Notice ID: 3edb7ee663eb42d8931375c817c1591eSolicitation
Z1DZ--509 Window Replacement
Archived on December 4, 2024. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 3:00 PM UTC−05:00
- Posted
- October 23, 2024
- Notice type
- Solicitation
Notice details
- Office
- 246-NETWORK CONTRACTING OFFICE 6 (36C246)
- Place of performance
- Central Virginia VA Health Care System 1201 Broad Rock Blvd, Richmond, 23249
- Last updated
- Jan 23, 2026
Identifiers
- Solicitation number
- 36C24624Q1207
- Notice ID
- 3edb7ee663eb42d8931375c817c1591e
Description
The purpose of this amendment is to do the following: To extend the due date to November 4, 2024 3PM EST. To answer RFI s. To provide the Revised SOW. To provide the update drawings to include measurements. To provide photos of the windows. To provide Sign-in Sheet RFI Does the end user require Low-e Tinted Glass or Window Film? If they want window film, we would require Elevations and not just floor plans. If they can provide quantity and sizes (width by height of each pane) that would work too. Low E would be preferred but a quote for both would be acceptable. Attached are the windows and sizes of windows, again these sizes are approximate and should be verified by the contractor, 25 windows in all. Is a tripartite escrow agreement acceptable if the cost of the job were to be over the threshold? In accordance with FAR Part 28.101-2(b) for construction contracts greater than $35,000, but not greater than $150,000, the contracting officer shall select two or more of the following payment protections, giving particular consideration to inclusion of an irrevocable letter of credit as one of the selected alternatives. Work placed on which floor? 1st and 2nd floor front and back of building as shown in the attachment. Contractor asked about indication of water damage in the rear windows. COR did not see any at this time. The Customer expressed concerns with humidity getting in the lab during performance of window replacement. Contractor should be prepared to mitigate exposure to humidity to prevent damage to lab equipment.
Award Overview
Possible prior contract
Inferred, not confirmedInferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.
Vendor
ABIDAH SERVICES LLCContract end date
May 22, 2025
NAICS
238150
Agency
Department of Veterans Affairs
Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.
Contacts
Documents
Select documents to download
Showing 10 of 10 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Solicitation | VETERANS AFFAIRS, DEPARTMENT OF | Oct 23, 2024 | - | |||
| Solicitation | VETERANS AFFAIRS, DEPARTMENT OF | Oct 23, 2024 | - | |||
| Solicitation | VETERANS AFFAIRS, DEPARTMENT OF | Oct 23, 2024 | - | |||
| Solicitation | VETERANS AFFAIRS, DEPARTMENT OF | Oct 23, 2024 | - | |||
| Solicitation | VETERANS AFFAIRS, DEPARTMENT OF | Oct 23, 2024 | - | |||
| Solicitation | VETERANS AFFAIRS, DEPARTMENT OF | Oct 23, 2024 | - | |||
| Solicitation | VETERANS AFFAIRS, DEPARTMENT OF | Oct 23, 2024 | - | |||
| Solicitation | VETERANS AFFAIRS, DEPARTMENT OF | Oct 23, 2024 | - | |||
| Solicitation | VETERANS AFFAIRS, DEPARTMENT OF | Oct 23, 2024 | - | |||
| Solicitation | VETERANS AFFAIRS, DEPARTMENT OF | Oct 23, 2024 | - |
Lifecycle
Solicitation:
36C24624Q1207- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationSep 13, 2024
Z1DZ--509 Window Replacement
- 2×SolicitationCurrentOct 1, 2024
Z1DZ--509 Window Replacement
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
CTX Chapel Window Repair / Replacement | 68% | Combined Synopsis | 10/13/2026 |
award notice | 62% | Awarded | Open |
Publish questions and Answers received. | 62% | Solicitation | 08/17/2026 |
Summary of Changes Please deliver bids to Dwayne Brauch, dwayne.brauch@va.gov Bid opening August 17, 2026 @ 10:00 am Microsoft Teams meeting Join: https://teams.microsoft.com/meet/226856731900460?p=sIkFuSwNDBiIivmfcb Meeting ID: 226 856 731 900 460 Passcode: Wb6sC7xr Need help? | System reference Dial in by phone +1 872-701-0185,,305028715# United States, Chicago Find a local number Phone conference ID: 305 028 715# For organizers: Meeting options | Reset dial-in PIN The following attachments are attached for this solicitation: Bid Questions Attachment F: Questions request form answered. Site Visit Agenda Site Visit Sign sheet Updated Wage Rate Determination for Stearns County VHA ICRA-1.4 (April 14 2026) B4.8.9 | 62% | Solicitation | 08/17/2026 |
PROJECT # 656-12-222 Replace Windows Building 4 Building 8 and Building 9 The Contractor shall furnish all labor, materials, tools and equipment required to repair, remove, replace and completely refurbish all windows in Buildings 4,8 and 9. The contractor shall remove the existing internal and external window trim and wall finishes in order to successfully gain access to and cut out the existing wood windows. Incorporated into the demolition of the windows will be the safe removal of both lead and asbestos containing material as guided by the local and national rules and regulations of lead and asbestos remediation. Additionally, the contractor will be responsible for the complete and satisfactory installation of the new window frames and sashes, screens and storm windows. The window installation shall include the patching and painting of walls, ceiling installation and restoration, trim and millwork installation, and repair of all damaged items in place. This work will be completed in an occupied building; all construction activities shall be completed behind proper construction barriers as described in the specifications. The contractor shall return the worksite to the Veterans Affairs Health Care System after the work is completed, and all of the required work is satisfactorily completed and signed off by the assigned Contracting Officer's Representative. Refer to the contract specifications and drawings for details All work completed in accordance with the specifications and contract drawings. Period of Performance is 445 Calendar Days | 62% | Solicitation | 08/17/2026 |
Additional Details
Solicitation Number
36C24624Q1207
Archive Date
Dec 4, 2024
Office Address
HAMPTON, VA, 23667