GovChime
Notice ID: 30b02c560c7d43b0a168ab03fd766cc5Combined Synopsis/Solicitation

J045--534-20-2-5088-0014, Chiller Maintenance and Repairs, Base +4

Archived on May 31, 2020. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
11:59 PM UTC−05:00
Posted
February 12, 2020
Notice type
Combined Synopsis/Solicitation
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
NAICS
238220: Plumbing, Heating, and Air-Conditioning Contractors
Agency
Department of Veterans Affairs

Notice details

Office
247-NETWORK CONTRACT OFFICE 7 (36C247)
Place of performance
Department of Veterans Affairs;Ralph H. Johnson VA Medical Center;Attn: Engineering Services;109 Bee Street;Charleston, SC, 29401-5799
Last updated
Dec 6, 2025

Identifiers

Solicitation number
36C24720Q0252
Notice ID
30b02c560c7d43b0a168ab03fd766cc5

Description

VHAPM Part 813.106-1/2 SAP: Soliciting Competition & Evaluation of Quotations/Offers Page 1 of 4 Original Date: 10/12/17 Revision 01 Date: 01/08/18 COMBINED SYNOPSIS/SOLICITATION FOR COMMERCIAL ITEMS General Information Document Type: Combined Solicitation/Synopsis Solicitation Number: 36C24720Q0252 Posted Date: 02/12/2020 Original Response Date: 02/22/2020 Current Response Date: 02/22/2020 Product or Service Code: J045 Set Aside (SDVOSB/VOSB): SDVOSB NAICS Code: 238220 Contracting Office Address NCO 7 Contracting Office Department of Veterans Affairs Ralph H. Johnson VA Medical Center 109 Bee St Charleston, SC 29403-5799 Description This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Items, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested, and a written solicitation document will not be issued. This solicitation is a Request for Quotations (RFQ). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2020-04. The associated North American Industrial Classification System (NAICS) code for this procurement is 238220, with a small business size standard of $15.0M. The Engineering Service Department at the Ralph H Johnson VA Medical Center, 109 Bee Street, Charleston, SC is seeking to purchase preventative maintenance for a Chiller and Tower. This requirement is for a base year and four (4) one-year option periods. All interested companies shall provide offer(s) for each period of performance in their response and to include a grand total for base year and 4 one-year option periods. Line Item Description Quantity Unit Price Total Price 0001 Chiller and Tower Maintenance and Repairs. Chiller and associated equipment in located C-104 and Tower located in Boiler Plant Court yard at Ralph H. Johnson, VAMC. Vendor shall provide all personnel, materials and equipment to conduct scheduled maintenance, regular and emergency repairs in accordance with the Statement of Work. This is for a Base plus 4 option year contract. Base year Period of Performance is 3/1/2020 to 2/28/21. 1 YR 1001 Chiller and Tower Maintenance and Repairs. Chiller and associated equipment in located C-104 and Tower located in Boiler Plant Court yard at Ralph H. Johnson, VAMC. Vendor shall provide all personnel, materials and equipment to conduct scheduled maintenance, regular and emergency repairs in accordance with the Statement of Work. This is for a Base plus 4 option year contract. Base year Period of Performance is 3/1/2021 to 2/28/22. 1 YR 2001 Chiller and Tower Maintenance and Repairs. Chiller and associated equipment in located C-104 and Tower located in Boiler Plant Court yard at Ralph H. Johnson, VAMC. Vendor shall provide all personnel, materials and equipment to conduct scheduled maintenance, regular and emergency repairs in accordance with the Statement of Work. This is for a Base plus 4 option year contract. Base year Period of Performance is 3/1/2022 to 2/28/23. 1 YR 3001 Chiller and Tower Maintenance and Repairs. Chiller and associated equipment in located C-104 and Tower located in Boiler Plant Court yard at Ralph H. Johnson, VAMC. Vendor shall provide all personnel, materials and equipment to conduct scheduled maintenance, regular and emergency repairs in accordance with the Statement of Work. This is for a Base plus 4 option year contract. Base year Period of Performance is 3/1/2023 to 2/28/24. 1 YR 4001 Chiller and Tower Maintenance and Repairs. Chiller and associated equipment in located C-104 and Tower located in Boiler Plant Court yard at Ralph H. Johnson, VAMC. Vendor shall provide all personnel, materials and equipment to conduct scheduled maintenance, regular and emergency repairs in accordance with the Statement of Work. This is for a Base plus 4 option year contract. Base year Period of Performance is 3/1/2024 to 2/28/25. 1 YR Services STATEMENT OF WORK GENERAL INFORMATION 1. Title of Project Chiller Maintenance 2. Scope of Work: The contractor shall provide full maintenance on the Chillers at the R.H. Johnson VA Medical Center (RHJVAMC). This includes parts, materials, technicians and supervisors necessary to conduct all required maintenance per the operations and maintenance manual of the equipment. 3. Background: The previous Chiller maintenance contract will expire 2/29/2020 4. Performance Period: The contractor shall complete the work required under this SOW, for a Base (with four option years). 5. Type of Contract: Firm-Fixed-Price B. GENERAL REQUIREMENTS The Contractor shall be fully responsible and accountable for the operation of all equipment beginning on the date specified in the Notice to Proceed. These specifications are a statement of the minimum level of work and services that are to be provided under this contract. They are not intended to be, nor shall they be construed as, limiting specifications or requirements. At a minimum, the contractor shall be required to take all steps and measures which would be taken by a prudent building owner to maximize the life expectancy and minimize downtime of the chillers and related systems and ensure safe and reliable operation. In addition, the Contractor shall be responsible for all costs associated with accomplishing repairs and replacements, including labor, equipment, and supplies for all equipment and systems specified or recommended by the system manufacturer. The Contractor shall develop and implement a preventive maintenance (PM) program, performed during normal hospital working hours acceptable to the Contracting Officer Technical Representative (COTR) or designee. All equipment shall be maintained in accordance with the manufacturer's recommendations, the best practices of the industry, and applicable codes, standards, and regulations. If a conflict arises between these standards, the most stringent will prevail. The PM program must be acceptable to the COTR or designee prior to the commencement of the contract period. The Contractor shall provide a reliable and well-trained contractor maintenance technician on-site as needed to provide non-emergent preventive maintenance and emergent services, as needed, during normal working hours, Monday through Friday, 8:00 am to 4:00 pm except for national holidays. The Contractor shall maintain a log in a designated VA location. Log shall be annotated at the end of each maintenance/inspection. The log shall identify each chiller, date and time of inspection maintenance/inspection performed, repairs needed. Overall condition of the chillers. If repairs require work outside the scope of routine maintenance, the contractor shall notify the COTR or designee for direction. Contractor shall not perform chargeable work until authorized by the COTR or designee. All scheduled work that requires a chiller to be taken out of service shall be coordinated with the COTR or designee and the contractor shall report to the COTR or designee the status of equipment or systems not operating by the close of each workday. Any equipment or system not operational by the official start time of the occupants shall be reported to the COTR or designee by 8:00 a.m. that day. The Contractor shall maintain the machinery spaces, shops and storage areas in a clean and orderly manner. When work is performed in these areas, the Contractor's personnel shall clean up all debris and leave the area in a presentable condition. The Contractor must obtain the approval of the COTR or designee before storing anything in machinery spaces. Operating supplies such as lubricants, rags, cleaners, etc., shall be properly secured in containers approved by the COTR or designee. Storage shall not negatively impact the means of egress, fire protection systems, and emergency lighting; nor, shall it significantly increase the amount of combustible material in the machinery space. Clearances from electrical equipment shall be maintained as required by NFPA 70, the National Electrical Code. SCHEDULED MAINTENANCE The Contractor shall provide full service to include routine and emergency maintenance and repair to the RHJVAMC installed chiller equipment. This will include all supervision, labor, tools, and parts as necessary to maintain the listed centrifugal chillers and associated equipment (to include primary chill water pumps, condenser pumps, and towers) in operational condition according