Notice ID: 38db562b097047d1b03bb2344e43160fSpecial Notice
The Contractor shall provide all labor, tools, materials, supplies, equipment, supervision, and transportation required to perform quarterly services and maintenance in accordance with manufacturer�s specifications of a government owned San-I-Pak Compactor
Archived on September 18, 2023. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 8:00 AM UTC−04:00
- Posted
- August 30, 2023
- Notice type
- Special Notice
- NAICS
- 811310: Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
- Agency
- Department of Veterans Affairs
Notice details
- Office
- 247-NETWORK CONTRACT OFFICE 7 (36C247)
- Place of performance
- Birmingham, AL, 35233
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- 36C24723Q1070
- Notice ID
- 38db562b097047d1b03bb2344e43160f
Description
SUBJECT* San-i-Pac Sterilizer Quarterly Preventative Maintenance and Service | New Base + 4 Notice of Intent to Sole Source GENERAL INFORMATION CONTRACTING OFFICES ZIP CODE* 35233-2904 SOLICITATION NUMBER* 36C24723Q1070 ARCHIVE 15 DAYS AFTER THE RESPONSE DATE RECOVERY ACT FUNDS N PRODUCT SERVICE CODE* J065 NAICS CODE* 811310 CONTRACTING OFFICE ADDRESS Department of Veterans Affairs Birmingham VA Medical Center 700 South 19th Street Birmingham, AL 35233-2904 POINT OF CONTACT* Terri Hudson Terri.Hudson@va.gov ADDITIONAL INFORMATION AGENCYS URL URL DESCRIPTION AGENCY CONTACTS EMAIL ADDRESS EMAIL DESCRIPTION DESCRIPTION The Department of Veterans Affairs, Network Contracting Office 07 (NCO 07), hereby provides notice of its intent to award a sole source, firm fixed price base and options contract for San-i-Pak quarterly Maintenance to San-I-Pak Pacific 23535 S Bird RD Tracy, California 95304-9339 | (209)836-2310 | pcorral@sanipak.com. The contract is expected to be awarded under the authority of 41 U.S.C. 3304(a)(1), as implemented by FAR 13.106-1(b) Soliciting from a Single Source. A Justification for Single Source Awards for Other Than Full and Open Competition has been prepared. The anticipated award date is September 06, 2023. The Contractor shall provide all labor, tools, materials, supplies, equipment, supervision, and transportation required to perform quarterly services and maintenance in accordance with manufacturers specifications of a government owned San-I-Pak Compactor Sterilizer. The Contractor shall notify the Birmingham VA Biomedical Department immediately should the inability arise to provide maintenance and support services for the San-I-Pak Compactor Sterilizer These services and supplies will be performed/delivered to the Birmingham VA Medical Center, Biomedical Department, 700 South 19th Street, Birmingham AL 35233. NAICS code: 811310-Electronic and Precision Equipment Repair and Maintenance (SBA Size Standard $12.5 Million) PSC: J065-Maint/Repair/Rebuild of Equipment Medical, Dental, and Veterinary Equipment and Supplies THIS NOTICE OF INTENT IS NOT A SOLICITATION OR REQUEST FOR COMPETITIVE QUOTES. However, interested parties may identify their interest and capability to respond to this requirement within three (3) calendar days after publication of this notice. A determination not to compete this requirement, based upon responses to this notice, is solely within the discretion of the Government. Information received will normally be considered solely for determining whether to conduct a competitive procurement. The Department of Veterans Affairs will NOT be responsible for any costs incurred by interested parties in responding to this notice of intent. Only written responses will be considered. All responses from responsible sources will be fully considered. As a result of analyzing responses to this notice of intent, the Government shall determine if a solicitation will be issued. Any prospective contractor must be registered in the System for Award Management (SAM) to be eligible for award and must submit a current authorized distributor letter from the manufacturer. All Service-Disabled Veteran Owned and Veteran Owned Small Businesses must submit a self-certifying statement that their company meets all criteria established IAW 13 CFR 121.406(b)(1)(i) through (b)(1)(iii) thus demonstrating compliance with the Non-Manufacturer Rule. Interested parties are encouraged to furnish information by email only with RESPONSE TO INTENT TO SOLE SOURCE 36C24723Q1070 in the subject line. All documents submitted will not be returned. All interested parties shall submit clear and convincing documentation demonstrating their capabilities to satisfy the requirements listed above to Terri Hudson, Contract Specialist, by email at Terri Hudson@va.gov NO LATER THAN September 03, 2023 @ 08:00 AM EST. The capability documentation should include general information and technical background describing in detail the prospective contractor's capabilities and experience that will demonstrate the ability to support these requirements.
