GovChime
Notice ID: de56af604d9c4f80bb8512f3dcf72238Award NoticeAwardedArchived

J061--AWARD NOTICE ELECTRICAL BPA WASHINGTON DC VAMC

Awarded on January 20, 2026. Full description on SAM.gov.

Awarded tounder 36C24526A0008 (source: SAM.gov award notice)• $0

Overview

Posted
January 20, 2026
Notice type
Award Notice
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
238210: Electrical Contractors and Other Wiring Installation Contractors
Agency
Department of Veterans Affairs

Notice details

Office
245-NETWORK CONTRACT OFFICE 5 (36C245)
Place of performance
Department of Veterans Affairs Washington DC VA Medical Center, Washington, District of Columbia, 20422
Last updated
Nov 4, 2026
First published
Last updated on SAM.gov
Award date
Jan 20, 2026
Award amount (SAM.gov award notice)
$0

Identifiers

Solicitation number
36C24526Q0114
Notice ID
de56af604d9c4f80bb8512f3dcf72238
Award number (PIID)
36C24526A0008

Description

Award Overview

Award Number

36C24526A0008

Award Amount (SAM.gov award notice)

$0

Award Date

Jan 20, 2026

Awardee

Awardee UEI

HNREJVLXV2J4

Awardee CAGE Code

1XMH1

Awardee Address

WASHINGTON, DC 20020, DC

Original Solicitation

Notice ID: de56af604d9c4f80bb8512f3dcf72238

Posted Date: Jan 20, 2026

Original Response Deadline: Not specified

Task Orders Under This IDV

Top 10 by total obligated

1
  • 36C24527N0090
    SAVAGE TECHNICAL SERVICES LLC
    Department of Veterans AffairsNAICS 238210
    $90.0KSigned Oct 20, 2026

More From This Vendor

Top 5 most recent

2
  • 36C24527N0090
    SAVAGE TECHNICAL SERVICES LLC
    Department of Veterans AffairsNAICS 238210
    $90.0KSigned Oct 20, 2026
  • 36C24526A0008
    SAVAGE TECHNICAL SERVICES LLC
    Department of Veterans AffairsNAICS 238210
    —Signed Jan 20, 2026

Contacts

Contracting Officer

Primary Contact

Bill Pratt
Contracting Officer

Documents

Files (16)

  • 36C24526Q0114 0002.pdf

    209 KBAdded in Combined Synopsis/Solicitation version 19Posted
    Download
  • ANSWERS TO RFI QUESTIONS.pdf

    52 KBAdded in Combined Synopsis/Solicitation version 19Posted
    Download
  • DIAGRAM FOR PARTICLE COUNT MANOMETER. AIR SCRUBBER.pdf

    3.8 MBAdded in Combined Synopsis/Solicitation version 19Posted
    Download
  • VHA ICRA-1.3 Dec 9 2024 -Blank Sample FOR LEVEL IV.pdf

    437 KBAdded in Combined Synopsis/Solicitation version 19Posted
    Download
  • PCRA and ICRA Requiremnts.pdf

    125 KBAdded in Combined Synopsis/Solicitation version 19Posted
    Download
  • Task Order Closeout - Quality Certification.pdf

    103 KBAdded in Combined Synopsis/Solicitation version 19Posted
    Download
  • 36C24526Q0114 0002_1.docx

    15 KBAdded in Combined Synopsis/Solicitation version 19Posted
    Download
  • 36C24526Q0114_01-05-2026_USE THIS RFQ.pdf

    778 KBAdded in Combined Synopsis/Solicitation version 2Posted
    Download
  • 36C24526Q0114 0001.pdf

    226 KBAdded in Combined Synopsis/Solicitation version 2Posted
    Download
  • 36C24526Q0114 0001_1.docx

    15 KBAdded in Combined Synopsis/Solicitation version 2Posted
    Download
  • VA Campus Map.pdf

    1.5 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • VHA DIRECTIVE 1028.pdf

    238 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • SAM_WAGE_DETERMINAITON_DC_2015-4281.pdf

    452 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • 36C24526Q0114--.pdf

    688 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • 36C24526A0008_1.docx

    13 KBAdded in Award Notice version 4Posted
    Download
  • 36C24526Q0114_1.docx

    14 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • VA
    www.va.govPosted
  • VA
    www.va.govPosted

