Notice ID: d5b77cedb0764d00964589259e7cc9d0Award NoticeAwarded
C1DA--AE Expand Ambulatory Rehab
Awarded on April 5, 2024. The description is published on SAM.gov: Full description on SAM.gov.
Awarded tounder 36C24624C0031 (source: SAM.gov award notice)• $687.7K
Overview
- Posted
- April 9, 2024
- Notice type
- Award Notice
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Notice details
- Last updated
- Sep 9, 2025
- Award date
- Apr 5, 2024
- Award amount (SAM.gov award notice)
- $687.7K
Identifiers
- Solicitation number
- 36C24623R0074
- Notice ID
- d5b77cedb0764d00964589259e7cc9d0
- Award number (PIID)
- 36C24624C0031
Description
No description in the SAM.gov data feed for this notice.
Award Overview
Award Number
36C24624C0031
Award Amount (SAM.gov award notice)
$687.7K
Award Date
Apr 5, 2024
Awardee
Awardee UEI
RZRBNXJTU7G5
Original Solicitation
Notice ID: d5b77cedb0764d00964589259e7cc9d0
Posted Date: Apr 9, 2024
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $1.4MSigned Aug 5, 2026
- $169.1KSigned May 2, 2025
- $272.4KSigned Feb 19, 2025
- $272.4KSigned Dec 30, 2024
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
36C24623R0074- Awarded
This opportunity has been awarded.
- AwardedCurrentApr 9, 2024
C1DA--AE Expand Ambulatory Rehab
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Please be advised that the submission deadline for SF 330 has been extended from November 20, 2026, to November 25, 2026, at 2:00 PM EST. See responses to RFI s below. VA responses to RFI s are bold below. Could you please clarify which disciplines are anticipated to be required? For example, regarding surveying, would the scope include a building measured survey, utility survey, site topographic survey, or a combination of these? Disciplines expected to be required: Architecture; Structural; Civil; Mechanical (HVAC); Plumbing; Electrical; Fire Protection; Industrial Hygiene; Interior Design; Surveying; Cost Estimating; Certified Physical Security Specialist; and other A/E services as defined by FAR 36.6 as necessary. Must a licensed surveyor be included as a named member of the SF330 team, or may surveying services be provided by a consultant on an as-needed basis? Identify the proposed discipline leads and specialty consultants required by the scope, including architecture, interior design, mechanical, electrical, plumbing/fire protection, and other disciplines as applicable. Describe the firm s and proposed team s experience with project specific technical features (e.g., MEP renovation, electrical distribution, emergency power, HVAC modifications, clinical space systems, fire protection/life safety systems, low voltage/IT coordination, medical gas systems, infection control/occupied facility coordination). Relevant VA experience and comparable non VA healthcare experience will be considered. Given that the primary scope involves renovating the existing second-floor clinic area, is new field surveying anticipated for this project? Building measurement and verification of existing utilities are expressly supported by the SOW. It requires a thorough as-built investigation and independent field verification of dimensions, wall layouts, utilities, material types, and other design conditions. The notice does not expressly require a boundary survey, campus-wide utility survey, or site topographic survey. It also does not define survey limits, accuracy, deliverables, or whether licensed land-surveying services are intended. Therefore: Existing-building measured documentation: required. Verification of utilities affecting the design: required. Please confirm if there is a page limit in addition to the 10MB PDF file size for the SF330 submission. 10MB PDF file size no page limit. For Factor II Specialized Experience and Technical Competence, the solicitation states that "recent experience means projects completed, substantially completed, or actively performed within five years before the response due date." Can the VA clarify whether this requirement is based on completion of the A/E design services? For this factor, recent experience means projects completed, substantially completed, or actively performed within five years before the response due date. Do the requirements outlined under Factor 3 Past Performance pertain to our Section F project examples? Section F project description will not necessarily satisfy Factor III by itself. Add the required performance information and cross-reference the project numbers rather than merely repeating scope descriptions. Are CPARS / PPQs required to be included with our submission? The supplied notice does not require CPARS attachments, completed PPQs nor does it exclude submission. As the Solicitation expects the A/E to collaborate with other A/E firms involved in other projects throughout the facility, can the VA provide the names of the actual other A/E firms and the other projects? No. Is a space program or a list of the specific specialty clinics to be consolidated on the 2nd Floor available and can it be provided at this time? No, not at this time. The anticipated disciplines include Surveying. Given that the project is primarily an interior renovation within Building 1, can the VA clarify the anticipated scope of surveying services required for this project? Building measurement and verification of existing utilities are expressly supported by the SOW. It requires a thorough as-built investigation and independent field verification of dimensions, wall layouts, utilities, material types, and other design conditions. The notice does not expressly require a boundary survey, campus-wide utility survey, or site topographic survey. It also does not define survey limits, accuracy, deliverables, or whether licensed land-surveying services are intended. Therefore: Existing-building measured documentation: required. Verification of utilities affecting the design: required. Can the VA clarify whether replacement of the air handling unit(s) serving the renovated 2nd Floor area is anticipated as part of this project, or whether the design should evaluate and determine HVAC system modifications necessary to support the renovated space? The SOW anticipates significant system upgrades, utility verification, and HVAC design, but it does not identify units to replace or establish replacement as a mandatory solution. The supported interpretation is