Z2DA--658-26-105 Repair Fuel Storage Tanks

Archived on February 13, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
5:30 PM EST
Posted
January 7, 2026
Notice type
Sources Sought
NAICS
237120: Oil and Gas Pipeline and Related Structures Construction
Agency
Department of Veterans Affairs

Notice details

Office
246-NETWORK CONTRACTING OFFICE 6 (36C246)
Place of performance
Department of Veterans Affairs Salem VA Medical Center, Salem, Virginia, 24153
Last updated
Nov 4, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
36C24626Q0243
Notice ID
2b5972df37204075b8323be9f50104f8

Description

Page 3 of 3 DEPARTMENT OF VETERANS AFFAIRS Network Contracting Office 6 (NCO 6) SOURCES SOUGHT NOTICE 658-26-105 Repair Underground Fuel Storage Tanks Salem VA Medical Center (Salem, Virginia) In accordance with FAR 15.201(e), responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. Additionally, the Government reserves the right to revise the Performance Work Statement and other contract requirements, before the release of any associated solicitation. This notice is not a Request for Proposals (RFP) or Request for Quotes (RFQ). Information provided in this notice is subject to change prior to release of a solicitation. OVERVIEW The Department of Veterans Affairs, Network Contracting Office 6 is conducting market research to identify potential sources for construction services to repair or modify fuel storage tanks and related equipment at the Salem VA Medical Center, 1970 Roanoke Blvd, Salem, VA 24153. The attached Statement of Work, Drawing and Specifications are draft documents and are subject to change prior to release of a solicitation. SCOPE OF WORK This project includes testing of underground and above ground fuel storage tanks, as well as demolition of underground tanks, testing requirements and installation/modification of fuel tank monitoring equipment located at the Salem VA Medical Center. All work will be performed at the Salem VA Medical Center, 1970 Roanoke Blvd, Salem, VA 24153. SMALL BUSINESS REQUIREMENTS For market research purposes, all responses to this notice will be reviewed, regardless of small business/socioeconomic category, including those firms that are identified as large businesses. Review of responses to this notice will support later determination of set-aside requirements, if a solicitation becomes available, where the rule of two is met regarding a set-aside, including set-asides under 38 U.S.C. 8127 and 8128 for Service Disabled Veteran Owned Small Businesses (SDVOSB) and/or Veteran Owned Small Businesses (VOSB) firms registered in the Small Business Administration s Dynamic Small Business Search (DSBS) Engine database, in accordance with priorities set by regulation. NAICS CODE: 237120, Oil and Gas Pipeline and Related Structures Construction (SBA Size Standard: ) SBA SIZE STANDARD: $45.0m annual revenue PRODUCT OR SERVICE CODE (PSC): Z2DA, Repair or Alteration of Hospitals and Infirmaries INSTRUCTIONS FOR RESPONDING: Interested companies can respond, via email, to daniel.spaulding@va.gov, with the following information: (1.) A summary of relevant experience in providing the same or similar services. Provide documentation of at least three (3) similar projects completed within the last five years. (2.) Company Point of Contact, including name, title, phone number and email address. (3.) Company name, SAM.gov UEI number, small business/socioeconomic status of the company, and address of the applicable office. Additional information may be requested by the Contracting Officer at a later time. POINT OF CONTACT: Daniel Spaulding Contracting Officer Network Contracting Office (NCO) 6 U.S. Department of Veterans Affairs daniel.spaulding@va.gov DUE DATE FOR RESPONSES: This notice will close on Wednesday, January 14, 2026, at 05:30PM Eastern Time. CONTRACTOR RESPONSIBILITY A potential source, for the purposes of this notice, is considered to be any company meeting the following requirements. Some of the below requirements may be modified prior to release of any solicitation. 1. The potential source is registered in the System for Award Management (SAM) database at https://www.sam.gov, as whichever entity/office that would receive award in the event of a solicitation. 2. The potential source is registered in the Small Business Administration s Small Business Search (SBS) Engine database at https://search.certifications.sba.gov/, if applicable. (This is only applicable to firms meeting Small Business Administration (SBA) and VA requirements for Service-Disabled Veteran-Owned Small Business (SDVOSB) or Veteran-Owned Small Business (VOSB) programs.) 3. The potential source has completed submission of the current cycle, for calendar year 2017, VETS-4212 Report at http://www.dol.gov/vets/programs/fcp/main.htm (Only applicable where the potential source has held federal contracts in the amount of $150,000.00 or more, performed during the current cycle). 4. The potential source has favorable (satisfactory) past performance information for federal contracts, as documented in Government databases, specifically the Contractor Performance Assessment Reporting System (CPARS), where applicable.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Daniel Spaulding
Contracting Officer

