GovChime
Notice ID: b28bf51547084ddea9b151e08bae5fd7Solicitation

R702--Tiered Evaluations Including Small Business Concerns Multiple Locations FY 22: Pharmacy Inventory Services

Archived on February 22, 2022. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
11:00 AM UTC−05:00
Posted
December 14, 2021
Notice type
Solicitation
NAICS
561990: All Other Support Services
Agency
Department of Veterans Affairs

Notice details

Office
248-NETWORK CONTRACT OFFICE 8 (36C248)
Place of performance
13 Pharmacy Locations within 4 stations, Orlando, FL, 32827
Last updated
Dec 4, 2025

Identifiers

Solicitation number
36C24822Q0197
Notice ID
b28bf51547084ddea9b151e08bae5fd7

Description

FY 22: Annual Pharmacy Wall to Wall Inventory VISN8: Miami-Orlando-Bay Pines-Gainesville

Full description on SAM.gov

Award Overview

Possible prior contract

Inferred, not confirmed

Inferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.

Contract end date

Feb 14, 2022

NAICS

561990

Agency

Department of Veterans Affairs

Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:36C24822Q0197
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationNov 26, 2021

    R702--Tiered Evaluations Including Small Business Concerns Multiple Locations FY 22: Pharmacy Inventory Services

    Notice e659b18ecf7948a1a4c4bb7da7c6caa6 on SAM.gov

  2. SolicitationCurrentDec 14, 2021

    R702--Tiered Evaluations Including Small Business Concerns Multiple Locations FY 22: Pharmacy Inventory Services

