aircraft Project Management Office (AIR PMO), under the Portfolio Acquisition Executive Robotic Autonomous Systems (PAE RAS), announces an Industry Day to support market research related to commercially available and emerging Group 1 and Group 2 Unmanned Aircraft System (UAS) Training, Mission Planning, Mission Rehearsal, Simulation, and Qualification Management Systems. This Industry Day is intended for representatives from industry with commercially available or emerging capabilities applicable to Group 1 and Group 2 UAS Training, Mission Planning, Mission Rehearsal, Simulation, and Qualification Management Systems. Air PMO will use this Industry Day to present representatives from industry with an overview of the Government's current capability objectives, operational considerations, and areas of interest for Group 1 and Group 2 UAS training and simulation systems. Additionally, the Government seeks to better understand commercially available technologies, emerging capabilities, and industry trends that may inform future capability development, requirements refinement, and acquisition planning. This Special Notice is issued in accordance with Federal Acquisition Regulation (FAR) Part 10 as part of the Government's market research process to identify commercially available capabilities and assess industry's ability to support potential future requirements. This announcement is for planning and market research purposes only and does not constitute a solicitation or commitment by the Government. BACKGROUND Simulation-based training has the potential to enhance operator proficiency, improve training availability, increase training throughput, reduce operational risk, and provide realistic Mission Planning and Mission Rehearsal capabilities for Group 1 and Group 2 Unmanned Aircraft Systems (UAS). These capabilities enable operators to safely practice in realistic and challenging operational and threat environments, emergency procedures, and degraded system behaviors that may be impractical, unsafe, or cost-prohibitive to execute using live aircraft. Additionally, simulation-based training may reduce operational impacts associated with range availability, airspace restrictions, spectrum congestion, weather delays, aircraft maintenance requirements, and logistical constraints while supporting standardized, repeatable, and scalable training across multiple UAS platforms. Through this market research effort, the Government seeks to better understand commercially available and emerging technologies, assess current industry capabilities and technology maturity, identify innovative approaches and best practices, and gather information that may assist in refining future capability objectives, training requirements, and acquisition strategies for Group 1 and Group 2 UAS Training, Mission Planning, Mission Rehearsal, Simulation, and Qualification Management Systems. MARKET RESEARCH PROCESS This Industry Day represents the first phase of Air PMO's market research effort. Subsequent phases are anticipated to include issuance of a Request for Information (RFI) requesting industry white papers, Government review of submitted white papers, and selected technical demonstrations. Information gathered throughout this market research effort may be used to support future capability development, acquisition planning, evaluation of commercially available solutions, and procurement strategies. INDUSTRY DAY Air PMO plans to host a virtual Industry Day via Microsoft Teams focused on Group 1 and Group 2 Unmanned Aircraft System (UAS) Training, Mission Planning, Mission Rehearsal, Simulation, and Qualification Management Systems. The Industry Day is tentatively scheduled for 03 September 2026. Final event details, including the date, time, registration procedures, attendance limitations, and Microsoft Teams meeting information, will be provided through an amendment or attachment to this Special Notice. The event will consist of an unclassified Government presentation followed by a Question and Answer (Q&A) session. During the presentation, Air PMO will provide an overview of current capability objectives, operational considerations, areas of interest, and the overall market research process related to Group 1 and Group 2 UAS Training, Mission Planning, Mission Rehearsal, Simulation, and Qualification Management Systems. The purpose of the Industry Day is to communicate the Government's areas of interest, provide industry with an understanding of the overall market research process, and facilitate an open exchange of information through the Question-and-Answer session. Following Industry Day, Air PMO anticipates releasing a Request for Information (RFI) requesting industry white papers to obtain additional information regarding commercially available capabilities and assess industry's ability to satisfy potential future Government requirements. Following the Government’s review of submitted white papers, selected vendors may be invited to participate in technical demonstrations to further assess the maturity, suitability, and applicability of proposed solutions. Air PMO will notify only those vendors selected to participate in the technical demonstration phase. Information obtained during the Industry Day, and subsequent market research activities may be used to support future capability development, acquisition planning, and procurement strategies. Interested parties are encouraged to submit questions in advance of the Industry Day to facilitate meaningful discussion during the event. The Government will also accept questions submitted during the live Question and Answer (Q&A) session. Responses may be provided during the event or, as appropriate, published in a consolidated Question and Answer document on SAM.gov following the Industry Day. Interested parties wishing to participate in the Industry Day shall register using the Industry Day Registration Link provided as a link to this Special Notice on SAM.gov. Registration shall be completed no later than the response date identified in this Special Notice. If a company is unable to access or submit its registration using the Industry Day Registration Link due to technical difficulties, registration information may be submitted by email to the Point of Contact identified in this Special Notice. Email registrations shall include the following information: Company Name Attendee