Notice ID: fdd1701fdf585504ebf05df1b6d6efecAward NoticeAwarded
Z--Provide Emergency Power to Telecommunication Rooms/603-18-601
Awarded on July 30, 2019. Full description on SAM.gov.
Awarded tounder 36C24919C0170 (source: SAM.gov award notice)• $848.6K
Overview
- Posted
- July 31, 2019
- Notice type
- Award Notice
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of Veterans Affairs
Notice details
- Place of performance
- ROBLEY REX VA MEDICAL CENTER;800 ZORN AVENUE;LOUISVILLE, KENTUCKY 40206 USA
- PSC
- Z: MAINT, REPAIR, ALTER REAL PROPERTY
- Last updated
- Dec 6, 2025
- Award date
- Jul 30, 2019
- Award amount (SAM.gov award notice)
- $848.6K
Identifiers
- Solicitation number
- 36C24919B0010
- Notice ID
- fdd1701fdf585504ebf05df1b6d6efec
- Award number (PIID)
- 36C24919C0170
Description
No Description Provided
Award Overview
Award Number
36C24919C0170
Award Amount (SAM.gov award notice)
$848.6K
Award Date
Jul 30, 2019
Awardee
Awardee UEI
GRB8KV2LGRG6
Original Solicitation
Notice ID: fdd1701fdf585504ebf05df1b6d6efec
Posted Date: Jul 31, 2019
Original Response Deadline: Not specified
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
36C24919B0010- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- 4×Pre-SolicitationMar 27, 2019
Z--Provide Emergency Power to Telecommunication Rooms/603-18-601
- SolicitationJul 18, 2019
Z--Provide Emergency Power to Telecommunication Rooms/603-18-601
- AwardedCurrentJul 31, 2019
Z--Provide Emergency Power to Telecommunication Rooms/603-18-601
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The Smithsonian Institution (“Smithsonian”) is providing this Notice of a Pending Solicitation for the installation of emergency generator at National Museum of American History (NMAH) 1300 Constitution Ave NW, Washington, D.C., 20560. Note: This is a revised RFP. Do not use previous posted documents from SOL# 33330226RF0010007. The applicable North American Industry Classification Codes (“NAICS”) are: 236220 - Commercial and Institutional Building Construction size standard is $45.0 million. 238210 – Electrical Contractors and Other Wiring Installation Contractors size standard is $19.0 million. Construction Budget: Over $10M. Project Information: The purpose of the NMAH: Install Emergency Generator project is to replace an aging 300 kW diesel-fueled generator located on the museum’s lower level, which has exceeded its operational lifespan. This will be accomplished by furnishing and installing two (2) new 500kW natural gas-fueled generators, on the roof adjacent to the existing emergency generator. The project also includes all necessary work to support the installation, including routing a new natural gas line through the building, and performing all associated structural, mechanical, electrical, plumbing, security, hazardous material abatement, and architectural modifications required to ensure full functionality, seamless integration with existing systems, and future serviceability and maintenance. Specifically, work under this project includes but is not limited to: a. Install two (2) new natural gas powered 500kW generators with integral paralleling gear on a new rooftop structural steel platform. Convert existing collections storage space (Room 4606) to a new Emergency Electrical Room to contain a new switchboard, ATS’s, transformers and panelboards. Decommission and remove existing Diesel generator on lower level. b. Coordination between complex existing building which will remain fully operational and open to the public during the duration of the work and new electrical and gas service pathways throughout. c. Existing conditions documentation early in the construction phase for implementation into BIM models. d. Development of coordination and construction BIM models early in the construction phase that depict existing conditions and proposed service pathways to enable the short circuit Study. e. A short circuit study of the proposed project prior to equipment submittals. f. Protection of existing finishes in the areas of work. g. Installation of a new gas line throughout the building to the roof to serve the new generators, including a quality control in situ mock-up. h. Installation of new conduit, MI cabling, panelboards, and pull-boxes throughout the building. Removal of existing conduit, panelboards, and pull-boxes throughout the building. i. Working around existing IT/Fiber Optic within the 4th floor corridors to allow for new conduit installation. j. Two