that the A/E must evaluate existing systems and develop modifications or replacement recommendations needed for the approved renovation. VA architectural guidance likewise calls for investigating whether existing systems have sufficient capacity for renovations. That guidance does not establish that these particular AHUs require replacement Will the 2nd Floor space be vacated during construction or will phased construction be required? Full vacancy is not promised. The SOW expressly requires construction phasing, infection-control planning, outage and temporary-access planning, and a temporary relocation plan if needed. Firms should demonstrate occupied-facility and phasing capability; the actual decanting and construction sequence remain to be determined with VA. The SOW states that "an all-inclusive concept will need to be created" for the approximately 16,530 SF renovation area. Can the VA clarify whether the interior design concept is intended to encompass only the renovated specialty clinic space or also adjacent public and circulation areas on the 2nd Floor? The all-inclusive interior design concept applies to the approximately 16,530-square-foot specialty clinic renovation area identified in the SOW. The A/E shall coordinate the renovated area with directly adjacent public and circulation areas as necessary to provide appropriate transitions and maintain operational continuity. Design of other portions of the second floor is not included unless specifically identified or authorized by the VA. Deadline time zone: Please confirm that 2:00 p.m. Eastern Standard Time for the October 14, 2026 question deadline and October 26, 2026 submission deadline means 2:00 p.m. prevailing Eastern Time on those dates. 2:00 pm EASTERN TIME, NEW YORK, USA Page and formatting limits: Please confirm that there is no page limit, minimum font size, or separate length limit for supplemental qualification statements, provided the complete submission is a single PDF no larger than 10 MB. Submit SF 330 Parts I and II by email to millard.adkins@va.gov as a single Adobe PDF file (no larger than 10 MB). No ZIP files. Receipt must be confirmed. No page limit or minimum font size. Past-performance documentation: Should firms attach Contractor Performance Assessment Reporting System (CPARS) reports or Past Performance Questionnaires (PPQs), or should Factor III be addressed through narrative only unless supporting records are requested? The supplied notice does not require CPARS attachments, completed PPQs nor does it exclude submission. Project examples: May the up to five projects discussed under Factor III be the same projects presented in SF330 Section F? May Section F include more than five projects if the Factor III discussion is limited to five? Yes. The projects discussed under Factor III may be the same projects presented in SF330 Section F. However, the Factor III response must provide the specific past-performance information requested by that factor, including the firm s performance regarding quality, cost control, schedule compliance, coordination, project outcome, and the roles of proposed key personnel, as applicable. Firms may cross-reference the corresponding Section F project number rather than repeat the full project description. The Factor III discussion is limited to no more than five projects. Additional projects may be included in Section F to the extent permitted by the SF330 requirements and the submission size limitation, but only the five projects identified for Factor III will be evaluated under the specific Factor III project-example requirements. Section E resumes: Which disciplines does the Government expect firms to treat as key discipline leads requiring Section E resumes? Please clarify whether resumes are required for every discipline listed under A/E Eligibility and Disciplines, or only the proposed key leads applicable to this project. The notice expressly asks for the PM and proposed key discipline leads, with architecture, interior design, mechanical, electrical, and plumbing/fire protection identified in Factor II. It does not expressly demand a separate resume for every discipline on the broad eligibility list. Include the PM and each proposed key lead, including specialty consultants who meet that definition including but not limited to cost estimator an Quality Manager. Receipt confirmation: The solicitation states that receipt must be confirmed. What form of confirmation is acceptable? If acknowledgment is not received before the submission deadline, whom should the firm contact, and through what method? Receipt will be confirmed by the contracting officer by email once received. The POC is Millard Adkins and can be contacted by email to Millard.Adkins@va.gov Project completion status: For projects presented in Section F and discussed under Factor III, must design be complete, construction be complete, or both? Factor II allows projects completed, substantially completed, or actively performed within the preceding five years; please clarify whether that same eligibility standard applies to Section F and Factor III. For Factor II, a project may be completed, substantially completed, or actively being performed, provided the qualifying work occurred within five years before the response due date. Neither design nor construction must necessarily be fully complete for a project to qualify under Factor II. For Factor III, firms should submit up to five recent and relevant projects that provide sufficient performance information for the Government to evaluate quality, cost control, schedule compliance, coordination, and project outcome. If a project is ongoing, the firm should clearly identify the work completed to date and the performance information available for evaluation. Regarding the subject solicitation, can you please confirm if this effort will require commissioning and life safety and if those roles are required to be third-party? Life safety is expressly required. The SOW requires final drawings addressing life safety and infection control, includes fire-protection drawings, and calls for relevant life-safety expertise in evaluation. It does not establish a separate third-party life-safety consultant requirement. Commissioning is not expressly assigned as a distinct service in the supplied SOW. Nevertheless, the cited requirement to comply with VA