Lifecycle

  1. 5
    Version 5Combined Synopsis/SolicitationArchived

    J061--AMENDMENT 0002 - ANSWERS TO RFIS AND EXTEND RFQ DUE DATE ELECTRICAL BPA WASHINGTON DC VAMC 36C24526Q0114

    Notice 8fc93c6cc0604561baa4225364641362 on SAM.gov

  2. 4
    Version 4Award NoticeArchivedCurrent

    Type changed from Combined Synopsis/Solicitation to Award Notice

    J061--AWARD NOTICE ELECTRICAL BPA WASHINGTON DC VAMC

    Notice de56af604d9c4f80bb8512f3dcf72238 on SAM.gov

Other notices for this solicitation

  1. Combined SynopsisRelated noticeDec 3, 2025

    J061--REQUEST FOR QUOTES ELECTRICAL REPAIR AND SERVICE BPA WASHINGTON DC VA MEDICAL CENTER

    Notice 10374430812b46468dbb004c86f0947d on SAM.gov

  2. Combined SynopsisRelated noticeDec 8, 2025

    J061--AMENDMENT 0001 TO CLARIFY RFQ DUE DATE ELECTRICAL BPA WASHINGTON DC VAMC 36C24526Q0114

    Notice 3fe65d1e8bcb4c69b56e73fd927da542 on SAM.gov

  3. AwardedRelated noticeJan 20, 2026

    J061--AWARD NOTICE ELECTRICAL BPA WASHINGTON DC VAMC

    Notice ffd1e1c12643495c9083d0cc617f9f2d on SAM.gov

  4. AwardedRelated noticeJan 20, 2026

    J061--AWARD NOTICE ELECTRICAL BPA WASHINGTON DC VAMC

    Notice b748cc8e3cb44bf48664949ce96a6f9a on SAM.gov

  5. AwardedRelated noticeJan 20, 2026

    J061--AWARD NOTICE ELECTRICAL BPA WASHINGTON DC VAMC

    Notice 93f7258842bb45cdb8a4cb36ae3a7757 on SAM.gov

  6. AwardedRelated noticeJan 20, 2026

    J061--AWARD NOTICE ELECTRICAL BPA WASHINGTON DC VAMC

    Notice ee20806c813349b4a234bacd0484836d on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Ameendment 0001 -Removal of Abandoned Telecommunications Equipment
-Solicitation10/23/2026
To convert the patient and public television distribution system at the Washington DC VA Medical Center from analog to digital signal delivery, and to replace or supplement the display equipment that cannot receive a digital signal.
-Solicitation10/20/2026
This is a Notice of Intent to Sole Source published in accordance with Federal Acquisition Regulation (FAR) RFO 5.101(a) Pre-solicitation notice requirements and (FAR) RFO 12.102 Restricting Competition. This Notice of Intent is for a proposed award of an open market sole source award to EATON CORPORATION for a Service and Preventative Maintenance contract for the following UPS equipment. EATON UPS MODEL 9390-160 - EH456CBC09 9390-160 EE423CAB13 93PM EN493UXX02 93PM EN373UXX02 93PM ES265UXX06 93PM ES262UXX03 93PM ET074UXX02 93PM ES255UXX04 The location of service will be at the Hershel "Woody" Williams VA Medical Center 1540 Spring Valley Drive Huntington, WV 25704-9300. The proposed award is for EATON CORPORATION UEI: NP3NSFVMNUM3. As the original equipment manufacturer (OEM), and an ISO9001 certified supplier, Eaton Corporation (formerly: Eaton Electrical Inc. and Powerware ) is the provider of factory-supported, factory trained, factory authorized and factory certified service for your critical UPS (Uninterruptible Power Supply) equipment. Eaton offers power quality services for its UPS products, as well as for related equipment such as power distribution units (PDUs), batteries, alternative energy devices and Cutler-Hammer switchgear. Eaton also services products from legacy brands, including Powerware, Exide Electronics, Best Power, IPM, Deltec and Lortec. Eaton is the only authorized provider of service support with the Eaton developed proprietary service software for 3-phase Eaton UPS products. Eaton does not train, certify or support independent third party service providers to deliver or service Eaton UPS and power quality products. Due to its lack of training on competitor s platforms Eaton does not service non-Eaton branded power quality equipment. Eaton only works on its own branded equipment or devices it s been certified to fully support and maintain (e.g., flywheels, static transfer switches). No other service supplier is authorized to possess Eaton proprietary (copyrighted) software, repair documentation, processes or materials. The Period of Performance is for 1 year / 12 months of service. Flex Plan with Two UPS and Two Battery Preventive Maintenance Checks for all 8 systems. The North American Industry Classification System (NAICS) code for this service is 238210 (Electrical Contractors and Other Wiring Installation Contractors). The Product Service Code (PSC) is J061 (Maint/Repair/Rebuild of Equipment- Electric Wire and Power Distribution Equipment). Small business size standard is $19 Million. While this synopsis does not constitute a solicitation, interested vendors may identify their interest and capability to satisfy the requirement. All responsible sources may submit a capability statement, which shall be considered by the agency, by emailing such statement and supporting documentation by NLT 10:00 AM Eastern Time (ET), 11/12/2026 to William Pratt at billie.pratt@va.gov . Please reference the announcement number (36C24527Q0046) in the subject line of the e-mail. Such documentation will be reviewed solely for the purpose of determining whether or not to conduct the procurement on a competitive basis. A determination not to compete this requirement, based upon responses to this notice, is solely within the discretion of the Government under authorities cited above. See attached: UPS OEM Sourcing Letter Eaton Corp.