Award Overview
Possible prior contract
Inferred, not confirmedInferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.
Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
36C24723Q1070- Special NoticeCurrentAug 30, 2023
The Contractor shall provide all labor, tools, materials, supplies, equipment, supervision, and transportation required to perform quarterly services and maintenance in accordance with manufacturer�s specifications of a government owned San-I-Pak Compactor
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
66% | Awarded | Open | |
This is a SOURCES SOUGHT ANNOUNCEMENT ONLY. It is neither a solicitation announcement nor a request for proposals or quotes and does not obligate the Government to award a contract. Requests for a solicitation will not receive a response. Responses to this-- sources sought announcement must be in writing. The purpose of this sources sought announcement is for market research to make appropriate acquisition decisions and to gain knowledge of potential qualified Service-Disabled Veteran Owned Small Businesses, Veteran Owned Small Businesses, 8(a), HubZone and other Small Businesses interested and capable of providing the services described below. Documentation of technical expertise must be presented in sufficient detail for the Government to determine that your company possesses the necessary functional area expertise and experience to compete for this acquisition. Responses to this notice shall include the following: (a) company name (b) address (c) point of contact (d) phone, fax, and email (e) Unique Entity ID (f) Cage Code (g) Tax ID Number (h) Type of small business, e.g. Services Disabled Veteran Owned small Business, Veteran-owned small business, 8(a), HUBZone, Women Owned Small Business, Small disadvantaged business, or Small Business HUBZone business and (i) must provide a capability statement that addresses the organizations qualifications and ability to perform as a contractor for the work described below. The Loma Linda VA Health Care System (LLVAHCS) located at 11201 Benton St. Loma Linda, CA 92357 is seeking a potential qualified contractor that can provide: Medical Gas Inspection. Important information: The Government is not obligated to/nor will it pay for or reimburse any costs associated with responding to this sources sought synopsis request. This notice shall not be construed as a commitment by the Government to issue a solicitation or ultimately award a contract, nor does it restrict the Government to a particular acquisition approach. The Government will in no way be bound to this information if any solicitation is issued. The VA is mandated by Public Law 109-461 to consider a total set-aside for Service-Disabled Veteran Owned Small Business set aside. However, if response by Service-Disabled Veteran Owned Small Business firms proves inadequate, an alternate set-aside or full and open competition may be determined. No sub-contracting opportunity is anticipated. The North American Classification System (NAICS) code for this acquisition is 811310 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance $12.5 Million. *******DRAFT*******DRAFT******DRAFT*******DRAFT******* D.1 STATEMENT OF WORK TITLE: VA Loma Linda Healthcare System s (VALLHCS) Annual Med Gas Inspection BACKGROUND INFORMATION: VA Loma Linda Healthcare System s (VALLHCS) requires a new maintenance and inspection contract for Medical Gas Distribution System. The Medical gas distribution system must undergo routine source and pipeline system inspections and maintenance to ensure continuous patient safety. PARTS and EQUIPMENT LIST: PARTS QUANTITY OBJECTIVES: VA Loma Linda Healthcare System s (VALLHCS) Medical gas distribution system inspections shall comply with NFPA99 (Health Care Facilities Code), OSHA Life safety fire code, and the ASSE 6000 standard. They require annual central supply checks, routine alarm tests, and specialized third-party inspections by certified ASSE 6020 Inspectors. The services performed shall conform to industry standards and this statement of work (SOW) and lockout and tagout procedures are to be done according to (OSHA Standard29 CFR 1910.147) VA Loma Linda Healthcare systems Policies and Regulations. SCOPE: Contractors shall provide all labor, personnel, supplies, equipment, tools, materials, supervision and other necessary items. Inspection, testing and verification are mandatory for medical gas work and will be performed by licensed ASSE 6020 Medical Gas Inspectors and ASSE 6030 Medical Gas Verifiers. Contractor shall perform Annual Medical Gas Distribution System Inspection on all Sources, Alarms, Zone Valves, and Patient Terminal Outlets / Inlets and bulk oxygen system. Including Areas as follows: Main Hospital First Floor: CLC, CLC Palliative Care, CLC Rehab, 1SW, Mod 3, Emergency department, Second Floor: ICU: 2SW, 2SE, Third Floor: OR 1 through 8, 3F-14, 3F-16, 3D-72, Recovery Room, SICU, X-Ray, MRI, Short Stay, G.I. Labs, 3NW, 3NE, 3SW, 3SE Fourth Floor: 4NW, 4NE, 4SW, 4SE, Nuclear Med, Dialysis, Blood Laboratory, Oncology Building 31 Eye Clinic Building 32 Audiology Building 30 List of items provided for inspection: Medical Gas Sources Medical air compressors, vacuum pumps, gas manifolds, and any other device used to deliver medical gases to patients. 