Name Attendee Title Attendee Email Address Attendee Telephone Number Email registrations shall include the following subject line: "Industry Day for Group 1 and Group 2 UAS Training, Mission Planning, Mission Rehearsal, Simulation, and Qualification Management Systems" Interested parties wishing to submit questions prior to the Industry Day shall use the Industry Day Question Submission Link provided as an attachment to this Special Notice on SAM.gov. Questions shall be submitted no later than the response date identified in this Special Notice. If a company is unable to access or submit questions using the Industry Day Question Submission Link due to technical difficulties, questions may be submitted by email to the Point of Contact identified in this Special Notice. Email question submissions shall include the following information: Company Name Point of Contact (POC) Name Point of Contact (POC) Title Point of Contact (POC) Email Address Point of Contact (POC) Telephone Number Question(s) Questions shall not include proprietary, competition-sensitive, or Controlled Unclassified Information (CUI), as questions and corresponding Government responses may be addressed during the Industry Day or published in a consolidated Question and Answer (Q&A) document on SAM.gov. Email question submissions shall include the following subject line: "Q&A – Industry Day for Group 1 and Group 2 UAS Training, Mission Planning, Mission Rehearsal, Simulation, and Qualification Management Systems" Telephone inquiries regarding this Special Notice will not be accepted. CAPABILITY AREAS OF INTEREST The Government is interested in understanding industry capabilities in the following areas. These capability areas are provided solely for market research purposes and are intended to facilitate discussion during Industry Day and subsequent market research activities. They do not constitute final requirements or imply any future procurement strategy. Training and Qualification Management Initial operator qualification training Refresher and sustainment training Instructor-led training Student performance tracking Student training records and qualification management Automated grading and evaluation After-action review and debrief capabilities Training syllabus management Unmanned Aircraft Simulation and Flight Fidelity Unmanned Aircraft-specific flight models Realistic flight characteristics and handling qualities Unmanned Aircraft performance modeling Payload effects on aircraft performance Environmental and weather effects Emergency procedure training Lost-link procedures Degraded system operations Mission Planning and Mission Rehearsal Mission planning functionality Mission rehearsal capability Route and waypoint planning Terrain analysis Obstacle analysis Airspace planning Real-world geographic mission rehearsal Operational environment replication Import and export of mission plans, geospatial data, and mapping products Terrain and Synthetic Environment Global terrain databases Satellite imagery integration Digital elevation models Urban environments Maritime environments Custom training area generation Area of Responsibility (AOR) development User-generated scenarios Instructor and Evaluation Capability Instructor Operator Station (IOS) Scenario creation and modification Student monitoring Real-time scenario control Scenario replay Instructor evaluation tools Scenario injection capabilities Contested and Tactical Environment Training GPS-denied operations GPS-degraded operations Electronic warfare effects Communications degradation Adverse weather operations Tactical mission scenarios Multi-aircraft operations System Integration and Interoperability Integration with operational hand controllers Integration with operational Ground Control Stations (GCS) Support for multiple aircraft types Open architecture solutions Future aircraft integration Government-configurable aircraft libraries Modular system design Compatibility with commercially available and Government-furnished simulation hardware, controllers, and peripherals TENTATIVE INDUSTRY DAY AGENDA (Eastern Time) 1000 – 1015 Welcome and Opening Remarks 1015 – 1115 Air PMO Presentation 1115 – 1300 Question and Answer (Q&A) Session The agenda is provided for planning purposes only and is subject to change. REGISTRATION Additional registration procedures, Microsoft Teams meeting information, and other administrative details will be provided through an amendment to this Special Notice and, as appropriate, directly to registered participants. Information obtained during the Industry Day may be used to refine capability objectives and inform subsequent market research activities. Following Industry Day, Air PMO anticipates issuing a Request for Information (RFI) requesting industry white papers. Information submitted in response to the RFI, together with information gathered throughout this market research effort, may be used to support future capability development, acquisition planning, evaluation of commercially available solutions, and procurement strategies for Group 1 and Group 2 Unmanned Aircraft System (UAS) Training, Mission Planning, Mission Rehearsal, Simulation, and Qualification Management Systems. NAVAIR appreciates your interest in the upcoming Air PMO Industry Day. In accordance with the Special Notice, N00019-26-PMA-263-0999, in the Introduction section: "This Industry Day is intended for representatives from industry with commercially available or emerging capabilities applicable to Group 1 and Group 2 UAS Training, Mission Planning, Mission Rehearsal, Simulation, and Qualification Management Systems." NDAA COMPLIANCE AND SMALL UAS REUSABLE ARCHITECTURE (SRA) AWARENESS Information obtained through this Industry Day, and subsequent market research activities may be used to inform future market research activities, acquisition planning, and procurement decisions. Accordingly, interested parties should be aware that future Government requirements may include compliance with applicable National Defense Authorization Act (NDAA) provisions, including but not limited to NDAA FY2020 Section 848, NDAA FY2023 Section 817, NDAA FY2019 Section 889, and the American Security Drone Act of 2023 (FY2024 NDAA, Public Law 118-31, Division A, Title XVIII, Subtitle B, Section 1821). The Government is interested in understanding the current NDAA compliance status of