GovChime
Notice ID: 706e7362ae3044da8eb01033a6c502b7Award NoticeAwardedArchived

J079--Helios UV Disinfection Unit Maintenance

Awarded on February 10, 2026. Full description on SAM.gov.

Awarded tounder 36C25026C0052 (source: SAM.gov award notice)• $40.0K

Overview

Posted
February 10, 2026
Notice type
Award Notice
NAICS
561210: Facilities Support Services
Agency
Department of Veterans Affairs

Notice details

Office
250-NETWORK CONTRACT OFFICE 10 (36C250)
Place of performance
Indiana, 46202
Last updated
Nov 3, 2026
First published
Last updated on SAM.gov
Award date
Feb 10, 2026
Award amount (SAM.gov award notice)
$40.0K

Identifiers

Solicitation number
36C25026Q0233
Notice ID
706e7362ae3044da8eb01033a6c502b7
Award number (PIID)
36C25026C0052

Description

The Department of Veterans Affairs, Veteran Health Indiana, Richard L. Roudebush VA Medical Center (RLRVAMC) in accordance with RFO 6.302-1, intends to negotiate on a sole source basis with Surfacide, LLC, for Helios UV Disinfection Unit Maintenance RLRVAMC. NAICS 561210 applies, the small business size standard is $47 million.

Contractor shall provide a comprehensive service maintenance agreement for two (2) Surfacide Helios UV Disinfection units at the Richard L. Roudebush VA Medical Center. February 22, 2026, through February 21, 2027, in strict accordance with all schedules, specifications, terms, conditions and provisions of the contract. This notice of intent is not a request for competitive proposals. It is not a solicitation or request for offers. No solicitation package is available. A determination not to compete is solely within the discretion of the Government. Any response to this notice must show clear and convincing evidence that competition would be advantageous to the Government. Responses must be received no later than 4:00 pm EDT on January 30, 2026. No telephone inquiries will be accepted. All responses must be emailed to Courtney.Seevers@va.gov.

Full description on SAM.gov

Award Overview

Award Number

36C25026C0052

Award Amount (SAM.gov award notice)

$40.0K

Award Date

Feb 10, 2026

Awardee

Awardee UEI

SKLJHJWJK2D4

Awardee CAGE Code

7AW03

Awardee Address

WAUKESHA, WI 53186, WI

Line Item Number

All

Original Solicitation

Notice ID: 706e7362ae3044da8eb01033a6c502b7

Posted Date: Feb 10, 2026

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

2
  • 36C24826P0386
    SURFACIDE, LLC
    Department of Veterans AffairsNAICS 561210
    $91.0KSigned Jun 9, 2026
  • 36C24826P0386
    SURFACIDE, LLC
    Department of Veterans AffairsNAICS 561210
    $91.0KSigned Feb 2, 2026

Contacts

Contracting Officer

Primary Contact

Courtney Seevers
Contracting Officer

Documents

Files (1)