-Pre-Solicitation11/12/2026
SUMMARY The Department of Veterans Affairs (VA), Veterans Health Administration (VHA), Network Contracting Office (NCO) 5, is issuing this Sources Sought Notice to identify vendors that are interested in and capable of providing the required services. The Louis A. Johnson VA Medical Center, located in Clarksburg, WV, requires a contractor to provide Triennial Electrical System Inspection, Testing, and Maintenance for the facility. Interested vendors should review the Statement of Work (SOW) to determine the specific services required. NCO 5 is seeking responses from firms that are interested in this procurement and possess the resources, capabilities, and qualifications necessary to perform these services. Anticipated NAICS CODE 238210, PSC CODE J061 Please submit your capabilities statement and provide responses to all questions listed below. SOURCES SOUGHT NOTICE: 36C24527Q0039 1. Business name (including Unique Entity ID (SAM.gov) 2. Business type, socio-economic status (e.g., Veteran-Owned, Woman-Owned, Disadvantaged Small Business, 8(a), etc.), and 3. Person of contact (including telephone number & email address). 4. Capability statement and summary of previous experience providing these types of services for the Veterans Health Administration or other similar facilities. 5. Available contract vehicles (GSA FSS, etc.) for use by Department of VA (including applicable NAICS) 6. Brief Summary of categories of services that your company can/cannot provide. 7. Certification(s) / Licenses for meeting the local requirements to provide these services at the DC VAMC (if applicable) 8. Confirmation that your organization has the capability and expertise to meet the performance requirements while complying with applicable limitations in subcontracting by responding to the questions below with your response: a. Do you intend to self-perform this effort? b. If you are located outside the immediate area, how will you self-perform? c. Or do you intend to subcontract work under this contract? If you intend to subcontract work under this contract, how will you ensure compliance with the limitations on subcontracting? Response Instructions: Respond to this Notice 36C24527Q0039 by 11-05-2026 @ 10 AM ET. Send all responses to Billie.Pratt@va.gov Subject line on email: 36C24527Q0039 Sources Sought Notice | Company Name STATEMENT OF WORK Triennial Electrical System Inspection, Testing, and Maintenance Louis A. Johnson VA Medical Center (688) 1 Medical Center Drive Clarksburg, WV 26301 Document Number ENG-SOW-2026-ELEC-TRI-001 Revision Rev 1 Generator load bank, arc flash, and power quality scope removed (separate contracts) Date Issued May 2026 Originating Activity Engineering Service (138), LAJ VAMC Cognizant Official Contracting Office VISN 5 Network Contracting Office Anticipated Vehicle Firm-Fixed-Price (FFP), Single-Award Set-Aside To be determined by Contracting Officer (SDVOSB priority per VAAR 819.7004) Period of Performance 180 calendar days from NTP, with mobilization NLT 30 days from award 1.0 GENERAL INFORMATION 1.1 Purpose The Department of Veterans Affairs (VA) requires a qualified electrical testing contractor to perform the triennial inspection, testing, and preventive maintenance of the normal and Essential Electrical System (EES) distribution and support equipment at the Louis A. Johnson VA Medical Center (LAJ VAMC), Clarksburg, West Virginia. The intent of this work is to verify the integrity, reliability, and code compliance of the in-scope electrical equipment, identify and correct deficiencies, and provide the documentation required to satisfy The Joint Commission (TJC), CMS Conditions of Participation, NFPA, and VA accreditation/inspection requirements for the elements within scope. 1.2 Background LAJ VAMC is a VHA Complexity Level 2 medical center within VISN 5. The campus electrical distribution serves Type 1 Essential Electrical Systems under NFPA 99 (Life Safety, Critical, and Equipment Branches). Buildings within scope include the main hospital, Boiler Plant, building 7, Building 20, the Clinical Addition, and supporting structures. The previous comprehensive triennial electrical inspection was performed in CY 2023; this procurement covers the CY 2026 cycle for the in-scope equipment. Generator triennial preventive maintenance and 3-year load bank testing (NFPA 110-2025 §8.4.2), the arc flash risk assessment / coordination study refresh, and any campus power quality / harmonics survey are being procured under separate contract vehicles and are NOT within the scope of this SOW. 1.3 Objective Achieve and document one hundred percent (100%) compliance with all applicable codes and standards listed in Section 3.0 for the equipment categories within scope, including but not limited to NFPA 70-2023 (NEC), NFPA 70B-2023, NFPA 70E-2024, NFPA 99-2024, NFPA 101-2024, NFPA 111-2022, ANSI/NETA MTS-2023, VHA Directive 1028, and VA PG-18-10. 