GovChime
Notice ID: 94f6e089c11c483f81c29449d96f18f7Solicitation

J061--Requirement- Preventive Maintenance Caterpillar Facility Backup Generator Services

Archived on May 12, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
5:00 PM UTC−04:00
Posted
April 10, 2024
Notice type
Solicitation
NAICS
811310: Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
Agency
Department of Veterans Affairs

Notice details

Office
248-NETWORK CONTRACT OFFICE 8 (36C248)
Place of performance
VA Medical Center 7305 N. Military Trail, West Palm Beach, 33410-6400
Last updated
Dec 6, 2025

Identifiers

Solicitation number
36C24824Q0299
Notice ID
94f6e089c11c483f81c29449d96f18f7

Description

Generator PM Check List 1. Visually Inspect Radiator/Heat Exchanger for Leaks, Damage and Obstruction 2. Add coolant to Bring the Coolant to it' s Correct Level (Max 2 Gals) 3. Inspect Condition of Radiator Cap. Gasket and Sealing Surface 4. Analyze Coolant for Proper antifreeze Percentage - -30 5. Analyze Conditioner SCA Level and add Additional SCA as Needed - 2000 6. Visually Inspect Water Pump and Cooling System Gaskets for Leaks 7. Inspect Flexible Water Connections for Cracking, Leaks and Pliability 8. Re-Torque Hose Clamps 9. Inspect Pulleys for Excessive Wear 10. Inspect Belts for Cracking and Fraying 11. Check Belt Tension 12. Check Jacket Water Heater(s) for Proper Operation and Adjust Thermostat Setting 13. Add Crankcase Oil to Bring the Oil to its Correct Level (Max 2 Gals) (Change Oil and Filters for Annual PM) 14. Inspect Oil Heater for Proper Operation and Check Thermostat Sea ls 15. Visually Inspect Front and Rear of Crankshaft Seals and Lubrication System Gaskets for Leaks 16. Record Fuel Level in Main Fuel Tank 17. Stick Main Tank for Water - 0 18. Test Day Tank Pump for Proper Operation and Level 19. Test Day Tank Alarms 20. Drain Water and Sediment from Day Tank (if accessible) 21. Clean or Replace In let Filters (during annual PM only) for Day Tank 22. Clean Primary Fuel Filter (if screen type) 23. Drain Water from Water Separator 24. Operate Fuel Priming Pump and Check for Proper Operation and Leaks 25. Check the Engine' s Fuel System for Leaks 26. Inspect Flexible Fuel Lines for Cracking, Leaks and Pliability 27. Check Governor Oil Level and Add Oil as Needed 28. Inspect Steel Fuel Lines for Cracks, Leaks and Proper Line Bracket Support 29. Check and Record Battery Cells Electrolyte Specific Gravity 30. Top Off Electrolyte Level 31. Check and Record Battery Charger Amperage a. Equ.. Rate: - 8.5 b. Float Rate: - 5.0 32. Check Battery Charger and Adjust Float Rate for Optimum Battery Performance and Life: a. Equ. Volts: - 29.6 b. Float Volts: - 28.4 33. Tighten Battery Cable Connections as Needed 34. Clean and Apply Corrosion Inhibitor to Terminals of Only Lead Acid Batteries as Needed 35. Inspect and Tighten Starter Motor Connections and Wiring 36. Inspect Flexible Exhaust Coupling for Cracks and Excessive Leakage 37. Visually Inspect Exterior of Exhaust Manifolds for Oil or Fuel Slobbering (signs of wet stacking) 38. Inspect Exhaust Rain Protection and/or Exhaust Outlet Screening 39. Drain Water in Exhaust Moisture Traps 40. Inspect Exhaust