    Notice b28bf51547084ddea9b151e08bae5fd7 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
The Contractor shall provide continued support to the 18th Military Police Brigade in the execution of travel administration, property accountability, and non tactical vehicle (NTV) program management. The Contractor shall administer travel operations using the Defense Travel System (DTS) and the Defense Property Accountability System (DPAS) across the Brigades area of responsibility (AOR). The Contractor shall maintain property accountability records and support the Accountable Property Office utilizing Global Combat Support System Army (GCSS Army) and the Decision Support Tool (DST). The Contractor shall oversee NTV dispatching, maintenance tracking, and fleet operations at Government Owned/Government Operated (GO/GO) facilities. Government Technical Monitors (GTMs), designated by the Contracting Officer Representative (COR), will provide workload guidance at each supported site. Contractor personnel shall be accountable solely to the Contractor, who remains responsible to the Government. This requirement is a non personal services effort that ensures audit compliance, accurate reporting, and sustained administrative readiness, enabling Soldiers to focus on mission essential duties.Updates have been made to the ELIN Attachment
51%
Solicitation11/03/2026
The purpose of Amendment 0001 is to update the NAICS code, the PSC, and the proposal due date as follows: (1) the NAICS code is changed from 561990 (All Other Support Services) to 561210 (Facilities Support Services), adjusting the small business size standard to $47.0 Million; (2) the PSC is changed from R706 (Support- Management: Logistics Support) to S216 (Housekeeping- Facilities Operations Support); and (3) the proposal due date is extended from 4 June 2026 to 5 June 2026 at 10:00 AM CDT. All other terms and conditions remain unchanged. Please note a signed copy of the amendment must be submitted in addition to other requirements at time of quote.This is a combined synopsis/solicitation for commercial products or services, prepared per RFO FAR Part 12. This announcement serves as the only solicitation; no separate written document will be issued. Important Submission Note: Offers must be submitted directly through the PIEE Solicitation Module. We will not accept submissions via DoD SAFE, third-party File Transfer Protocol (FTP) sites, or proprietary links. Non-Personal Service to provide all labor, transportation, equipment, materials, supervision and other items for services necessary to manage and perform ISB Support Services for Garrison ? Fort McCoy, WI, IAW the Performance Work Statement (PWS) for a period of performance of 01 July 2026 - 30 June 2027 base period with four (4) option years and a six (6) month option to extend. All documents including the solicitation, attachments, instructions and requirements for submitting a quote can be found in the PIEE links below. If there are any questions or issues with using the PIEE module, please reach out to the PIEE Help Desk at (866) 618-5988.
51%
Combined Synopsis06/05/2026
Annual physical wall-to-wall pharmacy inventory services are required per VHA Directive 1761, Supply Chain Inventory Management. If your business can fulfill this VA requirement, please contact me by email. A solicitation will follow.
50%
Market Research11/11/2026
REQUEST FOR INFORMATION (RFI): LOGCAP VI Small Business Suite – Follow-On Market Research DISCLAIMER: The Government is issuing this Request for Information (RFI) in accordance with Federal Acquisition Regulation (FAR) clause 52.215-3 (Request for Information or Solicitation for Planning Purposes). The Government does not intend to award a contract on the basis of this RFI or otherwise pay for the information solicited. Your response shall be treated as information only and shall not be used as a proposal. 1.0 PURPOSE The U.S. Army Contracting Command – Rock Island (ACC-RI), on behalf of the Army Sustainment Command (ASC), is issuing this follow-on RFI to further refine the acquisition strategy for the LOGCAP VI Small Business Suite. Based on feedback from the initial RFI, the Government recognizes a need to clarify the operational mechanics of the "Small Business with Prime Surge" model and seeks targeted industry input on managing concurrent operations during a national emergency. 2.0 CLARIFICATION OF ACQUISITION STRATEGY & RULES OF ENGAGEMENT DISCLAIMER: The operational mechanics and rules of engagement described below represent the Government's planned acquisition strategy and are provided solely to establish a common baseline for industry feedback. This strategy has not been formally approved. While the Government currently intends to execute the model as described, all parameters are subject to change prior to the release of the final solicitation. To ensure industry feedback is aligned with the Government's planned acquisition strategy, the Government provides the following baseline clarifications: The Definition of "Surge" (Scope vs. Volume): The Government will NOT activate a LOGCAP Large Business (LB) Prime simply because steady-state workload volume increases (e.g., reaching 125% or 150% of baseline). The Small Business (SB) Prime retains full ownership of the steady-state mission, including all associated volume spikes and routine fluctuations. The LOGCAP Prime is solely activated to execute completely separate, additive, mobilization-specific requirements (e.g., mass force deployment outloads) that fall outside the baseline LRC mission. The Activation Trigger is a Formal Event, Not a Metric: The LOGCAP Prime will not evaluate the SB’s capacity to determine if they should activate. Activation of the LOGCAP Prime is tied strictly to formal, documented Government directives (e.g., Presidential National Emergency Declaration, SECWAR Mobilization Order). Parallel Execution, Not Subordination: The SB Prime will never be subordinate to the LOGCAP