Documents

Files (4)

  • DRAFT 658-26-105_Specs.pdf

    346 KBAdded in Sources Sought version 3Posted
    Download
  • DRAFT 658-26-105_SOW.pdf

    157 KBAdded in Sources Sought version 3Posted
    Download
  • DRAFT 658-26-105_Drawing.pdf

    763 KBAdded in Sources Sought version 3Posted
    Download
  • 36C24626Q0243.docx

    19 KBAdded in Sources Sought version 3Posted
    Download

Lifecycle

  1. 3
    Version 3Sources SoughtArchivedCurrent

    Z2DA--658-26-105 Repair Fuel Storage Tanks

    Notice 2b5972df37204075b8323be9f50104f8 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
ID-CAMAS NWR- Fuel Tanks Wiring
75%
Solicitation10/08/2026
COMBINED SYNOPSIS / SOLICITATION NOTICE Commercial Products and Commercial Services / Simplified Acquisition Procedures (In accordance with FAR Subpart 12.6 and FAR Part 13 / FAR Subpart 36.2 as applicable) GENERAL INFORMATION • Action Code: Combined Synopsis/Solicitation • Document Type: Combined Synopsis/Solicitation Notice • Solicitation Number: 30321PR270000001 • Notice Date: 10/29/2026 • Set-Aside Status: Total Small Business Set-Aside • Primary NAICS Code: 237120 – Oil and Gas Pipeline and Related Structures Construction • Small Business Size Standard: $45.0 Million (for NAICS 237120) • Product Service Code (PSC): Z2PZ – Repair or Alteration of Other Utilities POINTS OF CONTACT Contracting Officer’s Representative: MKC Zachery Little Email: Zachery.T.Little@uscg.mil Phone: (417) 612-3258 SECTION 1: SYNOPSIS & DESCRIPTION This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued separately. The Department of Homeland Security, United States Coast Guard (USCG), has a requirement for repair, remediation, testing, and coating of fuel lines, storage tanks, and associated fuel system infrastructure located at USCG Station Sand Key, Clearwater, Florida. The Government intends to award a single, Firm-Fixed-Price (FFP) contract resulting from this request for quotation (RFQ). SECTION 2: PLACE OF PERFORMANCE & OPERATIONAL HOURS • Location: United States Coast Guard Station Sand Key 1375 Gulf Boulevard Clearwater, FL 33767 • Operating Hours: Normal base operating hours are 0700 to 1700 (7:00 AM – 5:00 PM), Monday through Friday, excluding federal holidays. Any work required outside these hours must receive prior written coordination and approval from the Contracting Officer’s Representative (COR). • Continuity of Operations: Station Sand Key is an active, operational military facility. The contractor shall coordinate all operations with the unit to ensure the station does not lose the capability to fuel operational vessels during the execution of repairs. SECTION 3: SUMMARY SCOPE OF WORK (SOW) DEPARTMENT OF HOMELAND SECURITY UNITED STATES COAST GUARD STATION SAND KEY SPECIFICATIONS FOR Repair Fuel Lines & Tank General: United States Coast Guard Station Sand Key requesting repair work to be completed on various fuel lines and fuel related systems. Location: United States Coast Guard Station Sand Key. 1375 Gulf Boulevard Clearwater, FL 33767 I. Continuity of Facilities Operation: Schedule work to minimize interference with the facility’s normal operations. Normal operating hours are from 0700 to 1700 Monday thru Friday except federal holidays. Any work during other hours unless otherwise instructed or permitted shall be scheduled and approved with the Contracting Officers Representative. II. Notification of Start and Completion of Work: The Contractor shall notify Coast Guard one week prior to start of work. III. Coast Guard Contracting Officers Representative: The Contractor shall contact the COR to coordinate all construction efforts onboard Coast Guard Facilities. MKC Zachery Little Zachery.T.Little@uscg.mil 417-612-3258 IV: Recycling and Disposal of Refuse: Minor refuse, excess or waste materials resulting from construction operations may be disposed of in Station dumpsters. All disposals shall be done in accordance with federal, state, and local laws and regulations. V: Safety: During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 - Safety and Health Regulations for Construction. The contractor shall have a written safety plan as required in FAR 5.236-13. The plan shall unequivocally assign responsibility and authority for safety to the superintendent by name. Immediate notification to the Contracting Officer’s Representative of lost time due to accidents is required. Provide two copies of workman’s compensation accident reports by noon of the day following the accident. The Coast Guard reserves the right to bar any workers or supervisors from the premises should they be documented as violating set safety standards and