  • 36C25026C0052_1.docx

    22 KBAdded in Award Notice version 3Posted
    Download

Lifecycle

  1. 3
    Version 3Award NoticeArchivedCurrent

    J079--Helios UV Disinfection Unit Maintenance

    Notice 706e7362ae3044da8eb01033a6c502b7 on SAM.gov

Other notices for this solicitation

  1. Special NoticeRelated noticeJan 29, 2026

    Helios UV Disinfection Unit Maintenance

    Notice d569d0fd1aa149b0ab715e2c67e4c7a1 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Items, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued. This solicitation is issued as an RFQ. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2023-01. The Department of Veterans Affairs (VA) Network Contracting Office (NCO 10) has a requirement for an Annual Inspection of Energy Control Procedures Lockout/Tagout for the Battle Creek VA Medical Center located in Battle Creek, Michigan. Contractor will perform an annual inspection of Lockout/Tagout (Energy-Control) Procedures per the requirements of OSHA1910-147 (VA-Required) to document the following: Ensure accuracy of Lockout Procedures and Tags in place Identify Lockout Procedures and Tags that are in place, but inaccurate due to equipment reconfigurations and/or relocations or are missing Create new machines/equipment LOTO Procedures and Tags for those requiring one. The Associated North American Industrial Classification System code for this procurement is 561210, Facilities Support Services, with a small business size standard of $47 Million. The Product Service Code for this procurement is H942, Other Quality Control Testing, and Inspection Fire Fighting, Rescue, and Safety Equipment. This requirement is a total SDVOSB set aside. See attached documents for detailed information and instructions to quoters
-Combined Synopsis08/27/2026
The major elements of scope of the Portsmouth ISS contract include, but are not limited to: Telecommunications; Surveillance and Maintenance of Facilities; Custodial Services; Grounds Maintenance, Snow Removal, and Pest Control; Roadway Parking and Lot Maintenance; Fleet Management; Real Property Management; Records Management and Document Control; Engineering; Training Services; Mail Services; Pollution Prevention, and Other Activities and Support to DOE. The U.S. Department of Energy (DOE) Office of Environmental Management (EM) Portsmouth/Paducah Project Office (PPPO) manages this scope under the EM Program.
-AwardedOpen
Z1HB- Facilities Support Services for Operations and Maintenance and Janitorial Support Contract - US EPA Facility Duluth, MN
-Pre-SolicitationOpen
Presolicitation Notice Presolicitation Notice Page 5 of 5 Presolicitation Notice *=Required Field Presolicitation Notice Page 1 of 5 The contractor will provide all material, labor, equipment, and supervision necessary to complete the above-named project at the VA Maryland Health Care System (VAMHCS), Building 1 Community Living Center (CLC) of the Loch Raven Campus. Primary Deliverables and Project Requirements Covid Ward 2nd floor B wing Upgrade exhaust fans Air Handling Unit (AHU-B) located in attic Replace and upgrade EF-1A and EF-1B for higher CFM outputs Install heat tracing for chillers Wiring and junction box located in room G-15. Chiller located outside CLC in the pit behind the service road. Assess current heat tracing for chill water line. Complete and terminate existing heat tracing wiring to an emergency electrical panel in G-17 in coordination with the VA. Panel selection is TBD. Install a 20-amp GFPE circuit breaker for the heat tracing to the panel selected by the VA. Kitchen basement Replace cooling coil(s) AHU-E located in attic. Replace fan motor AHU-E located in attic. AHU has one fan. New motor must be rated for and capable of sustaining a fan speed of 60Hz. Replace Variable Frequency Drive (VFD) VFD located in the attic and attached to the AHU Replace VFD in kind with Manufacturer (ABB) Controls Integration & Coordination VA has an existing contract with Johnson Controls International (JCI). The contractor shall coordinate with the COR and Facility Maintenance to satisfy necessities for the facility s existing Building Automation System (BAS) controls corresponding to all new work. Contractor will replace/reinstall or provide new hardware or connections for BAS monitoring when required to complete BAS programming or integration. This can include control wiring, modulators, switches, routing, existing equipment etc. These requirements are determined on a case-by-case basis. Testing Adjusting & Balancing (TAB) TAB shall occur after HVAC modifications are made. It must be performed by a certified vendor/contractor per TABB and/or other ANAB accredited programs for standard industry HVAC system performance compliance Contractor shall provide notice to and request attendance of the COR and/or other COR-approved VA representation prior to TAB. A report on the TAB results must be delivered to the COR. TAB report will be reviewed and approved by the VA prior to contractual closeout and final payment Warranty, Operations & Manuals (O&Ms) and Shop Drawings Contractor and/or subcontractor shall provide a warranty letter including point of contact, to