Notice ID: 9d15fd426dec4c6c83400e0ad5cef209Presolicitation
C1DA--A-E Replace Elevators - Fort Wayne Campus 610A4-26-201
Archived on December 17, 2025. Original response deadline: . Full description on SAM.gov.
Description
PURPOSE OF POSTING: In accordance with (IAW) Federal Acquisition Regulation (FAR) 36.603(a) and VA Acquisition Regulation (VAAR) 836.603, the Northern IN VA Healthcare System (Marion Campus) is requesting SF 330s from A/E firms wishing to be considered for Government contracts for the upcoming projects. SCOPE OF WORK: The Architect/Engineer (A/E) firm shall furnish professional services for 100% design to Replace Three Elevators in Building 1 at VA Northern Indiana Health Care System, Fort Wayne Campus, 2121 Lake Ave, Fort Wayne, IN 46805. The design will include Schematic Design, Design Development, Construction/Bid Documents per the A/E Design Submission Instructions Documents, Construction Administration Services, Technical Specifications and Cost Estimates. The Replace Elevators shall be designed based on the guides, manuals and planning criteria. The Project shall be designed to accommodate the following functions based on the guides, manuals, and planning criteria P-1, P-2, S-1 P1 Passenger Elevator 1 Type Gearless Passenger Speed 600fpm Capacity 4000lbs Travel (existing) 80' 8" Landings (existing) 6 Front (existing) Yes, it opens in the front Rear No, no rear opening Landings Served (existing) 6 - Basement, 1st, 2nd, 3rd, 4th, 5th Main Line Power 208v 3ph 60hz P2 Passenger Elevator 2 Type Gearless Passenger Speed 600fpm Capacity 4000lbs Travel (existing) 80' 8" Landings (existing) 6 Front (existing) Yes, it opens in the front Rear No, no rear opening Landings Served (existing) 6 - Basement, 1st, 2nd, 3rd, 4th, 5th Main Line Power 208v 3ph 60hz S1 Service Elevator Type Gearless Passenger/Service Speed 600fpm Capacity 4000lbs Travel (existing) 80' 8" Landings (existing) 6 Front (existing) Yes, it opens in the front Rear No, no rear opening Landings Served (existing) 6 - Basement, 1st, 2nd, 3rd, 4th, 5th Main Line Power 208v 3ph 60hz A/E design shall replace elevators to include the following: Replacing up to 3 elevators in building 1 Elevators must meet current codes and VA requirements Elevator exterior controls to be upgraded The Schematic Design shall include a comprehensive study, inspection and report of the existing project area conditions, which shall include: cables, elevator pits, emergency services, elevator box cars, elevator shaft, mechanical, electrical, architectural components, fire protection, etc. The project is to provide all necessary modifications and replacements to VA NIHCS existing elevators. A/E shall provide a preliminary construction duration time for planning purposes. This information shall be communicated to all bidders for their review and inclusion within their bids. It shall be communicated within the bid documents that the contractor will be required to review and provide any concerns regarding the projected construction duration. A/E shall develop and provide schedules of equipment necessary to activate and operate the areas located in the project area. A/E will be responsible for complete functional design and provide biddable documents meeting all the requirements. The VA Technical Information Library (TIL) available at http://www.cfm.va.gov/til/index.asp is managed by the VA Office of Construction and Facility Management. It is the master repository for all VA Numbered Standards for Construction to include design and construction specifications, procedures, standard details, BIM/CAD standards, equipment guides, space planning and design guides. The documents of the TIL shall be the minimum design criteria for all VA projects performed in the construction of new facilities and the modernization, alteration, addition, or improvement of its real property. VA additionally through the documents on the TIL has adopted the latest edition of the following codes and standards (but not limited to): Occupational, Safety and Health Administration (OSHA) Standards International Building Code (IBC) National Electrical Code (NEC) NFPA 101 Life Safety Code National Fire Protection Association (NFPA) Codes, except for NFPA 5000 and NFPA 900 National Standard Plumbing Code (NSPC) Safety Code for Elevators and Escalators, American Society of Mechanical Engineers (ASME) A 17.1 ASME Boiler and Pressure Vessel Code ASME Code for Pressure Piping International Plumbing Code (IPC) Architectural Barriers Act Accessibility Standard (ABAAS) for Federal Facilities Building Code Requirements for Reinforced Concrete, American Concrete Institute (ACI 318 2) and Commentary (ACI 318 R2) Manual of Steel Construction, Load and Resistance Factor Design Specifications for Structural Steel Buildings, American Institute of Steel Construction (AISC) Energy policy Act of 2005 (EPAct)Ventilation for Acceptable Indoor Air Quality ASHRAE Standard 62.1 DOE Interim Final Rule: Energy Conservation Standards for New Federal, Commercial and Multi-Family High-Rise Residential Buildings and New Low-Rise Residential Buildings, 10 CFR Parts 433, 434 and 435 Federal Leadership in High Performance and Sustainable Buildings: Memorandum of Understanding (MOU) Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management The Provisions for Construction and Safety Signs. Stated in the General Requirements Section 01010 of the VA