1.4 Definitions and Acronyms Acronym Definition AHJ Authority Having Jurisdiction ATS Automatic Transfer Switch CHENG / DCE Chief Engineer / Deputy Chief Engineer COR Contracting Officer's Representative EES Essential Electrical System (NFPA 99 Type 1) GFCI Ground-Fault Circuit Interrupter IRT Infrared Thermography LAJ VAMC Louis A. Johnson VA Medical Center, Clarksburg, WV NETA InterNational Electrical Testing Association PM Preventive Maintenance SOW Statement of Work UAN / UAC Utility Advisory Notice / Utility Advisory Committee UPS Uninterruptible Power Supply VLF Very Low Frequency (cable test method) NF 2.0 SCOPE OF WORK The Contractor shall furnish all labor, supervision, NETA-certified personnel, licensed electricians, professional engineering oversight, test equipment, calibrated instrumentation, materials, transportation, lodging, per diem, and incidentals necessary to perform the triennial inspection, testing, cleaning, and minor corrective maintenance of the in-scope electrical distribution and support equipment at LAJ VAMC, in accordance with Sections 3.0 and 4.0 of this SOW. 2.1 General Scope Summary Work shall include, but is not limited to: Visual, mechanical, and electrical testing of medium-voltage (MV) and low-voltage (LV) switchgear, switchboards, panelboards, motor control centers (MCCs), distribution and unit substations, dry-type and liquid-filled transformers, busway, and feeder cables. Functional testing and exercising of all Automatic Transfer Switches (ATSs) on the Life Safety, Critical, and Equipment Branches. Protective relay testing, calibration, and trip-curve verification on all MV and selected LV electronic-trip breakers (settings verified against the existing Government-furnished coordination study; no study revision performed under this SOW). Insulation resistance, contact resistance, and primary injection testing of LV power circuit breakers; secondary injection where applicable. Ground electrode and grounding system resistance testing (3-point fall-of-potential). Energized infrared thermographic survey of all electrical equipment from service entrance through branch panelboards. Patient care space receptacle testing in accordance with NFPA 99-2024 §6.3.3.3 (line voltage, polarity, grounding integrity, retention force). UPS battery system inspection and testing in accordance with NFPA 111-2022 and IEEE 1188 (VRLA) / IEEE 450 (vented). Documentation reconciliation of in-scope equipment maintenance records, deficiency reporting, and final triennial test report package. 2.2 Out of Scope (Procured Under Separate Contracts) The following are EXCLUDED from this contract and are being procured under separate contract vehicles: Generator triennial preventive maintenance and the NFPA 110-2025 §8.4.2 three-year load bank testing of the four (4) facility emergency standby generators. Arc Flash Risk Assessment update and Short-Circuit / Time-Current Coordination Study refresh, including arc flash labeling. (The Contractor under this SOW shall use the Government-furnished current arc flash study and labels for PPE selection only.) Campus Power Quality / harmonics survey, including IEEE 519 evaluation, transient capture, voltage sag/swell logging, and any related instrumentation. Replacement of major equipment (e.g., generators, transformers, switchgear) beyond the minor consumables and corrective work allowed under CLIN 0013. New construction, renovation, or substantial design work. Medium-voltage cable replacement (testing only is in scope). Lightning protection system inspection (separate NFPA 780 contract). Fire alarm system testing (separate NFPA 72 contract). Repairs exceeding $2,500 per item without prior written authorization from the Contracting Officer. 3.0 APPLICABLE DOCUMENTS, CODES, AND STANDARDS All work shall conform to the latest edition adopted by the AHJ as of the date of award. Where standards conflict, the most stringent shall govern. Contractor shall verify edition currency with the COR prior to mobilization. NFPA 110 and NFPA 70E are listed for limited reference (documentation reconciliation, contractor electrical safety) only; no testing under those standards is performed under this SOW. 3.1 National Fire Protection Association (NFPA) Standard Title Edition NFPA 70 National Electrical Code (NEC) 2023 NFPA 70B Standard for Electrical Equipment Maintenance (mandatory) 2023 NFPA 70E Electrical Safety in the Workplace (contractor safety only) 2024 NFPA 99 Health Care Facilities Code 2024 NFPA 101 Life Safety Code 2024 NFPA 110 Emergency & Standby Power (ATS / documentation reference only) 2025 NFPA 111 Stored Electrical Energy Emergency and Standby Power Systems 2022 3.2 Department of Veterans Affairs (VA) VHA Directive 1028 (current) Electrical Power Distribution Systems VA Master Construction Specifications, Division 26 Electrical (current) VA PG-18-10 Electrical Design Manual for VA Hospital Facilities (current) VA PG-18-3 Topic 3, Design and Construction Procedures 3.3 Industry Standards ANSI/NETA MTS-2023 Standard for Maintenance Testing Specifications for Electrical Power Equipment and Systems ANSI/NETA ETT-2022 Standard for Certification of Electrical Testing Technicians IEEE 43 Recommended Practice for Testing Insulation Resistance of Electric Machinery IEEE 80 / 81 Substation Grounding / Earth Resistance Measurement IEEE 400.2 Field Testing of Shielded Power Cable Systems