switchover events: One from existing to temporary emergency power supplies and one for temporary to new emergency power supplies. k. Reinforcement of existing structure to support the new generators. l. Removal of the existing diesel generator in the lower level. m. Testing for lead and asbestos on existing piping at new points of connection. n. Mechanical work in the lower level to provide new fuel oil pumps. o. Work within and adjacent to sensitive Collection Storage areas that will have access restrictions and will require security escort. p. Work within and adjacent to sensitive 5th floor spaces including the Library and the Director’s Suite. q. All work is within an operational Museum with both staff and the public present. r. Ceiling removals and installation on the 4th and 5th floors. s. Hot-work required to weld the gas and containment pipe sections, cutting of existing pipe, and heat producing hot applied roofing membrane. t. Erection of temporary construction safety barriers, dust and debris air filtration and localized welding fume extraction. u. Integration and coordination of new mechanical and generator control systems into existing Siemens BAS. v. Initial testing, commissioning and black start of new electrical emergency generator systems. The museum will be open to visitors, and area adjacent to the construction site may remain open to visitors and staff. Construction Schedule: Total period of performance allowed for construction is 680 calendar days from the Notice to Proceed. This is not the requst for Proposals. The full solicitation, request for proposals and supporting documents will be released on or about beginning of December 2026; however, there is no guarantee or implication of a guarantee this this project will be solicited. Electronic copies will be uploaded to SAM.gov site. This notice does not oblige the Government to award a contract or otherwise pay for the information provided in response. THIS IS NOT A REQUEST FOR PROPOSAL. DO NOT SUBMIT ANY DOCUMENTS. | 76% | Pre-Solicitation | 02/10/2027 |
561-26-104 Repair OR & Bathroom | 71% | Solicitation | 11/20/2026 |
Amendment 2 - New Site Visit# 2 scheduled, updating Questions Close date, updating RFP Close date -New Site Visit# 2 is now scheduled for Wednesday, November 18, 2026 at 8:30 am CST. Please meet up at the Fermilab Badge Office and then the site visit at Wilson Hall. Everyone is required to meet up at the Fermilab Badge Office for the pre-brief of the project. Follow the instructions in Exhibit O to apply for access to the site. Please email the Procurement Specialist at ginakern@fnal.gov with the information listed in the RFP regarding the Site Visit prior to attending. This includes if you already have site access. Please arrive at least 5-10 minutes early as the Site Visit will start on time. -New Questions Close Date is now November 24, 2026 at 5:00 pm CST. All questions must be submitted in writing only. Send all questions, referencing the RFP# in the subject line to ginakern@fnal.gov. -New Closing Date for the Request for Proposal (RFP) is now December 9, 2026 at 3:00 pm CST. Please submit your proposal with all required documents to ginakern@fnal.gov. ************************************************************************************************************************* Fermilab has a new requirement for Wilson Hall Floor 16 Electric and Elevator Machine Rooms Fire Rating and Mechanical Upgrade located at Batavia, IL. Site visit is scheduled for November 4, 2026 at 8:30 am CST. Request for Proposal Closes on November 17, 2026 at 3:00 pm CST. | 65% | Solicitation | 12/09/2026 |
Posting Amendment 0006 to provide official RFI Responses, updated Solicitation Documents, extend the Proposal Due Date, and other official information. | 65% | Solicitation | 11/25/2026 |