design criteria is significant: VA HVAC guidance requires commissioning practices tailored to project size and complexity and compliance with VA s commissioning manual. Civil Engineering and Surveying disciplines: The solicitation's required disciplines list includes Civil Engineering and Surveying, but neither discipline is addressed anywhere in the body of the SOW. Disciplines expected to be required: Architecture; Structural; Civil; Mechanical (HVAC); Plumbing; Electrical; Fire Protection; Industrial Hygiene; Interior Design; Surveying; Cost Estimating; Certified Physical Security Specialist; and other A/E services as defined by FAR 36.6 as necessary. Can you confirm whether Civil Engineering and Surveying services are in fact required for this project? They remain listed as anticipated disciplines Can you provide the anticipated scope of responsibilities for these two disciplines, since the current SOW does not describe any site, civil, or survey work for this second story interior renovation? No significant civil engineering or land surveying effort is currently anticipated for the second-floor renovation itself. However, firms should include civil engineering and surveying capabilities sufficient to support any site-related work that may become necessary as a result of construction phasing, utility modifications, temporary facilities, or continuity-of-operations requirements identified during design development. The VA has not predetermined the temporary relocation strategy. We wanted to clarify, for our SF330 submission if we needed to utilize the GSA SF330 form? Can we utilize a modified form to showcase photographs to reinforce our narrative about project examples provided in Part F. Preserve the SF330 sections, information, project identifiers, and signature certifications. GSA also provides a separate reproducible Section F. use only concise project-relevant images if space permits. | 77% | Market Research | 11/25/2026 |
Modification 2 to Presolicitation Notice 36C25527R0007, P/N 657-27-209JB, Project Title: Renovate Building 1 and 53 Main Lobbies. This modification provides answers to RFIs received, revised evaluation criteria and revised supplement B per below RFIs. The SF330 submission due date is extended from November 10, 2026 to November 16, 2026. RFIs Received with VA Responses in blue text: Construction Budget questions: Is that the Estimated Cost of Construction or the maximum for the A/E Design Fee? Estimated Cost of Construction If the $949,026 is the construction budget, this appears low in today's environment given that over 6,000 SF needs to be renovated. Can the VA please re-evaluate this budget and provide an update? The construction budget that was originally used in the supplement B pre-solicitation notice is incorrect. A revised supplement B is attached, changing the construction cost estimate from $949,026 to $725,873. The Construction budget is set and cannot be changed until the design process is underway. Key Personnel questions: The Presolicitation Notice lists: Supervisory, Fire Protection Engineer, Certified Professional Industrial Hygienist, and Life Safety Engineer. The Statement of Work and Supplement B list: Communications (voice/data), Interior Design, VPIH, Plumbing (including fire protection), and a 3rd Party Fire Protection Review. Questions: Which positions require resumes in Section E? What is the intended role of "Supervisory"? Per the SOW & Supplement B the following positions require resumes: Project Manager, Architectural, Mechanical, Electrical, Communication (voice data) Plumbing (Including Fire Protection), Structural, Interior Design, VPIH, Cost Estimator and a 3rd Party Fire Protection Review. Project manager is Supervisory Industrial Hygienist/Asbeston Project Designer: Question: Is an ABIH Certified Industrial Hygienist (CIH) acceptable for this position, and does a CIH satisfy the requirement for the VPIH and the state-accredited Asbestos Project Designer? If these must be separate individuals, should both be identified in the SF330? A CIH satisfies the requirement for the VPIH and the state-accredited Asbestos Project Designer. They can be the same individual. Site Visit: Supplement B, page 6, Section III.6.g: the A/E "shall meet with the COR at the proposed project site" prior to submitting a response Presolicitation Notice, page 4: "Personal visits to discuss this announcement will not be allowed" and only "the most highly rated firm must physically come to the site" before pricing Question: Please confirm that no site visit is required before the SF330 submission. No site visit is required prior to SF330 submission. Laboratory and Special Room Rquirements: Presolicitation Notice, page 7, Evaluation Criteria 2, Specialized Experience and Technical Competence: "laboratory requirements for the firm" Supplement B, page 18, Section B6.II.1: "floor plans of special rooms such as the endoscopy suite, recovery room, etc." Questions: Neither a laboratory nor an endoscopy suite or recovery room appears in the project scope. Do any of these requirements apply to this project? These requirements do not apply to this project. Can the VA please release updated and corrected documents? The evaluation criteria 2 will be changed to remove laboratory requirements for the firm and the COR will revise Supplement B to remove the endoscopy suite and recovery room from the Supplement B. | 76% | Pre-Solicitation | 11/16/2026 |
Pre-solicitation Notice #36C25526R0182 for project 657-27-210JB, A/E-Repair RRTP for Restrooms in Building 3 and 51. | 75% | Pre-Solicitation | 10/05/2026 |
