GovChime
Notice ID: 5101272c2c0547b3a2a85ac2e755a883Award NoticeAwarded

Z2DA--Correct HVAC Deficiencies Bldg. 110A

Awarded on July 11, 2022. Full description on SAM.gov.

Awarded tounder 36C24622C0060 (source: SAM.gov award notice)• $1.8M

Overview

Posted
July 12, 2022
Notice type
Award Notice
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
NAICS
238220: Plumbing, Heating, and Air-Conditioning Contractors
Agency
Department of Veterans Affairs

Notice details

Place of performance
Hampton, VA Medical Center 100 Emancipation Dr., Hampton, 23667
Last updated
Dec 4, 2025
Award date
Jul 11, 2022
Award amount (SAM.gov award notice)
$1.8M

Identifiers

Solicitation number
36C24622R0007
Notice ID
5101272c2c0547b3a2a85ac2e755a883
Award number (PIID)
36C24622C0060

Description

PRESOLICITATION NOTICE This notice is for Solicitation Number 36C24622R0007, Project Number 590-19-110 Correct HVAC Deficiencies, at Hampton VA Medical Center, 100 Emancipation Dr., Hampton, VA 23667. This shall be a Service-Disabled Veteran Owned Small Businesses (SDVOSB) Set-Aside. As a result, all SDVOSB may submit a proposal, which will be considered by the agency. The North American Industry Classification System (NAICS) code for this action is 238220 (Plumbing, Heating and Air-Conditioning Contractors) with a size standard of $16.5 million. FAR 36.204| Disclosure of the magnitude of construction project is between $1,000,000 and $5,000,000. Scope of Work: Provide construction services to correct (heating, ventilation, and air conditioning -HVAC) deficiencies including architectural, and (mechanical, electrical, and plumbing - MEP) in building 110A (Sterile Processing Service - SPS) and all associated work as per attached plans and specifications at Hampton, VA Veterans Medical Center: General: The following is a summary of the work: BASE PROPOSAL ITEM I, GENERAL CONSTRUCTION: Work includes, but is not limited to, general construction, alterations, architectural, interior finishes, mechanical and electrical work, and certain other items to supplement the existing outdated and undersized HVAC system to maintain the required SPS temperature and humidity in the space. The project shall include cleaning of the ductwork. The project shall comply with Directive 1116, SPS design guide and the HVAC design manual specifically the requirements in section 2.8 necessary removal of existing construction and certain other items. See the solicitation notice for the instructions to offerors and deduct alternates. PROPOSAL ITEM II DEDUCT ALTERNATE NO. I: Perform all work described in Base Proposal Item I above except: Proposal Deduct: Eliminate all elements associated with the glycol runaround energy recovery system. Removed elements include glycol coil in AHU, glycol coil in exhaust ductwork, exhaust filter bank, new exhaust ductwork in crawlspace (all ductwork in the crawlspace/pipe basement would be existing to remain if the deduct alternate is taken), glycol insertion pump package, glycol water circulation pump, air separator, expansion tank, chemical feeder, and glycol/water piping. Control points associated with the glycol system would be removed. Electrical deduct shall consist of all electrical connections, conduit, conductors, switches, and appurtenances associated with pumps 110A-GP-1 and 110A-GP-2. Electrical circuit breakers serving these items shall instead be Spare if the deduct is accepted. Architectural deduct work shall consist of concrete equipment base for associated pump along with painting and any other associated general trades work. Place of Performance: Tasks will be performed at the VA Medical Center, Hampton, VA, 23667. Work will be around an occupied healthcare facility in operation 24 hours a day. Specific requirements (see drawings for area of work): General see section 01 00 00 Asbestos and lead Abatement see division 2 Finishes see division 9 HVAC and Piping see division 23 Electrical - see division 26 Controls/Electronics see division 27 and 28 Period of Performance: Contractor shall commence work under this contract promptly after Notice to Proceed (NTP), execute the work diligently, and achieve final completion and acceptance including final cleanup of the premises within one-hundred eighty calendar days including submittals. Specific site requirements: Contractor and all subcontractors shall obtain a flash badge from the Police Service, provide proof of OSHA 10 training completion, provide TB test results, and shall abstain from smoking within the perimeters of the facility All individuals that enter any VA facility are always required to wear a face mask and will be pre-screened for COVID19; to include Veterans, employees, visitors, volunteers, and contractors (See VHA Supplemental Contract Requirements below). Construction Safety Requirements: - see attached Hampton Construction Safety Handbook in section 01 35 26 Submittals: - see sections 01 00 00, 01 33 23, and all applicable trade sections Quality Control: - see section 01 45 00 Schedules: - see section 01 32 16 .15 Environmental and Waste Management: - see sections 01 57 19, and 01 74 19 VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors 1. Contractor employees who work in or travel to VHA locations must comply with the following: a. Documentation requirements: 1) If fully vaccinated, shall show proof of vaccination. i. NOTE: Acceptable proof of vaccination includes a signed record of immunization from a health care provider or pharmacy, a copy of the COVID-19 Vaccination Record Card (CDC Form MLS-319813_r, published on September 3, 2020), or a copy of medical records documenting the vaccination. 2) If unvaccinated and granted a medical or religious exception, shall show negative COVID-19 test results dated within three calendar days prior to desired entry date. Test must be approved by the Food and Drug Administration (FDA) for emergency use or full approval. This includes tests available by a doctor s order or an FDA approved over-the-counter test. 3) Documentation cited in this section shall be digitally or physically maintained on each contractor employee while in a VA facility and is subject to inspection prior to entry to VA facilities and after entry for spot inspections by Contracting Officer Representatives (CORs) or other hospital personnel. 4) Documentation will not be collected by the VA; contractors shall always adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information. 2. Contractor employees are subject to daily screening for COVID-19 and may be denied entry to VA facilities if they fail to pass screening protocols. As part of the screening process contractors may be asked screening questions found on the COVID-19 Screening Tool. Check regularly for updates. a. Contractor employees who work away from VA locations, but who will have direct contact with VA patients shall self-screen utilizing the COVID-19 Screening Tool, in advance, each day that they will have direct patient contact and in accordance with their person or persons who coordinate COVID-19 workplace safety efforts at covered contractor workplaces. Contractors shall always adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information. Contractor must immediately notify their COR or Contracting Officer if contract performance is jeopardized due to contractor employees being denied entry into VA Facilities. This project will be procured as 100% set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) and must be listed as verified in the Vendor Information Pages (VIP) database at https://www.vip.vetbiz.va.gov/. The VA will issue a Request for Proposal (RFP) on or about 11/23/2021 via Contract Opportunities at https://beta.sam.gov/. A site visit will be scheduled, and the date/time/location will be provided with the solicitation.