Sources Sought Response Form Renovate Mission Support Facility (B145) & Repair/Renovate Conference Room (LRSO), Alert Facility (B1085) Minot Air Force Base (MAFB), North Dakota Sources Sought Notice # W9128F27SM005 NOTICE TYPE: Market Research / Sources Sought ACQUISITION AUTHORITY: 10 USC 2808a (Other Transaction Authority for Military Construction Projects) PROJECT TITLES: FY27 Renovate Mission Support B145, MAFB, ND FY27 RENOVATE CONFERENCE ROOM (LRSO) BUILDING 1085, MINOT AFB, ND NAICS CODE: 236220 – Commercial and Institutional Building Construction ESTIMATED VALUE: Firm Construction Cost Limitation (CCL): Renovate Mission Support Building 145 (CCL): $ 31,923,000 Renovate Conference Room (LRSO) Building 1085 (CCL): $ 3,503,000 PURPOSE By way of this Industry Outreach Questionnaire, the USACE-Omaha District intends to gauge Industry’s interest and capabilities in providing the requirement described hereunder. The Government welcomes qualifications and capability statements from all qualified entities regardless of federal construction experience or business size. The responses to this notice will be used for planning purposes for the upcoming procurement(s). This notice does not constitute a Request for Qualifications (RFQ), Request for Proposal (RFP), Request for Quotes, or Invitation for Bids (IFB). It does not guarantee the future issuance of an opportunity notice, nor does it commit the government to execute an agreement or pay for any information or administrative costs incurred in responding to this notice. This Agency will not accept unsolicited submissions in response to this notice. All costs associated with responding will be solely at the responding party's expense. Responding parties are requested to refrain from submitting proprietary information. Responses are to be sent via email to (POC) Phillip Wickham at Phillip.L. Wickham@usace.army.mil and (POC) Jessica Beckman at Jessica.L. Beckman@usace.army.mil not later than 11 December 2026 by 2:00 pm (MST)). Narratives shall be no longer than 5 pages. Email responses are required. PROBLEM AND BACKGROUND STATEMENT: The U.S. Army Corps of Engineers (USACE) is conducting market research on behalf Minot Air Force Base which has a requirement to address two distinct, but critical facility needs. The first is a full-scale renovation of the Mission Support Facility (Building 145), which requires significant interior, exterior, and systems modernization to continue supporting its operational function. The Mission Support Facility has a project timeline for award of the phase 1 agreement of FY26 Q3. The second is the need to convert an existing conference room (Building 1085) into a high-security Special Access Facility (SAF) accredited to Intelligence Community Directive (ICD) 705 standards. To streamline execution and foster innovation, the Government intends to address this suite of projects programmatically under a single Other Transaction Agreement (OTA). This approach seeks a capable partner or consortium to deliver a comprehensive design-build solution for both projects, potentially on a concurrent or closely phased schedule. The Special Access Facility (SAF) has a project timeline for award of the phase 1 agreement of FY26 Q3 The U.S. Army Corps of Engineers (USACE), Omaha District, is conducting market research on behalf of the Department of the Air Force (5th Bomb Wing / Air Force Global Strike Command) at Minot Air Force Base (AFB), North Dakota. The existing Minot AFB Alert Facility (Building 1085) requires critical renovation and spatial reconfiguration of its existing briefing, projector, and office spaces (Offices 225, 226, 227, Projector/Briefing Room 228, and a new Entry Control Vestibule, totaling approximately 2,660 SF) to establish a state-of-the-art Special Access Facility (SAF) supporting the Long-Range Stand-Off (LRSO) mission. CurrRntly, the existing spaces fail to meet the operational, acoustic, and physical security requirements of the mission users. Furthermore, the space requires extensive modernization to achieve full compliance with Intelligence Community Directive / Intelligence Community Standard (ICD/ICS 705) for Classified Open Discussion (OD) up to the Top Secret (TS) level. To resolve these operational shortfalls within an accelerated timeline, USACE intends to execute this project utilizing an innovative Construction Manager at Risk (CM@Risk) acquisition approach authorized under Other Transaction Authority (OTA) pursuant to 10 U.S.C. § 2808a. The Government's in-house USACE Design Team serves as the 100% Designer of Record (DOR) for both projects. The Government will advance the design for project 1 and 2 to an approximate 95% completion level, which will serve as the technical Requirements Package. The objective of this acquisition strategy is to select the single "best-suited" construction partner based on qualifications. The selected partner will collaborate with the USACE in-house DOR during Phase 1 to validate constructability, refine trade pricing, mitigate specialized supply-chain risks, and establish an open-book Guaranteed Maximum Price (GMP) prior