Z1DA--Repair Parking Garage Tendon 757-24-204 - Construction - VAACC Columbus
Awarded on April 3, 2026. Full description on SAM.gov.
Overview
- Posted
- April 3, 2026
- Notice type
- Award Notice
- Set-aside
- Service-Disabled Veteran-Owned Small Business Set Aside
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of Veterans Affairs
Notice details
- Office
- 250-NETWORK CONTRACT OFFICE 10 (36C250)
- Place of performance
- Columbus, Ohio, 43219
- Last updated
- Nov 2, 2026
- First published
- Last updated on SAM.gov
- Award date
- Apr 3, 2026
- Award amount (SAM.gov award notice)
- $97.0K
Identifiers
- Solicitation number
- 36C25026C0051
- Notice ID
- f80fa50bf3df4d82a3ffd85f7eb1aa40
- Award number (PIID)
- 36C25026C0051
Description
The contract was awarded to:
Rutson Contracting and Management, LLC
982 Howland Wilson RD SE
Warren, OH 44484-2516
Award Amount: $97,000.00
Award Overview
Award Number
36C25026C0051
Award Amount (SAM.gov award notice)
$97.0K
Award Date
Apr 3, 2026
Awardee
Awardee UEI
NT1LVUN1MPK1
Awardee CAGE Code
14XZ2
Awardee Address
Warren, OH 44484, UNITED STATES
Original Solicitation
Notice ID: f80fa50bf3df4d82a3ffd85f7eb1aa40
Posted Date: Apr 3, 2026
Original Response Deadline: Not specified
Contacts
Contracting Officer
Primary Contact
Documents
Files (19)
- Download
S02. Master Spec Sheet 00 01 10 - TOC Revised.pdf
3.8 MBAdded in Solicitation version 4Posted - Download
S02. Bid Opening Instructions.docx
15 KBAdded in Solicitation version 4Posted - Download
S02. Cast-In-Place Concrete - Revised 23 Jul 2025.pdf
137 KBAdded in Solicitation version 4Posted - Download
S02. Safety.docx
14 KBAdded in Solicitation version 4Posted - Download
S02. RFI Form.docx
18 KBAdded in Solicitation version 4Posted - Download
S02. Basis of Design Narrative - 757-24-207 - Parking Garage Tendon Repair - 6 Jan 2025 Combined.pdf
946 KBAdded in Solicitation version 4Posted - Download
S02. Wage Determiantion OH20250077.pdf
265 KBAdded in Solicitation version 4Posted - Download
S02. Stressing Tendons Revised 23 Jul 2025.pdf
231 KBAdded in Solicitation version 4Posted - Download
S02. 757-24-204 Parking Garage Tendon Break Inspection and Repair- SOW.pdf
62 KBAdded in Solicitation version 4Posted - Download
S02. 36C25026B0014_1 - Solicitation.pdf
592 KBAdded in Solicitation version 4Posted - Download
S02. 01 00 00 - General Requirements.pdf
528 KBAdded in Solicitation version 4Posted - Download
S02. 02 21 13 - Site Surveys.pdf
286 KBAdded in Solicitation version 4Posted - Download
S02. 01 33 23 Shop Drawings Product Data and Samples.pdf
294 KBAdded in Solicitation version 4Posted - Download
S02. 01 57 19 Temporary Environmental Controls.pdf
298 KBAdded in Solicitation version 4Posted - Download
S02. 01 32 16 Project Schedules Small Projects.pdf
213 KBAdded in Solicitation version 4Posted - Download
S02. 01 74 19 - Construction Waste Management.pdf
280 KBAdded in Solicitation version 4Posted - Download
S02. 02 41 00 - Demolition.pdf
134 KBAdded in Solicitation version 4Posted - Download
S02. 01 45 29 - Testing Laboratory Services.pdf
164 KBAdded in Solicitation version 4Posted - Download
S02. 01 42 19 Reference Standards.pdf
142 KBAdded in Solicitation version 4Posted
Lifecycle
- 3Version 3SolicitationArchived
Z1DA--Repair Parking Garage Tendon 757-24-204 - Construction - VAACC Columbus
- 6Version 6Award NoticeArchivedCurrent
Type changed from Solicitation to Award Notice
Z1DA--Repair Parking Garage Tendon 757-24-204 - Construction - VAACC Columbus
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