Master Construction Specification Ventilation for Acceptable Indoor Air Quality ASHRAE Standard 62.1 Safety Standard for Refrigeration Systems ASHRAE Standard 15 U.S. National CAD Standard Where conflicts exist between VA adopted codes and standards and the documents on the TIL, the A/E shall bring this to the attention of the VA. The resolution of the conflict shall be made by the authority having jurisdiction for VA to ensure consistency department wide. Designs for construction must produce a complete and usable facility or improvement when constructed. VA policy (VHA Office of Capital Assets Management, Engineering and Support memo Updated Construction Guidance and Expectations dated Sep 12, 2016) requires the A/E to certify that their design (including all bid alternates/bid deducts) is independent of any future construction project. In addition, the A/E must certify that it has produced a design that does not include equipment that will be procured separately unless directed otherwise by the VA. Equipment that can be part of the design includes those items to meet code requirements for building occupancy, items covered in the VA s Master Construction Specifications (PG-18-1) Divisions 1 through 10, 13 through 26 or 28 through 48, non-IT equipment items covered by Division 27 and items covered by Division Numbers 12 31 00, 12 32 00, 12 34 00 and 12 36 00. The A/E shall submit as part of the Final Bid Documents submittal a signed letter on company letterhead stating the design s independence. A/E shall be responsible for reviewing existing conditions to locations planned for development. Existing drawings of Building 1 are on file at the VA NIHCS for review by the A/E. Access to files shall be coordinated with the COR. The VA will employ a third-party commissioning agent to certify the design and construction meet Federal Mandates. The commissioning authority will verify the performance of the components and systems and, to ensure design requirements are met, develop a commissioning plan, inclusion of commissioning or requirements in construction documents, verification of installation and performance of commissioned systems (testing and system monitoring), operation/maintenance manuals and training, and a commissioning report. The A/E team shall work with the commissioning agent throughout the design and construction process to ensure all sustainable objectives are met. All drawings shall adhere to VA project software requirements for Building Information Modeling (BIM) and Computer Aided Design (CAD) available at http://www.cfm.va.gov/til/projReq.asp. BIM software shall be Revit 2020 or the latest version available to VA NIHCS, Fort Wayne Campus. The project BIM model minimum requirements shall be developed to include the systems described below as they would be built, the processes of installing them and to reflect record drawing conditions (possibly incorporating into the Fort Wayne VAMC Master Record Drawing pending facility expertise). The deliverable model at the DD and CD design phases shall be developed to include as many of the systems described below (but not limited to) as are necessary and appropriate at that design phase. Architectural/Interior Design Square Footage/Volume including Room Names and Numbers Departmental Ownership (By Common Name, Capital Asset Inventory Department Definition and Strategic Capital Investment Program Department Definition) Architectural Schedules Doors Architectural Specialties and Woodwork Life Safety Information (Fire Extinguishers, Wall Ratings, Door Ratings, Fire Protection/Alarms) General Signage Schedules Equipment Structural Shafts and Pits Mechanical Electrical/Telecommunications Power and Lighting Asbestos/ Hazard Material Info Security System Information (Access Controls, Security Cameras, Panic Alarms, Overhead Paging) Other Engineering Data as Required A/E shall develop a phasing plan and also develop deduct bid alternates for project award which will be based on available funding for construction of $800,000.00 GENERAL The A/E will be given the appropriate orientation by the VA NIHCS offices of Engineering Service and VISN Contracting. The A/E shall prepare all necessary drawings. The degree of completion and the stages of submission shall be as hereinafter specified. The VA NIHCS will provide all standard details, master specifications, design criteria, etc. A/E discussion with the VA NIHCS personnel concerning requirements will be arranged by and participated in by appropriate Engineering Service personnel. The A/E shall participate with the Project Engineering and other Services in review of project scope, design review comments, etc. There will be (1) submissions for schematic design drawings, and one (1) submission for design development drawings, (3) three submissions for construction documents (95% and 100% complete) plus a final submission which constitutes a complete bid package consisting of drawings, specifications, detailed final cost estimates, phasing and sequence drawings within each phase, and project bid alternates. Drawings showing architectural and other features of the affected building are available in files of the Engineering Service, VA NIHCS. The drawings are not to be expected to be accurate in all respects, and the Architect-Engineer is to verify all features affecting the project by field investigation. The A/E shall develop the project utilizing