GovChime
Notice ID: 182fc27738934359ae6606b969e90c87Combined Synopsis/SolicitationCancelled on SAM.gov

EQUIPMENT-REPROCESSING SINK-BATTLE CREEK

Cancelled on SAM.gov (notice posted July 9, 2026). Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
9:00 AM EDT
Posted
July 9, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
339113: Surgical Appliance and Supplies Manufacturing
Agency
Department of Veterans Affairs

Notice details

Office
250-NETWORK CONTRACT OFFICE 10 (36C250)
Place of performance
Michigan, 49037
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
36C25026Q0476
Notice ID
182fc27738934359ae6606b969e90c87

Description

  1. This request is to replace the Endoscopy Reprocessing Sink at the Wyoming Clinic, a CBOC to the Battle Creek VAMC, for the Sterile Processing Service (SPS). The current equipment was original to the building and is noncompliant with VHA Directive 1116(2), and the Association for the Advancement of Medical Instrumentation (AAMI) standards set forth by the Joint Commission, AMMI ST91. This has been deemed a Priority 1 replacement (Mission Critical) for the Gastrointestinal (GI) clinic’s reprocessing area within SPS during the recent site visit and audit from the VISN 10 Chief Sterile Processing Officer (CSPO). The C&A requirements do not apply, and a Security Accreditation Package is not required.

Endoscopy Reprocessing Sinks, quantity 1, will require the PureSteel Healthcare Reprocessing Brand, part number PS-97530-HA-03-301810B

Required Specifications:

  • Specifically designed for the cleaning of endoscopes
  • Overall size 97.5” L x 30” W, height adjustable
  • Three basins measuring 30” x 18” x 10” with telescoping drains
  • Ergonomics—including 45-degree wrist rests one per basin for a total of three), adjustable height by push-button access, and 10” gooseneck swivel spout sprayer with ergonomic grip
  • Sink Light Hood, one in 4’ L and one in 2’ L
  • Flat-bottom support shelf that mounts to pegboard backing, 14” x 12 x 1.5”
  • Water resistant programmable timer with alarm function, minutes and seconds, 9.75” L x 4.75” H x 3”D
  • Task Halogen Light, 27” gooseneck arm with 2X magnifier, water resistant
  • BACK Wall Pegboard, height adjustable with the sink, 97.5” L x 24” H, standard pegs throughout

Additional Accompaniments:

  • Volume indicator etching plate, one per basin
  • Wall mounted sink facet, 8” swing spout and lever handles
  • LED Basin lights
  • Gallon bottle holder
  • Scope Buddy Shelf mount system, 10” L x 11” D x 5” H at the back, 1” lip in front
  • Stainless steel wire baskets:
    • Front facing slant, 12” x 12” x 8-1/4”
    • Stainless steel basket size 12” x6”x 6”
  • Workflow plates:
    • Leak Testing
    • Wash
    • Rinse
  • Three Bay drain kit assembly

Full description on SAM.gov

Award Overview

Possible prior contract

Inferred, not confirmed

Inferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.

Contract end date

Dec 31, 2026

NAICS

339113

Agency

Department of Veterans Affairs

Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.

Contacts

Contracting Officer

Primary Contact

Documents

Files (1)