Using VLF ( 0.1 Hz) IEEE 450 Maintenance, Testing, and Replacement of Vented Lead-Acid Batteries IEEE 1188 Maintenance, Testing, and Replacement of VRLA Batteries IEEE C57.12.90 Test Code for Liquid-Immersed Distribution Transformers IEEE C57.106 Guide for Acceptance and Maintenance of Insulating Oil IEEE C2 (NESC) National Electrical Safety Code ASTM D877 / D1816 Dielectric Breakdown of Insulating Liquids 3.4 Regulatory and Accreditation The Joint Commission (TJC) Environment of Care: EC.02.05.03, EC.02.05.05, EC.02.05.07, EC.02.05.09 (in-scope elements only) CMS Conditions of Participation, 42 CFR §482.41 Physical Environment OSHA 29 CFR 1910.137 Electrical Protective Equipment OSHA 29 CFR 1910.269 Electric Power Generation, Transmission, and Distribution OSHA 29 CFR 1910 Subpart S Electrical OSHA 29 CFR 1926 Subpart K Electrical (Construction) 4.0 TECHNICAL REQUIREMENTS Each subsystem below corresponds to a Contract Line Item Number (CLIN) in Section 12.0. All testing shall conform to the visual, mechanical, and electrical test procedures and pass/fail acceptance criteria of ANSI/NETA MTS-2023 unless a more stringent VA or NFPA requirement applies. 4.1 Medium-Voltage (15 kV Class) Switchgear and Distribution Applies to the campus 15 kV-class metal-clad/metal-enclosed switchgear, primary disconnects, MV cable, and step-down transformers feeding the main hospital service. 4.1.1 Visual and Mechanical (NETA MTS §7.1) De-energize, lock-out / tag-out (LOTO), clean (vacuum and approved solvent) all compartments; inspect for arc tracking, contamination, corona, mechanical damage, hardware torque per manufacturer. Verify nameplate, mechanical interlocks, key interlock schemes, racking mechanisms, shutters, and viewing windows. Inspect grounding, bonding, and ground bus continuity. Lubricate per manufacturer; replace consumables (filters, desiccants, indicator lamps). 4.1.2 Electrical Tests (NETA MTS §7.1) Insulation resistance phase-to-phase and phase-to-ground, 1 minute (5,000 VDC for 15 kV class). AC overpotential / VLF withstand on MV cables per IEEE 400.2 (0.1 Hz, 22 kV peak for 15 kV class), if cable age exceeds 10 years. Contact resistance (ductor) on bus connections ( +50% of like-equipment baseline). Vacuum bottle integrity test (DC overpotential) on vacuum interrupters. Power factor / dissipation factor on MV bushings, CTs, and transformers (Doble M4000 or equivalent). 4.2 Low-Voltage Switchgear, Switchboards, and Panelboards 4.2.1 Visual and Mechanical (NETA MTS §7.1, §7.5, §7.6) Open and inspect every switchboard, distribution panel, and lighting panelboard not exceeding 24 months since last internal inspection (priority: service entrance, EES gear, ICU, OR, ED panels). Torque-check all bolted bus connections to manufacturer specification or NETA Table 100.12; document with calibrated torque wrench. Verify breaker-to-bus stab integrity, bracing, and bonding. 4.2.2 Electrical Tests Insulation resistance, phase-to-phase and phase-to-ground, 1,000 VDC minimum for 600 V class. Primary current injection on all main, tie, and feeder LV power circuit breakers 800 A frame; secondary injection on solid-state trip units. Settings shall be verified against Government-furnished current Coordination Study; deviations shall be reported as deficiencies. Contact / pole resistance on every LV power breaker; compare to baseline. GFCI testing on all required circuits (operability + 6 mA trip per UL 943). Verify and tighten neutral and ground bonding; verify single-point bonding at separately derived systems per NEC 250.30. 4.3 Distribution and Unit Substation Transformers Includes campus dry-type transformers and any liquid-filled units within scope. Visual inspection: enclosures, ventilation, bushings, indicators, sound level, infrared baseline. Insulation resistance (1 min / 10 min, polarization index) per IEEE 43. Turns-ratio test (TTR) all taps, all phases. Winding resistance (DC) per IEEE C57.12.90. For liquid-filled: dielectric breakdown (ASTM D877/D1816), Dissolved Gas Analysis (DGA) per IEEE C57.104, water content, acidity, IFT, and color. Verify and torque all bolted connections. 4.4 Automatic Transfer Switches (ATS) Life Safety, Critical, Equipment Branches Inspect contacts, mechanism, controllers, and wiring on every ATS. Verify timing settings: TDNE (time delay normal-to-emergency), TDEN, TDES, TDEC; document against NFPA 110 §6.2.6 and facility settings. Perform load-side and source-side voltage and phase rotation checks. Functional transfer test under no-load and (Government-coordinated) under-load; document transfer times. Bypass-isolation operation (where equipped) exercise both bypass and isolation positions. Replace consumable contacts where pitting > 25% per manufacturer. NOTE: Generator starting and the load-side EPSS performance test under NFPA 110-2025 §8.4.2 are excluded from this SOW (separate contract). ATS-side functional verification shall be coordinated with the generator contractor's testing window where practical. 