Full description on SAM.gov

Award Overview

Award Number

36C24622C0060

Award Amount (SAM.gov award notice)

$1.8M

Award Date

Jul 11, 2022

Awardee

Awardee UEI

N2H6YLMHS5J9

Awardee CAGE Code

6MZC8

Original Solicitation

Notice ID: 5101272c2c0547b3a2a85ac2e755a883

Posted Date: Jul 12, 2022

Original Response Deadline: Not specified

Contacts

Documents

No documents available.

Lifecycle

Solicitation:36C24622R0007
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. Pre-SolicitationNov 8, 2021

    Z2DA--Correct HVAC Deficiencies Bldg. 110A Project # 590-19-110 Hampton VA Medical Center Construction Services

    Notice 53989c0df3ec4936b7afc0a9fe82123f on SAM.gov

  2. 7×
    SolicitationNov 24, 2021

    Z2DA--Correct HVAC Deficiencies Bldg. 110A Project # 590-19-110 Hampton VA Medical Center Construction Services

    Notice a9ad37ac6bab4d16a8e150101a9ecd90 on SAM.gov

  3. AwardedCurrentJul 12, 2022

    Z2DA--Correct HVAC Deficiencies Bldg. 110A

    Notice 5101272c2c0547b3a2a85ac2e755a883 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This is an award notice regarding solicitation 36C24626R0072. Contract 36C24627C0002 has been awarded as described.
-AwardedOpen
See attached SF30 Amendment 0003. The amendment provides answers to RFIs/questions received regarding the solicitation. AMENDMENT 0003: The following documents are attached and incorporated into the solicitation. The responses to RFIs/questions themselves are included as the first attachment. ATTACH 1 0003 - RFIs 565-26-110 Replace AHU 34_21August2026 ATTACH 2 0003 - ELECTR_1 ATTACH 3 0003 - 100 Percent EL Study Report 2023-09-01 ATTACH 4 0003 - FA-03-04AR ATTACH 5 0003 - B3 2nd and 3rd Floor Branch Circuits 3E2 1981 ATTACH 6 0003 - Existing Site Plan_April 2024-Site plan ATTACH 7 0003 - Bldg 3 Asbebestos Drawing A2 2010 ATTACH 8 0003 - Bldg 3 Sheet 3-21R Second and Third Floor Electrical 1939 ATTACH 9 0003 - Bldg 3 Sheet 3-21 Second and Third Floor Electrical 1939 ATTACH 10 0003 - FAYETT_1 *NOTE: The following documents will not transmit to SAM.gov. These can be requested from the Contracting Officer via email at daniel.spaulding@va.gov at any time prior to the due date and time for offers. Reference solicitation 36C24626Q0827 in the email subject. ATTACH 11 0003 - BLDG 3 3rd Floor Plan_03-27-2019.dwg ATTACH 12 0003 - BLDG 3 3rd Floor Plan_03-27-2019.bak ATTACH 13 0003 - Bldg 3 floor 3 As built.dwf Project 565-26-110, Replace Air Handling Unit #34. See attached SF1442 solicitation and its attachments. NOTE: This solicitation replaces 36C24626Q0784 due to a technical error preventing the contracting office from issuing amendments to 36C24626Q0784. Due dates and times have been adjusted.
-Solicitation09/04/2026
Project 565-26-110 Replace Air Handler Unit #34 at the Fayetteville VA Medical Center in Fayetteville, NC. See attached SF1442 solicitation and its attachments. A presolicitation notice is not required for this action under RFO FAR 5.101(a), however the notice was needed for technical reasons to post the solicitation. NOTE: This solicitation replaces 36C24626Q0784 due to a technical error preventing the contracting office from issuing amendments to 36C24626Q0784. Due dates and times have been adjusted.
-Pre-Solicitation08/19/2026
-Pre-Solicitation09/08/2026
-Solicitation11/10/2026

Additional Details

Solicitation Number

36C24622R0007

Archive Date

Oct 19, 2022

Office Address

HAMPTON, VA, 23667