Prime. This is a Parallel Execution Model. The Associated Contractor Agreement (ACA) is strictly a lateral coordination tool used to de-conflict shared physical resources (e.g., gate access, railheads, staging yards) during concurrent operations. The SB answers exclusively to the Government Contracting Officer and COR, not the LOGCAP Prime. Strict CPARS Independence: The Government will evaluate the SB Prime strictly on their baseline PWS metrics, completely insulated from the LB Prime's mobilization execution. A failure by the LOGCAP Prime during a mobilization outload will not negatively impact the SB Prime’s CPARS. Temporary, Expeditionary Presence: The LOGCAP Prime’s activation is strictly temporary. Once the formal mobilization directive is rescinded, the LOGCAP Prime will execute a mandatory demobilization and exit the installation; they will not absorb steady-state garrison functions. Compensated Integration: The Government recognizes that concurrent operations require increased administrative effort. The Government intends to utilize specific contractual mechanisms (e.g., dedicated coordination CLINs) to ensure the SB Prime is fairly compensated for the administrative burden of integrating with the LB. 3.0 QUESTIONS FOR INDUSTRY With the understanding that the SB Prime handles all steady-state work (including its volume spikes) and the LOGCAP Prime handles only formal mobilization/deployment requirements, the Government requests feedback on the following operational and contractual mechanics: Section A: Managing the Operational "Seam" During Parallel Execution When a formal mobilization occurs, both primes will operate simultaneously on the installation. If the Government defines the boundary between the SB Prime and LOGCAP Prime using Unit Identification Codes (UICs)—where the SB retains all resident unit support and the LOGCAP Prime assumes all transient/mobilizing unit support—what specific operational friction points would this create at shared nodes like the Ammunition Supply Point (ASP) or Central Issue Facility (CIF)? Instead of delineating by UIC, would it be more operationally effective to delineate the scope by physical footprint (e.g., the SB retains the permanent motor pools, while the LOGCAP Prime exclusively operates temporary staging yards and the railhead)? Please explain the risks of this approach. Recognizing that Government CORs will be at maximum capacity during a mass mobilization, what specific, contractor-led de-confliction mechanisms (e.g., a Joint Operations Coordination Cell [JOCC] or shared scheduling dashboard) should be mandated in the ACA to manage the daily schedule of shared resources (e.g., wash racks, scales) before escalating conflicts to the COR? Industry has recommended using a RACI (Responsible, Accountable, Consulted, Informed) matrix to manage concurrent operations. What specific cross-cutting logistical functions (e.g., property book hand-offs, dispatching) absolutely require a standardized RACI matrix in the baseline solicitation to prevent duplicated effort or dropped requirements? The Government is considering placing the primary burden of integration on the LOGCAP Large Business (LB) Prime by requiring them to submit a 'Concurrent Operations Integration Plan'—mutually agreed upon and signed by the SB Prime—as a formal contract deliverable prior to surge execution. From a Small Business perspective, does making the LB responsible for securing this agreement ensure your operational needs are met, or does it inadvertently give the LB too much leverage during negotiations? If the Government adopts a model where daily coordination between the two primes is largely 'invisible to the USG,' how can the Government contractually protect the SB Prime’s workforce? What specific 'anti-poaching' clauses or rules of engagement must be included in the baseline solicitation to prevent the LOGCAP Prime from hiring away your steady-state staff to meet their mobilization surge requirements? During concurrent operations, both primes may require access to the same Government Automated Information Systems (e.g., GCSS-Army). What specific protocols or role-based access controls must be established prior to a mobilization event to prevent data corruption, duplicate ordering, or cybersecurity conflicts between the two primes? Section B: Scaling the Small Business Contract for Steady-State Mission Growth / Volume Spikes The SB Prime must absorb volume spikes within their steady-state scope independently of the LOGCAP Prime. What specific Contract Line Item Number (CLIN) structures should the Government utilize to allow the SB Prime to rapidly staff and execute the volume spikes that remain within their steady-state scope? What is the realistic maximum organic volume spike capacity (e.g., percentage above steady-state baseline) that a Small Business prime can absorb and execute effectively before mission degradation occurs? The Government is evaluating the most effective standard CLIN structures to accommodate sustained mission growth and volume spikes within the steady-state scope of the EAGLE mission while minimizing risk to Small Business (SB) Primes. To accommodate potential mission growth within a Firm-Fixed-Price (FFP) CLIN structure, what baseline variance percentage (e.g., a 10% sustained increase in volume) do you recommend the Government establish before triggering a formal review or equitable adjustment of the fixed price? If a variance threshold (e.g., 10%) is established under an FFP CLIN, how should the baseline and growth be measured (e.g., consecutive months of sustained growth, average quarterly volume increases, or another metric) to ensure fair and accurate pricing adjustments? For mission growth areas where the scope, labor mix, or volume cannot be accurately projected, is it highly preferable to utilize a Cost-Reimbursable (CR) CLIN structure? Please provide your rationale based on risk management and staffing speed for a Small Business