to the manufacturer s specifications. For FY 2020, the first maintenance period will be scheduled within 30 days of award of contract, and the work completed within ten (10) working days of scheduled start date. After that maintenance period, the Contractor shall perform quarterly maintenance inspections to performed at three (3) month intervals (March, June, September, December). These inspections are to be scheduled at least 30 days in advance with the Chiller Plant Supervisor and/or the Maintenance and Operations Supervisor and are to be completed by the tenth (10) working day of each month as specified above. The Contractor must respond to emergency calls within one (1) hour of notification and must report to the RHJVAMC within two (2) hours. PMs will be performed in accordance with manufacturer s instructions and will include, as a minimum, visual inspections, calibration checks, cleaning and lubrication, electrical checks and performance checks. The Contracting Officer s Technical Representative (COTR) for RHJVAMC is the Boiler/Chiller Plant Supervisor. The Contractor shall reference the Equipment Entry (EE) Number on all documentation once it is made available. See below for list of chillers and EE numbers (when issued). Inspection and Preventative Maintenance will include, as a minimum: Quarterly: General: Check general condition of equipment. Record a running log of pertinent system temperatures and pressures. Provide a written report of activities completed; indicate detected deficiencies, and repairs/calibrations performed. Check all thermometers and gauges on condenser and evaporator, calibrate as necessary. Check system and auxiliary water strainers and clean as required. Check all sight glasses. Record running amps and voltages. Record condenser and evaporator pressure drops Record water temperatures into and out of condenser and evaporator. Record refrigerant temperatures and pressures. Record oil temperatures and pressures. Record bearing temperatures. Service purge units and check operation Remove and clean purge condenser, oil separator, and compressor. Add new change of oil to oil separator and compressor. Recondition purge float valve and reseat as required. Lubricate purge/compressor motor and inspect. Set oil heater control. Check final purge operation and relief valve setting. Check purge unit controls and calibrate. Megger check the purge motor. Weight and replace purifier charcoal tank as applicable. Control panel test and calibration of controls Check and calibrate low temperature control. Check and calibrate high pressure control. Check and calibrate motor temperature control. Check and calibrate oil pressure relief valve setting. Check and calibrate load timing relay. Check and calibrate PE transducers/transmitters. Check and calibrate temperature controls for leaving chilled water. Check and calibrate gauges. Lubricate vane control shaft. Set vane operator. Lubrication systems Megger check the oil pump motor Replace oil strainer cartridges Provide oil sample for spectrographic analysis Check operation of cooling system Clean oil cooling water strainer Inspect oil heaters Change oil with approved type when indicated by analysis Remove oil sump cover, oil pump and motor assembly, flush oil sump thoroughly clean. Control Panel safety controls Check and calibrate all safety and interlocking controls Set in accordance with (IAW) manufacturer s specifications Testing and calibration shall be as required by the manufacturer s guidelines and maintenance manuals. Pumps and Towers (per manufacturers operations and maintenance manuals) Check running currents and motor temperatures, if conditions indicate, megger pump motors. Check strainers, clean and repair as necessary. Lubricate bearings and take vibration readings, if vibration readings are out of tolerance, replace bearings and seals as necessary. Lubricate tower fan motors as necessary, check running currents and temperatures, megger if conditions indicate, check vibration levels, replace bearings if necessary. Lubricate tower fan bearings, inspect and clean fan blades, check belts and replace as necessary. Clean tower basins and air intake diffusers as needed. Chiller Control System Pull alarm log from chiller plant control system and investigate all priority alarms Run overrides report Examine setpoints and current operating conditions Use data logs to investigate any abnormalities Repair, replace and calibrate any sensors found to be discrepant. Groom control system to ensure most efficient operation of total system. Annual Perform annual inspection list from Trane Installation, Operation and Maintenance Manual for Chillers 5, 6 and 8. Perform annual maintenance for chiller purge units per the Earthwise Purge System Operation and Maintenance Manual Perform annual maintenance for Chiller 7, Multistack unit per the Installation, Operation and Maintenance manual. Documentation The Contractor shall prepare a full report containing all inspection data to include, but not limited to, oil analysis, pressure and temperature data, materials and parts used, electronic analysis, deficiencies found, and corrective actions taken for each individual machine. Two hard copies of the report, in binder or hard bound, shall be delivered to the Chiller Plant Supervisor and/or M&O Supervisor. The Contractor shall also provide the report in electronic format (such as PDF). Documentation shall contain EE numbers. Submittals: Within 15 calendar days after award, the contractor shall submit to the CO the following: Two (2) bound copies of the preventative maintenance manual. List of chemicals and current MSDS to be used on contract. List of Contractor s contact information, including telephone numbers, to be used by RHJVAMC. Perform Monthly Chiller Performance Report Total Run Hours % vs Last Month s Total Run Hours % vs Last Year s Total Run Hours Total Life of Equipment Total Starts Per month % vs Last Month s total Starts % vs Last Year s Total Starts Avg Daily Starts % vs Last Month s avg Starts % vs Last Years avg Starts Total Life of Equipment Condenser Heat Transfer Rolling 6 months approach vs RLA Evaporator Heat Transfer Rolling 6 months approach vs RLA Plant Load Analysis Two- hour increments per day each month Response to service calls: For repairs and/or service calls, the Contractor must report to: Normal working hours Monday through Friday from 07:00 to 17:00 excluding holidays. Contractor will sign in and obtain an identification (ID) badge, badge must always be worn while Contractor is on station. Upon completion of work on station, a service report must be submitted to and the ID badge must be returned. Other than normal working hours Contractor will report to the Boiler Plant Operator, who will contact the VA Police. The VA Police will sign the Contractor in and provide an ID badge, which must be worn while on station. Upon completion of work, Contractor will return ID badge to VA Police and sign out. Contractor will submit a complete service report within five (5) working days. Hours of Work This is a full-service contract to include all necessary repairs and/or service calls seven (7) days/week, 24 hours/day, including all holidays. Failure to Respond For failure to respond to a repair and/or service call within one (1) hour, or failure to be on station within two (2) hours of being notified of need of service, a deduction of 1/10th of the quarterly rate will be taken for each day that a machine is inoperable. Furthermore, failure to perform any of the services set forth by this contract will be considered basis for invoking provisions of default. Additional Services The Contractor guarantees all equipment covered in this contract shall be in optimum working condition at the expiration of this contract, provided the Contractor is notified of the deficiencies at least one month before the contract expires. All changes, updates, or retrofits made on any component or system shall be annotated on VA s copy of equipment manuals, drawings, and records. Authorized Services Only those services specified within the contract are authorized. Before performing any service or repair of a non-contract nature, the Contractor must notify the CO and the COTR of the nature and reasoning for such additional work. If appropriate, the CO, or COTR may authorize the additional services or repairs under a separate purchase authorization. Reconditioning Reconditioning and/or extensive repair work determined by the CO to be beyond the scope of this contract and/or not economically feasible is not included in this contract. The Government reserves the right to obtain such services from other than listed Contractor. Discontinuance of Service The Government reserves the right to terminate service on a machine/equipment in part or in whole upon 30 days notice to the Contractor. Payment will be prorated accordingly. Subcontracting Due to the complexity of the services required herein, subcontracting will not be permitted. Parts The Contractor shall furnish only new, standard parts if parts are