  • RFQ 36C25026Q0476_1.docx

    229 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationArchived

    EQUIPMENT-REPROCESSING SINK-BATTLE CREEK

    Notice 417924343fa74504b40ae2b4a2173abe on SAM.gov

  2. 2
    Version 2Combined Synopsis/SolicitationCancelledArchived

    EQUIPMENT-REPROCESSING SINK-BATTLE CREEK

    Notice 09a21b97a37548cdbe965f9aba830638 on SAM.gov

  3. 3
    Version 3Combined Synopsis/SolicitationArchived

    EQUIPMENT-REPROCESSING SINK-BATTLE CREEK

    Notice 741d674e6b6a437b87f1f1f318b19d40 on SAM.gov

  4. 4
    Version 4Combined Synopsis/SolicitationCancelledArchivedCurrent

    EQUIPMENT-REPROCESSING SINK-BATTLE CREEK

    Notice 182fc27738934359ae6606b969e90c87 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Amendment 001 to Solicitation #36C25927Q0025 (Air-powered chiropractic tables) This amendment s purpose is to list and answer the questions submitted by the questions deadline as specified in the solicitation. Questions and Answers: CLIN 0018 is listed as "Delivery," but the solicitation states freight shall be added to another line item and not be its own line item. How should offerors handle delivery/freight pricing? Freight costs may be added to the delivery line item if the offeror deems appropriate. Is any on-site installation or assembly required at the SLC or Ogden facilities, or is this delivery of the equipment only? The expectation is that the tables are pre-assembled and will be easy to place in the clinics. However, if the tables are NOT pre-assembled, the offeror should include installation/assembly fees into the delivery line item and ensure it is noted. For an "or equal" product, will an Authorized Distributor Letter from the manufacturer of the equal product we quote satisfy VAAR 852.212-71(c), or must the letter be from Hill Laboratories specifically? The Authorized Distributor Letter must be from the manufacturer of the brand the offeror is proposing. Offerors would only need to provide a letter from Hill Laboratories IF they are offering the Government the Hill Laboratories product. Installation scope: The section is titled "Delivery and Installation," but no installation tasks are listed. Should the price include inside delivery to the treatment room, uncrating, assembly, set-up/leveling, functional testing, packaging and debris removal, and staff in-service training? If so, please name the rooms and floors at each site. The expectation is for the tables to be delivered pre-assembled to the facility. The VA staff would then take possession of the items and move them to the clinic space. The Offeror should include installation/assembly costs IF the tables are not delivered pre-assembled. Delivery windows and access: Please give the allowed delivery days and hours, receiving dock or entrance, elevator access, any check-in or escort steps, and a point of contact at each site (George E. Wahlen VAMC, 500 Foothill Dr., Salt Lake City; Ogden CBOC, 2945 South Washington Blvd., Suite 1, South Ogden). Are deliveries to the 2 sites allowed on different dates? Deliveries may occur on different dates if needed. Deliveries shall be made between 0700 and 1700 Mondays through Fridays (except on Federal holidays). Required delivery date: Is there a required or target delivery date, or a maximum lead time in calendar days after award? A target delivery date is not available. Offerors are encouraged to provide the most accurate delivery lead time possible based on information currently available from the manufacturer. This is an evaluation factor so Offeror s information will be compared. Freight vs. line 0018: The RFQ says freight shall be added to another line item and not be its own line item, but line 0018 is "Delivery." Should delivery/installation be priced on line 0018, or included in line 0001 with 0018 shown as "Included with line item 0001"? Freight costs may be added to the delivery line item if the offeror deems appropriate. If the tables are not pre-assembled, the Offeror will need to include installation/assembly fees in the delivery line item total. *Be sure to make a note that installation/assembly is needed. Removal of existing tables: Is the contractor expected to remove and dispose of any existing tables at either site? If yes, how many, which models, and is there a VA disposal process? No removal or disposal services are required for this requirement. "Or equal" salient characteristics: The RFQ says "air powered - NOT pneumatic or hydraulic." Air-powered systems run on compressed air, which is usually described as pneumatic. Please clarify what this requirement excludes so that "equal" products can be judged fairly. Salient characteristics updated to: Must be air powered/pneumatic NOT hydraulic Option lines: For an "equal" product, may an option that is standard on that product be shown as "Included with line item 0001"? Must each brand-name part number (for example, AF-F15, 92CS, 97) be matched one for one? Each line item does not need to be matched one for one. However, the Offeror should ensure the components listed in the line items are included in