Prime. When standard mission growth occurs, what lead time does a Small Business Prime require to recruit, onboard, and execute the increased requirement without mission degradation? Section C: HTRO Evaluation Criteria The Government intends to utilize a Highest Technically Rated Offeror (HTRO) methodology for the IDIQ base awards. To evaluate a Small Business's ability to absorb their own "steady-state volume spikes" during a high-tempo period, what specific past experience criteria should be used in the HTRO matrix to demonstrate a firm's ability to rapidly scale recruiting, management, and execution, and how would an offeror demonstrate that capability to the Government for validation? During the task-order competition phase, what specific criteria should the Government use to evaluate the credibility of a bidder's "Parallel Execution Plan" (i.e., their approach to de-conflicting shared resources and maintaining autonomy while the LOGCAP Prime executes the mobilization outload)? Additionally, what other key discriminators or evaluation factors should the Government utilize during the task-order competition to effectively differentiate between highly capable Small Business offerors? Section D: E-Craft Vendor Resource Requirements Administrative Burden: What specific resources (e.g., personnel, software, training) are required from a vendor's perspective to successfully implement, maintain, and submit reports through the eCraft system? Time Commitment: On average, how many labor hours per reporting period (e.g., weekly, monthly) are dedicated exclusively to eCraft compliance and data entry? System Integration: Does your organization use automated tools to extract data from your internal financial/accounting systems into the eCraft Periodic Report of Costs (PRC) format, or is the process primarily manual? Cost and USG Billing Structures Incurred Costs: Does utilizing the eCraft system cost your organization money? If so, please break down the nature of these costs (e.g., dedicated personnel salaries, specialized software, third-party compliance consultants, training). Charging the USG: How do you account for and charge the USG for the costs associated with eCraft compliance? Are these costs billed as Direct Costs against specific contracts? Are they absorbed into Indirect Costs (e.g., Overhead, G&A)? Please explain your organization's rationale and standard accounting practice regarding these charges. Experience and Operational Pitfalls General Experience: Briefly describe your overall experience working with the eCraft system. What aspects of the system work well for your organization? Common Pitfalls: What are the most significant challenges, pain points, or pitfalls your organization has experienced when using eCraft? (e.g., data validation errors, xml file generation, system access issues, alignment of eCraft categories with internal labor categories). Recommendations for Improvement: Based on your experience, what recommendations do you have for the USG to streamline the eCraft reporting process or reduce the burden on industry partners? Alternative Commercial Solutions: Are you aware of any other commercial off-the-shelf (COTS) solutions or software platforms that meet the Government's intent of proposal and invoice reconciliation through automated data ingestion? If so, please identify these solutions and briefly describe their advantages over the eCraft system. 4.0 INSTRUCTIONS FOR RESPONSE Small businesses should submit a response (maximum 15 pages) addressing the questions above and providing the following company information: Company Name, CAGE Code, and Unique Entity Identifier (UEI) Company Address and Primary Point(s) of Contact (Name, Title, Email, Phone) Small Business Certification(s) / Socioeconomic Categories Current EAGLE task order holder status (if applicable) Submission Deadline: Responses are requested no later than 1000 AM CST 03 AUG 2026. Submission Instructions: Please submit responses via email to the following points of contact: nathanial.s.tutor.civ@army.mil; hannah.j.kennedy.civ@army.mil and kassidy.j.hainline.civ@army.mil
45%
Market Research08/03/2026
Contractor answers to questions 1. Contractor experience and technical qualifications Question: May a newly established small business satisfy the minimum requirement of three years of wall-to-wall pharmacy inventory experience and experience at three pharmacies through the qualifications of proposed key personnel, subcontractors, or teaming partners? Will general retail, grocery, military inventory, or equipment-accountability experience qualify instead of pharmacy inventory experience? Government Response: No. 2. Historical inventory quantities, values, and workload Question: Can the Government provide historical inventory line-item counts, SKU quantities, replacement values, pharmacy sections, inventory areas, and prior inventory durations for each of the six facilities, separated by inpatient and outpatient pharmacies? Can the Government also provide historical staffing levels and facility square footage or shelving quantities? Government Response: Available historical inventory information will be provided in the attachment referenced by the Government. FY2026 inventory information is being compiled. Historical staffing levels are unknown, and facility square footage or shelving quantities are not available. 