commercially available solutions, as well as any planned pathways to achieve compliance where applicable. To support transparency and traceability of NDAA compliance, interested parties may, at their discretion, leverage the Navy's Small UAS Reusable Architecture (SRA) framework to document system components, supply chain attributes, and applicable security controls. The SRA framework provides Government-backed tools and self-assessment mechanisms that enable vendors to independently evaluate alignment with Department of War-approved benchmarks and facilitate review of compliance artifacts during future market research activities. Access instructions for the SRA framework and tools will be provided to verified industry participants. The SRA website is Public Key Infrastructure (PKI) enabled and requires a Department of Defense Common Access Card (CAC) or External Certificate Authority (ECA) certificate for access. Additional information regarding ECA certificates is available at: https://www.cyber.mil/eca Use of the SRA framework and associated tools is not required for participation in this Industry Day and is provided for awareness and informational purposes only. PROPRIETARY INFORMATION Government Support Contractors supporting this effort have executed Non-Disclosure Agreements (NDAs) with the Government that prohibit the unauthorized disclosure of proprietary information obtained during this Industry Day and associated market research activities. Vendors are responsible for clearly identifying and marking any proprietary, competition-sensitive, or Controlled Unclassified Information (CUI) included in pre-submitted questions, written responses, supporting information voluntarily provided to the Government, or other correspondence associated with this Industry Day. Should a vendor require a separate Non-Disclosure Agreement (NDA) with Government Support Contractors, the vendor may submit its NDA, together with any associated instructions, to the points of contact identified in this notice for review. It is the respondent’s responsibility to monitor this site for the release of any follow-on information. POINT OF CONTACT: FoSUAS_Industry_Day@us.navy.mil Contracting: diana.k.harritt.civ@us.navy.mil john.m.barr1.civ@us.navy.mil | - | Special Notice | 09/17/2026 |
As of today, Monday, 02 November 2026, this Call for Solutions is Amended under No. 0001 to incorporate an attachment not previously included with the posting last week. Please see attached for the technical specifications document titled, "ACC-APG_Digital IF_Draft Technical Specfication doc_W15P7T-27-R-DIGIF." No extension to the due dates within this CfS are offered at this time. Capability Program Executive Command and Control Information Network (CPE C2IN) Commercial Solution Opening (CSO) Call for Solutions (CfS) for Product Manager Wideband Enterprise Satellite Systems (PdM WESS) Commercial Digital Intermediate Frequency Subsystem (DIFS) under the Army Open Solicitation (AOS) Commercial Solutions Opening (CSO) Project Office/Customer Product Manager Wideband Enterprise Satellite Systems (PdM WESS) Contracting Activity Army Contracting Command – Aberdeen Proving Ground (ACC-APG) CSO Number Army Open Solicitation (AOS) - W9128Z-25-S-A002 Call for Solution Title Commercial Digital Intermediate Frequency Subsystem (DIFS) under the Army Open Solicitation (AOS) Commercial Solutions Opening (CSO) Contracting Points of Contact Contracting Officer: Licinda Peters Email: licinda.m.peters.civ@army.mil Contract Specialist: Keith Magaw Email: keith.a.magaw.civ@army.mil Questions Due Date/Time 05 November 2026 at noon Eastern Standard Time (EST) Solution Brief Due Date/Time 10 December 2026 at noon Eastern Standard Time (EST) Submit Solution Brief Via Sam.gov and AOS Controlled by U.S. Army Controlled by: PdM WESS CUI Category: Operations Security (OPSEC) Limited Dissemination Control: FEDCON POC: licinda.m.peters.civ@army.mil SECTION 1 - INTRODUCTION BACKGROUND Product Manager Wideband Enterprise Satellite Systems (PdM WESS) is seeking solutions for a Commercial-Off-The-Shelf (COTS) Digital Intermediate Frequency (IF) system to satisfy the requirements for Increment 1 of this modernization effort. The current legacy analog infrastructure limits scalability, resilience, and interoperability. Under this Call for Solutions, the selected vendor will deliver, integrate, install, and acceptance-test a flexible, open-standard, modular Digital IF solution across up to twenty (20) worldwide satellite communications (SATCOM) teleport sites. Increment 1 will establish a fully operational baseline designed to support subsequent capability upgrades and integrations in future fiscal years. SECTION 2 – REQUIREMENT DESCRIPTION PROBLEM STATEMENT Area of Interest: Modular Digital Intermediate Frequency Solutions for Next-Generation SATCOM Teleports Background & Operational Context Current Department of War (DoW) satellite communications (SATCOM) ground infrastructure relies heavily on legacy L-Band Intermediate Frequency (IF) distribution systems. These analog-hardware-bound architectures limit flexibility, inhibit rapid tech insertion, and create single points of failure across global teleport infrastructures. To counter emerging near-peer threats in dynamic operational environments, the warfighter requires highly resilient, agile, and rapidly scalable SATCOM. The Problem The legacy L-Band architecture fails to offer the ability to dynamically route or transport Radio Frequency (RF) signals over DoW Internet Protocol (IP) networks. This lack of flexibility inhibits the resilience of geostationary earth orbit (GEO) SATCOM operations. To transition to a modern, flexible, software-defined ground segment, the DoW requires an open-standard Digital IF architecture. However, before committing to a full-scale global deployment, the DoW must validate the operation, interoperability, security, and performance of these modular commercial solutions in a rigorous representative environment. Technical Objective & Scope The DoW seeks a commercial solution for an Increment 1 Digital IF capability set built on a flexible, open standard (e.g., Digital Intermediate Frequency Interoperability compliant), modular architecture. The selected solution will undergo standard site acceptance testing and operational verification to confirm compliance with contract performance requirements