539-23-101 Modernize Nurse Call Statement of Work The Contractor shall provide all tools, equipment, material, permits, labor, and supervision required to completely perform the required construction work for the Modernize Nurse Call Project (539-23-101) All work shall be completed in accordance with the project drawings and specifications. The scope of work involves renovation for nurse call system in the main hospital and CLC at the VA Cincinnati Site. Work includes, but is not limited to, general construction, alterations, electrical, and telecommunications necessary for demolition and removal of existing nurse call completion and installation of new work. A full list of requirements and further details are provided in the project drawings and specifications. The above construction Statement of Work (SOW) constitutes a basic outline of work and in no way outlines all details for the construction of this project. It is recommended that a detailed inspection of the premises, drawings and specifications be initiated to determine the needs and conditions for the construction of this project. | - | Pre-Solicitation | 11/30/2026 |
CONSTRUCTION STATEMENT OF WORK Install Roof Equipment Railings Project No. 539-22-206 The Contractor shall provide all tools, equipment, material, permits, labor, and supervision required to completely perform the required construction work for the Install Roof Equipment Railings project, including prepare site for building operations, demolition and removal of existing structures, furnish labor and materials and perform work as required by drawings and specifications. Work includes carpentry and roofing work, and certain other items shown and specified in project drawings and specifications. This construction project will install various rooftop safety railings and work platforms at the Cincinnati VA. This work includes general construction, roofing, abatement, etc. The above construction Statement Of Work (SOW) constitutes a basic outline of work and in no way outlines all of the details for the construction of this project. It is recommended that a detailed inspection of the premises, drawings and specifiction be initiated to determine the needs and conditions for the construction of this project. Period of Performance: All phases of work completed within 240 calendar days after issuance of the Notice to Proceed. | - | Pre-Solicitation | 11/30/2026 |
This project is for the construction of EHRM Infrastructure Upgrades at the Louis A Johnson VA Medical Center in Clarksburg, WV. | - | Market Research | 11/13/2026 |
The project’s general scope of work is to furnish all tools, equipment, material, permits, labor, supervision, and all other necessary resources to accomplish the following work: This project replaces a portion of the existing campus water loop piping and existing campus water loop isolation valves. The project also includes installing a water booster pump that will be powered by a new equipment branch of emergency power in Building 22. For the new equipment branch of emergency power to be added, new wiring will feed from Building 19 (generator building) utilizing an existing underground conduit to Building 22 to feed a new emergency power distribution panel which will replace the existing emergency power distribution panel that does not meet code requirements. Installation of a new automatic transfer switch and panelboard along with wiring and conduits will be required to create the new equipment branch of emergency power. The project will also disturb many portions of the existing asphalt roadways and parking lots as well as concrete sidewalks and curbing due to excavation work. The contractor shall patch or replace asphalt and concrete as shown on the drawings and repair any areas of the landscaping and lawn that get disturbed during the project. The existing campus water loop piping is located below many of the existing campus roadways and sidewalks, and it is anticipated that most of the new piping will be as well. Therefore, this project shall be completed in phases to allow campus access for employees and Veterans and maintain water service until a tie-in to an existing building service pipe is to take place. If a shutdown of water service for any building is required during the duration of the project, it must be coordinated with the COR. Period of performance is 300 calendar days from receipt of the Notice to Proceed. | - | Pre-Solicitation | Open |
Bid Log - Northport Chiller - Public | - | Special Notice | Open |
Additional Details
Solicitation Number
36C25026C0051
Archive Date
Jul 4, 2026
Office Address
DAYTON, OH, 45428