Manifold(s) for Broken or Missing Hardware 41. Inspect Air Filters for Plugging and Deterioration 42. Test Air Cleaner Indicator 43. Check All Air Intake Piping for Damage and Loose Connections 44. Inspect Turbocharger for Seal Leakage and Excessive End Play Clearance (if accessible) 45. Perform an Operational Check of Illumination and Safety Lamps 46. Check for and Tighten Loose Terminals on the Generator Set and Generator Control Panel 47. Check Tightness of Relays in the Generator Control Panel 48. Inspect for Excessive Dirt Accumulation in the Control Panel and Clean as Needed 49. Inspect air Cleaner Seal for Pliability and Sealing 50. Check Rotor Air Gap for Correct Clearances 51. Inspect rotor and Stator for Damage and Excessive Oil and/or Dirt build Up 52. Inspect Coupling and Guards for Loose or Missing Pa11s 53. Check Tightness of Generator Leads and Voltage Regulator Control wiring 54. Strap and Tape any Wiring or Generator Leads that Have rubbing or Worn Insulation 55. Inspect Brushes and Slip Rings or Rotating Rectifiers 56. Clean and Adjust Voltage Droop Potentiometer 57. Clean Crankcase Breather, Inspect Hose and Connections 58. Lubricate Fan Drive with Caterpillar Bearing Lubricant (annual PM only) 59. Lubricate Governor Linkage with Caterpillar Bearing Lubricant (annual PM only) 60. Lubricate Generator Bearing with Caterpillar Bearing Lubricant (annual PM only) 61. Inspect Generator Set Vibration Isolators and Adjust as Needed 62. Make a Walk Around Inspection of Complete Installation 63. Check for Unit On-Line Capability in Less Than Ten Seconds 64. Check and Record Battery Voltage Dip Level During Over crank Test for Minimum Voltage Required to Maintain Controls During Starting - 22.1 65. Check for Proper Cranking Termination Upon Starting 66. Check Proper Operation of Engine and Generator Instruments with Generator Running 67. Adjust Governor Control for Optimum Performance and Frequency - 60.0 68. Adjust Voltage Regulator for Proper Voltage - 482 69. Record Field Voltage During Generator No-Load Run for Base Line '0. Check and Record Alternator Voltage with Engine Running 70. Check for Abnormal Noise or Vibration 71. Check for Abnormal Exhaust Characteristics with Engine Running (signs of wet stacking) 72. Check for Proper Operation of Remote Fan Motors, Thermostats, Circulating Pumps, and Solenoid Valves 73. Check Inlet and Discharge Louvers for Proper Operation with Engine Running and Stopped 74. Check for Excessive Crankcase Blow-by with Engine Running 75. Re-Check Oil Level with Engine Running 76. Re-Check for Leaks with Engine Running 77. Test Auto-Sta rt System 78. Test Safeties and Prealarms on Control and Annunciator Pane ls 79. Take Oil Sample (after operational checks) for Caterpillar S.O.S. Program 80. Rest All Controls to Auto ma tic 81. Set Circuit Breaker to Correct Position 82. Check Fuel Valves for Correct Position 83. Check Voltage Regula tor is ON and NOT Tripped 84. Check Battery Charger is ON 85. Check Day Tank Controls are ON 86. Check Remote Radiator Fan Controls are ON 87. Check Auxiliary Water Pump Controls are ON 88. Check Jacket Wate r Heater(s) are ON 89. Check Louver Controls are ON