and site compatibility. Upon successful acceptance, this operational configuration will serve as the standardized baseline for deployment and installation across up to twenty (20) worldwide SATCOM teleport sites. Mission Impact Successful validation and deployment of this flexible open-standard Digital IF architecture will directly enhance warfighter lethality and survivability by delivering a highly resilient, agile, and survivable GEO-SATCOM capability which rapidly adapts to contested/congested environments. SCOPE AND TECHNICAL OBJECTIVES The scope of this effort is to acquire, integrate, test, and field a commercially available or commercial-derivative Digital IF suite, and to operationalize it within existing DoW Teleports. The subsystem shall demonstrate the core capability to digitize analog L-band satellite signals, transport them over a high-speed digital network, and convert them back to analog signals, while handling native digital IF traffic from modems. The subsystem shall leverage mature commercial solutions with an emphasis on automation, reliability, and adherence to open standards, for example, the IEEE-ISTO Std 4900-2021 (DIFI) standard. The offeror shall propose a commercial solution that achieves the following high-level technical objectives, aligned with the core characteristics of the DoW modernization framework: Objective 1: Interoperable Digital IF Conversion (Modular & Open): The DIFS shall convert legacy analog L-band aggregate signals (950 MHz - 2.050 GHz) into standards-compliant Digital IF packet streams and vice versa. This includes both transmit (analog-to-digital) and receive (digital-to-analog) paths, conforming to the DIFI standard to prevent vendor lock-in. Objective 2: Advanced Digital Signal Processing (Adaptable): The commercial subsystem shall combine multiple, disparate Digital IF streams into a single aggregate (combined) stream for uplink and channelize a single aggregate (combined) downlink stream into multiple, individual Digital IF streams for processing. Objective 3: High-Performance Digital Transport (Scalable): The subsystem shall utilize a non-blocking, high-speed digital switch fabric to route Digital IF streams between all subsystem components and external interfaces (e.g., Digital Modems, Global Agile Integrated Transport (GAIT) connections, Wide Area Network (WAN) transport etc. The fabric shall support standard network scaling, redundancy, and high-throughput operations (up to 100 Gigabit Ethernet). The switch fabric shall provide a means for rapid reconfiguration of packet forwarding by the Automated Management and Control Function without the use of Layer 3 routing protocols. The switch fabric shall use deterministic multicast routing based on the incoming port without requiring strict multicast tables. Objective 4: Automated Management and Control (Empowered): The subsystem shall feature a software-based management suite. This software shall automate the establishment, termination, and monitoring of communication paths based on satellite access parameters, manage automatic protection switching for redundant components, and support automated rerouting of critical traffic to alternate facilities. Objective 5: Integrated Test and Diagnostics: The DIFS shall incorporate built-in test capabilities to generate, capture, and analyze Digital IF streams to allow for rapid troubleshooting, performance verification (e.g., Error Vector Magnitude (EVM) & spectral purity), and subsystem health monitoring with minimal operational burden and with on-site test equipment. Objective 6: Resilient and Maintainable Design (Resilient): The commercial solution shall be designed for high availability Ai ≥ 0.9998) a long service life (15 years), and rapid maintainability (MTTR ≤ 30 minutes), using standard line-replaceable items (LRIs). Objective 7: Secure and Compliant Architecture (Secure): The subsystem design shall be capable of achieving a Risk Management Framework (RMF) authorization for a security categorization of (Confidentiality, Moderate), (Integrity, Moderate), (Availability, Moderate). Objective 8: Achieve Military Compliance and Certification Readiness: The delivered commercial units and data packages shall be verified to meet the requirements of a strategic military environment. The subsystem performance shall adhere to applicable military standards, including SATCOM interoperability (MIL-STD-188-164C), electromagnetic interference (MIL-STD-461G), and environmental engineering (MIL-STD-810H). All testing, data, and documentation produced shall support Wideband Global SATCOM (WGS) terminal certification. Objective 9: Global Integration and Installation Support (Fieldable): The commercial solution provider shall provide the engineering services, site-specific technical expertise, and field support necessary to install, integrate, and configure the DIFS baseline across up to twenty (20) or more globally dispersed DoW Teleports, ensuring seamless interoperability with host facility infrastructure and legacy analog/digital interfaces. The Government will consider commercial solution approaches and vendors that fall along a spectrum of technological maturity, from capabilities that may require some further development to those that are fully commercialized and currently fielded. Deliverables The primary deliverable is a Full-Scale Engineering Development (FSED) DIFS (First Article) that successfully meets the objectives in Section 3.0, followed by optional production units. Associated deliverables include: Technical Data Package (TDP): A comprehensive TDP including interface specifications, commercial subsystem design documents, and standard test procedures. Electronic Technical Manual (ETM): A manual sufficient for trained technicians to operate, maintain, and troubleshoot the subsystem. New Equipment Training (NET): Training materials and courseware required to train operators and maintainers on the subsystem. Test Reports: First Article Testing (FAT) reports suitable for use as evidence for WGS certification. Logistics Demonstration: A verification demonstration of maintainability requirements (e.g., MTTR) performed by the offeror using the provided ETM, tools, and recommended spare parts. Integration Support: Technical support for system integration and government-led field verification. Risk Management Framework: Artifacts suitable for verification