Notice ID: c5e72f9118d14b2aa051f8fafe223d9cAward NoticeAwarded
J061--Battle Creek Elevator Inspections and Testing Service
Awarded on December 30, 2021. Full description on SAM.gov.
Awarded tounder 36C25022C0060 (source: SAM.gov award notice)• $37.8K
Overview
- Posted
- January 4, 2022
- Notice type
- Award Notice
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 811310: Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
- Agency
- Department of Veterans Affairs
Notice details
- Last updated
- Sep 9, 2025
- Award date
- Dec 30, 2021
- Award amount (SAM.gov award notice)
- $37.8K
Identifiers
- Solicitation number
- 36C25021Q0328
- Notice ID
- c5e72f9118d14b2aa051f8fafe223d9c
- Award number (PIID)
- 36C25022C0060
Description
Battle Creek VA Medical Center Battle Creek, MI has a requirement for Elevator Inspection and Testing Service. This procurement has been set-aside 100% for award to Small Business (SB) concerns. Offers from other than SB concerns will not be considered and shall be rejected. Anticipated award date is February 2, 2021 for a base period of one (1) year plus four (4) one (1) year option periods to be exercised at the discretion of the Government. No telephone requests will be accepted. Solicitation packages will be available on or about January 22, 2021. Electronic solicitations may be obtained at no cost from the following URL: www.beta.sam.gov. All questions will be answered via Solicitation amendment. Questions must be submitted in writing to the Contracting Officer at the following e-mail address: olalekan.ismail@va.gov no later than January 26, 2021. Quotations are due no later than 12:00 pm (EST) on January 28, 2021 by email olalekan.ismail@va.gov or at Network Contract Office 10 (NCO10), 8888 Keystone Crossing, Suite 1100, Indianapolis, IN 46240 NAICS 811310 applies. Size standards $7.5 Million.
Award Overview
Award Number
36C25022C0060
Award Amount (SAM.gov award notice)
$37.8K
Award Date
Dec 30, 2021
Awardee
Awardee UEI
PEGXPBL25CF8
Original Solicitation
Notice ID: c5e72f9118d14b2aa051f8fafe223d9c
Posted Date: Jan 4, 2022
Original Response Deadline: Not specified
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
36C25021Q0328- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- Pre-SolicitationJan 22, 2021
J061--Elevator Inspections and Testing Service
- 2×SolicitationJan 22, 2021
J061--Elevator Inspections and Testing Service
- AwardedCurrentJan 4, 2022
J061--Battle Creek Elevator Inspections and Testing Service
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The Cincinnati Veterans Administration Medical Center (VAMC) has a requirement to provide repairs to generator operation to address failed generators & associated paralleling switchgear. The intention of this Sources Sought is to obtain information only. Please do not send a proposal. Requested information: To aid acquisition planning, we re seeking capable and interested firms for the information requested. If your firm meets the criteria please send the point of contract (ronald.heidemann@va.gov) the following, via email: Firm s Name Socio-Economic Status Whether or not your company has a contract vehicle we can order against If your company believes there is an alternative NAICS code please provide this If your company has any questions please provide. Contract Title. Repair Emergency Power Phase 2 Background. The chosen contractor shall provide repairs to generator operation to address failed generators & associated paralleling switchgear at the Cincinnati VAMC. The fulfillment of the project will allow for testing & repairs/replacement of existing equipment as required to restore full emergency backup generator functionality at this facility. Additional repairs required were identified by ABB during the initial repair of paralleling switchgear and the report is on the last page. Scope. The scope of this contract is to provide recommended repairs for both of the generators at Building #1. This system is currently functioning with only one generator, leaving the facility vulnerable in the event of a power failure at this site. Key task is to restore full emergency backup power for the facility to facilitate repairs of the existing equipment. Key task is test emergency power system and verify it works as intended. Specific Tasks. Maintain emergency generator availability for the facility Maintain security of the generator/switchgear room during the entire project. Work on generators can only be performed on weekend with prior coordination with the VA. Work will need to be done on two separate weekends, one weekend per generator work. Provide required repairs for the associated paralleling switchgear system per diagnose reports from ABB which includes Saturday work. Work includes the following items as identified in the ABB repair report: Replace two damaged MFR13 and reverse power relay to new protective relay and all installation/testing for both generators. Programming changes required for these replacement relays to ensure proper system functionality. Door modification to support the installation and operation of the upgraded relays. Wiring modifications to accommodate the replaced relays. Changes to the existing ABB systems drawings for these replaced relays. The General Contractor (GC) must coordinate as needed with the VA COR for testing of the generator control panels. Two new control panels (one per generator) have been installed. One control panel has been tested and verified to function as intended. The control panel on the inoperable generator requires testing and verification to ensure proper functionality. GC must provide a load bank for testing of both Generator 1 and Generator 2 on this day. 125% of load bank