to transitioning into Phase 2 physical construction execution. PROJECT DESCRIPTION AND OBJECTIVES: Project 1: Renovate Mission Support Center, Building 145 This project involves complete renovation and conversion of roughly 28,000 SF of the 45,236 SF facility into a centralized point for mission support functions for all airman, families, and retirees. General Demolition & Hazardous Abatement: Wall to wall, as required to implement the new layout and update dated systems. This includes but is not limited to the following: masonry and/or steel-studs walls; flooring, interior doors, and abandoned equipment; water, sewer and venting lines; electrical conductors and panels; HVAC distribution and equipment systems; and exterior doors & windows. All abandoned construction debris and equipment be to be recycled and/or disposed of off-site. Removal and disposal asbestos and other hazardous materials. Entry Control Vestibules: as required, replace entry/exit flow and ADA compliance, to accommodate fire alarm panels, and to account for any loading/unloading requirements. Mechanical: Update water lines and PIV to ensure they can independently support the fire suppression system, building conversion, and increased occupant load. Update all restroom plumbing, fixtures, exhaust system, and below grade plumbing, as required to support the new building occupant loads and revised layouts. Electrical Utility Systems: Update electrical, including subpanels, transformer(s), MDP, and switch gear. Demo existing electrical conductors, conduit, and grounding system on the Power Distribution System as required. Install emergency LED lighting in compliance with UFC 3-600-01.) Demolish interior and exterior lighting and replace with LED lights per UFC 3-530-01. Provide electrical load analysis to ensure maximum flexibility for future system changes. Civil: Replace/evaluate the exterior utility connections and site conditions. This includes but is not limited to the following: sanitary sewer, water supply, electrical feeds, site lighting, site drainage, and communications. Provide new communications feeds into separate and new COMM rooms. Update parking requirements are needed to serve the new workforce and guest occupant loads. Additional site work, including paving and utilities, is also required. Project 2: Convert Conference Room to Special Access Facility (SAF), Building 1085 This project provides for the complete architectural, structural, mechanical, electrical, and physical security renovation of approximately 2,660 SF on the second floor of Building 1085 (Area #1) at Minot AFB, North Dakota. The project will convert existing non-compliant spaces into an accredited, modern Special Access Facility (SAF) / Sensitive Compartmented Information Facility (SCIF) with an integrated Entry Control Vestibule, Briefing Room, Projector Room, and secure administrative offices. The scope of this acquisition includes: Demolition & Hazardous Abatement: Comprehensive selective demolition of existing interior wall framing, floor finishes, and ceiling systems down to the original structural substrate, along with required asbestos and lead-based paint testing and abatement. Radio Frequency (RF) Shielding & Acoustics: Application of continuous Radio Frequency (RF) foil barrier shielding across all outside perimeter structural surfaces—including the structural concrete floor, exterior/perimeter walls, and true concrete/corrugated metal ceiling deck. All electrical conduit, junction boxes, and fixtures on RF-treated surfaces must be surface mounted. All perimeter partitions, assemblies, and penetrations must be acoustically engineered and sound-baffled to satisfy Sound Transmission Class (STC) ratings for Top Secret Open Discussion per ICD/ICS 705 and AFGSC standards. Entry Control Vestibule: Construction of a secure entry control vestibule positioned between the existing restroom entry and Office 225. The vestibule will feature dual acoustical security doors (the outer door incorporating an RF foil barrier), an internal 6-inch step transition to the raised flooring, a visitor sign-in desk, and rough-in infrastructure for security cameras. Raised Access Flooring & Interior Systems: Installation of a new 6-inch accessible panel raised flooring system throughout the SAF footprint to accommodate concealed under-floor power, signal, and secure telecommunications raceways; new suspended acoustical ceiling systems at a minimum height of 9’-0” AFF; and