that the security architecture and included security controls are adequate for the security categorization. Programmatic Objectives & Commercial Acquisition Strategy This acquisition is conducted under the Army Open Solutions (AOS) to identify and procure mature, commercially available technologies using Other Procurement, Army (OPA) funds. The Government's objective is to verify a c, followed by the immediate execution of priced contract options for the procurement, installation, and sustainment of production-ready subsystems at up to twenty (20) or more DoW Teleports and strategic gateway sites worldwide. Program Schedule and Milestones The offeror shall propose a streamlined schedule based on commercial product availability and rapid verification milestones: Commercial Solution Technical Demonstration Physical Configuration Audit (PCA) / Baseline Review First Article Delivery First Article Testing (FAT) & Verification Logistics & Performance Demonstration Site Acceptance Testing (SAT) and Teleport Integration SECTION 3 – SUBMISSION AND SELECTION Selection of awardee is planned to be conducted using a three (3) step approach: Step 1 – Request for Solution Briefs, Step 2 – Pitch Session and/or Vendor Technical Demonstration (PS/VTD) and Step 3 – Proposal Submission. A multi-disciplined working group of technical experts will evaluate the solution Briefs on their own technical merit and not against other solutions. Solution Briefs, and Pitches and/or Demos will be evaluated based on adherence to the following submission and evaluation criteria. STEP: 1 – REQUEST FOR SOLUTION BRIEFS Parties with innovative solutions interested in being considered for this Digital IF solution shall submit a Solution Brief for review, prior to submission of a formal proposal. Solution Briefs that do not meet the requirements in this Call will not be considered. At the Government’s discretion, fully mature solutions, partial solutions, or solutions that are not commercially ready may either be awarded an Other Transaction (OT) to further mature the solution or retained in a library for three (3) months to be considered for contract or OT award at a later time. Not all fully matured solutions will be awarded a contract, nor will all partially mature or solutions that are not commercially available be given an OT award. The commercial solutions described in the solution Brief must clearly articulate relevancy to the technical objectives described in this Call, with a specific focus on delivering commercial capabilities to achieve objectives. No information submitted by an interested party in response to this Call will be returned. Submission of Solution Briefs shall adhere to the following general guidelines: Minimum of five (5) pages with a maximum of ten (10) pages or slides, not including the Coversheet, title page, or table of contents Times New Roman - not smaller than 12-point font type, although smaller font types may be used for figures, tables, and charts All Solution Briefs must be written in English Multiple Solution Briefs may be submitted for multiple solutions from the same Vendor A vendor’s standardized digital capability profile document will not be evaluated; Solution Briefs /White Papers must be submitted The Solution Brief shall address the following requirements/information: Capability Description: A detailed description of the product(s) or service(s) offered. Explain how the solution addresses the Objectives. Include technical specifications, performance data, and evidence of the solution's maturity or Technology Readiness Level (TRL). Company Experience and Past Performance: Provide a summary of the company’s experience in developing, producing, and sustaining DIFS-related capabilities for Department of Defense or other relevant customers. Production and Sustainment Approach: Describe the company's ability to scale production to meet potential demand, a proposed timeline required to scale to production, the number of units currently available for shipment, the current production rate, the number of units available for delivery per month if scaled, and its approach to providing training, field service support, long-term sustainment, and supply chain risk management. Pricing Structure: Provide a notional pricing structure for the proposed capabilities. This should include pricing for single units and an explanation of available discounts for range-based quantity purchases (e.g., 1-10 units, 11-50 units, 51+ units). Pricing for yearly sustainment and service agreements should also be addressed. Global Integration and Installation Approach: Describe the company’s experience and approach for managing, deploying, and physically installing the proposed subsystem across up to 20 globally dispersed teleport sites. This must include plans for site surveys, site-specific engineering, local integration support, and coordination of on-site acceptance testing. OTHER RELEVANT INFORMATION Use of a diagram(s) or figure(s) to depict the essence of the proposed solution is strongly encouraged. A Solution Brief submitted in response to a government solicitation (like a Call for Solutions or Commercial Solutions Opening) acts as a high-level pitch, but it is also a pre-contractual framework. A solution is meaningless without a timeline. Telling the government what you can build must be accompanied by how long it will take. If the solicitation specifies a 1.5-month maximum, including your proposed Period of Performance (PoP) proves to the evaluators that your technical approach is realistic and can actually be completed within strict constraints. Time directly dictates cost. A 45-day PoP implies a highly concentrated burst of work. Including the PoP explains your pricing; a $100,000 solution, for example, delivered over 1.5 months implies a very different team structure and urgency than the same cost spread over a year. For Solution Briefs, Pitches and/or Demos, and Proposals containing data that is not to be disclosed to the public for any purpose or used by the Government except for evaluation purposes, the vendor shall label any information they want protected as confidential. SOLUTION BRIEF DUE DATE/TIME Questions are due 05 November 2026 at noon Eastern Standard Time (EST) via email to Mr. Eric Belle, Project Management Specialist at eric.k.belle.civ@army.mil, Mr. Keith Magaw, Contract Specialist at