Full description on SAM.gov

Award Overview

Possible prior contract

Inferred, not confirmed

Inferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.

Contract end date

Aug 31, 2025

NAICS

811310

Agency

Department of Veterans Affairs

Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:36C24824Q0299
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationMar 28, 2024

    J061--Requirement- Preventive Maintenance Caterpillar Facility Backup Generator Services

    Notice 1cfb81070ac84e93b2635f744d77e39e on SAM.gov

  2. 2×
    SolicitationCurrentMar 28, 2024

    J061--Requirement- Preventive Maintenance Caterpillar Facility Backup Generator Services

    Notice 94f6e089c11c483f81c29449d96f18f7 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
-Combined Synopsis10/28/2026
SITE VISIT A site visit will be conducted on Monday, November 16, 2026, at 9:00 AM EST at the VA Medical Center, Manchester, 718 Smyth Road, Manchester, NH 03104. The purpose is to allow quoters to inspect the existing Eaton Powerware 9390 UPS, the installation location, access routes, and site conditions relevant to the UPS replacement and ongoing maintenance. Attendance is recommended but not required to submit a quotation. Quoters who do not attend are responsible for obtaining the information necessary to prepare a quote and will not be relieved of any contract obligation on the basis of not having attended. Quoters intending to attend the site visit shall notify Andrew Obrien, Deputy Chief of Facility Service, by email at Andrew.Obrien@va.gov, and CC Shawn Lawrence, Contract Specialist at Shawn.Lawrence@va.gov, no later than Thursday, November 12, 2026, at 5:00 PM EST. The email shall include the name, company, and citizenship of each attendee for facility access. Each attendee shall bring a valid government-issued photo ID and report to Facility Service in Building 6 upon arrival. Attendees shall comply with all facility safety, PPE, and security requirements. Statements made during the site visit do not change the solicitation. Any information that affects the solicitation will be furnished to all quoters only through a written amendment. Questions raised at the site visit should be submitted in writing per the instructions in 52.212-1 to receive a binding Government response. Quotation delivery: Submit quotations via email to Shawn.Lawrence@va.gov no later than November 26, 2026, at 5:00 PM EST. Questions regarding this solicitation shall be submitted in writing by email to the Point of Contact no later than 5:00 PM EST on November 19, 2026.
-Combined Synopsis11/26/2026
This is a Request for Quote (RFQ). The Government anticipates awarding a firm-fixed price contract resulting from this solicitation. This RFQ is set aside for Service-Disabled Veteran Owned Small Business (SDVOSB). All respondents must have an active registration in the System for Award Management (SAM) at www.sam.gov and certified by the SBA in Small Business Search (SBS). Interested SDVOSB s must be listed to receive contract awards. Department of Veterans Affairs, Network Contracting Office 16, is soliciting offers for Switchgear (Automatic Transfer Switch (ATS) Investigation and Repair. The service will be provided to (GVSMVAMC) G.V. Sonny Montgomery VA Medical Center in Jackson MS, in accordance with the Statement of Work (SOW). Site Visit: Date/Time Location POC Tuesday November 10th from 9:00am to 1:00pm. G. V. (Sonny) Montgomery VA Medical Center 1500 E Woodrow Wilson Drive Jackson, MS 39216 Willard Bill Rushing Facility Operations Supervisor Cell: 601-559-7104 Willard.Rushing@va.gov TECHNICAL QUESTIONS: All questions shall be received by Thursday November 12, 2026, at 4:00 P.M. CST. All questions submitted for this solicitation shall me electronically sent to the following email address: Vanessaann.Williams@va.gov. Please title email with the Solicitation Number, Technical Questions . Questions shall clearly identify which part of the solicitation. Questions received after the date stated may be addressed at the discretion of the Contracting Officer. Answers to questions will be addressed via an amendment to the solicitation posted to www.sams.gov. OFFER INSTRUCTIONS: 1. All offers are due NLT Wednesday, November 18, 2026, at 4:00 P.M. CST via e-mail only to Vanessaann.Williams@va.gov. Quotes shall be received on or before the date and time specified in Block 8 of the Standard Form (SF) 1449. Please title email with Solicitation Number, Proposal Submission, Vendor Name . 2. Offeror must complete and return the signed SF 1449, blocks 30a, 30b, and 30c. By signing the Standard Form (SF) 1449/Solicitation, the contractor attests acknowledgement and understanding of all solicitation requirements. 3. If applicable, must acknowledge receipt of all solicitation amendments by the offer due time/date specified, if applicable, by (a) Returning a signed copy of each amendment or (b) Acknowledging receipt of amendment on each copy of the quote or (c) By separate electronic communication which includes a reference to the solicitation and amendment numbers. 4. Offeror must submit the Price/Cost Schedule with unit prices rounded to the nearest hundredth. Please ensure unit price and total amounts are correct. Offeror agrees to hold the price in its offer firm for 60 calendar days from the date specified for receipt of offers. 5. Offeror must complete, sign, and return VAAR Clause 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION). 6. Offeror shall submit a Capability Statement that demonstrates their aptitude for working on these systems to include: Investigation Tasks: Inspect and evaluate: GE Main switchgear (MV, LV sections as applicable) ABB Distribution switchgear sections ASCO ATS-1 and ATS-2 (including logic boards, transfer mechanism, control power circuits) Identify voltage ratings of trip and close coils. Rack breakers out for physical inspection. Perform mechanical integrity inspection (linkages, springs, shutters, rails). Evaluate relay configuration: GE Multilin F-60, G-30, MIF II, UR-series relays, ABB relays. Review protective relay event logs. Verify battery health for control relays. Inspect control wiring and MOC/TOC blocks. Document all deficiencies discovered. Repair Tasks: Replace trip coils/close coils where improper voltages or failures are found. Replace or repair MOC/TOC blocks. Replace relay control batteries. Repair/replace defective relays (G-30, Multilin series, if field-repairable, ABB). Correct wiring faults, loose lugs, damaged insulation. ATS logic troubleshooting and repair (ASCO control board testing, timing sequence validation, mechanical). Functional testing of each breaker after repair. Re-racking, lubrication, cleaning, and cabinet maintenance Generator/ATS Integration Testing (as needed) Support load-bank verification of generator response (coordination with CAT dealer). Remove/reconnect bias signals during generator tuning (if required). Deliverables Investigation Report identifying all deficiencies. Repair Completion Report summarizing corrective actions performed. Updated device condition log for the switchgear, ATS units, and relays. Recommendations for future reliability improvements. It is the responsibility of the quoter to submit sufficient information to convey their technical capability in meeting the requirements of the Statement of Work. Failure to provide sufficient information will result in the quote being considered not technically acceptable. 