1.Inventoried by location. 2.Leak checked and documented. 3.Recommendations to comply with NFPA 99, 2024 edition Health Care Facilities Code. Master Alarm Panels Alarm panels are located at two separate locations throughout the facility. These panels monitor conditions directly from the medical gas sources. 1.Inventoried by location 2.Tested by removing existing pressure switches and other sensing devices to test the actuation points. No interruption of service is necessary if each device is mounted on code compliant demand fittings. 3.Verify proper points are being monitored at each panel. 4.Verify each panel is in the proper location. 5.Verify proper labeling. Area Alarm Panels Alarm panels that are located throughout the facility monitor medical gas pressures for the area only. 1.Inventoried by location. 2.Tested by lowering pressure in each zone for each gas and documenting the alarm point. 3.Verify proper location. 4.Verify proper labeling. Zone Valve Boxes Accessible valves typically found in a corridor covered by a plastic window used mostly for emergency purposes. 1.Inventoried by location. 2.Checked for leakage from packing, flange, and gauge port using oxygen safe leak detector. 3.Verify proper labeling. 4.Verify proper locations. Medical Gas Outlets/Inlets Connection points for each gas are located mostly in-patient areas. 1.Inventoried by location in each room or area inspected left to right and then top to bottom. 2.Complete an operational pressure test on each outlet and document pass/fail. (Test Parameters per NFPA 99, 2024 edition) 3.Check function of outlet/inlet and latching mechanism. 4.Check for leakage with equipment and without equipment attached. 5.Document connection type and outlet/inlet manufacturer. Oxygen Particulate Analysis Particulates are often found in existing medical gas systems due to improper installation methods that were used in the past. 1.Samples are taken on each floor in each building. Medical Air Dewpoint Analysis Moisture is removed from medical air systems at the source. Periodic Analysis of moisture throughout the facility is important to prevent possible contamination. 1.Samples are taken on each floor in each building. 2.A sample will be taken at the medical air source to compare building samples. Emergency Oxygen Supply Connection Box This box is typically mounted on the outside of a facility to facilitate the back feeding of the oxygen system if there is an interruption in service. 1.Inventoried by location. 2.Check existing location for proper compliance. 3.Check existing piping arrangements to ensure proper order of components. 4.Check to make sure box is secured. Testing to ensure all medical gas booms, and columns are leak free Most operating rooms and procedure rooms have some sort of device to help clinical personnel use the medical gases in the middle of the room by the patient. These devices are either medical gas booms or columns. The hoses and threaded connections inside these devices need to be checked periodically to ensure that there are no leaks. 1. All hoses and secondary equipment were removed from the outlets on each boom and column. 2. A test pressure for each system was observed and documented. 3. All medical gas valves were shut over a period of 10 minutes. 4. After the test period of 10 minutes passed the pressure was observed once again. 5. Any pressure drop was recorded. 