required. GC/subcontractor for paralleling gear work must test paralleling both Generator 1 (1500kW, 3 PH, 4W, 480Y/277V) and Generator 2 (1500kW, 3 PH, 4W, 480Y/277V) and verify it works with the 125% load bank. GC and subcontractor for paralleling gear must change priority of generators to verify they come back online/and shed as designed. GC and subcontractor for paralleling gear must provide a complete testing of the emergency power system including both generators and paralleling switchgear after all repair work is completed and verify it works as intended. Performance Monitoring Contract supervision will be conducted by the Project Section of Engineering Service at the Cincinnati VA Medical Center. Inspection will be made throughout the project and delivery and installation. Security Requirements  7.1 The C&A requirements do not apply and a Security Accreditation Package is not required  Cincinnati VA Medical Center (CVAMC) Record Management Clause.  1. Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.   2. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.   3. In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.   4. Cincinnati VA Medical Center (CVAMC) and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of CVAMC or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to CVAMC. The agency must report promptly to NARA in accordance with 36 CFR 1230.  5. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the Statement of Work. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to CVAMC control or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the Statement of Work. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).  6. The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and CVAMC guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.  7. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with CVAMC policy.   8. The Contractor shall not create or maintain any records containing any non-public CVAMC information that are not specifically tied to or authorized by the contract.   9. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.   10. The CVAMC owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which CVAMC shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20.  11. Training. All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take VHA-provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.   [Note: To the extent an agency requires contractors to complete records management training, the agency must provide the training to the contractor. TMS Course 10203, VA Privacy & Information Security Awareness will be used to satisfy this requirement.    12. The Contractor shall incorporate the substance of this clause, its terms and requirements including this paragraph, in all subcontracts under this Statement of Work and require written subcontractor acknowledgment of same.   13. Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor.  Government-Furnished Equipment (GFE)/Government-Furnished Information (GFI). None. Other Pertinent Information or Special Considerations. a. Identification of Possible Follow-on Work. None. b. Identification of Potential Conflicts of Interest (COI). None. c. Identification of Non-Disclosure Requirements. None. d. Packaging, Packing and Shipping Instructions. None e. Inspection and Acceptance Criteria. Project COR to conduct the final acceptance of satisfactory installation. Risk Control None Place of Performance. This product will be used at the Cincinnati VAMC, specifically within the generator and electrical rooms. Period of Performance. 90 calendar days including equipment/material lead time. Delivery Schedule. TBD Technical/Administrative Requirements Contracted work shall be conducted in accordance with the below VA Specifications. Warranty Contractor must provide a one (1) year warranty to include all materials and labor. ABB Report Julie, After reviewing the project requirements and available options, it has been determined that the only viable solution is to upgrade the MFR13 Relay. The upgrade is expected to be more expensive than originally anticipated because the scope of work extends beyond simply replacing the relay. The upgrade will also require: Programming of the upgraded relay to ensure proper system functionality. Door modifications to support the installation and operation of the upgraded relay. Wiring modifications to accommodate the upgraded relay Changes to the existing systems drawings for the upgrade. Due to these additional labor and material requirements, the total project cost will be higher than our initial estimate. While this was not anticipated as the solution, these modifications are necessary to ensure the system functions properly. Please let us know if you would like us to prepare a quote outlining the additional costs associated with this work for your review. I believe a similar quote was provided in 2025 for the relay upgrade. If you have any questions or would like to discuss the project in more detail, please feel free to reach out. Thanks, Brian Bednar Area Field Service Project Manager Mobile: 984-303-5371 fred.ervin@us.abb.com | - | Market Research | 10/21/2026 |