Structural Interior Design (SID) / Furniture, Fixtures & Equipment (FF&E) integration. Specialized Mechanical (HVAC) Systems: Provision of a brand-new, self-contained, standalone HVAC system serving exclusively the SAF area, fully compliant with ICD 705 (disconnecting, blanking, and sealing all existing supply/return ducts originating from adjacent building zones). Fresh air intake shall be routed through internal mechanical space and equipped with physical security bars, anti-listening mesh, and acoustic sound baffles. The system will tie into the base Energy Management Control System (EMCS) VLAN. In strict accordance with Minot AFB Roofing Standards, no mechanical equipment, ducting, or penetrations are permitted on the roof; all equipment must be housed internally. Electrical, Fire Protection & Life Safety: Upgraded electrical service including an updated building one-line electrical diagram complying with NFPA six-switch disconnect requirements; interior LED lighting compliant with UFC 3-530-01; a fully addressable fire alarm system capable of direct, point-to-point reporting to the base D-21 system without the use of intermediate relays; and tie-ins to the building's Mass Notification System (MNS). Security Infrastructure (IDS / CCTV / Intercom): Complete raceway, electrical rough-in, conduit, and box installations for a new Security Alarm System (Advantor IDS), internal and external surveillance cameras, and intercom speakers. All security wiring will be homerun back to Room 209 for final component integration Exterior & Installation Compliance: Full compliance with Minot AFB exterior siding, trim, and roofing standards, as well as DoD Minimum Antiterrorism Standards for Buildings (UFC 4-010-01) and applicable Facility-Related Control Systems (FRCS) cybersecurity standards. PROPOSED ACQUISITION METHODOLOGY AND SCHEDULE, DESIGN STATUS: To maximize collaboration, schedule speed, cost certainty, and industry innovation while maintaining a firm Construction Cost Limitation, USACE Omaha intends to utilize an Other Transaction (OT) Agreement under the authority of 10 USC 2808a, rather than a traditional FAR-based contract. This collaborative framework will be structured in a multi-phase Construction Management at Risk (CM@Risk) the design is at/near 95% completion: The builder is hired during Phase 1 to act as an expert consultant, helping the Designer of Record (DOR) push the design from 95% to 100% using real-time market data and MII (MCACES 2nd Generation) cost comparisons. Once the design hits 100% and the MII estimate validates the open-book pricing, the agreement transitions to Phase 2, where the builder goes "At-Risk" to construct the facility under a Guaranteed Maximum Price (GMP). The DOR retains design liability, but the contractor drives constructability and assumes responsibility for layout, schedule, and trade coordination. The Pricing Structure: Pre-Con Fee + Target Fee & GMP Preconstruction Services Fee: A fixed-price amount paid to the contractor strictly to fund their time spent helping the A/E finalize the 95% design into a 100% design. The Target Fee: The contractor’s transparent profit margin for managing the actual construction, bid competitively upfront. The GMP: The absolute ceiling for the construction phase (Validated Direct Costs + Target Fee + Shared Contingency). PHASED EXECUTION PLAN Phase 1: Preconstruction Services Agreement (CM@Risk Advisory) Solicitation (White Papers): The Solicitation would likely include the 95% design. The Deliverable is anticipated to be a concise 5-to-10 page White Paper. Evaluation Criteria will likely include corporate capability and CM@Risk past performance; preconstruction approach (how the firm plans to collaborate with the Government's A/E to close the remaining 5% design gap, identify value-engineering opportunities, and mitigate supply-chain risks); proposed Target Fee (for construction) and Preconstruction Services Fee. The Pitch Meeting (Oral Presentations): A 90-minute pitch where the contractor must bring their Project Manager, Site Superintendent, and their Preconstruction Manager. The Government team assesses how well the contractor's team will integrate with the A/E during the critical final design push. The OT will initially be awarded and funded only for the Preconstruction Services Fee. Design Finalization (Bridging the 5% Gap): The contractor’s Preconstruction team sits with the Government and the DOR. Because the design is not