regulations. VI. Inspection: The Contracting Officer’s Representative has the right to reject defective workmanship or materials or work not performed as per the project specifications. Only the Contracting Officer or his/her representative may accept work performed by the contractor. VII. Operations and Storage: The contractor is to take whatever steps necessary to ensure that his materials are protected. The Coast Guard has no responsibility for receipt, storage, or protection of contractor’s materials. All equipment, materials and supplies shall be addressed to the contractor. The Coast Guard will not accept shipments. The contractor is responsible for the protection of existing structures, utilities, work and vegetation. Any damage shall be repaired at the contractor’s expense. VIII. Contractor Identification: The contractor and subcontractor personnel shall, at all times, wear company identification. IX. Existing Utilities: The Contractor shall field verify all utility locations before commencing work. This shall include, but not be limited to, the use of visual, sonic, electronic or magnetic detection devices. Contractor shall be responsible for repairing any utilities damaged during construction at no additional cost to the Government. X: Regulations while onboard Coast Guard Station Sand Key: 1. Daily colors and the raising/lowering of the American flag will take place every morning at 0800 and every evening at sunset. All personnel on Base will face the main flag pole & maintain silence and all vehicles & equipment will halt during these brief events. 2. The construction site shall be maintained in a clean condition at all times. This included daily clean-ups of the construction and storage areas (FAR 52.236-12). The site shall be well lit and well barricaded/cordoned off as appropriate. 3. There is one smoking area on base, SE corner next to dumpsters. 4. Traffic Regulations: a) 15 mph speed limit b) No use of cell phones is permitted while driving vehicles or operating heavy machinery c) All personnel shall obey all marked traffic signals including stop signs & stop lights. 5. Absolutely no firearms or weapons of any kind are allowed onboard Station Sand Key 6. Only American citizens and permanent resident aliens are allowed onboard Station Sand Key. Absolutely no foreign nationals are permitted on the premises. 7. Notice shall be given to the Coast Guard’s representative 1 week in advance of any planned power, water, and sewage or lighting outages. 8. The contractor shall provide a consolidated list of all contracted personnel, including their driver’s license numbers (or other valid gov’t issued ID number) who will be working on Station Sand Key Facilities either the day of or prior to the notice to proceed date. 9. Contractors are welcome to utilize the restrooms on the 1st decks of the building. Providing they are clean and do not track mud, dirt or any other debris into the restrooms. 10. Should warnings of gale force or stronger winds, or other inbound natural disasters be issued, the contractor shall take every practicable precaution to minimize the danger to persons, to the work, and the adjacent property. These precautions shall include closing all openings, removing all loose materials, tools and equipment from exposed locations, and removing or securing scaffolding, securing field trailers, and other appropriate equipment and other temporary work. 11. No personnel other than the contracting officer have the authority to alter the terms of any contract or to issue any change orders. 12. All contractor vehicles, equipment and gear onboard Coast Guard properties are subject to search at all times. Additionally at all times due to security and operational needs, the contractors is subject to orders to evacuate the property at any time. VIII: SCOPE OF WORK: Contractor shall provide all labor, materials, and equipment necessary to complete the following noted below: 1. All work in this contract shall be completed in USCG STA Sand Key 1375 Gulf Blvd Clearwater, FL 33767 2. Both SCU’s (spill containment unit) have corrosion on the outside of the SCU’S. Treat/remove corrosion on DSL (Diesel) and RUL (Regular Unleaded) spill containment units. 3. Label and calibrate DSL and RUL clock gauge so that a high level 90% warning alarm will sound if tank is filled past capacity. Additionally, provide testing once repairs are made and submit to unit for record keeping. 