the table. Please ensure a note is provided if the brochures/specification documents do not clearly show those items are included with the table. Height and width: Does a maximum height of exactly 29" meet the requirement, and is the 27" width (line 0017) the required width? The tables must be able to reach at least 29 but if the table is able to exceed this height (up to ~ 32 ) that would be preferred. The width dimension of the table must be between 27 and 33 Authorized distributor letter: Is the OEM letter (VAAR 852.212-71(c)) required for all offerors who are not the OEM, including authorized dealers? Must it name this solicitation, or is a general authorization letter on OEM letterhead acceptable? If the Offeror is not the manufacturer of the product they are offering, they must provide an authorized distributor letter from the manufacturer. The letter must be from the manufacturer stating the Offeror is authorized to sell/distribute the manufacturer s product to the Government. The letter may be on letterhead an/or an email but it must clearly be from the manufacturer and specify the Offeror. Contractor access/PIV: Clauses 852.204-70/72 are included, but all risk levels are marked N/a. Please confirm that delivery and installation staff will not need a background check or PIV card, and that a visitor badge and escort is enough? The expectation is for the tables to be pre-assembled and the Offeror would only need to deliver the item to the warehouse dock/facility. No access to the facility is anticipated although the VA staff may accompany the Offeror if delivery/installation/assembly is needed. Warranty/service: Should on-site labor warranty or service be included, or only the minimum 1 year parts warranty? Minimum 1-year parts warranty; additional on-site and/or service warranty appreciated but not mandatory Page limits: The RFQ mentions page limitations but does not state any. Is there a page limit for any volume? No page limits are present for this solicitation. However, Offerors should be mindful of potential email size limitations. Option to Extend Services (52.217-8) and Service Contract Labor Standards (52.222-41/43) are included. Please confirm whether they apply to this one-time supply purchase with installation. FAR 52.217-8 was included in case an extension to the period of performance is needed. SCLS does not apply to this requirement. Deadline time zone. The RFQ states quotes are due 12:00 PM MST on 30 October 2026, while SAM.gov lists the response deadline at UTC-06:00 (MDT). Please confirm the controlling local time for submission. The deadline is 12pm MT on 10/30/2026. Delivery pricing. The instructions state freight shall be added to another line item and not be its own line item, yet the schedule includes line item 0018 "Delivery." Should delivery/freight be priced in line item 0018, or folded into line item 0001 with 0018 marked accordingly? Freight costs may be added to the delivery line item if the offeror deems appropriate. If the tables are not pre-assembled, the Offeror will need to include installation/assembly fees in the delivery line item total. *Be sure to make a note that installation/assembly is needed. Installation. Is installation/set-up of the tables required at either delivery location (Salt Lake City and Ogden), or is delivery only required? If set-up is required, will VA personnel escort access be arranged through the receiving facility? If the tables are pre-assembled, installation shall not be required. However, if assembly of the table is required, the Offeror should include those costs in their quote and should plan to be onsite to install/assemble each table. VA staff may escort visitors IF installation/assembly of the product is needed. This may be discussed during the post-award meeting. Authorized distributor letter. Must the VAAR 852.212-71(c) letter from the OEM name the offeror specifically, or is a general letter of authorization from the manufacturer sufficient? If the Offeror is not the manufacturer of the product they are offering, they must provide an authorized distributor letter from the manufacturer. The letter must be from the manufacturer stating the Offeror is authorized to sell/distribute the manufacturer s product to the Government. The letter may be on letterhead an/or an email but it must clearly be from the manufacturer and specify the Offeror. Line item 0013 option code. Line item 0013 references option "92CSAF" (rocker foot pedal substitute for air at foot end). Please confirm this is the correct Hill Laboratories option code for the requested item. Yes, this is the correct code Installation: the delivery section is titled "Delivery and Installation" and asks for lead time "including installation, if applicable." Is any installation, assembly or setup required, or is delivery to the receiving area at each site sufficient? The station team will either expect the table to come pre-assembled OR the Offeror will need to plan to assemble the tables onsite. Any fees associated with installation/assembly should be included in the delivery line item. If the