locked, they can actively change it. They perform value engineering, finalize equipment selections, and ensure the drawings are 100% constructible. Open Book Pricing vs. MII: As the design reaches 100%, the contractor conducts open-book market outreach. The Government and contractor review actual sub-bids together. USACE cost estimators finalize the Independent Government Estimate (IGE) using the MII software to validate costs and establish the GMP base. Phase 2: Construction Execution Agreement (Going "At-Risk") Execution: The Agreements Officer (AO) executes a bilateral modification to the OT Agreement, incorporating the GMP and funding the physical construction. Risk Allocation: Under CM@Risk, the contractor is now "At-Risk." While the DOR still owns fundamental engineering failures, the contractor loses the ability to claim "defective design" for constructability issues, material delays, or coordination errors, because they were explicitly paid to help finalize those exact decisions using market and MII data during Phase 1. REQUIRED INFORMATION TO BE SUBMITTED IN RESPONSE TO THIS NOTICE: Company Name, address, phone number, point of contract, email, web address: CAGE Code and Unique Entity Identifier (UEI), if available: Single and aggregate bonding levels: Current CMMC level reported in SPRS (if applicable): SUBMISSION REQUIREMENTS: What standard industry administrative practices, terms, or conditions should the Government adopt within this OTA to make it highly effective for a CM@Risk project? What are the most critical market constraints you currently anticipate for this scope of work (e.g., labor shortages, material lead times, equipment availability, specialized trade capacity? Provide 2–3 examples of projects completed in the last 10 years that involve new construction and/or major renovation on an active DoD installation. For each project, specify its final construction cost and the acquisition method used. Describe your experience working in and around mission-critical, semi-occupied facilities. What specific measures does your firm implement to ensure zero disruption to ongoing client operations? Provide any feedback, concerns, or recommendations your company has regarding the Government’s proposed hybrid approach (utilizing OTA authority to execute a CM@Risk for this project. Other Transaction Authority (OTA) & Statutory Compliance: Innovative Technologies: Describe any innovative materials, methods, or technologies your firm could propose for a project of this scale that could lead to cost savings, schedule acceleration, or enhanced facility performance and resilience. Barriers to Innovation: What commercial or Government-imposed barriers currently make it difficult to propose or implement innovative construction technologies? How could the flexibility of an OTA help overcome these barriers? CM@Risk & Design-Assist Involvement: 95% Design Entry: The Government plans to bring the CM@Risk contractor on board when the design is at 95%. Based on your experience, is a 5% design gap sufficient to add meaningful constructability and value-engineering input, or are the most critical decisions already locked in? Collaborative Framework: What collaborative mechanisms do you recommend the Government implement to rapidly close the 5% design gap and transition to a validated GMP? Describe your experience executing Construction Manager at Risk (CM@Risk) or other highly collaborative delivery methods, particularly where you served as a consultant before going "at-risk". Guaranteed Maximum Price (GMP), Risk Allocation & Compensation: Preconstruction Compensation: What specific compensation structures (e.g., fixed stipends, time-and-materials) would best compensate your firm for the pre-construction effort and design-assist phase? Open Book Pricing: How do you approach "open-book" pricing and transparency during Phase 1 to build trust and ensure the Government is receiving fair market value before locking in the GMP? Phase 1 Off-Ramp Risk: If the Government and the contractor cannot reach an agreement on the final GMP, what specific off-ramp conditions are critical to your firm? Teaming & Subcontractor Integration: Under a CM@Risk model starting at a 95% design, how and when do you plan to on-board your critical subcontractors (e.g., structural steel, MEP, fire protection)? Will you compete these subcontracts openly during Phase 1 to build the open-book GMP, or do you prefer bringing in established