keith.a.magaw.civ@army.mil, and Licinda M Peters, Contracting Officer at licinda.m.peters.civ@army.mil. Respondents who submit questions in response to the CfS, are requested to use “ACC-APG Digital IF CfS_ Questions Template_Attch 0001.” The completed question template should be attached to the email as an Excel document. This Call will remain open for no more than forty-five (45) days from the original posting. The due date for solution-Briefs submitted in response to this Call is no later than 10 December 2026. Solution Briefs received after the due date and time will not be considered for selection. SUBMISSION METHOD (UNCLASSFIED ONLY) In addition to soliciting SAM.Gov, the Digital IF effort utilizes AOS for the posting of Calls. Please submit your solution responses for the above requested information in PDF or Microsoft Word format no later than (NLT) Noon EST on 10 December 2026 to Mr. Eric Belle, Project Management Specialist at eric.k.belle.civ@army.mil, Mr. Keith Magaw, Contract Specialist at keith.a.magaw.civ@army.mil, and Licinda M Peters, Contracting Officer at licinda.m.peters.civ@army.mil. SOLUTION BRIEF EVALUATION CRITERIA (listed in priority order) Technical Understanding – Does the proposed solution demonstrate that the Vendor understands the Technical Objectives in section 2.2 and the Requirements/Information in section 3.1 of the Call for Solution? Does the Vendor clearly articulate how its technical solution meets the Technical Objectives and Requirements? Does the technical solution meet requirements in this Call? Capability Description & Technical Alignment – Does the proposed solution align with the Objectives? Interoperable Digital IF Conversion (Modular & Open). Does the proposed solution convert legacy analog L-band aggregate signals (950 MHz - 2.050 GHz) into standards-compliant Digital IF packet streams and vice versa? Does it work during both transmit (analog-to-digital) and receive (digital-to-analog)? Does the proposed conform to the DIFI standard? Does the proposed solution prevent vendor lock in? Advanced Digital Signal Processing (Adaptable). Does the proposed solution combine multiple, disparate Digital IF streams into a single aggregate stream for uplink? Does the proposed solution channelize a single aggregate downlink stream into multiple, individual Digital IF streams for processing? High-Performance Digital Transport (Scalable). Does the proposed solution utilize a non-blocking, high-speed digital switch fabric to route Digital IF streams between all subsystem components and external interfaces (e.g., Digital Modems, GAIT connections, WAN Transport etc.)? Does the proposed solution ensure that the DIF backbone switching fabric supports standard network scaling, redundancy, and high-throughput operations (up to 100 Gigabit Ethernet)? Does the proposed solution employ a DIFI backbone switch fabric that provides a means for rapid reconfiguration of packet forwarding by the Automated Management and Control function without the use of Layer 3 routing protocols? Does the proposed solution employ a DIFI backbone switch fabric that uses deterministic multicast routing based on the incoming port without requiring strict multicast tables? Automated Management and Control (Empowered). Does the proposed solution feature a software-based management suite? Does the proposed solution automate the establishment, termination, and monitoring of communication paths based on satellite access parameters? Does the proposed solution manage automatic protection switching for redundant components? Does the proposed solution support automated rerouting of critical traffic to alternate facilities? Integrated Test and Diagnostics. Does the proposed solution incorporate built-in test capabilities to generate, capture, and analyze Digital IF streams? Does the proposed solution allow for rapid troubleshooting, performance verification (e.g., EVM, spectral purity), and subsystem health monitoring without extensive external test equipment? Resilient and Maintainable Design (Resilient). Is the proposed solution designed for high availability Ai ≥ 0.9998)? Is it designed for a long service life (15 years)? Does it enable rapid maintainability (MTTR ≤ 30 minutes), using standard LRIs? Secure and Compliant Architecture (Secure): Is the proposed solution capable of achieving and maintaining the latest Risk Management Framework (RMF) authorization for a security categorization of (Confidentiality, Moderate), (Integrity, Moderate), (Availability, Moderate)? Will other proprietary knowledge, configuration or licenses inhibit the government from selecting a different contractor for future support if desired for the whole life cycle of the system? Are there foreseeable end-of-life/support/availability dates for any of the hardware, software or licenses within the system? Achieve Military Compliance and Certification Readiness. Does the proposed solution enable commercial units and data packages to be verified to meet the requirements of a strategic military environment? Does the subsystem performance adhere to applicable military standards, including SATCOM interoperability (MIL-STD-188-164C), electromagnetic interference (MIL-STD-461G), and environmental engineering (MIL-STD-810H)? Does the testing, data, and documentation produced support Wideband Global SATCOM (WGS) terminal certification? Global Integration and Installation. Does the proposed solution demonstrate a viable, low-risk approach to physical installation and system integration at up to 20 globally dispersed Teleport sites? Does the vendor possess the logistical, engineering, and field support capabilities required to achieve site acceptance and support operational readiness? Potential for Future Success – Does the proposed solution demonstrate that the Vendor has potential for success and a roadmap for sustaining and producing systems? Technical Readiness and Performance Potential: Does the proposed solution demonstrate the potential to meet specified performance metrics and address the Army needs? Is the underlying technology sound, scalable, and defensible? Are there plans for rigorous testing and validation? Product Viability and Market Fit: Does the proposed solution demonstrate a clear understanding of the Army operational requirements, a compelling value proposition, and evidence of military utility? Operational Readiness: Does the proposed