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in part 12, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; Offers are being requested and a written solicitation will not be issued. Solicitation number W50S8R26Q0025 is issued as a Request for Quotation (RFQ). This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. This solicitation is 100% small business set aside. The NAICS code that applies is 811310 and the size standard is $12.5M. This action will result in a firm-fixed price (FFP) purchase order utilizing simplified acquisition procedures. The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform generator maintenance and inspection, as defined in Attachment 1 Performance Work Statement: Contract Line Items (CLINS): CLIN 0001 Description: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform generator maintenance and inspection, as defined in Attachment 1 Performance Work Statement. Generator Preventative Maintenance PoP: 15 September 2026 – 14 September 2027 Qty: 12 Unit of Measure: Months Unit Cost: Total Cost: CLIN 0002 The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform B409 generator maintenance and inspection, as defined in Attachment 1 Performance Work Statement Paragraph 5.2. B409 Generator Diagnostic Inspection PoP: 15 September 2026 – 14 September 2027 Qty: 1 Unit of Measure: JOB Unit Cost: Total Cost: CLIN 0003 The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform B409 generator maintenance and inspection, as defined in Attachment 1 Performance Work Statement Paragraph 5.2. B409 Generator Repair/Overhaul PoP: 15 September 2026 – 14 September 2027 Qty: 1 Unit of Measure: JOB Unit Cost: Total Cost: Sub- CLINS Price Included in CLIN 0003 CLIN 0003AA Engine Gasket and Seal Replacement (PWS 5.2.2) Total Price: CLIN 0003AB Cooling System Refurbishment (PWS 5.2.2) Total Price: CLIN 0003AC Fuel System Refurbishment (PWS 5.2.2) Total Price: CLIN 0003AD Electrical and Starting System Replacement (PWS 5.2.2) Total Price: CLIN 1001 Description: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform generator maintenance and inspection, as defined in Attachment 1 Performance Work Statement. Generator Preventative Maintenance Note: Maintenance for the B409 generator is a non-severable component of the overall FFP monthly rate for CLIN 1001 and shall be included in the total proposed cost. However, for Government informational and budgeting purposes, the offeror shall provide a separate, non-binding annual cost breakdown specifically for the B409 generator within their price proposal. PoP: 15 September 2027 – 14 September 2028 Qty: 12 Unit of Measure: Months Unit Cost: Total Cost: CLIN 2001 Description: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform generator maintenance and inspection, as defined in Attachment 1 Performance Work Statement. Generator Preventative Maintenance Note: Maintenance for the B409 generator is a non-severable component of the overall FFP monthly rate for CLIN 1001 and shall be included in the total proposed cost. However, for Government informational and budgeting purposes, the offeror shall provide a separate, non-binding annual cost breakdown specifically for the B409 generator within their price proposal. PoP: 15 September 2028 – 14 September 2029 Qty: 12 Unit of Measure: Months Unit Cost: Total Cost: CLIN 3001 Description: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform generator maintenance and inspection, as defined in Attachment 1 Performance Work Statement. Generator Preventative Maintenance Note: Maintenance for the B409 generator is a non-severable component of the overall FFP monthly rate for CLIN 1001 and shall be included in the total proposed cost. However, for Government informational and budgeting purposes, the offeror shall provide a separate, non-binding annual cost breakdown specifically for the B409 generator within their price proposal. PoP: 15 September 2029 – 14 September 2030 Qty: 12 Unit of Measure: Months Unit Cost: Total Cost: CLIN 4001 Description: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform generator maintenance and inspection, as defined in Attachment 1 Performance Work Statement. Generator Preventative Maintenance Note: Maintenance for the B409 generator is a non-severable component of the overall FFP monthly rate for CLIN 1001 and shall be included in the total proposed cost. However, for Government informational and budgeting purposes, the offeror shall provide a separate, non-binding annual cost breakdown specifically for the B409 generator within their price proposal. PoP: 15 September 2030 – 14 September 2031 Qty: 12 Unit of Measure: Months Unit Cost: Total Cost: Delivery location/Place of Performance – 1947 Harrington Memorial Road, Mansfield, OH, 44903 Site Visit: A site visit has been scheduled for 24 August 2026 at 10:00 AM EST. Due to security conditions, all offerors SHALL register to attend this conference and site visit. Email the following information for all attendees to James Kliewer at james.kliewer.2@us.af.mil Upon request, a base access form will be provided for interested site visit attendees to fill out and sign. The base access form shall be completed and provided by 20 August 2026 at 1:00 PM EST in order to ensure access to the installation. Visitors shall arrive no sooner than 30 minutes/no later than 15 minutes prior to start of site visit. Note that failure to arrive at front gate prior to 9:45 A.M. may be grounds for exclusion from site visit, as there will be a one-time escort for all attendees (i.e. escort will not return to front gate for those who arrive late). Addendum 52.212-1 Instructions to Offerors-Commercial Items. 1.GENERAL INSTRUCTIONS TO OFFERORS: This Request for Quotation (RFQ) is being issued in accordance with the procedures at RFO FAR 12. The contracting officer is vested by authority above with additional procedural discretion and flexibility, for this acquisition which may allow to solicit, offer, evaluate, and award in a simplified manner that maximizes efficient economy, minimizes burden and administrative costs for both the Government and industry through procedures awarding this Contract. The Offeror’s quote shall be submitted electronically as outlined below. The government contemplates awarding a single FFP contract based on a competition between small businesses where the Offeror’s quote is most advantageous to the Government, price and other factors considered. 