AMENDMENT A0001 Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice REQUEST FOR SF 330 36C25227Q0013 Project 578-27-003: Renovate A Section 1st Floor Bldg. 1 (AE) Design/Engineering Services SF-330 Package Due: October 30, 2026, at 1:00 p.m. CST (see details below) Points of Contact: Donita.Grace@va.gov INTRODUCTION: THIS IS A TOTAL 100% SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB) SET-ASIDE in accordance with Public Law 109-461. This is a Request for SF330s for Architect/Engineer (A/E) Design Services for Project Number 578-27-003: Renovate A Section 1st Floor Bldg. 1 (AE) at the Edward J. Hines VA Hospital in Hines, IL. THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. NO SOLICITATION PACKAGE WILL BE ISSUED via SAM.gov. A request for proposal will be issued directly to the top-rated firm for which negotiations will commence in accordance with FAR part 36. The anticipated A/E design services, to be awarded, will be procured in accordance with the Selection of Architects and Engineers Act (Public Law 92- 582), FAR Part 36.6 and VA Acquisition Regulation 836.6. Period of Performance: 449 Calendar Days Contract Type: Firm-Fixed-Price Estimated Magnitude of Construction: Between $10,000,000 and $20,000,000 NAICS Code: 541310 Size Standard: $12.5 Million SBA & SAM : in accordance with VAAR 819.7003, at the time of SF330 submission and prior to award of any contract, the offeror must represent to the contracting officer that it is a (1) SDVOSB eligible firm; (2) Small business concern under the North American Industry Classification System (NAICS) code assigned to the acquisition; and (3) SDVOSB listed as verified in SBA at: https://veterans.certify.sba.gov/ Additionally, all eligible firms must be registered and current in the System for Award Management (SAM) database to be evaluated and eligible for contract award. If the firm is not registered in SAM, you may register online at https://www.sam.gov. 1. PURPOSE: This Source Selection Plan (SSP) outlines the procedures that will be used to solicit architectural and engineering (AE) design services for Project 578-27-003 Renovate A Section on First Floor of Building 1. The goal of this project is to provide complete AE design services to renovate section A of the 1st floor of building 1. 2. ACQUISISTION DESCRIPTION: 2.1: RFI: A Request for Information shall be published to https://sam.gov whereby interested architect-engineering companies shall submit an SF330 package. This competitive procurement shall utilize a best value trade-off source selection process identified in FAR 15. 2.1.a: Source Selection Evaluation Board (SSEB): For the purpose of this acquisition, the SSEB will be same as the Technical Evaluation Board (TEB). 2.1.b: Below are the individual (TEB) evaluation criteria and ratings for the SF330s, listed in descending order of importance. FACTOR 1: SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE (30 Maximum Points) Subfactor 1A: Specialized Experience (15 Points). Subfactor 1B: Additional Experience (10 points). Subfactor 1C: Technical Competence (5 points). The A/E Firm shall demonstrate its specialized experience and technical competence in the design and construction period services for projects of similar size and complexity. Specialized project experience should include design of renovations to existing hospitals, renovations to buildings constructed prior to 1970 w/space constraints, design of Pathology Suites, and HVAC upgrades to existing hospitals. Additional experience includes mechanical, electrical, and structural engineering, architecture, interior design and finishes, physical security upgrades, building management systems/building automation systems (BMS/BAS), Computer-Aided Design and Drafting (CADD), critical path scheduling, fire protection, construction infection control protocols, design and installation of biological refrigeration and preservation systems, design and installation of vacuum tube transport systems, and project phasing and coordination in an active hospital setting. Offeror shall provide a minimum of three (3), and no more than five (5) recent and relevant Government and private experience projects similar in size, scope, and complexity, and experience with the type of projects/competence above. Relevant is defined as those task requirements identified in the Statement of Work. Recent is defined as services provided within the past seven (7) years with at least 50% of the Construction completed. At a minimum, include the following for each submitted project (if applicable): Project title, location, contract number, and detailed narrative describing the scope of services provided including the type of work performed by the offeror and its role in the project i.e., prime contract, Teaming Partner, or subcontractor. Project Owner, owner s point of contact including telephone number and email address. Services & Deliverables provided under the contract/task order Period of Performance, including start and completion dates for design and construction if applicable. Estimated cost of construction based on AE s design Final construction cost (or projected final construction cost if still underway) The percentage of total cost resulting from changes due to AE omissions. To demonstrate technical competence, the offeror shall include narratives of how the firm addresses each of the following topics. Simply restating this list will not be sufficient. The management approach The coordination of disciplines and subcontractors Quality control procedures Familiarity with VA Design Guides/Manuals, Master Specifications and other applicable standards. FACTOR 2: PROFESSIONAL QUALIFICATIONS (20 Maximum Points) Subfactor 2A: Key Positions (15 Points). Subfactor 2B: SDVOSB Compliance (5 Points). The architects and engineers on the firm s staff representing the project or signing/stamping drawings in each discipline must possess a minimum of five (5) years of experience and are required to be licensed, registered, or certified by a U.S. state, the District of Columbia, or a U.S. territory. Provide professional license jurisdiction of issue and license numbers and/or proof of licensure. A resume for each of these key positions must be provided, corresponding with the title matching the disciplines listed for the project. At a minimum, the offeror must describe the professional qualifications and specific experience in the required disciplines within the past five (5) years. Key positions and disciplines required for this project include, but are not limited to: Project Manager Architect Mechanical Engineer Electrical Engineer Plumbing Engineer Structural Engineer Interior Designer The evaluation will consider education, certifications, training, registration, overall and relevant experience and longevity with the firm. Offer must include the following statement of SDVOSB compliance when submitting the personnel proposed to perform the work under this requirement: I [signatory authority] ______________________, [company] _____________________; certify that the team proposed to perform under this requirement demonstrates