necessary for a machine that is not under warranty. All parts will be of current manufacture and have compatibility with installed equipment. All newly installed parts become the property of the Government. Replaced parts will be disposed of by the Contractor after obtaining approval from the COTR. Any worn or defective parts will be replaced at no additional cost to the Government. Operating and consumable supplies are not part of this contract. Test Equipment The Contractor shall provide all test equipment necessary for the execution of this contract. The Government will not furnish parts and/or test equipment in performance of this contract. Obsolete equipment/machines Service under this contract will not cover obsolete equipment and/or machines where parts for such equipment and/or machines are not available from the original manufacturer s commercial parts list, unless mutually agreed to by the CO and COTR. Safety Standards The Contractor is required to adhere to all VA, OSHA, and EPA safety related policies, procedures, standards and regulations. The Contractor shall convey to its personnel and consultants the appropriate information regarding safety requirements, including the requirement for hazard communication. The Government shall provide the Contractor a copy of its facility safety program procedure, facilities lock-out/tag-out procedures, and Hazard Communications Program. The Contractor shall provide protective equipment to Contractor s personnel as required for execution of the requirements under this contract. The Contractor shall maintain a listing of all chemicals and current MSDS for all chemicals used in execution of this contract during on-site performance. List of Chillers and support equipment included in service and support contract: Chiller #5 is a Trane CenTraVac model CVHF910, Serial L13H03703, 1750 lbs of R123. Chiller #6 is a Trane CenTraVac model CVHF1070, Serial L14M05210 1450 lbs of R123. Chiller #7 is a Multistack heat recovery unit, Model MS050XC1H2H2AAC using R410A. Chiller #8 is a Trane CenTraVac model CVHF1070, Serial L15H04391, 1450 lbs of R-123. P-5, P-6 and P-14 are primary chill water pumps, 50 HP motor and pump P-7, P-8 and P-9 are condenser pumps, 75 HP motor and pumps with associated strainers The tower free cooling heat exchanger is associated with pumps P-12 and P-13 Multistack hot and chill water pumps are P-10 and P-11 Towers are numbered 5, 6 and 7, Evapco stainless steel, elevated 1000 tons/each. Chillers and towers are run by Trane control system with Bray valves for isolation. Trane chiller plant control system, associated controllers, and sensors. C. CHANGES TO STATEMENT OF WORK Any changes to this SOW shall be authorized and approved only through written correspondence from the CO. A copy of each change will be kept in a project folder along with all other products of the project. Costs incurred by the contractor through the actions of parties other than the CO shall be borne by the contractor. D. REPORTING REQUIREMENTS The Contractor shall obtain all necessary licenses and/or permits required to perform the work. In addition, the Contractor shall provide the COTR with a copy of any licenses and/or permits obtained. E. TRAVEL All work is to be conducted at the Ralph H. Johnson VAMC located at 109 Bee Street, Charleston, South Carolina. The contractor is responsible for any anticipated travel and per diem. F. GOVERNMENT RESPONSIBILITIES The VA shall grant the Contractor and its Subcontractor permission to all areas of the Ralph H. Johnson VA Medical Center that are required access to provide the Elevator Renovations. Chiller contractor shall be a licensed chiller contractor and shall have a minimum of three years of successful experience, trained supervisory personnel, experience with installing and repairing chillers. H. CONFIDENTIALITY AND NONDISCLOSURE It is agreed that: 1. The preliminary and final deliverables, and all associated working papers, application source code, and other material deemed relevant by VA which have been generated by the contractor in the performance of this task order, are the exclusive property of the U.S. Government and shall be submitted to the CO at the conclusion of the task order. 2. The CO will be the sole authorized official to release, verbally or in writing, any data, draft deliverables, final deliverables, or any other written or printed materials pertaining to this task order. No information shall be released by the contractor. Any request for information relating to this task order, presented to the contractor, shall be submitted to the CO for response. 3. Press releases, marketing material, or any other printed or electronic documentation related to this project, shall not be publicized without the written approval of the CO. CONTRACTOR PERSONNEL SECURITY REQUIREMENTS N/A End of Statement of Work Place of Performance Address: Department of Veterans Affairs Ralph H. Johnson VA Medical 109 Bee Street Charleston, South Carolina Postal Code: 29401-5799 Country: UNITED STATES Award shall be made to the offeror whose quotation offers the best value to the government, considering technical capability, past performance, and price. The government will evaluate information based on the following evaluation criteria: PRICE ALONE. The full text of FAR provisions or clauses may be accessed electronically at http://acquisition.gov/comp/far/index.html. The following solicitation provisions apply to this acquisition: FAR 52.212-1, Instructions to Offerors Commercial Items October 2018 FAR 52.212-3, Offerors Representations and Certifications Commercial Items December 2019 Offerors must complete annual representations and certifications electronically via the System for Award Management (SAM) website located at https://www.sam.gov/portal in accordance with FAR 52.212-3, Offerors Representations and Certifications Commercial Items. If paragraph (j) of the provision is applicable, a written submission is required. The following contract clauses apply to this acquisition: FAR 52.212-4, Contract Terms and Conditions Commercial Items October 2018 FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders January 2020 FAR 52.237-1, Site Visit April 1984 Date: February 19, 2020 Location: Ralph H. Johnson VA Medical Center Address: 109 Bee Street Charleston, SC 29401 Time: 10:00 AM EST Where: Front Lobby of Medical Center The following subparagraphs of FAR 52.212-5 are applicable: 52.204 10, 52.209-6, 52.219-6, 52.219-27, 52.219-28, 52.219-28, 52.222-3, 52.222-26, 52.222.35, 52.222-36, 52.222-37, 52.222-41, 2.222-42, 52.222-43, 52.222-55, 52.223-18, 52.225-1, 52.225-13, 52.232-33, and 52.232-34. All offerors shall submit the following: Submitted offers shall not exceed 25 single-sided pages and any pages beyond this amount will be removed and not evaluated. Files should be sent in PDF format and no larger than 10MB or they may be automatically rejected by the server. The Government is not responsible for rejected e-mails that exceed the e-mail capacity. All quotations submit shall include the Solicitation Number and Title in the subject line of the email. This is an open-market combined synopsis/solicitation for services as defined herein. The government intends to award a contract as a result of this combined synopsis/solicitation that will include the terms and conditions set forth herein. To facilitate the award process, all quotes must include a statement regarding the terms and conditions herein as follows: "The terms and conditions in the solicitation are acceptable to be included in the award document without modification, deletion, or addition." OR "The terms and conditions in the solicitation are acceptable to be included in the award document with the exception, deletion, or addition of the following: Quoter shall list exception(s) and rationale for the exception(s). Submission shall be received not later than 4:00pm (EST) on January 27. Offerors must be submitted via email to the Contract Specialist (CS), Cassandra Miller at Cassandra.miller@va.gov . ONLY ELECTRONIC MAIL (EMAIL) OFFERS WILL BE ACCEPTED. Hand deliveries or facsimile will not be accepted. Telephone responses will NOT be accepted. Late submissions shall be treated in accordance with the solicitation provision at FAR 52.212-1(f). Any questions or concerns regarding this solicitation should be forwarded in writing via e-mail no later than January 22, 2020 at 4:00 pm (EST) to Cassandra Miller, Contract Specialist (CS) at Cassandra.Miller@va.gov. No questions received after this date will be answered. Telephone or faxed questions will not be answered. ONLY ELECTRONIC MAIL (EMAIL) QUESTIONS WILL BE ANSWERED. The solicitation number must be identified on all submitted questions. Statements expressing opinions, sentiments, or conjectures are not considered valid inquiries and will not receive a response Point of Contact Cassandra Miller Contract Specialist, NCO 7 Contracting Office (90) Ralph H Johnson VA Medical Center Department of Veterans Affairs 109 Bee Street Charleston, SC 29403-5799 (843) 789-6391