6. Recommendations will be made to find existing leaks and to make repairs. Facilities responsibility: A. The facility shall coordinate with all departments to notify of the medical gas/vacuum system inspection and or repairs to be completed. B. The facility shall supply Inspecting personnel with facility maintenance personnel to unlock secured areas that have medical gas/vacuum systems, or a master key may also be supplied to complete inspection services. REPORTS: The contractor will annotate compliance with ASSE 6000, 6020 and 6030 Medical Gas specifications and requirements by submitting a detailed PM report to the Contracting Officer s Representative (COR) along with pictures for each equipment, after PM is completed. The reports shall be submitted to COR, within 14 days of work completion. The contractor shall provide additional reports as required by the COR. The contractor s report shall show the information listed below. The report shall contain, at a minimum, any other information required by the COR and all applicable NFPA and Joint Commission and OSHA specifications, the following: Date of P.M. Time of P.M. Identification of the equipment descriptions, manufacturer, and serial number Location of equipment under P.M. or repair Probable cause of repairs Correction action (servicing, repair or replacement) Who was notified? Comments and recommendations. Completion date Contractor shall complete scheduled preventive maintenance service, inspection and repairs to NFPA and Joint Commission and OSHA requirements for the Medical Gas Distribution System. OVER AND ABOVE REPAIR: Upon discovery of over and above repairs or unforeseen requirements, Contractor shall immediately notify the POC. Parts shall not be procured, nor installation or repairs initiated until approval is obtained from the Contracting Officer and appropriate Facilities Staff/POC. Charges for repair, labor and parts shall originate only when required and upon prior approval being granted by the Contracting Officer. Any additional work performed must be by licensed ASSE 6010 Medical Gas System Installers and ASSE 6040 Medical Gas System Maintenance Personnel. PERIOD OF PERFORMANCE: Base Plus Four from performance start date. Work may be scheduled during the day or night (Depending on load demand), Monday thru Friday and/or Saturday thru Sunday. Daytime hours: 6 am to 4 pm Evening hours: 4 pm to 4 am Contractor shall initiate work within 2 weeks of being contacted by the designated Contracting Officer s Point of Contact (POC) or designee. Work shall be scheduled through the POC or designee, who will coordinate with VALLHCS staff. Timelines are subject to change due to VALLHCS operational requirements. PLACE OF PERFORMANCE: VA Loma Linda 11201 Benton St. Loma Linda, CA 92357 LICENSING REQUIREMENTS: Offeror must possess a 30-hour Occupational Safety and Health Administration (OSHA) safety card. ASSE Medical Gas Verifier 6030 ASSE Medical Gas inspector 6020 SPECIFIC REQUIREMENTS: Contractor shall schedule start date with POC or designee five (5) business days in advance. Contactor personnel shall have valid Loma Linda PIV badges before starting work. Contractor shall coordinate energy source LOCK OUT /TAG OUT procedures with VALLHCS Electrical Supervisor before starting work. When work is complete, Contractor shall notify the VALLHCS Electrical Supervisor that energy sources will be restored and require verification. Contractor s supervisor or lead technician are to check in with VALLHCS Electrical Supervisor, or in their absence, with Graphics Control prior to work each day. Contractor shall conform to the following standards, policies, regulations, governing agency, and any other local, state, or Federal guidelines that are not listed here. OSHA 29CFR Regulations, www.osha.gov NFPA 99, www.nfpa.org Chapter 5 Gas and Vacuum Systems 5.1 Category 1 Piped Gas and Vacuum Systems 5.2 Category 2 Piped Gas and Vacuum Systems 5.3 Category 3 Piped Gas and Vacuum Systems ASSE AUTHORIZED SERVICES: Only those services specified herein are authorized under this contract. Before permitting and/or performing any service of a non-contract nature, the Contractor shall advise the CO of the reason (s) for the additional work and/or service. The Contractor is cautioned that only the CO or his/her designee may authorize additional service that are within the scope of this contract and that reimbursement shall not be made unless prior authorization is obtained from the CO. All changes to the contract shall be issued through a contract modification in writing from the CO to the Contractor. DELEGATION OF AUTHORITY: No additional service shall be provided without the approval from the Contracting Officer (CO) or his/her designee of this contract. The Contractor shall not accept any instructions issued by any other person(s) other than the CO or his/her delegated representative acting within the limits of his/her authority. GOVERNMENT-FURNISHED EQUIPMENT (GFE) GOVERNMENT FURNISHED INFORMATION (GFI): No Government equipment will be used by the Vendor. RECOGNIZED HOLIDAYS: The following is a list of all Government recognized holidays: In accordance with 5 U.S.C. 