4. Treat/remove corrosion both DSL and RUL tanks and all associated piping, apply environmentally safe paint to the entirety of both tanks and associated piping additionally attach appropriate markings on both tanks IAW local, state, and county regulations (capacity, description, ect.) 5. Investigate and make repairs to both DSL and RUL dispensers to correct flow rate. 6. Investigate and make repairs to both DSL and RUL UDC’s (under dispenser containment) complete integrity test once repairs are made and submit to unit for records keeping. 7. Complete integrity test for 03 transition sumps, make any necessary repairs and provide testing records to unit after any repairs are made for records keeping. 8. Investigate and make repairs to or replace leak detection panel and sensors, to ensure system operates correctly, additionally label monitoring panel for each leak detector location. 9. Conduct Line leak detection on all fuel lines, and make any repairs that are needed, provide test results to unit for records keeping. 10. Replace non-compliant section of copper fuel piping and components that supply emergency generator tank. 11. Contractor will work with unit to ensure the units does not lose the ability to fuel vessels while repairs are taking place. 12. Contractor will test run system after all repairs are made to ensure system operation. 13. Contractor shall provide dumpster AS NEEDED and shall be responsible for all cleanup of the project area. 14. Contractor shall be responsible for the removal of the dumpster once the project is complete. 15. Contractor shall protect all equipment and merchandise in work locations. 16. All work must be approved by the Contracting Officer’s Representative SECTION 4: SITE-SPECIFIC REGULATIONS & SECURITY REQUIREMENTS 1. Security & Personnel Screening: a. Only U.S. citizens and lawful permanent resident aliens are permitted on the installation. Foreign nationals are strictly prohibited. b. The contractor must submit a roster of all personnel (including subcontractors) containing full legal names and driver’s license numbers (or valid government ID) prior to or on the Notice to Proceed (NTP) date. c. All personnel, vehicles, equipment, and packages are subject to search at any time by Coast Guard security. 2. Military Customs & Flag Etiquette: a. Morning Colors (0800) and Evening Colors (Sunset): All personnel on base must halt vehicles/equipment, face the national ensign/flagpole, and observe silence during the playing of the National Anthem or bugle calls. 3. Traffic & Safety Rules: a. Installation speed limit is 15 MPH. b. Cellular phone use while driving or operating equipment on base is prohibited. c. Smoking is restricted to the designated smoking area (southeast corner near dumpsters). d. Firearms and weapons are strictly forbidden. 4. Safety & Environmental Compliance: a. Contractor shall comply with OSHA Construction Standards (29 CFR Part 1926). b. A written Site Safety Plan must be submitted prior to commencement of work per FAR 52.236-13, naming the designated site safety supervisor. c. Notify the COR immediately of any lost-time accidents, followed by copies of accident reports by 1200 the following business day. 5. Utility Verification & Weather Contingencies: a. The contractor is responsible for locating and protecting all existing underground and aboveground utilities prior to disturbing surfaces. b. In the event of tropical storm/gale force wind warnings, the contractor must immediately secure all scaffolding, equipment, loose materials, and containers. SECTION 5: SITE VISIT • Pre-Proposal Site Visit: o An organized site visit is scheduled for: NOV 04, 2026 at 10am EST. o Location: USCG Station Sand Key, 1375 Gulf Blvd, Clearwater, FL 33767. SECTION 6: EVALUATION CRITERIA (FAR 52.212-2) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. Award will be made based on: • Evaluation Basis: Best Value Tradeoff o Technical Capability: Compliance with all SOW requirements and demonstrated ability to maintain fuel availability. o Past Performance: Record of satisfactory past performance on similar commercial or government fuel infrastructure projects. o Price: Price reasonableness. SECTION 7: APPLICABLE CLAUSES & PROVISIONS The following Federal Acquisition Regulation (FAR) and Homeland Security Acquisition Regulation (HSAR) provisions and clauses apply: • FAR 52.204-7, System for Award Management • FAR 52.204-13, System for Award Management Maintenance • FAR 52.204-24 / 25 / 26, Representation Regarding Certain Telecommunications • FAR 52.212-1, Instructions to Offerors – Commercial Products and Commercial Services • FAR 52.212-2, Evaluation – Commercial Products and Commercial Services • FAR 52.212-3, Offeror Representations and Certifications – Commercial Products and Commercial Services • FAR 52.212-4, Contract Terms and Conditions – Commercial Products and Commercial Services • FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders – Commercial Products and Commercial Services • FAR 52.236-12, Cleaning Up • FAR 52.236-13, Accident Prevention • HSAR clauses as applicable to DHS acquisitions.