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:36C24720Q0252
  1. Combined Synopsis
  1. Combined SynopsisCurrentFeb 12, 2020

    J045--534-20-2-5088-0014, Chiller Maintenance and Repairs, Base +4

    Notice 30b02c560c7d43b0a168ab03fd766cc5 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Questions and Answers 36C24727Q0050 Boiler #3 Oxygen Analyzer and Steam Flow Meter RFI Responses Where should the output signals from the new steam flow meter and O2 analyzer terminate? For example, the existing building automation system (BAS), the existing Boiler 3 burner/boiler controls, or a local display only. Burner 3 boiler/burner controls where applicable and local display. Does the government require active O2 trim control to the burner fuel/air ratio, or monitoring and display of the O2 only? Oxygen analyzer must send signals/information to combustion controls to control trim. What is the material of construction for the stack? Is it single or double wall? Stack is double walled. Inside material is steel; outside material is galvanized steel. Stack is 36 D Selkirk Metalbestos Model P.S. Current operating pressure and temperature of the system for boiler #3? Design pressure is 200 psi. Typical operating pressure is 82 psi. Typical operating temperature is about 330 degrees Fahrenheit. What are the available outputs on the physical steam flow meter (e.g., 4-20 mA, Modbus RTU, BACnet MS/TP)? 4-20 mA analog. Is the flow meter wired directly into an analog terminal block on the CB Hawk, or is it wired directly to the facility s Building Automation System (BMS)? Steam flow meter is wired into local CB Hawk analog terminal block. Please provide nameplates for the existing oxygen analyzer and steam flow meter. Oxygen analyzer nameplate: Steam flow meter nameplate:
-Combined Synopsis10/26/2026
Install Chill Water System Filtration & Steam Condensate
-AwardedOpen
RFQ 36C24827Q0061 Amendment No. 1 This amendment is hereby issued to provide responses to questions and requests for information submitted by vendors, provide a revised PWS to address a correction on Boiler #2 description, as well as an updated Price/Cost Schedule reflecting the corrected description. Description of Boiler #2 contained on PWS and associated Line Items (LINs) of Price/Cost Schedule is hereby changed to read: Boiler Unit Number 2 (Local identifier): Fire tube steam boiler manufactured by York-Shipley; Serial number 96-19937-H-11618 The due date for Quote Submittal is changed from November 6, 2026, to November 10, 2026 at 10 AM AST. All other sections of the solicitation remain unchanged. RESPONSES TO QUESTIONS RECEIVED: Q1. Semiannual Safety-Device Testing: VHA Directive 1810, Appendix A, Section 2(a), establishes that safety devices requiring semiannual testing are ordinarily tested once annually by VA medical facility personnel and once annually by a qualified testing contractor, unless an alternative arrangement is approved. Does the Government require the contractor to perform both semiannual testing events under this solicitation? If so, has the alternative testing arrangement received the required approval? VACHS Boiler Plant personnel will perform the required semiannual safety-device testing. The Contractor shall perform the safety-device testing required under the PWS during its scheduled annual inspection and testing services. Q2. Monthly Safety Device Testing: PWS Section V(Q) includes safety-device tests for which the VHA Boiler and Associated Plant Safety Device Testing Manual establishes monthly testing frequencies, including primary and auxiliary low-water cutoffs, high- and low-water alarms, and the main flame-scanner flame-out test. Does the Government require the contractor to perform these tests monthly throughout the contract period, or will VACHS personnel continue performing the monthly tests while the contractor performs the scheduled maintenance and safety-device testing services? VACHS Boiler Plant personnel will perform the required monthly safety-device testing. Q3. Frequency of Nondestructive Testing, Component Replacement and Engineering Evaluations: PWS Sections V(I), V(L), V(U), V(V), and V(W) establish requirements involving component replacement, nondestructive testing (NDT), pressure-vessel inspections, and engineering evaluations, including ultrasonic thickness measurements, magnetic-particle examinations, and assessments of maximum allowable working pressure (MAWP) and remaining useful life. However, VHA Directive 1810, Appendix B, Table 2, establishes different inspection frequencies depending on the activity. For example, annual boiler inspections are required, whereas internal deaerator weld examinations using wet magnetic-particle testing are required at six-year intervals. Clarify the following: a. Nondestructive Testing: Are ultrasonic thickness measurements and magnetic-particle examinations required annually for each boiler and the deaerator, or are these examinations required only when indicated by inspection findings, equipment conditions, or established inspection intervals? The scope of this requirement applies to the Boilers only. b. Deaerator Weld Examination: Is the six-year internal deaerator weld examination required during the base contract period or any of the option years? If so, please identify the date of the most recent examination and the next scheduled examination. Not applicable. This service is cover under another service contract c. Engineering Evaluations: Are MAWP calculations, remaining-useful-life assessments, and deterioration-rate evaluations required annually for each boiler, deaerator, and condensate return tank, or only when inspection findings or equipment conditions warrant such evaluations? Not applicable. This service is not covered under this requirement. d. Component Replacement: Are component replacements identified in the PWS mandatory during each annual maintenance period, regardless of condition, or are replacements required only when inspection or testing establishes a deficiency, except where the PWS expressly requires replacement? Mandatory parts to be replaced annually during annual maintenance, regardless of its conditions: Sight glass with new seals, Compress air belt, oil filters, air filter, water gasket seal kits and fire side gaskets seal kit. e. Firetube Inspection Methods and Waterside Deterioration: PWS Section V(U) references fiberoptic inspection of boiler tubes, while Section V(V) establishes ultrasonic thickness measurement requirements. In a firetube boiler, fiberoptic examination from inside a tube primarily evaluates its fireside surface and does not directly establish the condition of the exterior waterside surface, where corrosion and pitting may occur. Please clarify whether the Government requires fiberoptic visual examination, ultrasonic thickness measurements, or additional examination methods capable of evaluating tube-wall deterioration affecting either surface. The Government requires the inspection methods specified in the Performance Work Statement (PWS). Fiberoptic inspection and ultrasonic thickness testing are complementary requirements, and both shall be performed. f. Boiler Tube Quantities and Technical Documentation: For each boiler, please identify the total number of firetubes, nominal tube diameter, original wall thickness or gauge, and applicable tube specifications. Please provide, if available, manufacturer drawings, tube-layout diagrams, pressure-vessel drawings, or other technical documentation identifying the shell, tube arrangements, tube sheets, and applicable pressure-retaining components, so that offerors can quantify the inspection scope. The Government has provided all available identifying information and that quotes/offers should be based on