solution outline a clear and realistic roadmap for achieving operational readiness, including any planned or completed testing, pilot programs, previous fieldings, and previous or current work with other Government Entities with its proposed technology? Integration Potential and Adaptability: Does the proposed solution demonstrate the potential to integrate smoothly with existing systems? Is the architecture flexible and adaptable to future needs? Team Expertise and Capability: Does the team possess the necessary skills and experience to execute the business plan and achieve projected milestones? Are roles clearly defined, and responsibilities assigned appropriately? Production Capacity: Does the solution address the availability of current units and a plan to scale production to meet potential Government demand. Sustainment and Training: Does the solution have a viable plan and long-term sustainment strategy, including field service support (FSRs) and training pipelines. Impact of Data Rights Asserted – Do any proposed data rights assertions limit or restrict the viability of the solution? Alternatively, does the Vendor mitigate performance and continuity risk through other means (e.g. escrow, Modular Open Systems Approach)? Does the Vendor discuss the Government’s Right to Repair? Does the Vendor include/offer warranties? Rough Order of Magnitude (unit pricing) – Is the ROM price provided realistic for the work to be performed and reflect a clear understanding of the requirements? Does the proposed solution address the risks associated with the cost of scaled procurement (quantity discounts) and long-term sustainment/licensing costs. Notice to offerors: The use of Artificial Intelligence (AI) tools may be used during evaluations. Any AI tools utilized by the Government will be employed in a manner consistent with applicable regulations that govern the protection of proprietary and source selection sensitive information. No proposal data will be transmitted to or processed by external, non-Government systems without appropriate safeguards and authorizations in place. Based on the results of the Step 1 evaluation, a Vendor will either receive a non-selection letter from the Contracting Officer providing a short summary of why the solution-brief was not selected, a notice of inclusion into the library, or an invitation to continue to the next step. Since CPE C2IN only requests minimal information from a Vendor at this initial stage (and not a full proposal), we generally will not provide significant feedback beyond the letter. STEP 2: PITCH SESSION/VENDOR TECHNICAL DEMONSTRATION (PS/VTD) The pitch session will allow selected companies from Step 1 to provide detailed information on their proposed solution. In-person pitch sessions will be held in an unclassified setting at Fort Belvoir, Virginia. If selected for an in-person pitch session (limited to 90 minutes with an additional 30-minute question and answer segment), each vendor will also conduct a VTD on the same day as the pitch session (limited to 1 hour to showcase subsystem capabilities. Vendors selected for a VTD will be given detailed testing information and requirements closer to the date of testing. The purpose of the VTD is to validate the information provided during the in-person vendor pitch session and give Army stakeholders an opportunity to witness the vendor subsystems’ capability performance within a controlled laboratory environment. The Government may bypass Step 2 and move a Vendor(s) into Step 3, based on the information provided in the Step 1 Brief. 3.4 STEP 3: PROPOSAL The Government will engage in collaborative discussions regarding the statement of work (SOW) with a Vendor who is invited to Step 3. During this process, the Government team and the Vendor team can discuss requirements, exchange ideas, share drafts of the proposal and SOW, and collaborate until a mutually beneficial SOW is agreed upon. Upon completion of discussions/collaboration, the Government may issue a Request for Proposal (“RFP”) to the Vendor selected. The RFP will have specific guidelines. Chiefly, Vendors must submit a technical volume, an updated SOW (if required), and a detailed price breakdown as it relates to the SOW. USE OF NON-GOVERNMENT ADVISORS Vendors are advised that data included in solution-briefs and technical/cost proposals submitted to the Government in response to this CSO Call may be released to support contractors or Federally Funded Research and Development Center (FFRDC) personnel for review and analysis. Any such personnel will serve in an advisory capacity only to the Government evaluators and will provide the CPE C2IN with independent review and analysis of technical matters and on accomplishment of objectives, tasks, and deliverables as proposed or required. All Government and non-government participants in the review process are required to execute government nondisclosure agreements and personal/organizational statements of financial interest, as appropriate. By submission, Vendors agree that their material may be reviewed by support contractors. SECTION 4 – AWARDS ANTICIPATED TYPE OF AWARDS The Government intends to award one FAR Part 12 commercial contract as a result of this Call for Solutions. The Government may also award an Other Transaction Authority (OTA(s)) as a result of a Vendor(s) submission(s). ANTICIPATED TIMELINE OF AWARD The selection of a Vendor for an award will be based on the relevance of their proposed solutions to meet the Government’s requirements, the maturity of their offerings, and their demonstrated ability to produce and sustain their capabilities. New and updated white papers will be accepted for the entire period the CSO Call is open. The estimated award timeline is first quarter of 2027. | - | Solicitation | 12/10/2026 |