7. Provide a list of three (3) other concerns and/or Government agencies for which services similar in size and scope were rendered by the Offeror over the past three years. The list must include name of contact, organization, a valid email address, valid phone number, dollar value of project, and description of the project.
-Combined Synopsis11/18/2026
The Cincinnati Veterans Administration Medical Center (VAMC) has a requirement to provide repairs to generator operation to address failed generators & associated paralleling switchgear. The intention of this Sources Sought is to obtain information only. Please do not send a proposal. Requested information: To aid acquisition planning, we re seeking capable and interested firms for the information requested. If your firm meets the criteria please send the point of contract (ronald.heidemann@va.gov) the following, via email: Firm s Name Socio-Economic Status Whether or not your company has a contract vehicle we can order against If your company believes there is an alternative NAICS code please provide this If your company has any questions please provide. Contract Title. Repair Emergency Power Phase 2 Background. The chosen contractor shall provide repairs to generator operation to address failed generators & associated paralleling switchgear at the Cincinnati VAMC. The fulfillment of the project will allow for testing & repairs/replacement of existing equipment as required to restore full emergency backup generator functionality at this facility. Additional repairs required were identified by ABB during the initial repair of paralleling switchgear and the report is on the last page. Scope. The scope of this contract is to provide recommended repairs for both of the generators at Building #1. This system is currently functioning with only one generator, leaving the facility vulnerable in the event of a power failure at this site. Key task is to restore full emergency backup power for the facility to facilitate repairs of the existing equipment. Key task is test emergency power system and verify it works as intended. Specific Tasks. Maintain emergency generator availability for the facility Maintain security of the generator/switchgear room during the entire project. Work on generators can only be performed on weekend with prior coordination with the VA. Work will need to be done on two separate weekends, one weekend per generator work. Provide required repairs for the associated paralleling switchgear system per diagnose reports from ABB which includes Saturday work. Work includes the following items as identified in the ABB repair report: Replace two damaged MFR13 and reverse power relay to new protective relay and all installation/testing for both generators. Programming changes required for these replacement relays to ensure proper system functionality. Door modification to support the installation and operation of the upgraded relays. Wiring modifications to accommodate the replaced relays. Changes to the existing ABB systems drawings for these replaced relays. The General Contractor (GC) must coordinate as needed with the VA COR for testing of the generator control panels. Two new control panels (one per generator) have been installed. One control panel has been tested and verified to function as intended. The control panel on the inoperable generator requires testing and verification to ensure proper functionality. GC must provide a load bank for testing of both Generator 1 and Generator 2 on this day. 125% of load bank required. GC/subcontractor for paralleling gear work must test paralleling both Generator 1 (1500kW, 3 PH, 4W, 480Y/277V) and Generator 2 (1500kW, 3 PH, 4W, 480Y/277V) and verify it works with the 125% load bank. GC and subcontractor for paralleling gear must change priority of generators to verify they come back online/and shed as designed. GC and subcontractor for paralleling gear must provide a complete testing of the emergency power system including both generators and paralleling switchgear after all repair work is completed and verify it works as intended. Performance Monitoring Contract supervision will be conducted by the Project Section of Engineering Service at the Cincinnati VA Medical Center. Inspection will be made throughout the project and delivery and installation. Security Requirements  7.1 The C&A requirements do not apply and a Security Accreditation Package is not required  Cincinnati VA Medical Center (CVAMC) Record Management Clause.  1. Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.   2. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.   3. In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.   4. Cincinnati VA Medical Center (CVAMC) and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of CVAMC or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to CVAMC. The agency must report promptly to NARA in accordance with 36 CFR 1230.  5. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the Statement of Work. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to CVAMC control or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the Statement of Work. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).  6. The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and CVAMC guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.  7. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with CVAMC policy.   8. The Contractor shall not create or maintain any records containing any non-public CVAMC information that are not specifically tied to or authorized by the contract.   9. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.   