the PWS requirements and field verification. g. Extent of Tube Examination and Sampling Requirements: Does the Government require examination and wall-thickness measurements of every firetube in each boiler, or is an engineer-justified representative sampling program acceptable? If sampling is permitted, please identify any minimum sample quantity or percentage, prescribed examination locations, acceptance criteria, and requirements for expanding the examination when initial results reveal pitting, corrosion, thinning, or other deterioration. May the qualified inspecting engineer establish and justify the sampling methodology based on equipment condition, applicable standards, and inspection findings? The Government does not require examination or ultrasonic thickness measurements of every firetube. The Performance Work Statement requires inspection of a representative number of tubes and ultrasonic thickness testing of representative samples, with additional testing of areas exhibiting indications of corrosion, erosion, or other deterioration. The Contractor's Qualified Professional Inspector may establish and justify the sampling methodology using professional engineering judgment and applicable industry standards, provided the inspection is sufficient to assess equipment condition and support all required findings, calculations, and recommendations. h. Boiler shell examination and engineering certification: Please identify the required extent of ultrasonic thickness measurements and other nondestructive examinations of boiler shells, tube sheets, and other applicable pressure-retaining components. For the MAWP, deterioration-rate, and remaining-useful-life evaluations required by the PWS, does the Government require a formal report signed and sealed by a licensed Professional Engineer? Please identify any specified inspection coverage, minimum-thickness criteria, engineering standards, or historical thickness data to be used. Must the engineering determinations address the complete boiler pressure vessel, including firetubes and shell, or only components examined under the prescribed inspection program? The Government requires ultrasonic thickness testing of representative samples and all areas exhibiting signs of corrosion, erosion, or other deterioration. PWS does not prescribe specific inspection coverage percentages, minimum thickness criteria, historical thickness data, or a requirement for a signed and sealed Professional Engineer report. The Contractor shall use applicable ASME Code requirements, inspection findings, and professional judgment to perform the required MAWP, deterioration-rate, and remaining-life evaluations and document the results in the final report. Q4. The PWS incorporates maintenance, inspection, and testing requirements applicable to the deaerator (DA) and condensate return tank (CRT), as established by VHA Directive 1810 and the VHA Boiler and Associated Plant Safety Device Testing Manual. However, the solicitation provides pricing contract line items (CLINs) only for the three steam boilers and does not identify the DA and CRT equipment specifications. To establish the equipment covered by the contract and prepare an accurate firm-fixed-price quotation, please clarify the following: a. Identify the manufacturer, model, serial number, and quantity of each DA and CRT included within the contractual scope of work. b. Provide the vessel capacity, design pressure, normal operating pressure, and applicable ASME identification or nameplate information for each DA and CRT. c. Provide, if available, the applicable manufacturer maintenance instructions, equipment data sheets, and relevant drawings identifying the installed DA and CRT configurations. d. Should offerors allocate the costs associated with DA and CRT maintenance, inspection, and testing among the three existing boiler CLINs, or will the Government establish separate CLINs for these services? Not applicable. This service is not covered under this requirement. Q5. PWS Section V(I) requires the contractor to replace, calibrate, and test boiler steam safety valves, with calibration and/or testing performed onsite. The VHA Boiler and Associated Plant Safety Device Testing Manual also establishes testing requirements applicable to boiler, deaerator, and pressure-reducing valve (PRV) downstream safety valves. To determine the complete scope of testing, calibration, and replacement services and prepare an accurate firm-fixed-price quotation, please clarify the following: a. Identify the total number of steam safety valves included within the contractual scope of work, specifying their installed locations, including those associated with each steam boiler, the deaerator tank, and downstream of the steam pressure-reducing valve (PRV). Review the VHA Boiler and Associated Plant Safety Device Testing Manual for guidelines and for typical safety devices equipment in a Boiler. b. For each safety valve, provide the manufacturer, model, nominal inlet and outlet sizes, serial number or other identification, and applicable ASME/National Board certification information. Review the VHA Boiler and Associated Plant Safety Device Testing Manual for guidelines and for typical safety devices equipment in a Boiler. c. Identify the set pressure (psig), rated steam discharge capacity (lb/hr), and applicable pressure and temperature ratings for each valve. The Government does not have verified safety valve set pressures, steam discharge capacities, or pressure/temperature ratings available for distribution under this solicitation. Offerors shall base their quotes/offers on the requirements of PWS and the identified boiler equipment. Verification of valve nameplate data and equipment ratings shall be performed during the inspection and testing activities required under the contract. d. Please confirm whether each of the three steam boilers is equipped with two safety valves, reportedly set at 130 psig and 135 psig, respectively, and whether the deaerator system includes one safety valve installed on the tank and another downstream of the PRV. Please identify any additional safety valves included within the contractual scope. Each of the three boilers is equipped with two steam safety valves with nominal set pressures of 130 psig and 135 psig, respectively. The contractual scope includes the inspection, testing, calibration, and evaluation of these boiler safety valves and associated boiler safety devices identified in the PWS. The deaerator system and its associated safety valves are not included within the scope of this contract. Offerors shall base their quotations on the solicitation requirements. Verification of installed equipment, valve nameplate data, and operating condition shall be performed during contract execution. e. Does PWS Section V(I) require replacement of all existing boiler steam safety valves during each annual maintenance period, regardless of their condition, or is replacement required only when a valve fails inspection or testing? Please also clarify whether any replacement requirement applies to the deaerator and PRV downstream safety valves. The Government's intent is to inspect, test, and calibrate the boiler steam safety valves. Replacement is required only when a safety valve cannot be successfully calibrated, fails testing, or is otherwise determined to be defective or unserviceable. This requirement applies to the boiler steam safety valves within the scope of the PWS. f. Please identify whether the Government requires onsite testing and certification of all applicable safety valves, including the boiler, deaerator, and PRV downstream valves, and whether any valves must be removed for shop testing, repair, or recertification. The Government requires testing and