6103, Executive Order 11582 and Public Law 94-97 the following National holidays are observed and for the purpose of this contract are defined as Legal Federal official holidays : New Year s Day: January 1 Martin Luther King s Birthday: Third Monday in January President s Day: Third Monday in February Memorial Day: Last Monday in May Juneteenth Independence Day: June 19 Independence Day: July 4 Labor Day: First Monday in September Columbus Day: Second Monday in October Veterans Day: November 11 Thanksgiving Day: Fourth Thursday in November Christmas Day: December 25 If a holiday falls on Sunday, the following Monday shall be observed as the legal holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a legal holiday by U.S. Government agencies. Also included, would be any other day specifically declared by the President of the United States of America to be a National Holiday. CONTRACTOR EMPLOYEES AND BADGES: Contractor personnel shall present a neat appearance and be easily recognized as Contractor employees. Examples: wearing of distinctive clothing such as uniform, badges, patches, etc. All contractor personnel shall be required to wear VA provided identification (I.D.) badges above the waist at all times while on the VA grounds. Contractor shall be required to coordinate with the COR to obtain the VA provided I.D. badges for all staff. All VA provided I.D. badges shall be returned at the end of the contract or upon completion of service. Failure to wear ID badges may result in removal from any of the VA facilities and/or otherwise referred to Government property. SAFETY AND PPE EQUIPMENT: Personal Protective Equipment shall be provided for each Contractor employee by the Contractor. Possession of weapons are prohibited. SMOKING and VAPING POLICIES: Smoking and vaping are prohibited on Government property. PARKING: It is the responsibility of Contractor personnel to park only in designated parking areas. Parking information is available from the VA Security Service. The VA shall not invalidate or make reimbursement for parking violations of the Contractor's personnel under any circumstances. COMPLAINTS: Contractor shall promptly and courteously respond to complaints within three (3) working days to the COR. Including complaints brought to the contractor s attention by the CO. Contractor shall maintain a written record of all complaints, both written and oral showing the identity of the individual, the nature of the complaint, and contractor s response. Contractor shall permit the Government to inspect the written records of complaints upon reasonable notice from the CO. Notice to potential offerors: All offerors who provide goods or services to the United States Federal Government must be registered in the System for Award Management (SAM) at www.sam.gov. Additionally, all Service-Disabled Veteran Owned Businesses or Veteran Owned Businesses who respond to a solicitation on this project must be certified by the Small Business Administration; Veteran Small Business Certification, (VetCert) https://veterans.certify.sba.gov/. All interested Offerors should submit information by e-mail to: catherine.fernandezpedernera@va.gov . All information submissions to be marked Attn: Catherine Fernandez, Contract Specialist and should be received no later than 10:00 AM PST on September 30, 2026. | 66% | Market Research | 09/30/2026 |
Q1: Under page 6 para 4.4, the SOW requires: "Generator/AS Integration Testing (as needed)..." What are the Makes, Models, S/Ns, and years of manufacture of the CAT generators (or other generators, that connect to these ATSs or associated equipment), so we can conduct the load banking as requested?" The CAT gens are 650 kw and 2250 kw. Load banking would only be needed if during the process it is needed for investigative purposes or to prove out repairs. Q2: "Does the government want CAT to accomplish or aid in the accomplishment of task 1 under para 4.4 "Remove/reconnect bias signals during generator tuning (if required)?" The use of CAT to carry out any tasks would be at the vendors discretion. Q3: "Does the government want CAT to accomplish or aid in the accomplishment of task 2 under para 4.4 "Remove/reconnect bias signals during generator tuning (if required)?" The use of CAT to carry out any tasks would be at the vendors discretion. Q4: If we are an authorized CAT generator service company, can we complete the tasks under para 4.4 without bringing in CAT? Yes Q5: The SOW states, "The solicitation requests, "Recommendations for future reliability improvement." (page 6, para 4.5)," and the main task is "repair services for facility switchgear and ATS systems that are malfunctioning." What will the government allow under this solicitation if the work required to accomplish the main task is outside the scope of the SOW. That is, will the government modify an award if more substantial repairs are required?  