the capability of 50% SDVOSB performance in compliance of 48 CFR 852.219-10. FACTOR 3: PAST PERFORMANCE (20 Maximum Points) Subfactor 3A: Past Performance of projects identified in FACTOR 1. (15 Points). Subfactor 3B: Average Past Performance of all projects (5 Points). Provide CPARS data for all projects identified in FACTOR 1. For any project that does NOT have CPARS data available, a Past Performance Questionnaire (PPQ) is required to be submitted with the SF330. Please utilize the attached PPQ document. CPARS data and PPQs will not be included in the page count. All projects provided in the SF330 must be completed by the office/ branch/ individual team member performing the work under this contract. The following information must be clearly specified on each performance report: Contract/task order number Project title Prime firm Start date Completion date Offers shall only include CPARS data for the projects listed in FACTOR 1. The contracting officer shall directly retrieve CPARS reviews from www.CPARS.gov to determine average past performance of previous projects. Government Past Performance Information Systems may be accessed. Evaluating past performance and experience may include information provided by the firm, customer inquiries, Government databases, publicly available sources, and additional projects in CPARS. Failure to provide requested data, accessible points of contact or valid phone numbers could result in a firm being considered less qualified. FACTOR 4: QUALITY CONTROL (10 Maximum Points) Subfactor 4A: Management approach (5 Points). Subfactor 4B: Quality methodology (5 Points). The A/E Firm shall describe its management approach, regarding coordination of disciplines and subcontractors, familiarity of the prime firm and any key subcontractors with VA Design Guides/Manuals, Master Specifications, ASHRAE standards, NEC, and other applicable standards. A/E Firm shall also provide the following: Quality Control organization, and management structure. Methods and procedures for control and prevention of nonconformances during design, preconstruction, and construction. Methods and procedures for nonconformance remediation at all stages of project. Methods and procedures for control and prevention of cost, and schedule overruns. Summarized schedules for selected three previous design projects that show initial approved project schedule, and any updates to schedule with time extensions. Provide a narrative to describe reasons and justifications for any deviations from initial schedule. Summarized cost estimates for selected three previous design projects that show initial approved total project cost estimate, and any increases to initial cost estimates. Provide a narrative to describe reasons and justifications for any deviations from initial estimates. Describe any unforeseen conditions that arose during construction for your last three projects. Provide a narrative to describe how your firm assisted the project management team to correct those deficiencies, and any methods used to mitigate extra costs and increases in project schedule. FACTOR 5: CAPACITY (10 Maximum Points) Subfactor 5A: Capacity to complete work within required timeline (5 Points). Subfactor 5B: Resource management and project management (5 Points). The A/E Firm shall attest to its capacity to accomplish the work in the required time. The evaluation will consider the firm s ability to meet the schedule of the overall project, as well as the available capacity of personnel in key disciplines. The A/E Firm shall also provide the following: A list that shows the total number of design and project professionals who are currently employed at the firm with professional titles for each. Total number of projects in study or planning stages Total number of active design projects Total number of active construction phase services A list of personnel assigned to each of the above projects An analysis and report of available capacity of key personnel for immediate new work The respondent shall: Summarize its approach to staffing and company resource management For the key personnel on the proposed project team, tabulate their current and projected workload as percentages of their available individual capacity. List all work awarded to the A/E Firm by the VA during the previous 12 months, as well as any current indefinite delivery, indefinite quantity (IDIQ) contracts that it has. List the current stage and percentage of completion for non-IDIQ projects. A signed statement shall be provided stating that the firm acknowledges that prior to award of the contract, it is required to notify the Government of any changes in its capacity that could limit its ability to perform the work within the required time. FACTOR 6: GEOGRAPHIC LOCATION (5 Maximum Points) Location of the firm, as measured by the travel time (hours) between the Offeror s principal business location and Edward Hines, Jr. VAMC, Hines, IL. Architect must provide details of travel between their main office and Edward Hines Jr, VAMC Hines, IL. This includes but not limited to airport travel time, driving distance, etc. If the architect has a satellite location, the architect must provide details of a fully staffed and well-established satellite office. Leasing documentation may be requested. FACTOR 7: EXPERIENCE IN CONSTRUCTION PERIOD SERVICES (5 Maximum Points) The A/E Firm shall demonstrate its experience in providing Construction Period Services for hospital facilities, particularly in HVAC renovation projects. The respondent shall provide a narrative that describes the methods and procedures used to implement each of the following Construction Period Services tasks: Professional field inspections during the construction period, with descriptions of types of inspections provided, and methods used for inspections and reporting during each phase of construction Review of construction submittals Support in answering requests for information during the construction period Support of construction contract changes to include updated drawings, drafting statements of work, and cost estimates. Weekly construction meeting participation Closeout documents to include final inspections and as-recorded drawings. SECONDARY SELECTION CRITERION*: FACTOR 8: CLAIMS (-5 to 0 Maximum Points) Subfactor 8: Record of significant claims against the firm because of improper or incomplete architectural and engineering services. (-5 to 0 Points). * The secondary selection criterion is used as a tiebreaker, if necessary, in ranking the most highly qualified firms following the completion of discussions. The secondary selection criterion will not be applied when determining a firm s SF330 submission. 