tables are already pre-assembled, then the VA staff will be able to take possession of the item upon delivery and then they will move the table to the clinic location. Authorized distributor letter (VAAR 852.212-71(c)): if the offeror is not the manufacturer, will a letter from the manufacturer authorizing the offeror to supply this specific order satisfy the requirement? If the Offeror is not the manufacturer of the product they are offering, they must provide an authorized distributor letter from the manufacturer. The letter must be from the manufacturer stating the Offeror is authorized to sell/distribute the manufacturer s product to the Government. The letter may be on letterhead an/or an email but it must clearly be from the manufacturer and specify the Offeror. Required delivery date: is there a required delivery date or a maximum acceptable lead time after award? A target delivery date is not available. Offerors are encouraged to provide the most accurate delivery lead time possible based on information currently available from the manufacturer. This is an evaluation factor so Offeror s information will be compared. May a small-business equipment distributor registered under NAICS 423450 submit a quotation for this solicitation, which is assigned NAICS 339113? NAICS 423450 shows a size standard of 200 employees while the NAICS for this requirement, 339113, is 800 employees. Therefore, as long as the Government is able to verify the Offeror has a NAICS in which it confirms their company size is below 800 employees, the Offeror should not be considered ineligible Does the SBA nonmanufacturer rule apply to this procurement, and if so, is a waiver available? Since this requirement is set-aside for small businesses, and the requirement is not expected to exceed the Simplified Acquisition Threshold, the limitations associated with the nonmanufacturer rule shall not apply. Offerors may provide products manufactured by both small and large businesses. Would an authorized reseller offering the specified Hill Laboratories equipment qualify, provided all technical specifications and manufacturer authorization requirements are satisfied? Yes. Offerors who obtain an authorized distributor letter from Hill Laboratories may submit a quote package to include the Hill Laboratories products. Air system: The specifications require air power but exclude pneumatic systems. Is the Hill Air Flex II s compressed-air system acceptable? The previous specification had a typo the system should be air-powered/pneumatic system. Headpiece: CLIN 0004 specifies an air-activated forward/straight drop, while the salient characteristics require a manual drop. Which is required? Please also confirm the intended configuration for AF-F22 headpiece motion with AF-F27 automatic distraction. Air powered drop is required. The distraction motion required is intended to stretch the neck in a superior motion like a decompression table would do and requires a headpiece to attach to the table so this distraction therapy can be done. See example video of how this feature should operate. https://www.youtube.com/watch?v=NEYLT0R_meA Weight: Does the 300 lbs. maximum include all installed accessories? Is there an allowable tolerance for the fully configured brand-name table? The weight of the table can exceed 300lbs if needed because of other accessories. The table itself should not exceed 300 lbs. Delivery: Please confirm the required delivery timeframe and whether room placement, setup, functional testing, demonstration, and packaging removal are required at both locations. The delivery timeline will be discussed with the awarded vendor after award of contract. Offerors shall provide their best estimate of the delivery/lead time for the items within their quote package as this will be compared to other quotes. It is common for the tables to be pre-assembled so only delivery to the facility would be expected unless assembly is needed for a brand of table. Offerors should factor in the installation/assembly time and costs IF there are any. Freight pricing: Should delivery be priced under CLIN 0018 or incorporated into the equipment lines, given the instruction against a separate freight line? Offerors shall use their best judgement. It may be easiest to just include any delivery and installation/assembly costs under line item 0018 but that is not mandatory. Reseller authorization: Will an OEM letter authorizing __ to supply the specified equipment for this solicitation satisfy the authorization requirement? Yes. A letter or email from the OEM stating the offeror is authorized to provide their product to the Government is sufficient. Deadline time zone: Please confirm whether the October 23 question deadline and October 30 quote deadline are noon Denver local time (MDT) or noon MST. The deadlines are Mountain Time. We are currently in MDT but this shall change to MST on 11/1/2026. This acquisition is a Total Small Business Set-Aside under NAICS 339113. The referenced brand, Hill Laboratories, appears to be other than small. FAR 52.219-33 (Nonmanufacturer Rule) is