Y1LZ--Warehouse Exterior Improvements
Awarded on August 26, 2026. Full description on SAM.gov.
Overview
- Posted
- August 26, 2026
- Notice type
- Award Notice
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- NAICS
- 238990: All Other Specialty Trade Contractors
- Agency
- Department of Veterans Affairs
Notice details
- Office
- 246-NETWORK CONTRACTING OFFICE 6 (36C246)
- Place of performance
- Hampton VA Medical System, Hampton, Virginia, 23667
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
- Award date
- Aug 26, 2026
- Award amount (SAM.gov award notice)
- $125.6K
Identifiers
- Solicitation number
- 36C24626Q0638
- Notice ID
- 80f56ea5053f4e7389494fd9b3ed1654
- Award number (PIID)
- 36C24626P0977
Description
Award Overview
Award Number
36C24626P0977
Award Amount (SAM.gov award notice)
$125.6K
Award Date
Aug 26, 2026
Awardee
Awardee UEI
GJMLVWMLBMN4
Awardee CAGE Code
7Y3P6
Awardee Address
VIRGINIA BEACH, VA 23456, VA
Original Solicitation
Notice ID: 80f56ea5053f4e7389494fd9b3ed1654
Posted Date: Aug 26, 2026
Original Response Deadline: Not specified
Contacts
Contracting Officer
Primary Contact
Documents
Files (13)
- Download
36C24626Q0638 0002.docx
19 KBAdded in Solicitation version 7Posted - Download
Attachment AA - pictures.docx
39 MBAdded in Solicitation version 3Posted - Download
Attachment AA - pictures.docx
39 MBAdded in Solicitation version 2Posted - Download
36C24626Q0638 0001.docx
16 KBAdded in Solicitation version 3Posted - Download
36C24626Q0638 0001.docx
16 KBAdded in Solicitation version 2Posted - Download
Attachment F - VA20260195.txt
12 KBAdded in Solicitation version 2Posted - Download
Attachment E - Facility Site Survey.pdf
42 MBAdded in Solicitation version 2Posted - Download
Attachment D - 32_05_23_Cement_and_Concrete_for_Exterior_Improvements.docx
44 KBAdded in Solicitation version 2Posted - Download
Attachment C - 01_35_26_Safety_Requirements.docx
91 KBAdded in Solicitation version 2Posted - Download
Attachment B - Construction Safety Pamphlet.pdf
3.2 MBAdded in Solicitation version 2Posted - Download
Attachment A - Site Visit.docx
2.5 MBAdded in Solicitation version 2Posted - Download
36C24626P0977_1.docx
14 KBAdded in Award Notice version 2Posted - Download
36C24626Q0638_1.docx
2.2 MBAdded in Solicitation version 2Posted
Lifecycle
- 3Version 3SolicitationArchived
Y1LZ--Warehouse Exterior Improvements
- 2Version 2Award NoticeCurrent
Type changed from Solicitation to Award Notice
Y1LZ--Warehouse Exterior Improvements
Other notices for this solicitation
- Market ResearchRelated noticeMay 27, 2026
Y1LZ--Warehouse Exterior Improvements
- SolicitationRelated noticeJul 2, 2026
Y1LZ--Warehouse Exterior Improvements
- SolicitationRelated noticeAug 4, 2026
Y1LZ--Warehouse Exterior Improvements
- SolicitationRelated noticeAug 4, 2026
Y1LZ--Warehouse Exterior Improvements
- AwardedRelated noticeAug 26, 2026
Y1LZ--Warehouse Exterior Improvements
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
This is an award notice for solicitation 36C24626Q0638. | 100% | Awarded | Open |
The Washington Air National Guard, 194th Wing at Camp Murray requires to complete government vehicle parking area and roadway surfaces at the new ASOG Complex, building 140. This project will include asphalt paving, concrete curbing, retaining wall construction, covered parking installation, and well as some lighting and security fence installation. Amendment 0003 is to update and correct some information to avoid confusion. See W50S9E26BA0002P00003 SF30 for list of changes. This update is to correct the closeout date and time for the solicitation module only, no other changes occured. | 57% | Solicitation | 10/15/2026 |
Department of Veterans Affairs Salem VA Medical Center 1970 Roanoke Blvd, Salem, VA 24153 Statement of Work (SOW) Project Title: Dock and Dock Plate Replacement – Buildings 14 & 15 Facility: Salem VA Medical Center (VAMC) Date: May 14, 2026 1. Scope of Work The contractor shall furnish all labor, materials, equipment, and supervision required to remove and replace existing dock plates and perform associated concrete and structural work at Buildings 14 and 15, Salem VAMC. All work shall comply with VA standards, local building codes, and OSHA safety requirements. 2. Description of Work Building 14 Remove existing dock plate. Sawcut and remove approximately 14 ft × 50 ft of asphalt. Remove approximately 50 ft of existing curb. Excavate for new footing at existing dock wall to extend dock area. Form and pour new 4 ft × 1 ft × 14 ft retaining wall with 4×4 steel angle on edge. Form and pour new 6 in × 18 in × 50 ft curb. Form and pour new concrete drive (14 ft × 50 ft × 6 in), sloped to allow trucks to back up level with dock. Extend existing handrail by 2 ft. Install new 4 in × 10 in × 14 in rubber dock bumpers. Building 15 Remove existing pit leveler and associated equipment. Infill existing pit with #57 gravel. Sawcut back of pit at cantilever. Pour new 4 in concrete slab pinned to existing foundation. Install new 4 in × 4 in pit leveler frame and pour concrete perimeter. Install new 6 ft × 8 ft hydraulic pit leveler and 4 in × 10 in × 14 in dock bumpers. 3. Performance Standards All work shall: Meet VA design and construction standards. Comply with Applicable Sections of the VA Electrical, Structural, and Safety Guidelines. Be executed following OSHA safety practices. Be completed per approved construction drawings and specifications. Ensure new concrete and metal installations are level, aligned, and finished to VA quality standards. 4. Schedule and Coordination Work schedule shall be coordinated with the VA Engineering Service prior to mobilization. Contractor shall provide a minimum 48-hour work notice for any activity affecting operations. Access to work areas shall be limited to authorized personnel only. 5. Safety and Environmental Requirements The contractor shall maintain a safe work environment at all times. All waste materials shall be removed and disposed of in accordance with EPA and local regulations. Contractor shall ensure dust control and minimal disruption to medical center operations. 6. Inspection and Acceptance All work will be inspected by the VA contracting officer’s representative (COR). Final acceptance will occur after successful inspection and demonstration of functionality of all installed components. Period of Performance is 120 days from issuance of Notice to Proceed (NTP). | 48% | Solicitation | 09/15/2026 |
Revised Sources Sought KENAI NWR Visitor Ctr EXTERIOR WOOD REFINISH | 46% | Market Research | 03/02/2026 |
The Red Wolf Recovery Program¿s Sandy Ridge Facility uses 16 holding pens to temporarily house red wolves and coyotes for treatment, acclimation, and other management needs. The facility¿s 2,500-foot double-perimeter fence has deteriorated over time, reducing its effectiveness at containing wildlife and preventing outside access. The project will remove the damaged inner fence, repair the existing outer fence, and remove one deteriorated holding pen to allow a section of fence to be relocated from standing water to higher ground. | 46% | Pre-Solicitation | 11/24/2026 |
Additional Details
Solicitation Number
36C24626Q0638
Archive Date
Dec 3, 2026
Office Address
HAMPTON, VA, 23667