Revit 2020 and Building Information Modeling BIM to develop architectural design drawings, renderings, construction documents, and record drawings at completion of construction as per the VA BIM guide located on the VA Technical Information Library (TIL). At each scheduled submittal date, the A/E shall submit to the VA a list of the submitted files that shall include 3D Views, Facility Data, and Revit Data Files. Submittal drawings shall be full size plots suitable for half size reproduction. The VA has ownership of the rights at the date of Closeout Submittal to all CAD files, Revit 2020 BIM Model and Facility Data developed for the Project. The VA may make use of this data following any deliverables. For preparation of construction specifications, the A/E will provide specifications in "Word" format and pdf format. The A/E shall supply copies of the specification files, combined into single document, to be electronically transported to the CO for incorporation into the VA specification booklet. SCHEDULE & SUBMISSION REQUIREMENTS Times listed herein are approximate and subject to negotiation. Each milestone in the timeline is subject to completion of the predecessor task and project requirements external to AE scope; as such, calendar days for task completion shall be negotiated instead of actual dates. The following is an estimated milestone schedule in terms of business days. Federal holidays do not count as business days. Activity Level of Completion Calendar Days Schematic Submission (SC) 35% 40 After Notice to Proceed VA Review of 35% (SC) 14 After Receipt of 35% Submission Design Development Submission (DD) 65% 30 After VA Approval of 35% SC Submission VA Review of 65% (DD) 14 After Receipt of 65% Submission Construction Document Submission (CD) 95% 30 After VA Approval of 65% DD Submission VA Review of 95% (CD) 14 After Receipt of 95% Submission Construction Document Bid Set Submission (CDBS) 100% 15 After VA Approval of 95% CD Submission VA Review of 100% CDBS 14 After Receipt of 100% CDBS Submission Deliver Final Construction Document Bid Set 9 After VA Approval of 100% CDBS Submission 124 A/E Design 56 VA Review 180 Total Design Timeframe Design Schedule is 180 days to complete Schematic Design, Design Development, Construction Documents, Technical Specifications, and Cost Estimates of Construction. Completion of Construction Administration Services will not be dependent upon award of Construction Contract. CONSTRUCTION PERIOD SERVICES Contract Procurement: a. Attend contractor s Pre-Bid site visit and respond with recommendations to any questionable items. If necessary, develop amendments or assist with project procurement. A written response is required. b. Attend one pre-construction meeting after award of contract. Submittal Review: a. The A/E firm shall review all construction materials, equipment, and change orders proposed by the contractor for use in construction of this project. All submittals and change order proposals will be reviewed for compliance with the specifications and reasonable costs and returned to Engineering Service within five (5) calendar days after receipt. Site Visits a. The A/E shall provide site visits as requested by the COR as noted below: i. One (1) visit for the pre-bid conference. ii. One (1) visit for the pre-construction conference. iii. Nine (9) visits for general construction, inspection/progress. iv. One (1) visit for final inspections. b. A/E to provide other construction phase services as defined in signed contract. Misc. a. The A/E shall review and answer all RFI s submitted by the contractor within five (5) calendar days after receipt. b. A/E to participate in weekly telephonic project meetings with the VA and contractor. As-Built Drawings a. The A/E shall modify design drawings and models based on marked drawings supplied by the contractor and are to be verified by the A/E in field. As-Builts are to include all addendums and bulletins issued by the VA/AE during construction. These changes shall be bubbled and dated. An electronic Revit BIM 2020 and AutoCAD 2020 model of the As-Builts is to be submitted to the COR on CD-ROM. Any approved shop drawings with major differences from contract drawings, supplemental agreements processed change orders, etc., shall be incorporated. The A/E shall deliver updated record drawings (4 sets); (2) ½ size sets, (2) Full size sets. - - - END OF SCOPE - - - SUBMITTALS INSTRUCTIONS: All interested and capable vendors are to submit a hard copy SF330 package for review. The SF330s can be delivered to the address below: ATTN: Eric Sweatt Network Contracting Office (NCO) 10 8888 Keystone Crossing Suite 325 Indianapolis, IN 46228 The package must be received in government control no later than 12/10/2025 at 11:00 A.M. EST. EVALUATION CRITERIA: The government will evaluate each potential contractor under the terms of its: Professional qualifications necessary for satisfactory performance of required services. Specialized experience and technical competence in the type of work required, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials. Capacity to accomplish the work in the required time. Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules. Location in the general geographical area of the project and knowledge of the locality of the project; provided that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project; and Experience in construction period services to include professional field inspections during the construction period, review of construction submittals, support in answering requests for information during the construction period, and support of construction contract change to include drafting statements of work cost estimates. A selection board has been appointed to complete the functions required by FAR 36.602-3, under the short selection process outlined in FAR 36.602-5(a). END OF ANNOUNCEMENT