10. The CVAMC owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which CVAMC shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20.  11. Training. All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take VHA-provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.   [Note: To the extent an agency requires contractors to complete records management training, the agency must provide the training to the contractor. TMS Course 10203, VA Privacy & Information Security Awareness will be used to satisfy this requirement.    12. The Contractor shall incorporate the substance of this clause, its terms and requirements including this paragraph, in all subcontracts under this Statement of Work and require written subcontractor acknowledgment of same.   13. Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor.  Government-Furnished Equipment (GFE)/Government-Furnished Information (GFI). None. Other Pertinent Information or Special Considerations. a. Identification of Possible Follow-on Work. None. b. Identification of Potential Conflicts of Interest (COI). None. c. Identification of Non-Disclosure Requirements. None. d. Packaging, Packing and Shipping Instructions. None e. Inspection and Acceptance Criteria. Project COR to conduct the final acceptance of satisfactory installation. Risk Control None Place of Performance. This product will be used at the Cincinnati VAMC, specifically within the generator and electrical rooms. Period of Performance. 90 calendar days including equipment/material lead time. Delivery Schedule. TBD Technical/Administrative Requirements Contracted work shall be conducted in accordance with the below VA Specifications. Warranty Contractor must provide a one (1) year warranty to include all materials and labor. ABB Report Julie, After reviewing the project requirements and available options, it has been determined that the only viable solution is to upgrade the MFR13 Relay. The upgrade is expected to be more expensive than originally anticipated because the scope of work extends beyond simply replacing the relay. The upgrade will also require: Programming of the upgraded relay to ensure proper system functionality. Door modifications to support the installation and operation of the upgraded relay. Wiring modifications to accommodate the upgraded relay Changes to the existing systems drawings for the upgrade. Due to these additional labor and material requirements, the total project cost will be higher than our initial estimate. While this was not anticipated as the solution, these modifications are necessary to ensure the system functions properly. Please let us know if you would like us to prepare a quote outlining the additional costs associated with this work for your review. I believe a similar quote was provided in 2025 for the relay upgrade. If you have any questions or would like to discuss the project in more detail, please feel free to reach out. Thanks, Brian Bednar Area Field Service Project Manager Mobile: 984-303-5371 fred.ervin@us.abb.com
-Market Research10/21/2026
This is a SOURCES SOUGHT and is for informational/market research purposes only. THIS IS NOT A REQUEST FOR PROPOSAL, QUOTATION OR BID, NOR A SYNOPSIS OF A PROPOSED CONTRACT ACTION. The purpose of this Sources Sought is to conduct market research to determine if responsible sources exist, to assist in determining the category of Small Business Set-Aside. The proposed North American Industry Classification System (NAICS) Code is 811310, Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance, which has a corresponding Size Standard of $12.5 million dollars. The 125 Fighter Wing, Florida Air National Guard, Jacksonville, FL is seeking sources to perform 12-year hydrostatic testing, recharge, or repairs on 33 Each Amerex model 600k, 150lb Halon Fire Extinguishers. The Contractor shall provide documentation that they are EPA approved Section 608 technician certified under 40 CFR Part 82, Subpart F and meet the specific requirements of Subpart H for halon emissions reduction. Responses to this sources sought notice must be submitted electronically (via email). Please return the attached Sources Sought Cover Sheet with your email response. A contractor’s response to this Sources Sought shall be limited to the information sheet and five (5) additional pages of information for past performance or experience which may help in market research for industry capacity and shall include the following information: 1. Contractor’s name, address, point of contact, phone number, email address and CAGE code. 2. Contractor’s small business category and business size: Small Business, Small Disadvantaged, 8(a) firm, Historically underutilized Business Zones (HUBZone), Economically Disadvantaged Women-Owned Small Business (EDWOSB), and Service- Disabled Veteran-Owned Small business(SDVOSB). 3. Provide a maximum of two examples of projects similar in size, scope, and complexity with a brief description of each project, customer name, contract number, and the dollar value. Projects considered similar in scope to this project include a variety of field support requirements for the same projects simultaneously. 4. Provide additional relevant information on the contractor’s experience/capabilities as it pertains to the proposed work outlined. DISCLAIMER: This notice does not obligate the Government to award a contract. No reimbursement will be made for any costs associated with providing information in response to this Sources Sought or any follow up information. The Government reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate. Any organization responding to this notice should ensure that its response is complete and sufficiently detailed to allow the Government to determine the organization’s qualification to perform the work. Respondents are advised that the Government is under no obligation to acknowledge receipt of the information received or to provide feedback to respondents with respect to any information submitted. After a review of the responses a solicitation may be published on www.SAM.gov. However, responses to this notice will be considered adequate to a solicitation. All interested partied must be registered in the System for Award Management (SAM) at https://www.sam.gov and remain current for the duration of the contract to be eligible for award of a Government contract.
-Market Research11/13/2026

Additional Details

Solicitation Number

36C24824Q0299

Archive Date

May 12, 2024

Office Address

TAMPA, FL, 33637