3. Physical inventory completion deadline Question: The solicitation contains references to both January 31 and February 28 for completing physical inventories. Which deadline governs? Government Response: All physical inventories at the six VA facilities shall be completed no later than January 31 of the applicable contract year. All final reports, validations, corrections, and required closeout documentation shall be completed and submitted no later than February 28 of that year. 4. Inventory scheduling and completion requirements Question: May the six facilities be inventoried sequentially by one crew, or must multiple facilities be inventoried concurrently? Are weekend or after-hours inventories permitted, and must each facility's inventory begin at 8:00 a.m. and be completed within one business day? Government Response: The six facilities may be inventoried sequentially between January 1 and January 31, provided that each facility's physical inventory is completed within one business day. Inventories shall ordinarily begin at 8:00 a.m. local time. Weekend work, after-hours access, and inventory dates must be coordinated with each individual VA Medical Center. One original response suggested concurrent scheduling, while several others expressly permitted sequential scheduling. This draft follows the repeated sequential-scheduling responses and should be confirmed. 5. Automated dispensing systems and controlled substances Question: Is the Contractor required to physically count medications contained in automated dispensing cabinets and packaging systems, or will the Government provide system-generated inventory reports? Who is responsible for counting controlled substances? Government Response: The VA Medical Center Pharmacy will generate inventory reports from applicable automated dispensing and packaging systems for incorporation into the Contractor's final reports. Controlled substances will be physically counted by authorized VA Pharmacy personnel, and the Contractor shall incorporate the Government-provided results into the final inventory reports. 6. Government-furnished data and pricing information Question: Will the Government provide product master files, McKesson Prime Vendor pricing information, direct-purchase costing information, and automated-system inventory extracts? What information must the Contractor obtain independently? Government Response: No. No, Vendor should get this from McKesson, Yes, Must meet the requirements of the SOW. 7. Final inventory report format and submission Question: What electronic format and data elements are required for final inventory reports? Will the Government provide a sample report template, and may reports be submitted after February 28 if the physical inventory was completed by January 31? Government Response: A separate electronic inventory report shall be submitted for each facility within seven calendar days after completion of its physical inventory. The report shall include facility, pharmacy/section, item name and strength, package description, applicable NDC/UPC/UPN, McKesson item number where applicable, quantity, current package price, extended replacement cost, section/location, and total inventory replacement cost. Please email mario.russell@va.gov for VISN 09 Spreadsheets. Reports shall be compatible with Microsoft Excel or an equivalent Government-approved spreadsheet application. The Government will not provide a sample report template. All final reports and required corrections must be completed by February 28. Reports submitted after that deadline will not meet the stated requirement. 8. Contractor equipment, software, and access Question: May the Contractor use its own handheld scanners and inventory software? Are specific scanning devices, software platforms, or VA network integrations required? What security and access requirements apply? Government Response: The Contractor may use its own scanners and inventory software, provided they meet the SOW requirements. 9. Pharmacy inventory scope and storage locations Question: Does outpatient inventory include satellite pharmacies and other pharmacy-controlled storage locations? Are medications stored in specialized or low-temperature refrigerators included? Government Response: The number and type of outpatient and satellite pharmacy locations vary by facility. All applicable medications under pharmacy control, including medications stored in specialized refrigeration units, shall be included unless specifically excluded by the SOW. The Contractor shall coordinate the inventory areas with each facility. 10. Incumbent contractor and historical contract information Question: Is this a new requirement or a recompete? If there is an incumbent contractor, what is the previous contract number, awarded contract value, and total price? Government Response: Professional Inventory Control Systems INC, 36C24926P0139, $19,200.00, $19,200.00. 11. Subcontractor participation and on-site staffing Question: May a small business prime contractor use a subcontractor to perform physical inventories under the prime's management and quality control? Must the prime contractor provide its own personnel on-site during each inventory? Government Response: No 12. Past performance evaluation Question: Will an offeror without directly relevant past performance receive a Neutral rating rather than an Unacceptable rating? Government Response: Neutral as this is based of LTPA. 13. Insurance and bonding Question: What insurance coverage and bonding requirements apply, including minimum limits, when evidence must be submitted, and whether a subcontractor's insurance may satisfy any part of the requirement? Government Response: Please reference the SOW. 14. Service Contract Labor Standards wage determination Question: The SOW references an applicable Department of Labor wage determination, but none is attached. Which wage determination applies to this requirement? Government Response: No Wage Determination applies. 15. Implementation plan submission Question: Is the implementation plan required with the technical quotation, or may it be submitted after contract award? Government Response: No. This is based off LTPA 16. Solicitation status and amendments Question: Are the posted SOW and evaluation criteria final for quotation purposes, or does the Government anticipate issuing an amendment to clarify or revise the requirements? Government Response: Final.
43%
Special Notice11/15/2026

Additional Details

Solicitation Number

36C24822Q0197

Archive Date

Feb 22, 2022

Office Address

TAMPA, FL, 33637