Overview
Agency:
Department of Veterans Affairs
Office:250-NETWORK CONTRACT OFFICE 10 (36C250)
Posted:November 3, 2025
NAICS:541330: Engineering Services
Last Updated:Sep 25, 2026
PSC:C1DA: ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES
Set-Aside:Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Type:Presolicitation
Place of Performance:Department of Veterans Affairs VA Northern Indiana Health Care System Fort Wayne Campus 2121 Lake Avenue, Fort Wayne, Indiana, 46805
Award Overview
Possible prior contracts
Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).
Contacts
Contracting Officer
Primary Contact
Documents
Showing 1 of 1 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Presolicitation | VETERANS AFFAIRS, DEPARTMENT OF | Nov 3, 2025 | 36.62 KB |
Lifecycle
Solicitation:
36C25026R0020- Pre-Solicitation
Formal solicitation typically follows within 30–60 days. (estimate)
- 2×Pre-SolicitationCurrentOct 23, 2025
C1DA--A-E Replace Elevators - Fort Wayne Campus 610A4-26-201
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
Provide complete design services, including all necessary schematics, design development, surveys, cost estimates, construction drawings and specifications, and construction period services (CPS) for solicitation to upgrade and replace all elevators and elevator components at the Cincinnati VA Medical Center, 3200 Vine Street, Cincinnati, OH 45220 and the Ft. Thoms Domiciliary, 1000 S. Ft. Thomas Ave, Ft. Thomas, KY 41075. This project will modernize, replace, and repair 21 elevators that are deteriorated, outdated, or frequently out of service. Several elevators contain obsolete components that are no longer available for purchase, requiring replacement to ensure continued reliability and maintainability. Other units require upgrades to doors, flooring, and ceiling finishes due to normal use and deterioration. SELECTION CRITERIA The Government will evaluate each potential contractor under the terms of its: A. Professional qualifications necessary for satisfactory performance of required services; B. Specialized experience and technical competence in the type of work required, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials; C. Capacity to accomplish the work in the required time; D. Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules; E. Location in the general geographical area of the project and knowledge of the locality of the project; provided, that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project; F. Experience in construction period services to include professional field inspections during the construction period, review of construction submittals, support in answering requests for information during the construction period, and support of construction contract changes to include drafting statements of work, and cost estimates shall be included as an evaluation criterion when construction period services is included in the statement of work for A-E services, and; G. The extent to which potential contractors identify and commit to the use of service-disabled veteran-owned small businesses, veteran-owned small businesses, and other types of small businesses as subcontractors. SUBMITTAL INSTRUCTIONS All interested and capable contractors must submit an electronic copy of their SF 330s, via email, by the closing time/date of this announcement. Note the following: No hard/physical copies will be accepted. Limit SF 330 packages to 50 pages. Only the first 50 pages will be evaluated. Submit all documentation as one single file. The total size of the electronic submission (email and all attachments) must not exceed 15MB; larger emails may get rejected by the network server and will be considered non-responsive. Cited relevant projects must be within the last five (5) years. Submit packages via email to the contract specialist by the deadline:Â ronald.heidemann@va.gov Subject line must include the notice number: 36C25027R0008 Please include your firm s POC and UEI in the email body. ***End of Presolicitation Notice** | Pre-Solicitation | 541330 | Service-Disabled Veteran-Owned Small Business Set-Aside | 10/16/2026 | 11/02/2026 | - | |
| Awarded | 541330 | Service-Disabled Veteran-Owned Small Business Set-Aside | 10/14/2026 | Open | - | ||
| Awarded | 541330 | Service-Disabled Veteran-Owned Small Business Set-Aside | 10/14/2026 | Open | - | ||