listed in the clause matrix but is not marked applicable. Please confirm whether the Nonmanufacturer Rule applies, and if so, whether an SBA class waiver is in place that would permit a small business offeror to supply the Air Flex II or an equal product from a large manufacturer. Since this requirement is set-aside for small businesses, and the requirement is not expected to exceed the Simplified Acquisition Threshold, the limitations associated with the nonmanufacturer rule shall not apply. Offerors may provide products manufactured by both small and large businesses. **The manufacturer for the Air Flex II, Hill Laboratories, has been confirmed to be a small business per SAM.gov Reps and Certs. The Description states "Freight shall be added to another line item and not be its own line item," but Line Item 0018 is titled "Delivery" with a quantity of 2 EA. Please clarify where freight should be priced. The Offeror may add the cost of freight to the delivery line item (#0018) or to the first line item if appropriate. The salient characteristics cap the weight of the table and equipment at 300 lbs. Please confirm whether this applies to the base table only or to the fully configured table with all listed options. This applies to base table only. Please confirm that Line Item 0018, quantity 2 EA, represents one delivery to each of the two locations. Correct, the quantity of 2 is due to one table EACH needing to be delivered to two separate locations. Therefore, delivery would be completed as two jobs. For the VAAR 852.212-71(c) manufacturer authorization, is a signed letter from the OEM on its letterhead (naming __ as an authorized distributor for this solicitation) sufficient, or is a specific format required? No specific format. Just some letter/email from the OEM stating the Offeror is authorized to sell their product to the Government. If an "equal" product is offered, should the authorization letter come from that product's manufacturer? Yes. An authorization letter is only needed from the OEM of the brand product the Offeror is offering. Is a delivery lead time after award stated in days (e.g., ARO) acceptable for Volume III, or is there a required delivery date? Yes. Offerors shall indicate the estimated number of days After Receipt of Order (ARO) of the contract in which the Offeror would be able to deliver the product to the locations once they receive the awarded contract. A specific date is not needed as the Government understands that it would be difficult to calculate since we do not know the specific date in which this requirement will be awarded.
-Combined Synopsis10/30/2026
Brand Name Only, Unrestricted RFQ for Hemosphere Alta Bundle.
-Combined Synopsis09/24/2026
Omnicell Automated Dispensing Cabinet Department of Veterans Affairs, Network Contracting Office (NCO)10, located at 8888 Keystone Crossing, Suite 1100, Indianapolis 46240, in support of John D. Dingell VA Medical Center, 4646 John R Street, Detroit, MI 48201, requires an Omnicell Automated Dispensing Cabinet, which is manufactured by Omnicell. NCO anticipates entering a firm-fixed-price purchase with the contractor providing the lowest price technically acceptable. This procurement will be conducted using RFO 12 procedures. NAICS 339112, the standard size is 1,000 employees. The anticipated issue closing date is August 14, 2026.
-Combined Synopsis08/07/2026
-AwardedOpen
THIS REQUEST FOR INFORMATION (RFI) / SOURCES SOUGHT NOTICE IS ISSUED SOLELY FOR INFORMATION AND PLANNING PURPOSES. THIS IS NOT A SOLICITATION. SUBMISSION OF INFORMATION ABOUT PRICING, DELIVERY, THE MARKET, AND CAPABILITIES IS HIGHLY ENCOURAGED AND ALLOWED UNDER THIS RFI FOR PLANNING PURPOSES IN ACCORDANCE WITH (IAW) FAR 15.201(e). DISCLAIMER This RFI is issued solely for information and planning purposes and does not constitute a solicitation. All information received in response to this RFI that is marked as proprietary will be handled accordingly. IAW FAR 15.201(e), responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. Responders are solely responsible for all expenses associated with responding to this RFI. SOURCES SOUGHT/RFI DESCRIPTION This is NOT a solicitation announcement. This is a Sources Sought Notice / RFI only. The purpose of this Sources Sought Notice / RFI is to gain information about potential qualified sources and their size classification relative to NAICS 339113 (size standard of 800 Employees). Responses to this Sources Sought Notice / RFI will be used by the Government to make appropriate acquisition decisions. After review of the responses to this Sources Sought Notice / RFI, further RFIs and/or a solicitation or other announcements may be published. The Department of Veterans Affairs (VA) San Diego Healthcare System is seeking sources capable of providing medical grade bed covers equivalent to Stryker IsoTour. The list of DRAFT characteristics is intended to be descriptive, not restrictive, of the supplies/services that are required. Statement of Work: Bed Covers Introduction: The purpose of this Statement of Work (SOW) is to establish a firm fixed-price