GovChime
Notice ID: db1c8c50026d464eba2a05b417f0a918Combined Synopsis/SolicitationArchived

N045--Loch Raven VAMC Bldg. 6 Boiler Replacement REQUEST FOR QUOTE

Archived on February 1, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
11:00 AM EST
Posted
November 14, 2025
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
238220: Plumbing, Heating, and Air-Conditioning Contractors
Agency
Department of Veterans Affairs

Notice details

Office
245-NETWORK CONTRACT OFFICE 5 (36C245)
Place of performance
Department of Veterans Affairs Loch Raven VAMC, Baltimore, Maryland, 21201
Last updated
Nov 6, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
36C24526Q0118
Notice ID
db1c8c50026d464eba2a05b417f0a918

Description

Page 1 of 1 SCOPE OF WORK LR Bldg 6 Boiler Replacement Project: 512-25-052 GENERAL SCOPE OF WORK: The contractor will provide all material, labor, equipment, and supervision necessary to complete the above-named project at the VA Maryland Health Care System (VAMHCS), Loch Raven Campus. Contractor is to remove the existing boiler in the Building 6 mechanical room a Weil McClain Water Tube Boiler rated at 209MBH and replace it with a CSD-1 compliant boiler on the existing equipment pad. The old boiler should be properly disposed of after removal with disposal receipts provided to VA. New boiler should use existing utility lines for tie-in s where possible except for the existing Vent line. Per NBCI code, the vent line must be PVC and the atmospheric metal duct deteriorate. Contractor to confirm feasibility of utility line tie-ins and vent line replacement during pre-bid walk through. Utility tie-ins may require minor modifications to fit the existing space and new boiler. Contractor to follow boiler manufacturer install instructions for proper installation. Contractor will provide materials to meet ICRA requirements set forth by safety based on the work to be completed. Contractor to provide warranty and start-up after install of new boiler to confirm proper operation. Remove and dispose of existing Weil McClain Water Tube Boiler (209MBH). Provide disposal receipts to VA. Provide and install CSD-1 compliant Boiler sized to match existing boiler. Utilize existing utility lines for tie-ins where possible except for the vent line. New PVC vent line must be installed. Contractor to adhere to any and all local, state, federal, and VA specifications and guidelines. Work will be completed in 30 calendar days from Notice To Proceed.

Full description on SAM.gov

Award Overview

Possible prior contract

Inferred, not confirmed

Inferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.

Contract end date

Jul 19, 2027

NAICS

238220

Agency

Department of Veterans Affairs

Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.

Contacts

Contracting Officer

Primary Contact

William Chris Galletta
Contracting Officer

Documents

Files (3)

  • REGISTER OF WAGE DETERMINATIONS Baltimore.pdf

    167 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • 36C24526Q0118 RFQ LR Bldg 6 Boiler.pdf

    477 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • 36C24526Q0118_1.docx

    28 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • VA
    www.va.govPosted

Lifecycle

  1. 3
    Version 3Combined Synopsis/SolicitationArchivedCurrent

    N045--Loch Raven VAMC Bldg. 6 Boiler Replacement REQUEST FOR QUOTE

    Notice db1c8c50026d464eba2a05b417f0a918 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

36C24526Q0118

Archive Date

Feb 1, 2026

Office Address

LINTHICUM, MD, 21090