4.5 Protective Relay Testing Test all MV protective relays (50/51, 50/51N, 87, 27/59, 81, etc.) per ANSI C37.90 and NETA MTS §7.9. Verify settings against the Government-furnished current Coordination Study any deviation reported as a deficiency. (Study revision and arc flash incident energy recalculation are out of scope; see §2.2.) Functional trip test through the breaker (system test) on at least one device per protection zone. Provide before-and-after settings record and certified test reports. 4.6 Grounding System Three-point fall-of-potential test on the main service ground per IEEE 81; target 5 ohms per VA PG-18-10. Two-point bond-resistance testing on equipment grounds and lightning ground ring tie-ins (visual only for LP system). Verify isolated ground (IG) integrity in patient care spaces and IT/data closets. 4.7 Infrared Thermographic Survey Energized scan with calibrated radiometric camera ( 0.05°C NETD, 50 V; permit must be approved by the DCE or CHENG. LOTO procedures shall conform to 29 CFR 1910.147 and the LAJ VAMC LOTO program; group lockout for multi-employer work. 9.2 PPE Arc-rated PPE selected from the Government-furnished current site-specific arc flash labels and study; if any in-scope equipment is missing a current label, work on that equipment shall STOP and the COR notified. Voltage-rated rubber gloves (Class 0/2/4 as appropriate), tested within last 6 months. Insulated tools rated for system voltage. 9.3 Test Equipment All instruments shall be calibrated within the last 12 months by a NIST-traceable lab; calibration stickers and certificates shall be available on request. Use only Cat III / Cat IV-rated meters appropriate to the system voltage. 9.4 Reporting Any near-miss, injury, or property damage shall be reported to the COR within 1 hour. Daily safety briefings (tailgates) documented and provided to the COR weekly. 10.0 ACCEPTANCE, WARRANTY, AND QUALITY ASSURANCE 10.1 Acceptance Criteria All test results meet the pass/fail thresholds of ANSI/NETA MTS-2023 and the manufacturer's published values. All deficiencies discovered are documented, classified (Priority 1 4), and either corrected within scope or reported with Class A engineering recommendations. All required documentation submitted, accepted, and incorporated into the LAJ VAMC Engineering record set and TJC EOC binder. Compliance crosswalk demonstrates 100% coverage of NFPA 70 / 70B / 99 / 111, TJC EC.02.05.x (in-scope elements), CMS §482.41, and VHA Directive 1028 line-items in scope. 10.2 Warranty Workmanship warranty: minimum twelve (12) months from date of Government acceptance of final report. Any retest required to validate corrected deficiencies during the warranty period shall be performed at no additional cost. 10.3 Quality Assurance Surveillance Plan (QASP) The Government will administer the QASP through the COR, with surveillance methods including: 100% inspection of submittals, random sampling of field test data sheets ( 10%), customer complaint resolution, and final acceptance review. Performance metrics: Schedule adherence: 95% of Level-2 schedule milestones met. Submittal quality: 5% return rate for revision. Safety: zero recordable incidents; zero electrical-contact events. Compliance: 100% of in-scope code requirements addressed and documented. 11.0 GOVERNMENT-FURNISHED PROPERTY AND INFORMATION The Government will provide: Existing single-line diagrams, prior triennial reports, current Arc Flash Study and labels, current Coordination Study, and EPSS records (electronic copies). Access to the facility, equipment rooms, and key control during the Period of Performance. Designated laydown / staging area outside the building footprint. Trash/recycling and standard sanitary facilities. PIV/contractor flash credentials following completion of background investigations. The Government will NOT provide: Tools, instruments, calibration services, consumables, PPE, or test equipment. Lodging, meals, transportation, or per diem. 12.0 CONTRACT LINE ITEM NUMBER (CLIN) STRUCTURE The IGCE issued under separate cover (ENG-IGCE-2026-ELEC-TRI-001 Rev 1) reflects the following 14-CLIN structure. Offerors shall price each CLIN as Firm-Fixed-Price (FFP) except where noted. CLIN Description Type / Unit 0001 Project Management, Submittals, and Mobilization FFP / Lot 0002 Medium-Voltage Switchgear & MV Cable Testing FFP / Lot 0003 Low-Voltage Switchgear, Switchboards, Panelboards FFP / Lot 0004 Distribution & Unit Substation Transformers FFP / Lot 0005 Automatic Transfer Switches (all branches) FFP / Lot 0006 Protective Relay Testing & Calibration FFP / Lot 0007 Grounding System Testing FFP / Lot 0008 Infrared Thermographic Survey FFP / Lot 0009 Patient Care Receptacle Testing (NFPA 99 §6.3.3.3) FFP / Lot 0010 UPS / Battery Systems (NFPA 111) FFP / Lot 0011 Documentation Reconciliation & Compliance Crosswalk FFP / Lot 0012 Final Reporting & Project Closeout FFP / Lot 0013 Contingency for Minor Corrective Maintenance (NTE) T&M / NTE 0014 Optional After-Hours / Weekend Premium Pool Option / NTE 13.0 COMPLIANCE CROSSWALK (100% MAP IN-SCOPE ELEMENTS) The following matrix maps each in-scope element to the governing standard. Generator/EPSS, arc flash, and power quality compliance are addressed by separate contracts. Scope Element / CLIN Primary Standard(s) Accreditation Tie-In MV Switchgear (CLIN 0002) NETA MTS §7.1; NFPA 70 Art. 110, 230, 240; NFPA 70B §11 TJC EC.02.05.05; VHA