J041--558-22-172, Replace Chillers in AHU 1 and 2
Archived on September 11, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM EDT
- Posted
- August 31, 2026
- Notice type
- Solicitation
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of Veterans Affairs
Notice details
- Office
- 246-NETWORK CONTRACTING OFFICE 6 (36C246)
- Place of performance
- Durham VHAMC, Durham, North Carolina, 27705
- PSC
- J041: MAINT/REPAIR/REBUILD OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 36C24626B0029
- Notice ID
- 485a1beb808b474f9019afc653e58f4b
Description
STATEMENT OF WORK
Project Number: 558-22-172 Replace Chillers for AHU 1 and 2
- Scope:
- The scope of work shall generally consist of but not limited to the following: providing all labor, materials, tools, equipment, permits, testing, and reports required to complete the replacement of chillers that serves AHU 1 and 2 and associated equipment and structural upgrades as shown in the drawings and specifications.
- Construction Period -
- Pre-Construction Meeting: Contractor shall participate in and facilitate a Pre-Con in conjunction with the Contracting Officer, COR, A&E, and building stakeholders as needed.
- Contractor to hold weekly Construction Progress Meetings via Microsoft Teams or in-person and include the COR and CO as principal participants.
- Contractor provides Meeting Minutes within no less than 7 days following each Construction Progress Meeting.
- As-Built Drawing Submission: Provide Red-line drawings to A/E that include the contractor’s mark-ups in PDF formats.
- Hours of Operation and Phasing:
- Construction should be phased and timed such that:
- General Operation of the affected areas is not interrupted
- The facility operates on a 24-hour, 7 day per week schedule
- Contractor will conduct operations during 1st, 2nd and 3rd shifts such that minimal interruption of function occurs. 1st shift construction activities will be allowed with approval of the COR.
- Contractor to develop and coordinate phasing plan with input from staff and final approval of COR.
- General Operation of the affected areas is not interrupted
- Any construction work that necessitates a utility outage must be scheduled for the second shift or during the weekend. Please coordinate all shutdowns with the VA COR and submit a written shutdown request at least 20 days in advance of the proposed shutdown date.
- Construction should be phased and timed such that:
- Storage: No storage of any material will be allowed on VA property unless approved by the COR.
- Period of Performance: Contractor shall complete this project no later than 270 days after issue of notice to proceed (NTP).
- Utility and System or Service Outages: No utility services such as water, gas, steam sewers or electricity, parking, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized in accordance with VA Lock-out Tag-out requirements. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without the Medical Center Director’s prior knowledge and written approval. The contractor shall submit a request to interrupt any such services to COR, in writing, 20 days in advance of proposed interruption.
- General Requirements
- The contractor’s employees shall not enter the work site without appropriate badges and identification. They may also be subject to inspection of their personal effects when entering or leaving the project site.
- Execute work to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied jointly by patients or medical personnel, and Contractor’s personnel, except as permitted by COR where required by limited working space.
- Means of Egress: Do not block existing egress for occupied buildings, including paths from exits to roads per NFPA 101 and VA requirements. Minimize disruptions and coordinate with COR.
- All buildings will be occupied during performance of work. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical Center operations will continue during the installation period.
- Hot Work: Perform and safeguard hot work operations in accordance with NFPA 241 and NFPA 51B. Coordinate with COR. Obtain permits from facility Safety Manager at least 48 hours in advance.
- New work shall be installed and connected to existing work neatly, safely and professionally. Contractor to coordinate periodic VA inspection to ensure satisfactory workmanship of GC and Subcontractors. Any portion of the VAMC that is disturbed or damaged shall be replaced or repaired to its prior condition.
- The contractor is required to notify the COR upon arrival and departure of personnel at the work site every day work is performed during the execution of this project.
END OF SCOPE OF WORK
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
Files (10)
- Download
36C24626B0029 0004 posting abstract 08312026.pdf
106 KBAdded in Solicitation version 9Posted - Download
36C24626B0029 0003 RFI responses site sign in seismic specs 08212026.pdf
318 KBAdded in Solicitation version 5Posted - Download
chillers July 30 sign in.pdf
1.1 MBAdded in Solicitation version 5Posted - Download
13 05 41 - SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS.pdf
76 KBAdded in Solicitation version 5Posted - Download
36C24626B0029 0002 AVAIL OF FUNDS.pdf
88 KBAdded in Solicitation version 4Posted - Download
36C24626B0029 0001--site visit map.pdf
2.8 MBAdded in Solicitation version 3Posted - Download
36C24626B0029 POST 07242026.pdf
482 KBAdded in Solicitation version 2Posted - Download
558-22-172_VA Durham_Replace Chillers Drawings.pdf
17 MBAdded in Solicitation version 2Posted - Download
558-22-172_Durham Chillers_Specs.pdf
11 MBAdded in Solicitation version 2Posted - Download
36C24626B0029_1.docx
16 KBAdded in Presolicitation version 4Posted
Links (1)
- Department of Veteran's Affairs Websitewww.va.govPosted
Lifecycle
- 7Version 7PresolicitationArchived
J041--558-22-172, Replace Chillers in AHU 1 and 2
- 2Version 2SolicitationArchived
Type changed from Presolicitation to Solicitation
J041--558-22-172, Replace Chillers in AHU 1 and 2
- 3Version 3SolicitationArchived
J041--558-22-172, Replace Chillers in AHU 1 and 2
- 4Version 4SolicitationArchived
J041--558-22-172, Replace Chillers in AHU 1 and 2
- 5Version 5SolicitationArchived
J041--558-22-172, Replace Chillers in AHU 1 and 2
- 9Version 9SolicitationArchivedCurrent
J041--558-22-172, Replace Chillers in AHU 1 and 2
Similar Opportunities
Additional Details
Solicitation Number
36C24626B0029
Archive Date
Sep 11, 2026
Office Address
HAMPTON, VA, 23667