the VA. Warranty is based on workmanship, material and equipment. Duration of warranty starts after acceptance and use of new equipment & components O&Ms for all new equipment and other components requiring preventative maintenance shall be provided to the VA. All O&M documents must be received by the VA prior to contractual closeout and final payment Contractor shall provide training to the VA. Shop Drawings All layout changes and new equipment shall be updated in as-builts, shop drawings, manufacturer diagrams, details, where applicable. Due to the nature of the contract, this requirement will be determined based on off application by the COR at completion of work. If no applicable documents are required, then the COR will opt for omission. Assumptions Contractor to provide a cost/unit for each of the deliverable items above and use the total amounts provided for their proposal. Contractor to track the quantities used on their pay applications with any amounts left over being returned to the government after final payment. All deliverables must be received by the VA prior to final payment. Line items will be tracked in every pay application. Financial progress for a line item will be cross-referenced with the corresponding item s physical progress and/or completion status. Misrepresentation of a line item s financial progress may result in rejection from the COR and require the contractor to resubmit the pay application with revision(s). Pay applications must be submitted with a total amount not to exceed the Purchase Order (PO) balance. A contract modification from the Contracting Officer (CO) is required for payment application submissions exceeding the PO balance. Additional work outside of the contract and contractual supplement documents (provided drawings, as-builts, details, existing product information, etc) require authorization and written execution from the CO. Any additional work (quantified via labor, material or equipment) performed/provided by the contractor without guidance from the VA or direction from the CO shall not be included in payment applications. The contractor is committed to working at their own expense and risk under this condition. Supplemental contractual and scope of work include existing as-builts, details and compliance for VA guidelines, federal & state guidelines, applicable codes, etc. VA can provide the contractor with additional available drawings and other documentation. These are considered items pertaining to the original contract s scope of work Standard Inclusions & General Compliance Contractor is responsible for cleaning the work area of trash regardless of if it is their trash or not. This includes areas that other entities may have access to like the attic and mechanical spaces. Contractor is responsible for stewardship of work area and compliance with VA medical facility guidelines. Contractor will adhere to VA-granted permitting requirements and industry standard safety practices including but not limited to: Infection Control Risk Assessment (ICRA) Pre-Construction Risk Assessment (PCRA) Hot or burn work Confined space entry work (if applicable) Lock out tag out (LOTO) procedures PPE Parking at the Loch Raven campus is limited and contractors are subject to facility guidelines for locations of contractor vehicles. Guidance for contractor parking is enforced by the COR, Facility Maintenance Supervisor, Campus Manager, and Deputy Medical Director. Parking outside the campus boundary is not in the VA s jurisdiction The contractor shall coordinate with the facility prior to work that impacts patient care such as shutting down A/C, heating, power or other utilities. Utility and HVAC shutdowns require at least a 14-day written request to the facility per the VA s internal Standard Operating Procedure. Period of performance is 90 calendar days.
-Solicitation11/30/2026
The contractor will provide all material, labor, equipment, and supervision necessary to complete the above-named project at the VA Maryland Health Care System (VAMHCS), Building 1 Community Living Center (CLC) of the Loch Raven Campus. Primary Deliverables and Project Requirements Covid Ward 2nd floor B wing Upgrade exhaust fans Air Handling Unit (AHU-B) located in attic Replace and upgrade EF-1A and EF-1B for higher CFM outputs Install heat tracing for chillers Wiring and junction box located in room G-15. Chiller located outside CLC in the pit behind the service road. Assess current heat tracing for chill water line. Complete and terminate existing heat tracing wiring to an emergency electrical panel in G-17 in coordination with the VA. Panel selection is TBD. Install a 20-amp GFPE circuit breaker for the heat tracing to the panel selected by the VA. Kitchen basement Replace cooling coil(s) AHU-E located in attic. Replace fan motor AHU-E located in attic. AHU has one fan. New motor must be rated for and capable of sustaining a fan speed of 60Hz. Replace Variable Frequency Drive (VFD) VFD located in the attic and attached to the AHU Replace VFD in kind with Manufacturer (ABB) Controls Integration & Coordination VA has an existing contract with Johnson Controls International (JCI). The contractor shall coordinate with the COR and Facility Maintenance to satisfy necessities for the facility s existing Building Automation System (BAS) controls corresponding to all new work. Contractor will replace/reinstall or provide new hardware or connections for BAS monitoring when required to complete BAS programming or integration. This can include control wiring, modulators, switches, routing, existing equipment etc. These requirements are determined on a case-by-case basis. Testing Adjusting & Balancing (TAB) TAB shall occur after HVAC modifications are made. It must be performed by a certified vendor/contractor per TABB and/or other ANAB accredited programs for standard industry HVAC system performance compliance Contractor shall provide notice to and request attendance of the COR and/or other COR-approved VA representation prior to TAB. A report on the TAB results must be delivered to the COR. TAB report will be reviewed and approved by the VA prior to contractual closeout and final payment Warranty, Operations & Manuals (O&Ms) and Shop Drawings Contractor and/or subcontractor shall provide a warranty letter including point of contact, to the VA. Warranty is based on workmanship, material and equipment. Duration of warranty starts after acceptance and use of new equipment & components O&Ms for all new equipment and other components requiring preventative maintenance shall be provided to the VA. All O&M documents must be received by the VA prior to contractual closeout and final payment Contractor shall provide training to the VA. Shop Drawings All layout changes and new equipment shall be updated in as-builts, shop drawings, manufacturer diagrams, details, where applicable. Due to the nature of the contract, this requirement will be determined based on off application by the COR at completion of work. If no applicable documents are required, then the COR will opt for omission. Assumptions Contractor to provide a cost/unit for each of the deliverable items above and use the total amounts provided for their proposal. Contractor to track the quantities used on their pay applications with any amounts left over being returned to the government after final payment. All deliverables must be received by the VA prior to final payment. Line items will be tracked in every pay application. Financial progress for a line item will be cross-referenced with the corresponding item s physical progress and/or completion status. Misrepresentation of a line item s financial progress may result in rejection from the COR and require the contractor to resubmit the pay application with revision(s). Pay applications must be submitted with a total amount not to exceed the Purchase Order (PO) balance. A contract modification from the Contracting Officer (CO) is required for payment application submissions exceeding the PO balance. Additional work outside of the contract and contractual supplement documents (provided drawings, as-builts, details, existing product information, etc) require authorization and written execution from the CO. Any additional work (quantified via labor, material or equipment) performed/provided by the contractor without guidance from the VA or direction from the CO shall not be included in payment applications. The contractor is committed to working at their own expense and risk under this condition. Supplemental contractual and scope of work include existing as-builts, details and compliance for VA guidelines, federal & state guidelines, applicable codes, etc. VA can provide the contractor with additional available drawings and other documentation. These are considered items pertaining to the original contract s scope of work Standard Inclusions & General Compliance Contractor is responsible for cleaning the work area of trash regardless of if it is their trash or not. This includes areas that other entities may have access to like the attic and mechanical spaces. Contractor is responsible for stewardship of work area and compliance with VA medical facility guidelines. Contractor will adhere to VA-granted permitting requirements and industry standard safety practices including but not limited to: Infection Control Risk Assessment (ICRA) Pre-Construction Risk Assessment (PCRA) Hot or burn work Confined space entry work (if applicable) Lock out tag out (LOTO) procedures PPE Parking at the Loch Raven campus is limited and contractors are subject to facility guidelines for locations of contractor vehicles. Guidance for contractor parking is enforced by the COR, Facility Maintenance Supervisor, Campus Manager, and Deputy Medical Director. Parking outside the campus boundary is not in the VA s jurisdiction The contractor shall coordinate with the facility prior to work that impacts patient care such as shutting down A/C, heating, power or other utilities. Utility and HVAC shutdowns require at least a 14-day written request to the facility per the VA s internal Standard Operating Procedure. Period of performance is 90 calendar days.
-Pre-Solicitation12/14/2026

Additional Details

Solicitation Number

36C25026Q0233

Archive Date

Mar 12, 2026

Office Address

DAYTON, OH, 45428