2.1.c: After TEB Individual Ratings of the SF330s are completed, the TEB shall convene and develop consensus ratings for the seven evaluation factors of the SF330s as defined above. COMMENT DESCRIPTION DEFINITIONS Strong point: Provides Merit/advantages to VA that increase the likelihood of successful contract performance. Weak point: Flaws/disadvantages that increase the likelihood of unsuccessful contract performance. 2.2.c: The eighth factor (Secondary Selection Criterion) will only be used if needed. The TEB shall provide a listing, in order of preference, of the firms considered most highly qualified to perform the work. The contracting officer shall issue a Request for Proposal (RFP) to the architect-engineer the TEB recommends for negotiations. 3. SOURCE SELECTION PROCESS: 3.1 SF330 Reviews: The board will review and evaluate the submitted SF330 s in accordance with the stated evaluation criteria to determine each individual offeror s ability and capability to perform the work required and confirmation of determination of responsibility per FAR 9.1. a) TECHNICAL EVALUATION BOARD SF330 INDIVIDUAL EVALUATIONS (1) Each board member will conduct an independent review and evaluation and complete an evaluation rating sheet for EACH SF330. Each category will be addressed with strengths or weaknesses noted. (2) The evaluation will be in accordance with the Evaluation Factors which are listed in the solicitation. b) TECHNICAL EVALUATION BOARD SF330 CONSENSUS (1) After each member has completed their independent evaluation, the Chairperson will discuss the evaluations with the entire team and assure each evaluation is complete. (2) During these discussions, the board will reach a consensus rating for each SF330 and document ratings using the consensus evaluation worksheets. The SF330 can be downloaded through the GSA Forms Library at: https://www.gsa.gov/forms-library/architect-engineer-qualifications. No Fax Responses will be accepted: personal visits for discussing this announcement will not be entertained or scheduled. Questions may be directed only by e-mail to Donita.Grace@va.gov. VA Primary Point of Contact: Donita Grace, NCO 12 Contract Specialist, Donita.Grace@va.gov. The page limit for SF330 s will be 30 pages max., any pages after 30 will not be considered. See attached document: P01 - SOW 578-27-003 Renovate A Section 1st Floor Bldg. 1 | 74% | Combined Synopsis | 11/16/2026 |
Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice REQUEST FOR SF 330 36C25227Q0013 Project 578-27-003: Renovate A Section 1st Floor Bldg. 1 (AE) Design/Engineering Services SF-330 Package Due: October 30, 2026, at 1:00 p.m. CST (see details below) Points of Contact: Donita.Grace@va.gov INTRODUCTION: THIS IS A TOTAL 100% SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB) SET-ASIDE in accordance with Public Law 109-461. This is a Request for SF330s for Architect/Engineer (A/E) Design Services for Project Number 578-27-003: Renovate A Section 1st Floor Bldg. 1 (AE) at the Edward J. Hines VA Hospital in Hines, IL. THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. NO SOLICITATION PACKAGE WILL BE ISSUED via SAM.gov. A request for proposal will be issued directly to the top-rated firm for which negotiations will commence in accordance with FAR part 36. The anticipated A/E design services, to be awarded, will be procured in accordance with the Selection of Architects and Engineers Act (Public Law 92- 582), FAR Part 36.6 and VA Acquisition Regulation 836.6. Period of Performance: 449 Calendar Days Contract Type: Firm-Fixed-Price Estimated Magnitude of Construction: Between $10,000,000 and $20,000,000 NAICS Code: 541310 Size Standard: $12.5 Million SBA & SAM : in accordance with VAAR 819.7003, at the time of SF330 submission and prior to award of any contract, the offeror must represent to the contracting officer that it is a (1) SDVOSB eligible firm; (2) Small business concern under the North American Industry Classification System (NAICS) code assigned to the acquisition; and (3) SDVOSB listed as verified in SBA at: https://veterans.certify.sba.gov/ Additionally, all eligible firms must be registered and current in the System for Award Management (SAM) database to be evaluated and eligible for contract award. If the firm is not registered in SAM, you may register online at https://www.sam.gov. 1. PURPOSE: This Source Selection Plan (SSP) outlines the procedures that will be used to solicit architectural and engineering (AE) design services for Project 578-27-003 Renovate A Section on First Floor of Building 1. The goal of this project is to provide complete AE design services to renovate section A of the 1st floor of building 1. 2. ACQUISISTION DESCRIPTION: 2.1: RFI: A Request for Information shall be published to https://sam.gov whereby interested architect-engineering companies shall submit an SF330 package. This competitive procurement shall utilize a best value trade-off source selection process identified in FAR 15. 2.1.a: Source Selection Evaluation Board (SSEB): For the purpose of this acquisition, the SSEB will be same as the Technical Evaluation Board (TEB). 