Under this contract, the government is looking for the vendor to establish what the issues with the system are and to repair those issues to have a fully operational system. The recommendations for improvement if directly associated to bring the system back to operational status would be considered part of repairs. Any recommendations that would assist in the future that are not required at this time to make the system functional would be submitted to the government for future contractual consideration. What are the total quantities and types of breakers, and what are their amperage ratings and trip-unit manufacturers/models? The purpose of the site visit was for the vendor to get the information required. GE/ABB/ASCO. Contract is investigative/repair and vendor will acquire information during performance. What breaker testing methods are expected, including whether primary- or secondary-injection testing is required? No expectations. Testing will be accomplished IAW NFPA 70 B and E. What are the quantities and types/models of protective relays requiring inspection or testing? The purpose of the site visit was for the vendor to get the information required. Contract is investigative/repair and vendor will acquire information during performance. What types and quantities of switches are included in the scope? The purpose of the site visit was for the vendor to get the information required. Contract is investigative/repair and vendor will acquire information during performance. Is any gear located on mezzanines? Is there suitable access and space near the electrical rooms to stage a generator and test equipment? No equipment is on mezzanine. Room is available. Are equipment photos or an equipment schedule available? The purpose of the site visit was for the vendor to get the information required. Contract is investigative/repair and vendor will acquire information during performance. What are the total quantities and types of breakers, and what are their amperage ratings and trip-unit manufacturers/models? The purpose of the site visit was for the vendor to get the information required. GE/ABB/ASCO. Contract is investigative/repair and vendor will acquire information during performance. What breaker testing methods are expected, including whether primary- or secondary-injection testing is required? No expectations. Testing will be accomplished IAW NFPA 70 B and E. What are the quantities and types/models of protective relays requiring inspection or testing? The purpose of the site visit was for the vendor to get the information required. Contract is investigative/repair and vendor will acquire information during performance. What types and quantities of switches are included in the scope? The purpose of the site visit was for the vendor to get the information required. Contract is investigative/repair and vendor will acquire information during performance. Is any gear located on mezzanines? Is there suitable access and space near the electrical rooms to stage a generator and test equipment? No equipment is on mezzanine. Room is available. Are equipment photos or an equipment schedule available? The purpose of the site visit was for the vendor to get the information required. Contract is investigative/repair and vendor will acquire information during performance. | 59% | Combined Synopsis | 11/18/2026 |
SITE VISIT A site visit will be conducted on Monday, November 16, 2026, at 9:00 AM EST at the VA Medical Center, Manchester, 718 Smyth Road, Manchester, NH 03104. The purpose is to allow quoters to inspect the existing Eaton Powerware 9390 UPS, the installation location, access routes, and site conditions relevant to the UPS replacement and ongoing maintenance. Attendance is recommended but not required to submit a quotation. Quoters who do not attend are responsible for obtaining the information necessary to prepare a quote and will not be relieved of any contract obligation on the basis of not having attended. Quoters intending to attend the site visit shall notify Andrew Obrien, Deputy Chief of Facility Service, by email at Andrew.Obrien@va.gov, and CC Shawn Lawrence, Contract Specialist at Shawn.Lawrence@va.gov, no later than Thursday, November 12, 2026, at 5:00 PM EST. The email shall include the name, company, and citizenship of each attendee for facility access. Each attendee shall bring a