Notice ID: 6e122bf2a6ed499bb5a879c78a48645fSources Sought
Access Control Replacement
Archived on November 8, 2024. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 3:30 PM UTC−04:00
- Posted
- October 21, 2024
- Notice type
- Sources Sought
- NAICS
- 238210: Electrical Contractors and Other Wiring Installation Contractors
- Agency
- Department of Veterans Affairs
Notice details
- Office
- 247-NETWORK CONTRACT OFFICE 7 (36C247)
- Place of performance
- Decatur, GA, 30033
- Last updated
- Jan 23, 2026
Identifiers
- Solicitation number
- 36C24725Q0097
- Notice ID
- 6e122bf2a6ed499bb5a879c78a48645f
Description
Removal and Replacement of Existing Access Control. Vendor will provide own tools, materials, labor and supervision. Vendor will provide all service required to include, but not limited to; Three (3) ACU Controllers, Two (2) ACU Controllers, Eight (8) Batteries, Nine (9) Keypad Card Readers, Five (5) Electric Door Latches, All required software and supporting material/services. This is for a One-Time Service.
Award Overview
Possible prior contract
Inferred, not confirmedInferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.
Contract end date
Oct 20, 2023
NAICS
238210
Agency
Department of Veterans Affairs
Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.
Contacts
Documents
Showing 1 of 1 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Sources Sought | VETERANS AFFAIRS, DEPARTMENT OF | Oct 21, 2024 | - |
Lifecycle
Solicitation:
36C24725Q0097- Market Research
Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)
- Market ResearchCurrentOct 21, 2024
Access Control Replacement
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Questions and Answers 36C24727Q0050 Boiler #3 Oxygen Analyzer and Steam Flow Meter RFI Responses Where should the output signals from the new steam flow meter and O2 analyzer terminate? For example, the existing building automation system (BAS), the existing Boiler 3 burner/boiler controls, or a local display only. Burner 3 boiler/burner controls where applicable and local display. Does the government require active O2 trim control to the burner fuel/air ratio, or monitoring and display of the O2 only? Oxygen analyzer must send signals/information to combustion controls to control trim. What is the material of construction for the stack? Is it single or double wall? Stack is double walled. Inside material is steel; outside material is galvanized steel. Stack is 36 D Selkirk Metalbestos Model P.S. Current operating pressure and temperature of the system for boiler #3? Design pressure is 200 psi. Typical operating pressure is 82 psi. Typical operating temperature is about 330 degrees Fahrenheit. What are the available outputs on the physical steam flow meter (e.g., 4-20 mA, Modbus RTU, BACnet MS/TP)? 4-20 mA analog. Is the flow meter wired directly into an analog terminal block on the CB Hawk, or is it wired directly to the facility s Building Automation System (BMS)? Steam flow meter is wired into local CB Hawk analog terminal block. Please provide nameplates for the existing oxygen analyzer and steam flow meter. Oxygen analyzer nameplate: Steam flow meter nameplate: | - | Combined Synopsis | 10/26/2026 |
| - | Awarded | Open | |
| - | Awarded | Open | |
EO 14398 | Elevator Modernization | CLIN 0094 | Atlanta GA | - | Awarded | Open |
The purpose of this amendment is to remove wording unintentionally added to the Request for Information 36C24827Q0104. Please disregard the highlighted sentence below that is currently in the Description under SCOPE OF WORK . It should not be included. SCOPE OF WORK: The Contractor shall provide all labor, travel, parts, materials, transportation, equipment, tools, training, supplies, management and supervision to perform circuit tracing and documenting electrical circuits within the critical and non-critical areas of Building 1. The Contractor shall furnish all labor, equipment, sanitized, disinfected and labels for containers, supplies, materials, transportation and supervision required to provide pick up, transport, incineration and/or acceptable disposal of biomedical infectious, veterinary, chemotherapy, biological/pathological, sharps waste, and contaminated wastes. Attached is the corrected copy of the Request for information description. | - | Market Research | 11/11/2026 |
Additional Details
Solicitation Number
36C24725Q0097
Archive Date
Nov 8, 2024
Office Address
AUGUSTA, GA, 30904