72%
Combined Synopsis11/13/2026
The 375th Contracting Squadron is performing Market Research to identify potential SBA-certified Women-Owned Small Businesses (WOSB) under NAICS 237120 (Oil and Gas Pipeline and Related Structures Construction) with the qualifications, licenses, and technical capabilities to perform electrical conduit repair, drop tube replacement, and overfill alarm installation across designated fueling facilities at Scott Air Force Base, IL. Please contact MSgt Nolan Strange, nolan.strange.1@us.af.mil or Mr. Jody Noram, jody.noram.1@us.af.mil if you have any questions or concerns. DISCLAIMER: This Sources Sought is issued solely for information and planning purposes. It does not constitute a Request for Proposal (RFP), Invitation for Bid (IFB), or Request for Quotation (RFQ), nor does it guarantee a future solicitation will be issued. The Government will not reimburse respondents for any costs associated with preparing or submitting information in response to this notice. 3. Capability Statement Submittal Requirements Interested vendors possessing the required expertise, equipment, and certified personnel are invited to submit a Capabilities Statement (maximum 5 pages) addressing the following: Company Information: Company name, address, SAM Unique Entity Identifier (UEI), CAGE Code, Point of Contact (name, email, phone), and Socioeconomic status (e.g., 8(a), SDVOSB, WOSB, HUBZone, Small Business). Technical Capabilities & Experience: Summary of relevant past performance completed within the last three (3) years on underground storage tank (UST) fueling systems, conduit breakout/pour-back, overfill drop tube replacements, and Veeder-Root or automatic tank gauge (ATG) sensor/alarm installations. Licensing & Certifications: Confirmation that personnel hold required state/local UST service technician certifications, Veeder-Root certified installer/technician credentials, and applicable electrical licensing. Rough Order of Magnitude (ROM): Optional feedback on typical lead times, mobilization timeframes, and commercial pricing structure for tasks of this nature. PART 2: STATEMENT OF WORK (SOW) 1.0 Objective & Overview The Contractor shall furnish all necessary labor, supervision, materials, tools, equipment, testing apparatus, and transportation (except for specified Government/Owner-Furnished Equipment) to perform concrete breakout and conduit correction, electrical re-wiring, drop tube replacement, and overfill alarm installation across designated fueling facilities. 2.0 Detailed Scope of Work by Facility and Task TASK AREA 1: Premium Tank Sump Conduit Repair & Electrical Remediation The Contractor shall repair incorrectly poured conduit serving the Premium tank sump, complete necessary electrical re-pulls, and restore the concrete pad to original structural grade. Demolition & Concrete Breakout: Precision sawcut and breakout existing concrete around the Premium tank sump to expose the buried conduit line. Protect adjacent sump structures, lid seats, and underground utilities from collateral damage during breakout operations. Conduit Clearing & Realignment: Cut apart the obstructed/incorrect conduit run and clear out concrete or foreign debris resulting from the prior incorrect pour. Reconnect the conduit run using code-compliant, liquid-tight, fuel-resistant fittings and conduit rated for Class I, Division 1/2 hazardous fuel environments. Ensure proper pitch, sealing, and alignment. Electrical Wiring & Terminations: Pull new electrical conductors/wiring from the main building panel/control area to the tank sub-unit junction box in accordance with the National Electrical Code (NEC/NFPA 70). Terminate all wiring connections, verify seal-offs, and conduct comprehensive continuity, insulation resistance (megger), and operational tests to ensure proper equipment operation. Civil Restoration: Backfill excavated trench using suitable aggregate, compacted in uniform lifts to match surrounding base compaction specifications. Form and pour back high-early-strength concrete to match the existing grade, thickness, and finish of the fueling apron. TASK AREA 2: Facility 6047806 – Tank 3 Drop Tube Replacement The Contractor shall remove obsolete fill hardware and install a compliant drop tube assembly on Tank 3. Hardware Removal & Disposal: Remove the existing fill adapter, fill cap, and drop tube