2.1.b: Below are the individual (TEB) evaluation criteria and ratings for the SF330s, listed in descending order of importance. FACTOR 1: SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE (30 Maximum Points) Subfactor 1A: Specialized Experience (15 Points). Subfactor 1B: Additional Experience (10 points). Subfactor 1C: Technical Competence (5 points). The A/E Firm shall demonstrate its specialized experience and technical competence in the design and construction period services for projects of similar size and complexity. Specialized project experience should include design of renovations to existing hospitals, renovations to buildings constructed prior to 1970 w/space constraints, design of Pathology Suites, and HVAC upgrades to existing hospitals. Additional experience includes mechanical, electrical, and structural engineering, architecture, interior design and finishes, physical security upgrades, building management systems/building automation systems (BMS/BAS), Computer-Aided Design and Drafting (CADD), critical path scheduling, fire protection, construction infection control protocols, design and installation of biological refrigeration and preservation systems, design and installation of vacuum tube transport systems, and project phasing and coordination in an active hospital setting. Offeror shall provide a minimum of three (3), and no more than five (5) recent and relevant Government and private experience projects similar in size, scope, and complexity, and experience with the type of projects/competence above. Relevant is defined as those task requirements identified in the Statement of Work. Recent is defined as services provided within the past seven (7) years with at least 50% of the Construction completed. At a minimum, include the following for each submitted project (if applicable): Project title, location, contract number, and detailed narrative describing the scope of services provided including the type of work performed by the offeror and its role in the project i.e., prime contract, Teaming Partner, or subcontractor. Project Owner, owner s point of contact including telephone number and email address. Services & Deliverables provided under the contract/task order Period of Performance, including start and completion dates for design and construction if applicable. Estimated cost of construction based on AE s design Final construction cost (or projected final construction cost if still underway) The percentage of total cost resulting from changes due to AE omissions. To demonstrate technical competence, the offeror shall include narratives of how the firm addresses each of the following topics. Simply restating this list will not be sufficient. The management approach The coordination of disciplines and subcontractors Quality control procedures Familiarity with VA Design Guides/Manuals, Master Specifications and other applicable standards. FACTOR 2: PROFESSIONAL QUALIFICATIONS (20 Maximum Points) Subfactor 2A: Key Positions (15 Points). Subfactor 2B: SDVOSB Compliance (5 Points). The architects and engineers on the firm s staff representing the project or signing/stamping drawings in each discipline must possess a minimum of five (5) years of experience and are required to be licensed, registered, or certified by a U.S. state, the District of Columbia, or a U.S. territory. Provide professional license jurisdiction of issue and license numbers and/or proof of licensure. A resume for each of these key positions must be provided, corresponding with the title matching the disciplines listed for the project. At a minimum, the offeror must describe the professional qualifications and specific experience in the required disciplines within the past five (5) years. Key positions and disciplines required for this project include, but are not limited to: Project Manager Architect Mechanical Engineer Electrical Engineer Plumbing Engineer Structural Engineer Interior Designer The evaluation will consider education, certifications, training, registration, overall and relevant experience and longevity with the firm. Offer must include the following statement of SDVOSB compliance when submitting the personnel proposed to perform the work under this requirement: I [signatory authority] ______________________, [company] _____________________; certify that the team proposed to perform under this requirement demonstrates the capability of 50% SDVOSB performance in compliance of 48 CFR 852.219-10. FACTOR 3: PAST PERFORMANCE (20 Maximum Points) Subfactor 3A: Past Performance of projects identified in FACTOR 1. (15 Points). Subfactor 3B: Average Past Performance of all projects (5 Points). Provide CPARS data for all projects identified in FACTOR 1. For any project that does NOT have CPARS data available, a Past Performance Questionnaire (PPQ) is required to be submitted with the SF330. Please utilize the attached PPQ document. CPARS data and PPQs will not be included in the page count. All projects provided in the SF330 must be completed by the office/ branch/ individual team member performing the work under this contract. The following information must be clearly specified on each performance report: Contract/task order number Project title Prime firm Start date Completion date Offers shall only include CPARS data for the projects listed in FACTOR 1. The contracting officer shall directly retrieve CPARS reviews from www.CPARS.gov to determine average past performance of previous projects. Government Past Performance Information Systems may be accessed. Evaluating past performance and experience may include information provided by the firm, customer inquiries, Government databases, publicly available sources, and additional projects in CPARS. Failure to provide requested data, accessible points of contact or valid phone numbers could result in a firm being considered less qualified. FACTOR 4: QUALITY CONTROL (10 Maximum Points) Subfactor 4A: Management approach (5 Points). Subfactor 4B: Quality methodology (5 Points). The A/E Firm shall describe its management approach, regarding coordination of disciplines and subcontractors, familiarity of the prime firm and any key subcontractors with VA Design Guides/Manuals, Master Specifications, ASHRAE standards, NEC, and other applicable standards. A/E Firm shall also provide the following: Quality Control organization, and management structure. Methods and procedures for control and prevention of nonconformances during design, preconstruction, and construction. Methods and procedures for nonconformance remediation at all stages of project. Methods and procedures for control and prevention of cost, and schedule overruns. Summarized schedules for selected three previous design projects that show initial approved project schedule, and any updates to schedule with time extensions. Provide a narrative to describe reasons and justifications for any deviations from initial schedule. Summarized cost estimates for selected three previous design projects that show initial approved total project cost estimate, and any increases to initial cost estimates. Provide a narrative to describe reasons and justifications for any deviations from initial estimates. Describe any unforeseen conditions that arose during