GovChime
Notice ID: 59185b6776844498a2cc675e00742707SolicitationArchived

C1DA--626A4-25-201 - AE Upgrade Primary Power Distribution

Archived on August 24, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM CDT
Posted
July 21, 2025
Notice type
Solicitation
NAICS
541330: Engineering Services
Agency
Department of Veterans Affairs

Notice details

Office
249-NETWORK CONTRACT OFFICE 9 (36C249)
Place of performance
Alvin C York VA Medical Center 3400 Lebanon Rd, Murfreesboro, 37129-1237
Last updated
Nov 11, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
36C24925R0037
Notice ID
59185b6776844498a2cc675e00742707

Description

626A4-25-201 - 36C24925R0037 - AE Upgrade Primary Power Distribution Responses to RFIs: The Statement of Work is good but since this is an upgrade to the existing facilities, do you have 1-line/as-built drawings that we can use in our bid preparation? A: Please see attached one-line drawings for existing conditions. The DWG file is the overall campus one line. The PDF shows a co-generator that was added to the campus power. There seems to be some discrepancies in the one-lines, so the AE s need to keep that in mind. A site walk would also go a long way in assisting us with pricing. A: No, site visit will not be provided since this is an AE Design. No fee proposal shall be needed until after evaluation has been made on the provided SF330. Page 3 says PPQs will count towards the page limitations but there is no mention of the page limit anywhere else. Is there a page limit for the SF330 submission? A: Size: Maximum size of the e-mail message shall not exceed five (5) megabytes. Only one email is permitted unless otherwise stated in this paragraph or in writing by a Contracting Officer. Submitted SF330 s are not to exceed a total of fifty (50) pages INCLUDING cover page and any other submitted documents. Does the VA have a list of which disciplines firms should provide resumes for in Section E? A: Yes, see page 5 of SF 330 Does the VA have a minimum or maximum number of projects they want firms to submit in Section F? A: Yes, the AE should provide 3-5 relevant projects for this section. Can you please confirm that we only need to provide VA projects awarded in the previous 12 months and the full potential value of any current indefinite delivery contracts for the prime A-E and not for our proposed subcontractors? A: Provide the available capacity of key disciplines by providing current project workload, inclusive of all projects awarded by the VA during the previous 12 months and the full potential value of any current indefinite delivery contracts. Can you please confirm we are not required to submit CPARS with our submission, only PPQs if CPARS are not available for the project? A: CPARS to be submitted, if there is no CPARS data available, Past Performance Questionnaires (PPQs) will be accepted. Can you please confirm that the geographical location of the firm is not an evaluation consideration of Factor 5 (Location)? Page 4 states location in the general geographical area of the project but then states that the intent is not where the firm is located. This paragraph also refers to Secondary Selection Criteria Factor 1, where information related to the firm s location is to be addressed, but there is no paragraph or subcategory for Secondary Selection Criteria in the RFQ. A: Geographical location of the firm is not an evaluation consideration, however, intent of this factor is to showcase a firm s understanding of the site and locality, and not where the firm is located. Firm s location to be addressed is to determine what Wage Determination to extract from SAM.gov. Would you consider cancelling this solicitation and re-issuing it through the IDIQ AE MATOC TVHS-Nashville and Murfreesboro that was awarded in September 2024? This vehicle has not yet been used to solicit responses to RFQs and seems to be a perfect fit for this project. A: No Thanks for any insight you can give as to why this vehicle is not being used. A: CONSTRUCTION BUDGET DESIGN LIMITATIONS/PROJECT MAGNITUDE: Estimated Budget Between $5,000,000.00 and $10,000,000.00. Can you please clarify if PDFs are an acceptable format for the 626A4-25-201 - 36C24925R0037 - AE Upgrade Primary Power Distribution SF330s to be submitted? A: Yes, PDFs are acceptable. Can you please also confirm the page limitations? A: Size: Maximum size of the e-mail message shall not exceed five (5) megabytes. Only one email is permitted unless otherwise stated in this paragraph or in writing by a Contracting Officer. Submitted SF330 s are not to exceed a total of fifty (50) pages INCLUDING cover page and any other submitted documents.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Jen Jamieson
Contract Specialist

Documents

Files (11)

  • Atch 8 CAD DRWG VA MURF OVERALL 1-LINE.pdf

    262 KBAdded in Solicitation version 4Posted
    Download
  • Atch 7 Drawing Co-Gen One Line.pdf

    724 KBAdded in Solicitation version 4Posted
    Download
  • 36C24925R0037 0002.docx

    31 KBAdded in Solicitation version 4Posted
    Download
  • 36C24925R0037 0001.docx

    24 KBAdded in Solicitation version 2Posted
    Download
  • Atch 6 Access to VA Information and VA Information Systems.pdf

    168 KBAdded in Solicitation version 2Posted
    Download
  • Atch 5 VA Information Custodial Language.pdf

    85 KBAdded in Solicitation version 2Posted
    Download
  • Atch 4 Certificate of Acknowledge No Construction Contract.pdf

    67 KBAdded in Solicitation version 2Posted
    Download
  • Atch 3 Certificate of Independent Price Determination.pdf

    90 KBAdded in Solicitation version 2Posted
    Download
  • Atch 2 AE Supplemental Design Submission Instructions.pdf

    52 KBAdded in Solicitation version 2Posted
    Download
  • Atch 1 VA Form 6298 Architect-Engineer Fee Proposal.pdf

    544 KBAdded in Solicitation version 2Posted
    Download
  • 36C24925R0037.docx

    133 KBAdded in Solicitation version 2Posted
    Download

Lifecycle

  1. 1
    Version 1SolicitationArchived

    C1DA--626A4-25-201 - AE Upgrade Primary Power Distribution

    Notice bbaf29c7634b42e9b56e025fc807b6be on SAM.gov

  2. 2
    Version 2SolicitationArchived

    C1DA--626A4-25-201 - AE Upgrade Primary Power Distribution

    Notice 55c71d5057a74915926989d84b0b219f on SAM.gov

  3. 4
    Version 4SolicitationArchivedCurrent

    C1DA--626A4-25-201 - AE Upgrade Primary Power Distribution

    Notice 59185b6776844498a2cc675e00742707 on SAM.gov

Other notices for this solicitation

  1. Pre-SolicitationRelated noticeJun 9, 2025

    C1DA--626A4-25-201 - AE Upgrade Primary Power Distribution

    Notice 1d529fede37d499aa611242a957f61d5 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

36C24925R0037

Archive Date

Aug 24, 2025