calibration of the boiler safety valves in accordance with the PWS. Valve removal, shop testing, repair, recertification, or replacement shall only be required when a valve cannot be successfully tested, calibrated, or is otherwise determined to be defective or unserviceable. The PWS does not specifically require testing, certification, removal, repair, or replacement of deaerator or downstream PRV safety valves. g. Please provide an equipment schedule or existing valve inventory, if available, identifying the specifications and locations of all safety valves included within the contract. The Government does not have an equipment schedule or valve inventory available for distribution under this solicitation. The boiler scope includes six (6) steam safety valves total, consisting of two (2) safety valves per boiler with nominal set pressures of 130 psig and 135 psig. Offerors shall base their quotations on the solicitation requirements. Verification of valve specifications, nameplate data, and exact locations shall be performed during contract execution. Q6. The solicitation identifies the manufacturers and serial numbers of the three steam boilers; however, the Performance Work Statement does not identify whether the boilers and their associated systems remain in their original equipment manufacturer (OEM) configurations or have undergone subsequent alterations, modifications, equipment replacements, or retrofits. Clarify the following: a. Whether any of the three boilers have undergone modifications or alterations from their original OEM configurations, including replacement or retrofitting of the original burner assemblies. b. For each boiler with modifications or retrofits, identify the manufacturer, model, and configuration of the replacement equipment and describe the extent of the alterations necessary to integrate that equipment into the existing boiler system. c. Identify all additional, replacement, or modified components associated with such alterations, including, but not limited to, fuel pumps, fuel-pressure regulating or throttling valves, fuel-train components, piping arrangements, combustion controls, burner management systems, safety interlocks, instrumentation, electrical controls, and associated auxiliary equipment. d. Identify any additional equipment or components installed as part of these modifications that are included within the maintenance, inspection, calibration, testing, or repair requirements of the current PWS. e. Where the installed equipment differs from the original OEM configuration, identify the applicable manufacturer maintenance and testing requirements and provide, if available, current as-built drawings, equipment schedules, control diagrams, operating sequences, and documentation of the modifications. The Government does not have modification records, as-built drawings, equipment schedules, control diagrams, or other documentation available for distribution under this solicitation. Offerors shall base their quotations on the equipment identified in the PWS and the requirements specified therein. Any existing field modifications, retrofits, equipment replacements, or deviations from the original OEM configuration shall be identified and documented by the Contractor as part of the inspection, testing, and evaluation activities required under the contract Q7.PWS Section V(B) requires inspections, testing, and calibrations to comply with the written recommendations of the equipment manufacturers, the VHA Boiler and Associated Plant Safety Device Testing Manual, and applicable NFPA 85 requirements. The Superior Boiler manufacturer s maintenance instructions prescribe certain daily, weekly, and monthly operational and functional checks, as well as semiannual fireside cleaning and associated maintenance activities. However, VHA Directive 1810, Appendix B, Table 3B, establishes an annual fireside-cleaning frequency for high-pressure steam boilers. The Directive also distinguishes routine boiler-plant operational duties from inspections and testing that must be performed by qualified contractors. Please clarify the following: a. Are the daily, weekly, and monthly manufacturer-recommended operational and functional checks required to be performed by the contractor at the specified frequencies, or will these activities remain the responsibility of VACHS boiler-plant personnel? Daily, weekly, and monthly operational and functional checks identified in the manufacturer's operating and maintenance manuals are considered routine boiler plant operational activities and shall remain the responsibility of VACHS boiler plant personnel. The Contractor is not required to perform recurring daily, weekly, or monthly operational checks at the frequencies specified by the manufacturer unless such services are specifically included in the approved maintenance schedule developed under this contract. b. Does the Superior Boiler manufacturer s semiannual fireside-cleaning recommendation require the contractor to perform two complete fireside-cleaning services annually, rather than the single annual fireside-cleaning service established by VHA Directive 1810, Appendix B, Table 3B, or is one annual fireside-cleaning service sufficient to satisfy the contractual requirements? Contractor shall perform one comprehensive fireside cleaning and inspection annually in accordance with the PWS requirements and applicable VHA guidance. If, during the course of inspection or operation, conditions are identified that warrant additional cleaning, the Contractor shall document the condition and provide recommendations to the COR for review and consideration. c. Are other manufacturer-recommended maintenance activities exceeding the frequencies established by VHA Directive 1810 required to be performed by the contractor, or will the contractor s responsibilities be limited to the maintenance, inspections, calibrations, and safety-device testing specifically scheduled under the PWS? The Contractor shall comply with the maintenance, inspection, calibration, testing, evaluation, and reporting requirements specifically identified in the PWS. Manufacturer recommendations should be utilized as part of the Contractor's technical evaluation and execution of the required services. However, the contract does not require the Contractor to perform additional recurring maintenance activities at frequencies exceeding those established in the PWS unless specifically directed by the Government or otherwise determined to be necessary based on observed equipment condition. Q8. With reference to PWS Section V(O), will the Government provide an inventory of the installed boiler plant instrumentation requiring periodic calibration, including pressure gauges, thermometers, pressure and temperature transmitters, oxygen analyzers, and other applicable measuring and control devices? No. The Government will not provide an instrumentation inventory. Offerors shall base their quotations on the requirements of PWS, including calibration of all applicable measuring and control devices associated with the boiler systems. Verification and identification of installed instrumentation shall be performed during contract execution. Q9. If available, please identify each instrument s equipment location, manufacturer, model, measuring range, quantity, calibration frequency, and applicable acceptance tolerances. The Government does not have this information available for distribution under this solicitation. Offerors shall base their quotation on the requirements of the PWS. The Contractor shall identify the installed instrumentation requiring calibration and perform the required calibration, testing, and documentation in accordance with the manufacturer s recommendations and applicable