construction for your last three projects. Provide a narrative to describe how your firm assisted the project management team to correct those deficiencies, and any methods used to mitigate extra costs and increases in project schedule. FACTOR 5: CAPACITY (10 Maximum Points) Subfactor 5A: Capacity to complete work within required timeline (5 Points). Subfactor 5B: Resource management and project management (5 Points). The A/E Firm shall attest to its capacity to accomplish the work in the required time. The evaluation will consider the firm s ability to meet the schedule of the overall project, as well as the available capacity of personnel in key disciplines. The A/E Firm shall also provide the following: A list that shows the total number of design and project professionals who are currently employed at the firm with professional titles for each. Total number of projects in study or planning stages Total number of active design projects Total number of active construction phase services A list of personnel assigned to each of the above projects An analysis and report of available capacity of key personnel for immediate new work The respondent shall: Summarize its approach to staffing and company resource management For the key personnel on the proposed project team, tabulate their current and projected workload as percentages of their available individual capacity. List all work awarded to the A/E Firm by the VA during the previous 12 months, as well as any current indefinite delivery, indefinite quantity (IDIQ) contracts that it has. List the current stage and percentage of completion for non-IDIQ projects. A signed statement shall be provided stating that the firm acknowledges that prior to award of the contract, it is required to notify the Government of any changes in its capacity that could limit its ability to perform the work within the required time. FACTOR 6: GEOGRAPHIC LOCATION (5 Maximum Points) Location of the firm, as measured by the travel time (hours) between the Offeror s principal business location and Edward Hines, Jr. VAMC, Hines, IL. Architect must provide details of travel between their main office and Edward Hines Jr, VAMC Hines, IL. This includes but not limited to airport travel time, driving distance, etc. If the architect has a satellite location, the architect must provide details of a fully staffed and well-established satellite office. Leasing documentation may be requested. FACTOR 7: EXPERIENCE IN CONSTRUCTION PERIOD SERVICES (5 Maximum Points) The A/E Firm shall demonstrate its experience in providing Construction Period Services for hospital facilities, particularly in HVAC renovation projects. The respondent shall provide a narrative that describes the methods and procedures used to implement each of the following Construction Period Services tasks: Professional field inspections during the construction period, with descriptions of types of inspections provided, and methods used for inspections and reporting during each phase of construction Review of construction submittals Support in answering requests for information during the construction period Support of construction contract changes to include updated drawings, drafting statements of work, and cost estimates. Weekly construction meeting participation Closeout documents to include final inspections and as-recorded drawings. SECONDARY SELECTION CRITERION*: FACTOR 8: CLAIMS (-5 to 0 Maximum Points) Subfactor 8: Record of significant claims against the firm because of improper or incomplete architectural and engineering services. (-5 to 0 Points). * The secondary selection criterion is used as a tiebreaker, if necessary, in ranking the most highly qualified firms following the completion of discussions. The secondary selection criterion will not be applied when determining a firm s SF330 submission. 2.1.c: After TEB Individual Ratings of the SF330s are completed, the TEB shall convene and develop consensus ratings for the seven evaluation factors of the SF330s as defined above. COMMENT DESCRIPTION DEFINITIONS Strong point: Provides Merit/advantages to VA that increase the likelihood of successful contract performance. Weak point: Flaws/disadvantages that increase the likelihood of unsuccessful contract performance. 2.2.c: The eighth factor (Secondary Selection Criterion) will only be used if needed. The TEB shall provide a listing, in order of preference, of the firms considered most highly qualified to perform the work. The contracting officer shall issue a Request for Proposal (RFP) to the architect-engineer the TEB recommends for negotiations. 3. SOURCE SELECTION PROCESS: 3.1 SF330 Reviews: The board will review and evaluate the submitted SF330 s in accordance with the stated evaluation criteria to determine each individual offeror s ability and capability to perform the work required and confirmation of determination of responsibility per FAR 9.1. a) TECHNICAL EVALUATION BOARD SF330 INDIVIDUAL EVALUATIONS (1) Each board member will conduct an independent review and evaluation and complete an evaluation rating sheet for EACH SF330. Each category will be addressed with strengths or weaknesses noted. (2) The evaluation will be in accordance with the Evaluation Factors which are listed in the solicitation. b) TECHNICAL EVALUATION BOARD SF330 CONSENSUS (1) After each member has completed their independent evaluation, the Chairperson will discuss the evaluations with the entire team and assure each evaluation is complete. (2) During these discussions, the board will reach a consensus rating for each SF330 and document ratings using the consensus evaluation worksheets. The SF330 can be downloaded through the GSA Forms Library at: https://www.gsa.gov/forms-library/architect-engineer-qualifications. No Fax Responses will be accepted: personal visits for discussing this announcement will not be entertained or scheduled. Questions may be directed only by e-mail to Donita.Grace@va.gov. VA Primary Point of Contact: Donita Grace, NCO 12 Contract Specialist, Donita.Grace@va.gov. The page limit for SF330 s will be 30 pages max., any pages after 30 will not be considered. See attached document: P01 - SOW 578-27-003 Renovate A Section 1st Floor Bldg. 1 | 74% | Combined Synopsis | 10/30/2026 |
Additional Details
Solicitation Number
36C24623R0074
Archive Date
Jun 8, 2024
Office Address
HAMPTON, VA, 23667