1.1. Questions regarding this RFQ shall be in writing and directed via e-mail to james.kliewer.2@us.af.mil. All correspondence shall reference W50S8R26Q0025. The cut-off for questions is no later than 26 August 2026 at 1:00 P.M. ET. All questions will be answered electronically so that all respondents will be provided with equal access to all questions and answers. 1.2. The Offeror is notified that the Government will not reimburse costs incurred for quote preparation. The proposal evaluation and discussion procedures. FAR 15.203 do not apply to this acquisition. The Government will conduct evaluations using an approach that is most advantageous to the government, price and other factors considered, using RFO FAR 12.203, considering solely the offeror’s response to this RFQ. 1.3. The government does not intend to hold any exchanges after receipt of quotes and respondents are advised to submit their best offer at the time quotes are due. In the event that exchanges with respondents after the receipt of quotes are deemed necessary, the contracting officer may hold such exchanges with any or all quoters, at any time, in any manner, without complying with the rules in 15.204, which are not applicable to this acquisition. A competitive range may, or may not, be established at the sole discretion of the contracting officer. All respondents will be treated fairly and impartially, in accordance with RFO FAR 1.102. 1.4. The offeror shall submit an unclassified quote which demonstrates its ability to perform and meet the requirements in Attachment 1 Performance Work Statement (PWS). 1.5. Quote shall conform to all the requirements of this RFQ. Failure to conform may result in your quote being rejected and no longer considered for award. 1.6. By responding to this RFQ, the offeror agrees to meet all the requirements incorporated herein, including those listed in the PWS, and agrees to all the terms, conditions, and provisions. 1.6.1. The Offeror’s quote shall be submitted electronically to the addresses listed under “Quote Submission Instructions”. The closing date and time for submittal of quote is 21 September 2026, 1:00 P.M. EDT. 1.7 Quote Organization 1.7.1. The Offeror’s quote shall consist of three volumes. The offeror shall submit an unclassified quote which demonstrates its ability to perform and meet the requirements in Attachment 1 Performance Work Statement, enclosed with this solicitation. Volume 1 – Factor 1. Technician Qualifications Factor 2. Technical Approach for Generator Overhaul Factor 3. Service Response Plan b. Volume 2 – Past Performance c. Volume 3 - Price Required Content 1.8 Volume 1 – Technical shall be organized in sections as it addresses the corresponding sections. The offeror shall provide a realistic and descriptive solution for tasks and evidence that the offeror has current capability and resources to meet the requirements defined in Attachment 1 Performance Work Statement. To facilitate the evaluation of Technical Capability, the Offeror’s Technical Proposal must specifically address the following sub-factors: Factor 1: Technician Qualifications Requirement: Offerors shall provide verifiable documentation (e.g., copies of current certificates, official training records) demonstrating that proposed personnel meet or exceed the minimum certification requirements identified in the PWS. Standard for "Acceptable" Rating: The proposal must include valid, current documentation demonstrating that the proposed workforce includes technicians who possess: OEM factory training or certification for both Cummins and Kohler generator systems as listed in Technical Exhibit 3. Standard for "Unacceptable" Rating: The proposal fails to provide documentation for any of the required certifications, or any provided certification is expired, invalid, or does not meet the requirements as stated. Factor 2: Technical Approach for Generator Overhaul Requirement: Offerors shall submit a technical approach narrative (not to exceed 3 pages) that describes their plan for executing the comprehensive overhaul of the Cummins 900kW generator (Building 409), as specified in PWS Section 5.0. Standard for "Acceptable" Rating: The submitted narrative clearly demonstrates a thorough understanding of the requirement by addressing, at a minimum, the offeror's approach to: pre-overhaul diagnostics; replacement of specified gaskets, seals, and cooling system components; fuel and lubrication system refurbishment; and the execution and documentation of the final 4-hour load-bank test. Standard for "Unacceptable" Rating: The narrative is generic, fails to address the specific mandatory overhaul tasks detailed in the PWS, or proposes a method that is materially non-compliant with the requirement. Factor 3: Service Response Plan Requirement: Offerors shall submit a brief plan (not to exceed 2 pages) detailing their capability and methodology for meeting the emergency and routine service call response times specified in the PWS. Standard for "Acceptable" Rating: The plan affirmatively states the offeror's ability to meet the mandatory on-site response times and describes the 24/7/365 dispatch and service coordination process that will be used to ensure a qualified technician arrives on-site at Mansfield Lahm ANG Base within: 24 hours for emergency calls on "Mission Critical" generators. Three (3) business days for emergency calls on "Standard" generators. Standard for "Unacceptable" Rating: The plan fails to confirm the offeror's ability to meet the mandatory on-site response times or describes a process that does not support these requirements. 