Dir 1028 LV Distribution (CLIN 0003) NETA MTS §7.5, §7.6; NFPA 70 Art. 408, 240; NFPA 70B §11 TJC EC.02.05.05; CMS §482.41 Transformers (CLIN 0004) NETA MTS §7.2; IEEE C57; NFPA 70B §13 TJC EC.02.05.05 ATS (CLIN 0005) NETA MTS §7.22; NFPA 110 §6.2; NFPA 99 §6.7 TJC EC.02.05.07; VHA Dir 1028 Relays (CLIN 0006) NETA MTS §7.9; ANSI C37.90; IEEE C37.2 TJC EC.02.05.05 Grounding (CLIN 0007) NETA MTS §7.13; IEEE 81; NEC Art. 250 VA PG-18-10 IRT (CLIN 0008) NFPA 70B Annex L; NETA MTS §9 TJC EC.02.05.05 Patient Receptacles (CLIN 0009) NFPA 99-2024 §6.3.3.3; NEMA WD-6 TJC EC.02.05.05; CMS §482.41 UPS / Batteries (CLIN 0010) NFPA 111-2022; IEEE 450 / 1188 TJC EC.02.05.07 Documentation (CLIN 0011, 0012) NFPA 70B §8 TJC EC.02.05.01 13.1 Compliance Coverage Boundary Statement This SOW achieves 100% compliance for all in-scope equipment listed above. The complete LAJ VAMC electrical compliance posture for the CY 2026 cycle is achieved through the combined deliverables of THIS contract plus the following separate contracts: (a) Generator triennial PM and 3-year load bank (NFPA 110-2025 §8.4.2) covering EPSS testing; (b) Arc flash risk assessment update and short-circuit/coordination study refresh (NFPA 70E §130.5; IEEE 1584); and (c) Campus power quality / harmonics survey (IEEE 519). The Engineering Service is responsible for the integrated compliance crosswalk across all three procurements.
-Market Research11/05/2026
Department of Veterans Affairs, Veterans Health Administration, Network Contracting Office 5, is issuing this Notice of Sources Sought for a contractor for delivery, installation, and start-up, of a rental 80 KVA UPS. For the CLARKSBURG Louis A Johnson VA MEDICAL CENTER. 1 Medical CTR DRIVE, Clarksburg, WV 26301. All responsible sources may submit a capabilities statement and answer the subcontracting questions listed below. At minimum the below response must include the following. All responses must include the following information or will not be considered. Please respond to this Sources Sought Notice 36C24526Q0812 with your: 1. Business name (including Unique Entity ID (SAM.gov) 2. Business type, socio-economic status (e.g., Veteran-Owned, Woman-Owned, Disadvantaged Small Business, 8(a), etc.), and 3. Person of contact (including telephone number & email address). 4. Capability statement and summary of previous experience providing these types of services for the Veterans Health Administration or other similar facilities. 5. Available contract vehicles (GSA FSS, etc.) for use by Department of VA (include applicable NAICS) 6. Brief Summary of categories of services that your company can/cannot provide. 7. Certification(s) / Licenses for meeting the local requirements to provide these services at the DC VAMC (if applicable) 8. Confirmation that your organization has the capability & expertise to meet the performance requirements while complying with applicable limitations in subcontracting by responding to the questions below with your response: a. Do you intend to self-perform this effort? b. If you are located outside the immediate area, how will you self-perform? c. Or do you intend to subcontract work under this contract? d. If you intend to subcontract work under this contract, how will you ensure compliance with the limitations on subcontracting? Please include certifications or knowledge that demonstrate competency. Electrical License Must be able have the ability for Installing or interfacing with a UPS especially a three phase 80 kVA system Certifications working with Liebert/Vertiv UPS systems requires familiarity with their installation, electrical interface, battery system, control wiring, commissioning practice, and safety requirements. LOC out Tag out procedures, OSHA 10/30 Training Certifications NFPA 70E certification. Commissioning of Liebert unit Must Respond with all information by September 14th, 2026, at 10:00 AM ET. Send all responses to Bill Pratt, Billie.Pratt@va.gov STATEMENT OF WORK SCOPE OF WORK PROJECT DATA: a) TITLE: Server Room UPS Rental b) BUILDING/FACILITY: Bldg. 1 LAJVAMC 2. GENERAL SCOPE This project covers the delivery, installation, and start-up, of a rental 80 KVA UPS. Contractor will verify the existing connected load to an existing Liebert UPS: Model 37BP080XWXCBNR Serial # 3T00005193 Perform all necessary demolition and site preparations to install a temporary UPS of the same size and capacity as existing. Due to space limitations, it is anticipated that the existing Liebert UPS referenced above will require full disassembly and removal prior to the placement and connection of a temporary UPS of comparable size and capacity. The Contractor shall be responsible for all labor, materials, equipment, and tools necessary to complete the delivery, demolition of existing, installation of temporary and start-up, maintenance (if required), and removal of the rental equipment to include disassembly at the end of the rental period. The Contractor shall clean the work area daily and secure all tools and materials for patient and staff safety. 