assembly. Safely load, manifest (if required), transport, and legally dispose of all obsolete components off-site in compliance with all local, state, and federal environmental regulations. Furnish & Install New Hardware: Furnish and install one (1) new OPW overfill prevention drop tube (or Government-approved equal), one (1) new fill adapter, and one (1) new heavy-duty locking cap. Special Technical Condition: Work assumes the existing drop tube is removable without structural failure and the existing spill container (spill bucket) remains sound and reusable. If the drop tube is seized or the spill bucket is found to be compromised/damaged, the Contractor shall immediately notify the Contracting Officer Representative (COR). Any required replacement of seized components or spill containers shall be evaluated and authorized via a formal bilateral change order prior to proceeding. Regulatory Compliance Verification: Set and verify that the drop tube shutoff mechanism operates at the exact level mandated by 40 CFR Part 280 / state UST regulations (e.g., 95% tank capacity shutoff or 90% flow restriction). Deliverables & Documentation: Document pre-work conditions, intermediate installation stages, and final configuration with high-resolution digital photographs. Submit photos and completed compliance checklist with the final job completion paperwork. TASK AREA 3: Facility 6047801 – Overfill Alarm Installation The Contractor shall remove the existing overfill alarm and install owner-provided Veeder-Root monitoring hardware. Demolition: Disconnect and remove the existing overfill alarm unit; transport and dispose of all removed scrap components off-site. Installation of Government/Owner-Furnished Equipment (GFE/OFE): The Government/Owner will provide: One (1) Veeder-Root Overfill Alarm (Part # 790091-001 / SKU: 790091-001) One (1) Veeder-Root Universal Sensor Mounting Kit (Part # 330020-012 / SKU: 330020-012) The Contractor shall furnish all certified labor, wiring, hardware, seals, and incidental consumables to properly mount, wire, and integrate the alarm with the existing automatic tank gauge (ATG) system. Testing & Commissioning: Perform functional operational checkout of the Veeder-Root alarm and sensor assembly to verify positive alarm annunciation and correct signal communication to the console. Deliverables & Documentation: Take detailed digital photographs of the completed installation, wiring junction, and console status screen indicating an operational, alarm-free condition. Submit completion paperwork and test verification logs to the COR. 3.0 Site Cleanup, Waste Management & Housekeeping Debris Haul-Off: The Contractor shall continuously maintain a clean and safe work zone. Upon completion of each task, the Contractor shall collect, load, haul off, and legally dispose of all concrete rubble, excavated soils, cut conduit, old wiring, discarded drop tubes, and packaging debris. Hazardous Materials: Any fuel-wetted materials or petroleum rags generated during servicing shall be managed and disposed of in accordance with applicable RCRA and local environmental standards. 4.0 Submittals and Deliverables Deliverable Site Safety Plan & AHAs Activity Hazard Analysis for sawcutting, confined spaces, and hazardous fuel zones Technician Certifications Veeder-Root certified technician & state UST licenses With quote / proposal submittal Drop Tube Compliance Verification Documented drop tube shutoff height calculation and verification sheet Photo Documentation Package Clear digital photos showing before, during, and after conditions for all tasks Disposal Manifests/Receipts Proof of lawful disposal for concrete and metallic/fuel-wetted scrap 5.0 Safety, Code Compliance & Working Conditions Safety Regulations: All work shall comply with OSHA 29 CFR 1910 and 1926 standards, NFPA 30 (Flammable and Combustible Liquids Code), NFPA 30A (Motor Fuel Dispensing Facilities), and NFPA 70 (National Electrical Code). Hot Work & Hazardous Locations: Sump areas represent Class I, Division 1/2 environments. The Contractor shall implement atmospheric monitoring (LEL meters) and obtain all required hot work permits before operating saws, cutting tools, or electrical equipment near open sumps.
72%
Market Research10/30/2026
59%
AwardedOpen
On or about 20 May 2026, Government intends to issue a solicitation for ?Grand Forks Fueling System Repair.? The solicitation will close on or about 15 June 2026. This solicitation will be 100% set-aside for Small Business.
53%
Pre-SolicitationOpen

Additional Details

Solicitation Number

36C24626Q0243

Archive Date

Feb 13, 2026

Office Address

HAMPTON, VA, 23667