valid government-issued photo ID and report to Facility Service in Building 6 upon arrival. Attendees shall comply with all facility safety, PPE, and security requirements. Statements made during the site visit do not change the solicitation. Any information that affects the solicitation will be furnished to all quoters only through a written amendment. Questions raised at the site visit should be submitted in writing per the instructions in 52.212-1 to receive a binding Government response. Quotation delivery: Submit quotations via email to Shawn.Lawrence@va.gov no later than November 26, 2026, at 5:00 PM EST. Questions regarding this solicitation shall be submitted in writing by email to the Point of Contact no later than 5:00 PM EST on November 19, 2026. | 59% | Combined Synopsis | 11/26/2026 |
The Cincinnati Veterans Administration Medical Center (VAMC) has a requirement to provide repairs to generator operation to address failed generators & associated paralleling switchgear. The intention of this Sources Sought is to obtain information only. Please do not send a proposal. Requested information: To aid acquisition planning, we re seeking capable and interested firms for the information requested. If your firm meets the criteria please send the point of contract (ronald.heidemann@va.gov) the following, via email: Firm s Name Socio-Economic Status Whether or not your company has a contract vehicle we can order against If your company believes there is an alternative NAICS code please provide this If your company has any questions please provide. Contract Title. Repair Emergency Power Phase 2 Background. The chosen contractor shall provide repairs to generator operation to address failed generators & associated paralleling switchgear at the Cincinnati VAMC. The fulfillment of the project will allow for testing & repairs/replacement of existing equipment as required to restore full emergency backup generator functionality at this facility. Additional repairs required were identified by ABB during the initial repair of paralleling switchgear and the report is on the last page. Scope. The scope of this contract is to provide recommended repairs for both of the generators at Building #1. This system is currently functioning with only one generator, leaving the facility vulnerable in the event of a power failure at this site. Key task is to restore full emergency backup power for the facility to facilitate repairs of the existing equipment. Key task is test emergency power system and verify it works as intended. Specific Tasks. Maintain emergency generator availability for the facility Maintain security of the generator/switchgear room during the entire project. Work on generators can only be performed on weekend with prior coordination with the VA. Work will need to be done on two separate weekends, one weekend per generator work. Provide required repairs for the associated paralleling switchgear system per diagnose reports from ABB which includes Saturday work. Work includes the following items as identified in the ABB repair report: Replace two damaged MFR13 and reverse power relay to new protective relay and all installation/testing for both generators. Programming changes required for these replacement relays to ensure proper system functionality. Door modification to support the installation and operation of the upgraded relays. Wiring modifications to accommodate the replaced relays. Changes to the existing ABB systems drawings for these replaced relays. The General Contractor (GC) must coordinate as needed with the VA COR for testing of the generator control panels. Two new control panels (one per generator) have been installed. One control panel has been tested and verified to function as intended. The control panel on the inoperable generator requires testing and verification to ensure proper functionality. GC must provide a load bank for testing of both Generator 1 and Generator 2 on this day. 125% of load bank required. GC/subcontractor for paralleling gear work must test paralleling both Generator 1 (1500kW, 3 PH, 4W, 480Y/277V) and Generator 2 (1500kW, 3 PH, 4W, 480Y/277V) and verify it works with the 125% load bank. GC and subcontractor for paralleling gear must change priority of generators to verify they come back online/and shed as designed. GC and subcontractor for paralleling gear must provide a complete testing of the emergency power system including both generators and paralleling switchgear after all repair work is completed and verify it works as intended. Performance Monitoring Contract supervision will be conducted by the Project Section of Engineering Service at the Cincinnati VA Medical Center. Inspection will be made throughout the project and delivery and installation. Security Requirements  7.1 The C&A requirements do not apply and a Security Accreditation Package is not required  Cincinnati VA Medical Center (CVAMC) Record Management Clause.  1. Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.   2. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.   3. In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.   4. Cincinnati VA Medical Center (CVAMC) and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of CVAMC or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to CVAMC. The agency must report promptly to NARA in accordance with 36 CFR 1230.  5. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the Statement of Work. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to CVAMC control or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the Statement of Work. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).  6. The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and CVAMC guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.  7. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with CVAMC policy.   8. The Contractor shall not create or maintain any records containing any non-public CVAMC information that are not specifically tied to or authorized by the contract.   9. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.   10. The CVAMC owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which CVAMC shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20.  11. Training. All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take VHA-provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.   [Note: To the extent an agency requires contractors to complete records management training, the agency must provide the training to the contractor. TMS Course 10203, VA Privacy & Information Security Awareness will be used to satisfy this requirement.    12. The Contractor shall incorporate the substance of this clause, its terms and requirements including this paragraph, in all subcontracts under this Statement of Work and require written subcontractor acknowledgment of same.   13. Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor.  Government-Furnished Equipment (GFE)/Government-Furnished Information (GFI). None. Other Pertinent Information or Special Considerations. a. Identification of Possible Follow-on Work. None. b. Identification of Potential Conflicts of Interest (COI). None. c. Identification of Non-Disclosure Requirements. None. d. Packaging, Packing and Shipping Instructions. None e. Inspection and Acceptance Criteria. Project COR to conduct the final acceptance of satisfactory installation. Risk Control None Place of Performance. This product will be used at the Cincinnati VAMC, specifically within the generator and electrical rooms. Period of Performance. 90 calendar days including equipment/material lead time. Delivery Schedule. TBD Technical/Administrative Requirements Contracted work shall be conducted in accordance with the below VA Specifications. Warranty Contractor must provide a one (1) year warranty to include all materials and labor. ABB Report Julie, After reviewing the project requirements and available options, it has been determined that the only viable solution is to upgrade the MFR13 Relay. The upgrade is expected to be more expensive than originally anticipated because the scope of work extends beyond simply replacing the relay. The upgrade will also require: Programming of the upgraded relay to ensure proper system functionality. Door modifications to support the installation and operation of the upgraded relay. Wiring modifications to accommodate the upgraded relay Changes to the existing systems drawings for the upgrade. Due to these additional labor and material requirements, the total project cost will be higher than our initial estimate. While this was not anticipated as the solution, these modifications are necessary to ensure the system functions properly. Please let us know if you would like us to prepare a quote outlining the additional costs associated with this work for your review. I believe a similar quote was provided in 2025 for the relay upgrade. If you have any questions or would like to discuss the project in more detail, please feel free to reach out. Thanks, Brian Bednar Area Field Service Project Manager Mobile: 984-303-5371 fred.ervin@us.abb.com | 59% | Market Research | 10/21/2026 |
Additional Details
Solicitation Number
36C24723Q1070
Archive Date
Sep 18, 2023
Office Address
AUGUSTA, GA, 30904