industry standards. Q10. Clarify whether the contractor is responsible for replacing instruments that fail calibration or are determined to be defective, and whether such replacements are included in the firm-fixed-price maintenance scope or authorized separately as corrective work. The Contractor shall identify and document any instruments found to be defective or unable to be successfully calibrated and shall notify the COR. Replacement of defective instruments is not included in the firm-fixed-price maintenance scope and, if required, will be addressed separately by the Government Q11. Please confirm whether the boiler plant currently has an installed propane/combustible gas leak detection system, including the number and location of detectors, manufacturer and model, associated control panels, audible/visual alarms, and any connections to the boiler burner-management or fuel-gas safety-shutdown systems. The boiler plant is equipped with a propane/combustible gas detection alarm system. However, the gas detection system is independent of the boilers and their burner management systems and does not automatically initiate boiler shutdown or fuel shutoff functions. Q12. Please clarify whether the contractor is responsible for: a. Periodic inspection, calibration, and functional testing of the gas detectors. Limited to the detector that is part of the boiler safety or combustion control system that is specifically within the scope of the PWS. b. Verification of alarm setpoints and detector response. Only for those that are part of the equipment specifically covered by the PWS. c. Functional testing of associated alarms, gas shutoff valves, and boiler shutdown interlocks, where installed. The Contractor shall perform testing of safety devices, alarms, shutoff valves, and interlocks specifically identified in PWS Section V(Q). d. Replacement of defective or expired sensors or detectors. No. Replacement of defective, failed, expired, or obsolete gas detectors or sensors is not included in the firm-fixed-price scope of this contract. Any deficiencies identified during the performance of the work shall be documented and reported to the COR. Recommended corrective actions shall be provided for Government review. e. Providing calibration certificates and documented functional-test results. Calibration certificates and test results shall be provided for equipment and instruments calibrated and tested under the scope of the PWS. The Contractor shall document all testing, calibration, and inspection activities in the required service reports. If these services are required, please identify the applicable testing and calibration frequencies and whether replacement components are included in the firm-fixed-price maintenance scope or addressed separately as corrective work. See responses above for each one. Q13. Is this a brand-new contract, or is there an incumbent performing the services? If not brand new, please provide current/previous contract number? This is a follow-on contract being procured as a competitive set-aside for SDVOSB verified vendors. Latest contract number is 36C24822P0298. This information is publicly available on Federal Procurement Data System (FPDS) at www.sam.gov and/or US Spending at https://www.usaspending.gov/ Current contractor information may be requested and disclosed under Freedom of Information Act (FOIA) in accordance with 38 Code of Federal Regulations (CFR) 1.553(b). The VA accepts FOIA requests submitted via email. Email must be sent to SAJFOIA@va.gov , for additional information about FOIA regulations and procedures, please visit www.foia.va.gov Q14. PWS V.I requires the contractor to "replace, calibrate and test the steam safety valves." Must the safety valves be replaced every year, or only if they fail testing? Please provide the number, size and set pressure of the safety valves on each boiler. The intent of PWS Section V.I is to ensure that all steam safety valves are properly inspected, calibrated, tested, and capable of performing their intended safety function in accordance with applicable codes, standards, and manufacturer requirements. PWS does not require the automatic annual replacement of steam safety valves solely based on the passage of time. Safety valves shall be evaluated, calibrated, and tested as part of the required services. Replacement shall be required if a valve fails testing, cannot be properly calibrated, exhibits deficiencies affecting safe or reliable operation, or is otherwise determined to be unsuitable for continued service. The Government does not have the number, size, or pressure data for all installed safety valves readily available at this time. The Contractor shall verify the installed safety valve configuration, including quantity, size, capacity, set pressure, and condition, as part of the required inspection and assessment services and shall document this information in the inspection report. Any safety valves identified as deficient or requiring replacement shall be immediately reported to the COR, along with recommendations for corrective action. Q15. Please provide the horsepower, design pressure and fuels (natural gas, No. 2 fuel oil, LPG pilot) for each of the three boilers. Boiler #1; Size: 300HP; Boiler Operating Pressure: 110 psi Boiler #2; Size: 250HP; Boiler Operating Pressure: 110 psi Boiler #3; Size: 300HP; Boiler Operating Pressure: 110 psi Q16. Does the annual NDT scope in PWS V.V and V.W (ultrasonic thickness grid, magnetic particle testing, MAWP and remaining-life calculations) apply to the deaerator and condensate tanks every year, or only in certain contract years? The NDT requirements identified in PWS Sections V.V and V.W apply to the boilers and associated equipment within the scope of this contract. The deaerator (DA) and condensate receiver tank (CRT) inspections, testing, NDT evaluations, MAWP calculations, and remaining life assessments are covered under a separate service contract and are not included within the scope of this requirement. Q17. Will a site visit be offered before the closing date? If so, please provide the date, time and point of contact. Site Visit will not be conducted at this time. Prepare and submit Quotes/Offers at your best terms based on the information contained in the RFQ. Q18. Is there an incumbent contract for this requirement? If so, please provide the contract number. See Q13 response above. Q19. Replace Safety Valve: Will the cost of new Valves be covered by the site? Replacement shall be required if a valve fails testing, cannot be properly calibrated, exhibits deficiencies affecting safe or reliable operation, or is otherwise determined to be unsuitable for continued service. Q20. Replace Gage Glass: Will new Gage cost be covered by the site? No. The cost of replacement gage glasses shall be included in the Contractor's quotation and contract pricing. Q21. Cleaning - Will Gaskets be provided by the Site or Contractor? No. The cost of replacement gage glasses shall be included in the Contractor's quotation and contract pricing. Q22. Testing - How often will Non-Destructive Testing be required? Annually, once over the 5-year period? Additionally, will NB Inspector be required on-site during Non-Destructive Testing? See Q16 response above. Q23. When was the last maintenance and testing done on each boiler? Boiler #1: February 2026 Boiler #2: December 2025 Boiler #3: June 2026 Q24. Is there a set maintenance and testing schedule? In accordance with PWS Section IV.J and Sections V.19 and V.20, the Contractor shall develop and submit a detailed schedule for the required inspections, testing, calibrations, and maintenance activities in coordination with the PM/COR. Q25. Will an on-site visit be required as soon as the contract is awarded