1.9 Volume 2 – Past Performance - Past performance information may be obtained from any sources available to the Government. For example, the Government may retrieve past performance information from the Contractor Performance Assessment Reporting System (CPARS), GSA, or Federal Awardee Performance and Integrity Information System (FAPIIS). As a result, this RFQ does not include a past performance information submittal from quoters. 1.10 Volume 3 – Price - The price volume is the only volume that shall include of cost and price data. The quote shall consist of all information to support proposed cost and prices. Certified cost and pricing data are not required; however, the Government reserves the right to request information other than certified cost and pricing data prior to award. 1.11. Quote Submission Instructions: 1.11.1. The Government will only accept electronic submissions. Should the Government want to print the volumes of the quote, the submission shall be clearly indexed and logically assembled. 1.11.2. Ensure that all volumes are submitted in response to this RFQ. Failure to do so may result in your quote not being considered. Your quote shall be structured in a manner that clearly addresses the requirements for this RFQ. Responses that are overly verbose or include marketing material are not desired. 1.11.3. Offeror shall submit their quote to the contracting officer at james.kliewer.2@us.af.mil not later than the submittal due date of 21 September 2026, 1:00 P.M. EDT. --- End of FAR 52.212-1 Addendum --- BASIS OF AWARD- EVALUATION 1. Basis for Contract Award – Evaluation of Offers-Simplified Acquisition Procedures (a) Basis for Contract Award. In accordance with the procedures at RFO FAR 12 streamlined procedures for solicitation, evaluation, and award. It is the Government’s intent to award a single, direct award of a firm-fixed price contract. The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The offeror must satisfy the requirements described in the evaluation criteria, as well as all other RFQ requirements. The Government may perform a comparative evaluation (comparing offers to each other) to select the contractor that is best suited and provides the best value, considering the evaluation factors in this solicitation. The following factors shall be used to evaluate offers. (i) Technical (ii) Past Performance (iii) Price (b) A quotation is not an offer and, consequently, cannot be accepted by the Government to form a binding contract. Therefore, issuance by the Government of an order in response to a supplier’s quotation does not establish a contract. A written notice of award or purchase order, mailed or otherwise furnished to the successful quoter is an offer by the Government to the supplier to buy certain supplies or services upon specified terms and conditions. A contract is established when the supplier accepts the offer. 2. Quote Evaluation: The evaluation process will be accomplished as follows (Organized by Volume): A. General: We will award a contract to the responsible quoter who represents the best value to the Government on the basis of comparison of its (1) quote, (2) technical, (3) past performance. B. Volume I, Technical 1. General: The technical factor assessment will assess the prime’s (hereafter referred to as quoter’s) ability to successfully accomplish the effort based on the quoter’s demonstrated technical approach as specified on the work timeline. The Government will evaluate the quoter’s demonstrated technical approach in supplying products and services that meet users’ needs as specified in the Attachment 1 Performance Work Statement. Technical approach simply means the method of fulfilling the government’s requirement and will be assessed based on direct comparisons of quotes--without objective standards--pursuant to RFO FAR 12. Technical Documentation: Factor 1. Technician Qualifications Factor 2. Technical Approach for Generator Overhaul Factor 3. Service Response Plan RESPONSIVE OFFEROR RATING RATING DESCRIPTION PASS Offeror has returned a complete proposal package. FAIL Offeror has NOT returned a complete proposal package. 2. Technical Evaluation. Technical Capability will be evaluated on an Acceptable/Unacceptable basis utilizing the product specifications provided to the Government. To be determined Technically Acceptable, the offerors quoted product must meet all requirements as stated in Attachment 1 Performance Work Statement. An offeror shall obtain an “Acceptable” rating to continue further in the competition. Offerors who are deemed to merit an “Unacceptable” rating in the Technical Capability Factor will be removed from further consideration for award. Once the minimum requirements are established, the team shall evaluate the offeror's quote against these requirements to determine whether the quote is acceptable or unacceptable, using the ratings and descriptions outlined herein. Quotes are evaluated for acceptability, but not ranked using the non-price factors/subfactors. In order to be considered awardable, there must be an "acceptable" rating in every non-price factor/subfactor. C. Volume II, Past Performance Factor 1. General: The past performance assessment will assess the prime’s (hereafter referred to as quoter’s) ability to successfully accomplish the proposed effort based on the quoter’s demonstrated present and past work record. The Government will evaluate the quoter’s demonstrated record of contract compliance in supplying products and services that meet users’ needs, including cost and schedule. The recency and relevancy of the information, the source of the information, context of the data and general trends in the contractor’s performance will be considered. First, we will evaluate recency. For purposes of this evaluation, recency is defined as demonstrated experience (active or completed efforts) performed within the past three (3) years from the issuance date of this solicitation. Second, we will evaluate recent contracts for relevancy as described below. Third, we will evaluate relevant contracts for overall quality. The evaluation of the quoter’s (including partnerships and joint venture) present/past performance WILL NOT include the present/past performance of any subcontractors, predecessor companies, affiliates, other divisions or corporate management even though they may perform major or critical aspects of this requirement. Only the quoter's (includes partnerships and joint ventures) past performance will be evaluated. 