3. GENERAL CONDITIONS AND DEFINITIONS COR:Â Contracting Officer s Representative. A VA employee of the Louis A. Johnson VA Medical Center Facilities Management Service officially assigned to act as Project Manager and Inspector. The COR shall be the primary point of contact on all matters concerning the contract work. Coordination:Â All administrative and logistical requirements regarding the project must be exclusively coordinated with the assigned COR. No other person has authority to direct or approve changes to contract work unless specifically authorized. Provide (Rental):Â For the purpose of this scope, the term Provide means to deliver, install, and make available for use fully functional rental UPS system(s) and associated battery cabinet per manufacturer s instructions and SOW requirements. Remove (Rental Return):Â At the conclusion of the rental period, all equipment will be disconnected and prepared for return shipment to the vendor. The vendor will coordinate pickup and removal with the COR. The contractor shall remove all debris resulting from delivery, installation, and start-up immediately upon completion of the activity. The work site will be left clean and orderly at all times. All activities shall correspond to this Scope of Work. Any discrepancy identified between this SOW and actual site conditions shall be promptly brought to the attention of the VA COR before continuation. 4. DETAILED REQUIREMENTS Equipment to be Provided and Installed: UPS Systems (Qty 1): Size, model capacity to be field verified by vendor based on existing connected load. Reference 80 kVA Liebert UPS as basis for comparison. Services Included: Delivery of all rental equipment to the loading dock at Louis A. Johnson VA Medical Center, 1 Medical Center Drive, Clarksburg, WV 26301. Start-up services by a qualified Sure Power Engineer (does not include on-site commissioning or load testing). Return (outbound) shipping at the end of the rental period. All equipment shall remain the property of the rental vendor and be maintained in accordance with manufacturer s specifications during the rental period. Maintenance and Service Schedule: The Contractor shall provide a detailed maintenance and service schedule for the rental equipment to the VA Contracting Officer s Representative (COR) prior to or upon equipment delivery. This schedule shall include all planned maintenance, inspections, and required servicing for the duration of the rental period. Any updates or changes to the maintenance schedule must be promptly communicated to the COR. Documentation of all performed maintenance and service activities shall be submitted to the VA for tracking and recordkeeping purposes. Customer Responsibilities: Provide a safe, accessible location for equipment installation at Louis A. Johnson VA Medical Center. Installation and all required external cabling to be done by the VA or as otherwise coordinated. Notify contractor of any required schedule changes or access issues at least 72 hours in advance. Site and Safety Requirements: Contractor is responsible for all activities related to the safe delivery, set-up, energizing, and de-energizing of the rental units. All packaging, dunnage, and debris from delivery, start-up, or removal must be promptly cleaned up and removed off government property daily. VA dumpsters may not be used. Performance Verification: After start-up, the Contractor shall demonstrate in-service that the UPS units and battery cabinets are functioning as intended, in coordination with VA technical staff. Any technical troubleshooting or warranty service during the rental shall be promptly performed by the Contractor or their designee. At the conclusion, the Contractor shall participate in the power-down and removal of both the UPS and battery cabinet and coordinate all return logistics. 5. SAFETY PRECAUTIONS A. Contractor shall comply with all applicable Federal, State, and Local requirements regarding safety and health, including but not limited to OSHA statutes and regulations. The contractor is solely responsible for determining applicable requirements and ensuring a safe and healthful worksite. B. The Contractor shall take precautions to protect Government property at all times. C. The Contractor shall observe all facility fire, safety, and security requirements, including protection of egress routes. D. No flammable liquids will be stored or used in the VA facility. E. Appropriate portable fire extinguishers shall be available per National Fire Protection Association (NFPA) standards. F. The Contractor shall take necessary precautions to avoid triggering smoke detectors or sprinkler systems. 6. PERIOD OF PERFORMANCE The period of performance for this contract shall be a base year of twelve (12) consecutive months from the date of equipment delivery and acceptance at the Louis A. Johnson VA Medical Center, with two (2) Government unilateral option to extend the contract for an additional twelve (12) months. The Government may exercise the option year by providing written notice to the Contractor at least thirty (30) days prior to the expiration of the base year. All terms and conditions applicable to the base year shall apply to the option period, if exercised.
-Market Research09/14/2026

Additional Details

Solicitation Number

36C24526Q0114

Archive Date

Feb 19, 2026

Office Address

LINTHICUM, MD, 21090