Blanket Purchase Agreement (BPA) to procure bed covers equivalent to Stryker IsoTour covers for base plus four option years. This requirement is intended to streamline the acquisition of these specific components to ensure the continued operational readiness of medical equipment. Scope of Work: The contractor shall provide the necessary parts as specified in the technical requirements section of this SOW. This is a BPA intended for recurring requirements; the government will issue individual delivery orders against this agreement as need arises during the period of performance. Period of Performance: The BPA shall remain in effect for a base period of one (1) year from the date of establishment, with four (4) optional one-year renewal terms, subject to government funding and performance evaluation. Base: 1/1/2027 12/31/2027 Option Year 1 (OY1): 1/1/2028 12/31/2028 Option Year 2 (OY2): 1/1/2029 12/31/2029 Option Year 3 (OY3): 1/1/2030 12/31/2030 Option Year 4 (OY4): 1/1/2031 12/31/2031 Deliverables: The chart below is estimated quantities for base and all option years; quantities are not a contractual statement of precise quantities that the Government will order. The quantities given are estimated only, and no guarantee of their accuracy is either given or implied. The Government will only pay for quantities that are actually ordered per each delivery order and for which the services are fulfilled. Item Description Base Estimated Quantity OY1 Estimated Quantity OY2 Estimated Quantity OY3 Estimated Quantity OY4 Estimated Quantity Top Covers Equivalent to Stryker IsoTour 63 63 251 63 63 Bottom Covers Equivalent to Stryker IsoTour 63 63 251 63 63 Salient Characteristics: NOTE: All parts must be new, unused, and in their original manufacturer packaging. No refurbished or third-party alternative parts will be accepted. VAAR 852.212-71 Gray Market and Counterfeit Items clause applies on this acquisition. No remanufacturers or gray market items will be acceptable. The contractor shall be an Original Equipment Manufacturer (OEM), authorized dealer, authorized distributor or authorized reseller verified by an authorization letter or other signed documents from the OEM. The letter must either state specific product(s) quoted or that the quoter is an authorized distributor for all the manufacturer s products. This letter must be on the manufacturer s letterhead and contains the signature of an authorized official for the manufacturer. If the offerors fail to provide a signed letter from the OEM (unless the contractor is the OEM), your quote will not be evaluated for award. If you are the OEM, state so in your quote response. Bed covers shall not void or adversely affect any existing manufacturer warranties applicable to the Stryker Model 2872 IsoTour Gel Support Surface. The contractor shall provide documentation demonstrating compatibility with the OEM mattress system and that use of the replacement cover will not negatively impact warranty coverage. Bed covers shall be fully compatible with the Stryker Model 2872 IsoTour Gel Support Surface and shall fit the existing mattress without modification to the mattress or stretcher system. Bed covers must be medical grade. Bed covers must be fluid-resistant or fluid proof. Bed covers shall permit normal use of all existing mattress attachment mechanisms. Top covers shall be designed to fit IsoTour Gel Support Surface mattresses measuring 78.75" (200 cm) L x 35.5" (90.2 cm) W x and 9.5" (24.1 cm) H. Bottom covers shall be designed to fit mattresses measuring 84.25 (213.9 cm) in L x 35.5" (90.2 cm) W and shall securely interface with the corresponding top cover to maintain intended mattress function and patient support. Schedule: Deliverables shall be provided upon the issuance of a BPA delivery order. The contractor shall provide the following: Order Acknowledgement: Within two (2) business days of receiving the order. Shipping Notification: Including tracking numbers and expected delivery dates. The following delivery addresses are applicable, and the vendor will be instructed where to deliver order. Place of Performance: The contractor will be instructed where to deliver each delivery order. VA San Diego Healthcare System 3350 La Jolla Village Drive San Diego, CA 92161 Delivery hours 7am-3pm M-F, Federal holidays excepted VA Off-Site Warehouse 9755 Birch Canyon Pl, Ste 100 San Diego, CA 92126 Delivery hours: 7am-3pm M-F, Federal holidays excepted Federal Holidays: New Year s Day January 1 Martin Luther King s Birthday 3rd Monday in January Presidents Day 3rd Monday in February Memorial Day Last Monday in May Juneteenth Day June 19 Independence Day July 4 Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veterans Day November 11 Thanksgiving Day 4th Thursday in November Christmas Day December 25th The President of the United States of America may declare additional days as a Federal holiday, and if so, this holiday will automatically be added to the list above. When a holiday falls on a Sunday, the following Monday shall be observed as a Federal holiday. When a holiday falls on a