GovChime
Notice ID: 7cfaeff367f74b2cb6a146a446abd01cSolicitation

Z1DA--Correct Fire and Smoke Damper Deficiencies - 583-24-511

Archived on June 30, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−04:00
Posted
May 29, 2024
Notice type
Solicitation
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of Veterans Affairs

Notice details

Office
250-NETWORK CONTRACT OFFICE 10 (36C250)
Place of performance
Richard L Roudebush VA Medical Center 1481 W 10th Street, Indianapolis, 46202
Last updated
Dec 6, 2025

Identifiers

Solicitation number
36C25024B0056
Notice ID
7cfaeff367f74b2cb6a146a446abd01c

Description

Questions and Answers: Add #1 stated as builts will be provided before bid date? The dampers shown on the as-builts attached to this addendum include all but four dampers included in the scope of this project, as well as many more. Please reference the list of corrections attached to the solicitation when viewing these drawings. The four dampers not in the drawings have had their locations verified and are included in the list attached to the solicitation Is there a list with damper sizes There is no complete list with damper sizes due to incomplete records. The average size of known fire dampers is 24"Wx16"H SD replacement calls out for a mixing damper to be installed is there a spec on this damper also is this SD to be removed and the mixing damper installed in the duct work? The smoke dampers are 46"Wx62"H and the actuators are 24V. The smoke dampers are all in a plenum accessed from a mechanical room. There will be no duct work or access panels for the smoke dampers. Under Unknown will any work associated with this be as a change order to the contract? The dampers that need to be verified may require contract modifications if a full replacement is necessary. In General without actually visiting each individual damper to review accessibility, size and or obstructions to put together a accurate proposal Each individual damper will need to be verified as part of this project.

Full description on SAM.gov

Award Overview

Possible prior contract

Inferred, not confirmed

Inferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.

Contract end date

May 31, 2021

NAICS

236220

Agency

Department of Veterans Affairs

Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:36C25024B0056
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationApr 11, 2024

    Z1DA--Correct Fire and Smoke Damper Deficiencies - 583-24-511

    Notice 5eed5c6f2b8149afb841e0881f724690 on SAM.gov

  2. 3×
    SolicitationCurrentApr 26, 2024

    Z1DA--Correct Fire and Smoke Damper Deficiencies - 583-24-511

    Notice 7cfaeff367f74b2cb6a146a446abd01c on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
539-23-101 Modernize Nurse Call Statement of Work The Contractor shall provide all tools, equipment, material, permits, labor, and supervision required to completely perform the required construction work for the Modernize Nurse Call Project (539-23-101) All work shall be completed in accordance with the project drawings and specifications. The scope of work involves renovation for nurse call system in the main hospital and CLC at the VA Cincinnati Site. Work includes, but is not limited to, general construction, alterations, electrical, and telecommunications necessary for demolition and removal of existing nurse call completion and installation of new work. A full list of requirements and further details are provided in the project drawings and specifications. The above construction Statement of Work (SOW) constitutes a basic outline of work and in no way outlines all details for the construction of this project. It is recommended that a detailed inspection of the premises, drawings and specifications be initiated to determine the needs and conditions for the construction of this project.
-Pre-Solicitation11/30/2026
CONSTRUCTION STATEMENT OF WORK Install Roof Equipment Railings Project No. 539-22-206 The Contractor shall provide all tools, equipment, material, permits, labor, and supervision required to completely perform the required construction work for the Install Roof Equipment Railings project, including prepare site for building operations, demolition and removal of existing structures, furnish labor and materials and perform work as required by drawings and specifications. Work includes carpentry and roofing work, and certain other items shown and specified in project drawings and specifications. This construction project will install various rooftop safety railings and work platforms at the Cincinnati VA. This work includes general construction, roofing, abatement, etc. The above construction Statement Of Work (SOW) constitutes a basic outline of work and in no way outlines all of the details for the construction of this project. It is recommended that a detailed inspection of the premises, drawings and specifiction be initiated to determine the needs and conditions for the construction of this project. Period of Performance: All phases of work completed within 240 calendar days after issuance of the Notice to Proceed.
-Pre-Solicitation11/30/2026
This project is for the construction of EHRM Infrastructure Upgrades at the Louis A Johnson VA Medical Center in Clarksburg, WV.
-Market Research11/13/2026
The project’s general scope of work is to furnish all tools, equipment, material, permits, labor, supervision, and all other necessary resources to accomplish the following work: This project replaces a portion of the existing campus water loop piping and existing campus water loop isolation valves. The project also includes installing a water booster pump that will be powered by a new equipment branch of emergency power in Building 22. For the new equipment branch of emergency power to be added, new wiring will feed from Building 19 (generator building) utilizing an existing underground conduit to Building 22 to feed a new emergency power distribution panel which will replace the existing emergency power distribution panel that does not meet code requirements. Installation of a new automatic transfer switch and panelboard along with wiring and conduits will be required to create the new equipment branch of emergency power. The project will also disturb many portions of the existing asphalt roadways and parking lots as well as concrete sidewalks and curbing due to excavation work. The contractor shall patch or replace asphalt and concrete as shown on the drawings and repair any areas of the landscaping and lawn that get disturbed during the project. The existing campus water loop piping is located below many of the existing campus roadways and sidewalks, and it is anticipated that most of the new piping will be as well. Therefore, this project shall be completed in phases to allow campus access for employees and Veterans and maintain water service until a tie-in to an existing building service pipe is to take place. If a shutdown of water service for any building is required during the duration of the project, it must be coordinated with the COR. Period of performance is 300 calendar days from receipt of the Notice to Proceed.
-Pre-SolicitationOpen
-Special NoticeOpen

Additional Details

Solicitation Number

36C25024B0056

Archive Date

Jun 30, 2024

Office Address

DAYTON, OH, 45428