2. Past Performance Assessment: Present and Past Performance is a measure of the degree to which you have satisfied your customers in the past and complied with federal, state, and local laws and regulations. Your past performance is relevant to this competition when you have done recent work that has confronted you with the same kinds of challenges that you would reasonably expect to encounter during performance of the contract described by the RFQ. We will assess your past performance on the basis of recency, relevancy, and quality (general trends in contractor performance and source of information). Past performance information may be obtained from any sources available to the Government. 3. Past Performance Evaluation Ratings: a) As a result of the recency and relevancy assessments of current and prior contracts, a relevancy rating described below will be assigned within the past performance evaluation. Table 1 Adjectival Rating Description Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires. Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires. Scope = Type of Work, Functions, Skill Mix and/or Labor Classifications, etc. Magnitude of effort = Dollar Value and Period of Performance Complexities = Contract Type (e.g., Indefinite Delivery Contract, Firm-Fixed-Price, FAR-based, Other Government Transaction, UCC), Location (on-base, off-base, geographical), Terms and Conditions (e.g., private, Federal, DoD, Army, National Guard Bureau), etc. Table 2 Adjectival Rating Description Acceptable Based on the quoter’s performance record, the Government has a reasonable expectation that the quoter will be able to successfully perform the required effort, or the quoter’s performance record is unknown. Unacceptable Based on the quoter’s performance record, the Government does not have a reasonable expectation that the quoter will be able to successfully perform the required effort. D. Volume III, Quote 1. General: We will determine the merits of your quote on the basis of (a) its acceptability and (b) its quoted price. (a) Acceptability: We will determine the acceptability of your quote on an acceptable or unacceptable basis. We will consider your quote acceptable if it (i) conforms to the material solicitation requirements; (ii) manifests your unconditional assent to the terms of this Request for Quote (RFQ), and (iii) you are a responsible prospective contractor pursuant to RFO FAR 9.104-1. (NOTE: By submission of a quote, the quoter represents that it unconditionally assents to the terms of this Request for Quote, except for any written express exceptions.) (i) Conformance. Material solicitation requirements include those terms affecting quality, quantity, price, or delivery. (ii) Assent. If you (1) take exception to any term of this RFQ, (2) propose any additional terms, or (3) omit material information required by this RFQ then we will consider your quote to be unacceptable and ineligible for contract award. (b) Price: We will evaluate your price for fairness and reasonableness in accordance with RFO FAR 12.204. E. Compliance and Responsibility: 1. Compliance and Responsibility Information: Prior to the evaluation of quotes, Annual Representations and Certifications, Offeror Representations, Certifications, and the Submission of Other Information completed via the System for Award Management (https://www.sam.gov) will be assessed for compliance with requirements applicable to this RFQ. Quotes found to not be in compliance with these requirements may be determined ineligible for award. 2. REJECTION OF OFFERS: Offerors shall carefully read, understand, and provide all the information requested in the quote. If there are parts of the RFQ that are vague and/or ambiguous, request clarification from the Contract Specialist and/or the Contracting Officer before the established cut-off date for questions. The circumstances that may lead to the rejection of a quote are: 2.1. When the quote fails to meaningfully respond to the instructions specified. Examples of failure to meaningfully respond include: 2.1.1 When the Government is evaluating an Offeror’s technical approach and a quote merely repeats the RFQ Statement of Work without elaboration or fails to present more than a statement indicating its capability to comply with the RFQ terms and does not provide, support, or detail how they will perform. 2.1.2 When the quote fails to provide any of the data and information required in the RFQ. 2.2 When the quote reflects an inherent lack of technical competence or a failure to comprehend the complexity and risks required to perform the RFQ requirements due to submission of a quote, which is substantially high or low in Price and/or unachievable in terms of technical or schedule commitments. 