and the contractor can align a technician to be on site? An immediate on-site visit upon contract award is not required by the PWS. However, the Contractor shall coordinate with the PM/COR and provide the required advance notice in accordance with the contract requirements prior to performing any inspection, testing, calibration, or maintenance activities. Following contract award, the Government anticipates coordinating a kickoff meeting and scheduling activities with the Contractor to facilitate execution of the work. The timing of any on-site visit shall be mutually coordinated between the Contractor and the PM/COR, taking into consideration boiler plant operations, facility needs, personnel availability, and the requirement that no more than one boiler be removed from service at a time. Q26. There is a detailed description of what is required for testing the boilers but not for maintenance. a. What is the maintenance schedule? Daily, monthly, quarterly, yearly? The Contractor shall perform the maintenance, inspections, testing, calibrations, and assessments required by the PWS during each contract year. The specific schedule for execution of the work shall be developed by the Contractor and coordinated with the PM/COR in accordance with PWS Sections IV.J, V.19, and V.20. The contract does not require the Contractor to perform daily, weekly, or monthly routine operational checks unless specifically identified in the PWS. b. Does the VA have an in-house technician that will be providing daily checks, and then the contractor for this contract does quarterly and yearly maintenance and testing? VACHS personnel perform the routine operation and monitoring of the boiler plant, including day-to-day operational activities. The Contractor's responsibilities under this contract are limited to the preventive maintenance, inspections, testing, calibrations, safety-device testing, evaluations, and reporting specifically required by the PWS. Q27. The CLN structure is currently set up as 1 all-inclusive price. What should be included in that price? a. What parts, if any, is the contractor expected to furnish? The Contractor shall furnish all labor, materials, consumables, tools, instrumentation, and equipment necessary to perform the services required by the PWS. This includes replacement parts and materials specifically identified in the PWS, such as gage glasses, gaskets, air compressor belts, refractory patching materials, and other consumable items necessary to complete the required maintenance, testing, and inspection activities. Repairs or major component replacements identified during the inspection process that are not specifically required by the PWS shall be documented and reported to the COR for review and disposition. b. Is there a certain number of hours of labor time that the VA would like us to include? If one contractor budgets 50 hours of labor while another budgets for 25 hours of labor, their pricing will vary drastically. This is a performance-based services acquisition, the Government expects Offerors to thoroughly review the PWS and submit their best quotation/offer based on their experience, and commercial practices. Offerors shall independently determine the labor resources necessary to perform complete preventive maintenance, inspection, testing, calibration, evaluation, and reporting service for each boiler in accordance with the PWS, applicable codes and standards, manufacturer recommendations, and VA requirements. The Government's expectation is that each boiler receives a complete maintenance and testing service as required by the contract. The maintenance activities will be scheduled throughout the year and coordinated with the PM/COR to avoid disruption to facility operations. c. How many visits are required per year? Same as labor, 1 contractor may budget 2 trips, and another contractor may budget 12 trips. This is a performance-based requirement, the Government has not established a minimum or maximum number of site visits. Offerors shall determine the number of visits necessary to perform all contract requirements and shall include all associated costs in their proposed price. The Contractor shall develop and coordinate the work schedule in accordance with the PWS. The Contractor is responsible for identifying the resources and site visits necessary to successfully perform the required services. d. Are we to include pricing for emergency work? Labor, parts, boiler rental in case of a catastrophic failure? No, PWS/SOW is for maintenance and testing, as described following applicable manufacturer recommendations. Q28. Are there any active and known problems or deficiencies with the boilers? Page 10 of the solicitation states The service required must restore steam boiler units back in service as described in the manufacturer s manual . If a boiler has a known problem, we will need to know what that is to accurately bid the project. If it is a simple part replacement, it may only cost $100 for parts and 2 hours of labor. If the boiler needs a new motor, that would most likely be thousands of dollars and at least 2 full days of labor. The Government does not maintain a list of known deficiencies and does not warrant the condition of any boiler, component, or ancillary equipment beyond the information provided in the solicitation. The Contractor is responsible for evaluating the condition of the boilers and associated equipment as part of the inspection, testing, maintenance, and assessment services required by the PWS. The intent of the requirement stating that the boilers be restored to service in accordance with manufacturer recommendations is to ensure that the Contractor performs the specified maintenance, testing, calibrations, inspections, and adjustments necessary to verify operational readiness and identify conditions affecting performance and reliability. Any deficiencies identified during performance shall be documented and promptly reported, together with the Contractor's recommendations for repair, replacement, or other corrective action. Repairs or major component replacements not specifically required by the PWS are not included in this contract and shall be addressed separately by the Government, as appropriate. Q29. Is an on-site SSHO or Superintendent required? Must the be directly employed by the contractor? If the awarded contractor use a subcontractor, could the SSHO/Sup be employed by the sub? The Contractor shall be responsible for providing adequate supervision and safety oversight necessary to perform the work safely and in compliance with all applicable federal, state, local, VA, OSHA, and facility safety requirements. The Contractor shall ensure that personnel performing the work possess the qualifications and certifications required by the PWS. Q30. Are there any geographic or linguistic requirements? Examples: Must the contractor turn in a Spanish and English copy of all reports? Must the on-site technician be fluent in Spanish? Must the on-site technician be a resident of Puerto Rico? No, all reports are to be turned in English, as English is the Federal Government official business language. Being able to communicate in Spanish may be beneficial but it is not required. There is no residency requirement, is up to the Contractor to determine the best approach based on their experience. Performance shall comply with the required frequency and required response time as per PWS/SOW.
-Combined Synopsis11/10/2026
RFQ 36C26327Q0060 Amendment 0002 Questions and Answers for solicitation posting
-Combined Synopsis11/10/2026
Amendment to cancel requirement. See SF 30
-Solicitation11/04/2026

Additional Details

Solicitation Number

36C24720Q0252

Archive Date

May 31, 2020

Office Address

AUGUSTA, GA, 30904