Sources Sought Notice THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. THE GOVERNMENT WILL NOT PAY NOR REIMBURSE ANY COSTS ASSOCIATED WITH RESPONDING TO THIS REQUEST. THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. The Department of Veterans Affairs is seeking a qualified Architect-Engineering (AE) firm to provide Schematics, Design Development, Construction Documents, Technical Specifications, Construction Period Services, Site Visits, Cost Estimates, As-Built Documentation, and all other related information for Project 58A5-27-503 Project Design Replace Flat Roof at the Canandaigua VA Medical Center, 400 Fort Hill Avenue, Canandaigua, NY 14424. this project is to develop a conditions-report and design documents for replacing the existing flat roofs on buildings 4, 5, 6, 7, 8, 10, 36, 37, 118, and various connecting tunnels. The conditions report shall be prepared after a thorough investigation of the existing conditions with estimated costs and improvements. The following design will include all selected repairs and improvements from the conditions report that fit within VA construction budget. As part of the report and design effort, the existing conditions shall be tested and verified, including evaluation of the drainage, materiality, masonry, fall protection, equipment, ACM, insulation, and structural integrity. New work may include redesign / reconstruction of support structures, drainage, roof type change, and parapet wall restoration to ensure water intrusion and legacy issues are mitigated. In addition to repairs and modifications, all interior drainage piping shall be replaced minimum 10 from roof drain unless, otherwise discussed with VA for convenience or practical reasons or as needed due to conditions of ease or degradation. This requirement is being procured in accordance with the Brooks Act as implemented in FAR Subpart 36.6. Applicable NAICS code is 541330 and small business size standard of $25.5 Million. Magnitude of Construction is between $500,000 and $1,000,000. This is a 100% Service-Disabled Veteran Owned Small Business Set Aside. The anticipated award date of the proposed A-E Contract is on or before December 30, 2026. Potential contractors must be registered in SAM (www.sam.gov ) and are visible/verified/certified as SDVOSB in Dynamic Small Business Search (https://dsbs.sba.gov/search/dsp_dsbs.cfm) at time of submission of their qualifications in order to be considered for an award. In order to assure compliance with VAAR clauses, 852.219-75 VA Notice of Limitations on Subcontracting Certificate of Compliance for Services and Construction (NOV 2022) and 852.219-73 VA Notice to Total Set-Aside for Verified Service-Disabled Veteran-Owned Small Businesses (NOV 2022), all firms submitting a SF 330 for this notice are required to indicate what percentage of the cost of contract performance will be expended on the concerns employees and in which discipline(s) and percentage of cost of contract performance to be expended (and in what disciplines) by any other consultant/subcontractor or otherwise used small or large business entity(s). Any consultant/subcontractor or otherwise business entity(s) used must be identified by name, office location and size/type of business (i.e., SDVOSB, VOSB, 8(a), small, large, etc.). Failure to provide this information will deem the firm s SF 330 submittal as non-responsive and preclude further evaluation All A/E firms are advised that in accordance with VAAR 836.606-71 the total cost of the production and delivery of designs, plans, drawings and specifications shall not exceed six (6) percent of the estimate cost of construction. Other A-E fees are not included in the six (6) percent. Additionally, FAR Clause 52.236-22 (c) - Design Within Funding Limitation, will be applicable to this procurement action. SCOPE OF SERVICE REQUIRED Project no. 528A5-27-503: A/E Design Replace Flat Roof LOCATION Canandaigua VAMC, 400 Fort Hill Avenue Canandaigua, NY 14424 COST RANGE Magnitude of Construction is between $500,000.00 and $1,000,000.00 Estimated Construction Cost Range: $5,000,000. TYPE OF CONTRACT CONTEMPLATED The Department of Veterans Affairs is contemplating awarding a firm fixed price contract. DESIGN COMPLETION PERIOD: The Department of Veterans Affairs requires design and contract support services. The A/E shall deliver 100% bid documents in 255 calendar days from the Notice to Proceed (NTP). SELECTION CRITERIA DESCRIPTIONS The submitted SF-330s will be evaluated on the following criteria: This acquisition will be in accordance with FAR Part 36.602-1 and VAAR Part 836.602-1. The following evaluation criteria will be used to evaluate SF-330 technical proposals: The A/E must demonstrate its qualifications with respect to the published evaluation criteria for all services. Evaluation Criteria is of equal importance with an exception of criterion 1 and 7 which shall carry an additional weight multiplier of 1.5. Each criterion shall be rated out of a score of 1 to 10. Total possible score is 80. Specific evaluation criteria include: 1.Specialized experience and technical competence in the type of work required, including, roof replacements, structural repairs, drainage, temporary systems and investigative services. 2. Professional Qualifications necessary for performance of site surveys such as the one described within the SOW including qualified personnel and approach to this scope. 3. Capacity to accomplish the work in the required time. 4. Past Performance on contracts with Government agencies and private industry in terms of cost control, quality of work and compliance with performance schedules. 5. Specific experience and qualifications of personnel proposed for assignment to the project and their record of working together as a team. 6. Location in the general geographical area of the project and knowledge of the locality of the project; provided, that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project. 