2.3 When the quote contains any unexplained significant inconsistency between the proposed effort and price, which implies the Offeror has (a) an inherent misunderstanding of the PWS, or (b) an apparent inability to perform the resultant contract. 2.4 When the quote contains major error(s), omission(s) and or deficiencies that indicate a lack of understanding or an approach that cannot be expected to meet requirements or involves a very high risk and none of these conditions can be corrected without major rewrites or revisions of the quote. 2.5 When the quote offers a product or service that does not meet all stated material requirements of the RFQ and Statement of Work. 2.6 When the quote is late, in accordance with FAR 52.212-1(c) and the Electronic Submission Instructions herein. 2.7 When the quote is significantly high or low as to cost or price, or is unaffordable to the government. 2.8 When the quote is not in full compliance with the terms and conditions of the RFQ. List of Attachments: Attachment 1: Performance Work Statement Attachment 2: Clauses and Provisions Attachment 3: Wage Determination NG Agency Protest Program is intended to encourage interested parties to seek resolution of their concerns with the National Guard (NG) as an Alternative Dispute Resolution forum, rather than filing a protest with the Government Accountability Office (GAO) or other external forum. Contract award or performance is suspended during the protest to the same extent, and within the same time periods as if filed at the GAO. The NG protest decision goal is to resolve protests within 35 calendar days from filing. An agency protest may be filed with either the Contracting Officer or the NG Agency’s Protest Decision Authority, but not both, in accordance with NG protest procedures. To be timely, the protests must be filed with the periods specified in FAR 33.103. To file a protest under the NG Agency Protest Program, the protest must request resolution under that program and be sent to the address below: National Guard Bureau Office of the Director of Acquisitions/ Head of Contracting Activity ATTN: NGB-AQ-O 111 S. George Mason Dr. Arlington, VA 22204 Email: ng.ncr.ngb-arng.mbx.ngb-task-order-ombudsman@army.mil All other agency-level protests should be sent to the Contracting Officer for resolution at the address in the solicitation. See FAR clause 52.233-2. ***************************************************************************************** ***************************************************************************************** Amendment 1 Posting Questions and Answers Round 1 Added Attachment 1 Performance Work Statement Generator Maintenance 25 August 2026. Changes are Diagnostic inspection, repair and overhaul, and final testing see Paragraph 5.2.Also added annual maintenance requirement. Added CLIN 0002 for B409 diagnostic inspection and CLIN 0003 b409 generator repair/overhaul to include subclins for key items to solicitation - changes reflected above. Proposal due date has been extended to 8 September 2026 at 1:00 PM EDT. ***************************************************************************************** ***************************************************************************************** ***************************************************************************************** Amendment 2 Posting Questions and Answers Round 2 ***************************************************************************************** ***************************************************************************************** ***************************************************************************************** Amendment 3 Revision to Factor 1 of Quote and Evaluation criteria removing EGSA and NFPA requirements. Proposal due date has been extended to 21 September 2026 at 1:00 PM EDT. ***************************************************************************************** | - | Combined Synopsis | 09/21/2026 |
Fire Suppression System Maintenance and Kitchen Exhaust Cleaning Richard L Roudebush VA Medical Center 1481 West 10th Street, Indianapolis, Indiana 46202 Additional service location: 9045 East 59th Street, Building 402, Indianapolis, Indiana 46216 The Contractor shall maintain the identified fire suppression systems in a serviceable condition, remove grease accumulation from the complete identified kitchen exhaust systems, and maintain the Building 402 grease trap. The Contractor shall provide all labor, supervision, transportation, tools, access equipment, routine maintenance materials, cleaning supplies, waste handling, testing, service labels, and documentation required by this PWS. The recurring scope includes five kitchen fire suppression systems and five Kidde IND-21 Hazmat dry chemical systems, with monthly inspections of all ten systems, semiannual maintenance and service certification, and annual maintenance tasks. All five hoods require quarterly exhaust inspections and complete interior and exterior cleaning. The Building 402 grease trap requires quarterly inspection, pump-out, and cleaning. Appendix A identifies equipment and locations; Appendix B states service quantities, deliverables, and performance standards. The prime Contractor remains responsible for all subcontracted work and for submitting complete records directly to the COR. A kitchen cleaning report does not document fire suppression system maintenance, monthly suppression inspections, or grease-trap service; each service shall have its own identifiable record. | - | Solicitation | 12/01/2026 |
RFQ to follow this announcement. | - | Pre-Solicitation | 12/01/2026 |
