Notice ID: db1c8c50026d464eba2a05b417f0a918Combined Synopsis/SolicitationArchived
N045--Loch Raven VAMC Bldg. 6 Boiler Replacement REQUEST FOR QUOTE
Archived on February 1, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 11:00 AM EST
- Posted
- November 14, 2025
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 238220: Plumbing, Heating, and Air-Conditioning Contractors
- Agency
- Department of Veterans Affairs
Notice details
- Office
- 245-NETWORK CONTRACT OFFICE 5 (36C245)
- Place of performance
- Department of Veterans Affairs Loch Raven VAMC, Baltimore, Maryland, 21201
- Last updated
- Nov 6, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 36C24526Q0118
- Notice ID
- db1c8c50026d464eba2a05b417f0a918
Description
Page 1 of 1
SCOPE OF WORK
LR Bldg 6 Boiler Replacement
Project: 512-25-052
GENERAL SCOPE OF WORK:
The contractor will provide all material, labor, equipment, and supervision necessary to complete the above-named project at the VA Maryland Health Care System (VAMHCS), Loch Raven Campus. Contractor is to remove the existing boiler in the Building 6 mechanical room a Weil McClain Water Tube Boiler rated at 209MBH and replace it with a CSD-1 compliant boiler on the existing equipment pad. The old boiler should be properly disposed of after removal with disposal receipts provided to VA. New boiler should use existing utility lines for tie-in s where possible except for the existing Vent line. Per NBCI code, the vent line must be PVC and the atmospheric metal duct deteriorate. Contractor to confirm feasibility of utility line tie-ins and vent line replacement during pre-bid walk through. Utility tie-ins may require minor modifications to fit the existing space and new boiler. Contractor to follow boiler manufacturer install instructions for proper installation. Contractor will provide materials to meet ICRA requirements set forth by safety based on the work to be completed. Contractor to provide warranty and start-up after install of new boiler to confirm proper operation.
Remove and dispose of existing Weil McClain Water Tube Boiler (209MBH).
Provide disposal receipts to VA.
Provide and install CSD-1 compliant Boiler sized to match existing boiler.
Utilize existing utility lines for tie-ins where possible except for the vent line. New PVC vent line must be installed.
Contractor to adhere to any and all local, state, federal, and VA specifications and guidelines. Work will be completed in 30 calendar days from Notice To Proceed.
Award Overview
Possible prior contract
Inferred, not confirmedInferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.
Contract end date
Jul 19, 2027
NAICS
238220
Agency
Department of Veterans Affairs
Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.
Contacts
Contracting Officer
Primary Contact
Documents
Files (3)
- Download
REGISTER OF WAGE DETERMINATIONS Baltimore.pdf
167 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
36C24526Q0118 RFQ LR Bldg 6 Boiler.pdf
477 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
36C24526Q0118_1.docx
28 KBAdded in Combined Synopsis/Solicitation version 3Posted
Links (1)
- VAwww.va.govPosted
Lifecycle
- 3Version 3Combined Synopsis/SolicitationArchivedCurrent
N045--Loch Raven VAMC Bldg. 6 Boiler Replacement REQUEST FOR QUOTE
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
36C24526Q0118
Archive Date
Feb 1, 2026
Office Address
LINTHICUM, MD, 21090