partners from day one? Feedback on the Acquisition Strategy & Alternatives: Would your organization be interested in competing for a single, consolidated Other Transaction Authority (OTA) agreement that incorporates Project 1 and Project 2 as distinct scopes of work at the same installation? Please identify any anticipated benefits, risks, or challenges associated with consolidating these requirements under one OTA. Does the proposed CM@Risk-OTA strategy incentivize your firm to participate? Why or why not? Are there alternative acquisition strategies, phasing approaches, or commercial practices the Government has not considered that would result in a more efficient process, faster delivery, or lower cost? COMMENTS: Provide comments or identify any concerns your company has regarding the planned approach. Note that the Government will not be responding to inquiries about the action at this time. Your responses and comments will be used by Government personnel to assess the viability and scope of the proposed approach and will be kept in the strictest confidence. Telephone inquiries will not be accepted. ACRONYMS AND DEFINITIONS: CUI (Controlled Unclassified Information): Information that requires safeguarding or dissemination controls pursuant to and consistent with applicable law, regulations, and government-wide policies, but is not classified under Executive Order 13526 or the Atomic Energy Act, as amended. GMP (Guaranteed Maximum Price): A pricing structure commonly used in Progressive Design-Build where the parties collaboratively develop the design, scope, and pricing prior to establishing a final construction price. Once negotiated and incorporated into the Agreement through a modification, the GMP functions as a Firm-Fixed-Price (FFP) commitment for the defined scope of work. The Design-Builder assumes the risk for completing the work within the negotiated GMP and is generally responsible for cost overruns, except for Government-directed changes, differing site conditions, or other authorized modifications that formally adjust the GMP. ICD/ICS (Intelligence Community Directive/Intelligence Community Standard): A system of policy documents that govern the U.S. Intelligence Community. ICD/ICS 705 specifically provides the standards for the secure design, construction, and operation of Sensitive Compartmented Information Facilities (SCIFs). Off-Ramp: Refers to a contractual mechanism that allows the Government to discontinue the Progressive Design-Build relationship if a fair and reasonable GMP or FFP for construction cannot be achieved. Upon off-ramp, the Government retains rights to the completed design to continue the project through another delivery method or design-builder. OT (Other Transaction) Agreement: A legally binding instrument other than a standard contract, grant, or cooperative agreement. OTs are not subject to the Federal Acquisition Regulation (FAR) and provide significant flexibility in tailoring the procurement process and terms to the needs of a project. Construction Manager at Risk (CM@Risk): Integrated project delivery method where the owner contracts a construction manager to provide advisory, estimating, and scheduling services during the design phase and then act as the general contractor during construction. Under this model, the construction manager commits to delivering the project within a Guaranteed Maximum Price (GMP), legally assuming the financial risk for any allowable cost overruns beyond that established ceiling. SAM (System for Award Management): The official U.S. government website where all entities must be registered to do business with the federal government. SCIF (Sensitive Compartmented Information Facility): An accredited area, room, group of rooms, or installation where sensitive, compartmented information (SCI) may be stored, used, discussed, and/or electronically processed. UEI (Unique Entity Identifier): The 12-character alphanumeric identifier assigned to all entities (public and private companies, individuals, institutions, or organizations) who register to do business with the federal government in the System for Award Management (SAM). USACE (U.S. Army Corps of Engineers): The federal agency, acting as the engineering and construction agent for the Department of Defense, responsible for managing this solicitation and the resulting OT. | 62% | Market Research | 12/11/2026 |
Additional Details
Solicitation Number
36C24919B0010
Archive Date
Aug 9, 2019