7. Specific examples of survey documents as described in the scope of work and approach to preparation of the documents as requested by the VA. 8. Record of significant claims against the firm because of improper or incomplete architectural and engineering services. Criterion 1 - Specialized experience and technical competence in the type of work required, including, roof replacements, structural repairs, drainage, temporary systems and investigative services. Offerors will be evaluated on specialized experience and technical competence in the performance of services similar to those anticipated under this contract with regard to: Experience with roofing systems. Experience with design of building drainage systems. Experience with specialized HVAC and electrical design for healthcare facilities. Experience in providing post construction award services (shop drawing review, as-built drawing and Quality Assurance Plan (QAP) preparation, construction inspection services, and Operating and Maintenance Manuals). Experience with government designs and construction. Experience with historic buildings, preservation, and alterations. Submission requirements: Provide a detailed write-up of how the firm has accomplished the requirement. In addition, provide up to five (5) projects completed or substantially completed within the past five (5) years that best illustrate specialized experience of the proposed team in the areas outlined above. Example projects shall note project s square footage. All projects provided in the SF-330 must be completed by the office/branch/regional office/individual team member actually proposed to manage and/or perform work under this contract. To enable verification, firms should include the DUNS number along with each firm name in the SF-330 Part 1, Section F Item 25 Firms from Section C Involved in this Project, block (1). Include a contract number or project identification number in block 21. Include an e-mail address and phone number for the point of contact in block 23(c). Include in the project description the contract period of performance, award contract value, current contract value, a summary of the work performed that demonstrates relevance to specialized experience as outlined above. If the contractor served as a subcontractor on a project, indicate the value of the work they provided towards the performance of the overall project. If a project was performed by a joint venture, and not all joint venture partners are on the team proposed for this contract, the offeror/team should specifically address the work performed by the joint venture partner offering/teaming on this contract. Likewise, if the offeror/team member worked as a subcontractor on a project, the description should clearly describe the work actually performed by the offeror/team member and the roles and responsibilities of each on the project, rather than the work performed on the project as a whole. If the project description does not clearly delineate the work performed by the entity/entities offering/teaming on this contract, the project could be eliminated from consideration. NOTE: If the Offeror is a joint venture, information should be submitted as a joint venture; however, if there is no information for the joint venture, information should be submitted for either joint venture partner, not to exceed a total of five (5) projects for this criterion. Projects shall be submitted on the SF-330. For submittal purposes, a task order on an IDIQ contract is considered a project, as is a stand-alone contract award. Do not list an IDIQ contract as an example of a completed project. Instead, list relevant completed task orders or stand-alone contract awards that fit within the definition above. Examples of project work submitted that do not conform to this requirement will not be evaluated. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being rated lower. All information for Criterion 1 should be submitted in Part 1, Section F of the SF-330. The Government WILL NOT consider information submitted in addition to Part 1, Section F in evaluating Criterion 1. Criterion 2 - Professional Qualifications necessary for performance of site surveys as the one described with the SOW including qualified personnel and approach to this scope. Offerors will be evaluated in terms of the qualifications, competence and experience of the key personnel and technical team proposed to accomplish this work. Key personnel are individuals who will have major contract or project management responsibilities and/or will provide unusual or unique expertise. Provide a balanced licensed and or certified workforce in the following disciplines Architecture, Structural, Mechanical, Electrical, Interior Design, Environmental services and Historic Preservation Submission requirements: Provide a detailed description of how the team has performed site surveys and would approach the survey for this project. In addition, provide resumes for all proposed key personnel. Resumes are limited to one page each and should cite project specific experience and indicate proposed role in this contract. Provide professional registration, certification, licensure and/or accreditation. Indicate participation of key personnel in example projects in the SF-330 Part 1 Section G. Criterion 3 - Capacity to accomplish the work in the required time. Firms/teams will be evaluated in terms of their