Saturday, the preceding Friday shall be observed as a Federal Holiday. Quality Assurance and Inspection: The government reserves the right to inspect all delivered items. Any parts that arrive damaged, incorrect, or fail to meet the OEM specifications defined in Section 3.0 will be rejected and returned at the vendor's expense. Replacement parts must be provided within ten (10) business days of the rejection notice. Special Instructions Invoicing: Invoices shall be submitted electronically via Tungsten or the designated government payment system, referencing the specific purchase order numbers, which shall be provided on each delivery order. If your company is interested and capable of providing the required supplies/services, please provide the information indicated below. Response to this notice should include company name, address, point of contact, size of business pursuant to the following questions: (1) Submit your capabilities statement illustrating how your organization can/cannot meet the list of SOW requirements. For instances where your company cannot meet the SOW requirement(s), please explain. For instances where your company can meet the SOW requirement(s), please show how your company meets/exceeds each requirement. (2) Please review the list of SOW requirements and provide any additional feedback or suggestions. If none, please reply as N/A. (3) Please indicate the size status and representations of your business, such as but not limited to: Service-Disabled Veteran-Owned Small Business (SDVOSB), Veteran-Owned Small Business (VOSB), HUBZone, Woman Owned Small Business (WOSB), Large Business, etc. (4) Is your company considered small under the NAICS code identified in this RFI? (5) Are you the manufacturer, authorized distributor, and/or can your company provide a solution to the required supplies/services described in the list of SOW? (6) If you are a large business, do you have any designated/authorized distributors? If so, please provide their company name, telephone, point of contact and size status (if available). (7) If you re a small business and you are an authorized distributor/reseller for the items identified above, do you alter; assemble; modify; the items requested in any way? If you do, state how and what is altered; assembled; modified. (8) Limitations on Subcontracting: How does your business ensure compliance with the limitations on subcontracting as outlined in 13 CFR § 125.6? (9) Are the items you are identifying/providing considered Commercial of the Shelf (COTS) items as defined in FAR Part 2.101 under commercial items? (10) Non-Manufacturer Rule: If applicable, can you confirm your business complies with the Non-Manufacturer rule? Specifically, does your company: Provide a product from a small business manufacturer or processor? Not exceed 500 employees? Primarily engage in the retail or wholesale trade and normally sell the type of item being supplied? Take ownership or possession of the item(s) with its personnel, equipment or facilities in a manner consistent with industry practice? (11) Please indicate whether your product conforms to the requirements of the Buy American Act? (12) What is your lead time to deliver a single unit with all components? Is there scale in lead time with greater quantities? Please elaborate. (13) What is estimated life span of your solution? What support/services does that entail? (14) Does your proposed equipment have FDA clearance? Please specify what FDA clearance(s) have been obtained. (15) Does your organization offer a leasing solution? Please elaborate. (16) Does your company have a Federal Supply Schedule (FSS) GSA/NAC/SAC/BPA/NASA SEWP or any other Federal Government contract? If so, please provide the contract number(s). (17) If you are an FSS GSA/NAC/SAC/BPA/NASA SEWP or any other Federal Government contract holder, are all the items/solutions you are providing information about available on your schedule/contract? Please state if all or some items are available on the contract. (18) General pricing of your products/solution is encouraged. Pricing will be used for the purpose of market research only. It will not be used to evaluate for any type of award. (19) Please provide your SAM.gov Unique Entity ID/Cage Code number. Responses to this notice shall be submitted via email to Hestia.Sim@va.gov. Telephone responses will not be accepted. Responses must be received no later than Friday, November 20, 2026, by 10 AM Pacific Local Time. All responses to this Sources Sought/RFI will be used for planning purposes only. Responses to this Sources Sought Notice / RFI are not considered a request to be added to a prospective bidders list or to receive a copy of the solicitation. If further RFIs and/or a solicitation or other announcement is issued as a result of the information provided from this RFI, all interested parties must respond to the specific posting separately IAW the specifications of that announcement.
-Market Research11/20/2026

Additional Details

Solicitation Number

36C25026Q0476

Archive Date

May 5, 2026

Office Address

DAYTON, OH, 45428