This is a Sources Sought Notice, and this notice is being issued for market research purposes only. This notice is not a Request for Quotation or Proposal (RFQ/RFP), and a solicitation is not being issued at this time. This notice shall not be construed as a commitment by the Government to issue a solicitation, nor does it restrict the Government to a particular acquisition methodology. The purpose of this notice is to obtain information regarding the availability and capability of all qualified sources to perform a potential requirement. Interested parties are asked to submit capability statement that clearly and convincingly identifies their ability to fulfill the requirements. Industry feedback to the information below is requested to ensure the VA has not created a defacto sole source requirement. The Network Contracting Office (NCO-10) is seeking to identify Service Disabled Veteran Owner Small Businesses (SDVOSB) and/or Veteran Owned Small Businesses (VOSB) to perform the following services at Detroit VA Medical Center: Annual Preventative Maintenance and Support Services for Environmental Management Service (EMS) which consists of the following janitorial equipment: Steam Cleaners, Extractors, Vacuums, Scrubbers, power washers and other similar equipment. Scope: The contractor shall provide all management, tools, supplies, equipment, transportation, and labor to develop and implement a preventative maintenance and repair plan for the janitorial equipment used by the Environmental Management Service (EMS) of VA Michigan Healthcare System Detroit, Michigan (Detroit VA Medical Center). Vendor to inspect equipment to evaluate condition (a complete list will be provided in the subsequent solicitation documents) Service of equipment to ensure optimal performance and maximum service life for the VA Perform all recommended manufacturer maintenance for the equipment Provide parts order list and labor estimates for repairs outside of the scope of the preventative maintenance and support services contract (i.e., misuse or abuse of equipment by VA staff, etc.). The Government requests that interested parties: Failure to provide a capabilities statement and answers to the questions below may result in your response being excluded in the Governments market research and potential set-aside considerations. Submit a statement of capability outlining their firm s capabilities related to this requirement. Capabilities statement shall provide a detailed overview and qualifications to perform the requirement, including past experience with projects similar in scope. All information shall be submitted in MS Word or Adobe PDF format and shall not exceed 10 pages, including all attachments. Each party s submission shall also include the following information: Organization Name Organization Address Point-of-Contact (name, title, address, telephone number, and email) SAM UEI Number Business Socio-Economic statuses (SBA Certifications, etc.) GSA Contract Number (if applicable) Any other pertinent information Answer questions 1-3 below: Failure to provide a capabilities statement and answers to the questions below may result in your response being excluded in the Governments market research and potential set-aside considerations. QUESTION #1: Is your firm interested in providing a fair and reasonable quote for this requirement? Yes / No (choose one) QUESTION #2: Is your firm an SBA Certified SDVOSB and/or VOSB? If so, please provide a copy of VETCERT certification. QUESTION #3: Is your firm an SBA Certified EDWOSB, WOSB, HUB, 8a, SDV? Please provide any additional certifications regarding the socio-economic status of your company including, WOSB, EDWOSB, HUB, 8a, Small Disadvantage Business, Small Business, etc. The applicable NAICS code for this requirement is NAICS 811310 Commercial and Industrial Machinery and Equipment Repair and Maintenance Services with a Small Business Size Standard of $12.5 Million. The Product Service Code is J079 Maintenance, Repair, and Rebuilding of Equipment Cleaning Equipment and Supplies. For informational purposes only, the following Wage Determinations apply to this requirement: No 2015-4839 Rev 32 (Wayne) All businesses are encouraged to respond; however, each respondent must clearly identify their business size and socio-economic category(s) in their capabilities statement. This Sources Sought is only for the purpose of identifying potential sources as part of market research. No Request for Proposal (RFP), Quote (RFQ), or Invitation for Bid (IFB) exists. Responses to this Sources Sought are not quotes, proposals, or bids on which the VA can issue any contract. This Notice is issued for information and planning purposes only and does not itself constitute an RFP, RFQ or IFB. The Government does not intend to award a contract based only on responses to this Sources Sought. Responses will not be returned. Responders are solely responsible for all expenses associated with responding to this Sources Sought; the VA will not pay for information received in response. Do not submit pricing information in response to this Sources Sought. Failure to provide a capabilities statement and answers to the questions above may result in your response being excluded in the Governments market research and potential set-aside considerations. Detailed capabilities statement and answers to questions 1-3 must be submitted by email to Contracting Specialist Venkatlekhith Muntha at Venkatlekhith.Muntha@VA.gov in an electronic format (email), no later than 1:30 PM EST on (10/20/2026). Responses email subject line shall be the following: 36C25025QXXXX - (Vendor Name) - Response to Sources Sought. All submissions must be in either Word or Adobe PDF format and shall not exceed 10 pages total. | - | Market Research | 10/20/2026 |
Additional Details
Solicitation Number
36C25021Q0328
Archive Date
Jan 11, 2022
Office Address
DAYTON, OH, 45428