Project Title: Tactical Communication Systems Procurement, Services & Sustainment (TCS-PSS) Reference Number: CSO-ARMY-TCS-PSS-2027 Primary NAICS: 334220 – Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing 1. Opportunity Overview The Department of the Army, representing the Capability Program Executive Command and Control Information Network (CPE C2IN), the Project Manager Command and Control Transport (PM C2T), and the Product Manager Tactical Communication Systems (PdM TCS), has issued a Call for Solutions (CfS) under Defense Federal Acquisition Regulation Supplement (DFARS) Part 212.70 to establish a 10-year enterprise acquisition framework for innovative tactical communication capabilities. This initiative seeks to secure a mix of single-award Indefinite Delivery, Indefinite Quantity (IDIQ) contracts and/or Other Transactions (OTs) to streamline the procurement, testing, fielding, and lifecycle sustainment of both legacy systems and emerging transport hardware and software. Focused on supporting Next Generation Command and Control (NGC2), the effort aims to deliver highly secure—National Security Agency (NSA) High Assurance certified or Sensitive but Unclassified - Encrypted (SBU-E) qualified—resilient, and interoperable communication systems. To counter future cryptographic threats, the framework is seeking capable vendors to provide a plan for incorporating Post-Quantum Cryptography (PQC) compliant algorithms and achieving National Institute of Standards and Technology (NIST) validation by 31 December 2030, ensuring robust data protection and mission command resilience in contested joint and coalition environments. 2. Critical Milestones & How to Respond Questions & Comments Due: 04 November 2026 at 16:00 EST White Papers Due: 14 December 2026 at 17:00 EST 3. Points of Contact Contracting Officer: Jennifer Anderson, jennifer.d.anderson57.civ@army.mil Contract Specialist: Aaliyah Coles, aaliyah.m.coles.civ@army.mil Please refer to the attached Call for Solutions (CSO-ARMY-TCS-PSS-2027) document for full submission instructions, evaluation criteria, and detailed technical characteristics. 29 October 2026: Amendment 3 – Vendor Questions and Government Responses: The Government’s responses to the initial round of vendor questions are attached to this amendment. Vendors are strongly encouraged to review these responses in their entirety before submitting additional questions, as the responses may address matters relevant to White Paper preparation. As stated in the prior amendment, additional questions must be submitted no later than November 4, 2026, in accordance with the Call for Solutions instructions. White Paper Submission Deadline: The White Paper submission deadline is extended to 14 December 2026. All White Papers must be submitted in accordance with the instructions and submission requirements established in the Call for Solutions. Security Criteria for SBU-E Tactical Radio Devices: An additional controlled document is available to verified vendors. This document includes security criteria for SBU-E tactical radio devices broken out into screening that must be satisfied and differentiating for trade off analysis. Access to this document is limited to vendors whose eligibility and access have been verified through the Government’s established process. Vendors shall handle the document in accordance with all applicable access, safeguarding, and distribution requirements. Attachments Attachment 1: Initial Vendor Questions and Government Responses Attachment 2: Security Criteria for Sensitive But Unclassified-Encrypted (SBU-E) Enclave Tactical Radio Devices — Available to Verified Vendors Only Amendment 2 (26 October 2026) – The submission schedule for the TCS-PSS Call for Solutions has been revised. The deadline for submitting questions is now extended to 04 November 2026, and the submission deadline for White Papers has been extended to 03 December 2026. To reiterate, to request access to Controlled Unclassified Information (CUI) documents, vendors must complete the following steps: SAM.gov Request: Submit an access request directly through the SAM.gov posting. (Note: ONLY SUBMIT ONE DOCUMENT APPROVAL REQUEST THROUGH SAM.GOV PER VENDOR). Email Verification Package: Send an email to jennifer.d.anderson57.civ@army.mil,; aaliyah.m.coles.civ@army.mil; and douglas.g.thier.civ@army.mil containing: Approved DD Form 2345 CAGE Code Joint Certification Program (JCP) Number Signed Non-Disclosure Agreements (NDAs) for all individuals requiring access to CUI document 3. Reminder, all vendor questions regarding this CfS must be submitted via the designated Microsoft Forms link. Important: No vendor emails containing questions regarding the CfS will be answered or responded to. The Government will consolidate and provide formal answers to all submitted questions following the final receipt of questions. All other terms, conditions, and submission guidelines remain unchanged. Amendment 1 (19 October 2026; 1600 EST) - The purpose of this amendment is to establish the mandatory security and verification protocols for vendors requesting access to the CUI and Export-Controlled attachments associated with this Call for Solutions. Certain attachments referenced in this Call for Solutions are marked as Controlled Unclassified Information (CUI) with Limited Dissemination Controls and/or Export Controls. The dissemination of Export-Controlled information is restricted by the Arms Export Control Act or the Export Administration Act of 1979. Export-controlled items shall not be disseminated outside the U.S. Government or to U.S. Government contractors without first verifying the recipient’s eligibility and authority to receive export-controlled information by verifying they have a current, valid DD Form 2345. Interested vendors must provide their CAGE Code, a copy of the DD2345, and their Joint Certification Program (JCP) number to Contracting Officer Jennifer Anderson (jennifer.d.anderson57.civ@army.mil), Contract Specialist Aaliyah Coles (aaliyah.m.coles.civ@army.mil) and Contract Specialist Douglas Thier (douglas.g.thier.civ@army.mil). Once the CAGE Code and JCP data has been verified the Controlled documents will be sent to interested parties. Additionally, vendors will be required to submit a Non-disclosure Agreement (NDA), for all personnel requiring access to these documents. A copy of this NDA can be obtained by emailing the Contracting Officer Jennifer Anderson (jennifer.d.anderson57.civ@army.mil), Contract Specialist Aaliyah Coles (aaliyah.m.coles.civ@army.mil) and Contract Specialist Douglas Thier (douglas.g.thier.civ@army.mil). For more information regarding the JCP approval process and the DD Form 2345 click or copy and paste the link below into a web browser: https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/SpecificDD2345Instructions.aspx | - | Solicitation | 12/14/2026 |
Additional Details
Solicitation Number
36C24525Q0840
Archive Date
Sep 16, 2025