ability to plan for and manage work under the contract and capacity to accomplish the work in the required time. Submission requirements: Describe the firm s ability to concurrently perform and manage multiple projects in different locations to meet aggressive schedules, multiple disciplines, and control costs and the firm s capacity to accomplish multiple projects simultaneously. Criterion 4 - Past Performance Offerors will be evaluated on past performance with Government agencies and private industry in terms of work quality, compliance with schedules, cost control, and stakeholder/customer satisfaction. Evaluating past performance and experience will include information provided in Past Performance Questionnaires (PPQs) or CPARS/ACASS for Criterion 1 projects and may include other information provided by the firm, customer inquiries, Government databases, and other information available to the Government including contacts with points of contact in other criteria. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being rated lower. NOTE: Past performance information for projects listed under Criterion 1. Submission requirements: SUBMIT A COMPLETED CPARS/ACASS EVALUATION FOR EACH PROJECT UNDER CRITERION 1. IF THERE IS NOT A COMPLETED CPARS/ACASS EVALUATION, the Past Performance Questionnaire (PPQ) included in this notice is provided for the offeror or its team members to submit to the client for each project the offeror includes under Criterion 1. Criterion 5 - Specific experience and qualifications of personnel proposed for assignment to the project and their record of working together as a team. Submission requirements: Offerors shall submit evidence of individuals experience and qualifications in their respective fields. Additionally, documentation must be provided to show these individuals have worked together as a team on previous projects and their role. (Completing Sections E, F, and G, on the SF-330 meets the documentation requirement). Furthermore, offerors shall describe the ability of the firm to manage, coordinate and work effectively with team members, both internal staff and consultants. Discuss the history of working relationships with team members, including joint venture partners where applicable. Criterion 6 - Location within a 400-mile radius to the design site (Canandaigua, NY) and knowledge of the location (Canandaigua, NY); provided, that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project. Provided that the application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the contract, firms/teams will be evaluated on the locations of their office or offices that will be performing the work under this contract. Submission requirements: Indicate firms/teams location, including main offices, branch offices and any subconsultants offices and demonstrate how this will be advantageous to the Government. Do not include office locations is no team members are to be working from or located at. Criterion 7 Specific examples of survey documents as described in the scope of work and approach to preparation of the documents as requested by the VA. Submission requirements: Offerors shall provide documentation written description and examples of firm s ability to perform. Criterion 8 - Record of significant claims against the firm because of improper or incomplete architectural and engineering services. Offerors with substantiated claims against the firm as a result of improper architectural and engineering services provided in the last three (3) years. Submission requirements: Records and any other documentation of substantiated claims highlighting improper or incomplete architectural engineering services against the firm within the last three (3) years. The SF-330 shall contain a statement affirming that there are no records of significant claims because of improper or incomplete architectural and engineering services. Evaluation Scoring Evaluation factors 1, 2, 3, 5, 7, and 8 will be evaluated 1-10 using the following adjectival ratings as follows: Outstanding (10): Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low. Good(7-9): Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low. Acceptable(4-6): Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is moderate. Marginal(1-3): Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high. Unacceptable(0): Proposal does not meet requirements and contains one or more deficiencies. Proposal is not awardable. The firm s proposal demonstrates a misunderstanding of the requirement, and the approach fails to meet performance standards. The firm s proposal has major omissions and inadequate details to assure evaluators that the offeror has an understanding of requirement. The ratings identified below were used in the evaluation of Past Performance (Criterion 4): Substantial Confidence(10): Based on the offeror s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort. No doubt exists based on the offeror s past performance that they can satisfy the requirements of the contract. Satisfactory Confidence (7-9): Based on the offeror s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort. Little doubt exists based on the offeror s past performance that they could satisfy the requirements of the contract. Unknown Confidence (Neutral 5-6): No recent/relevant performance record is available, or the offeror s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. Limited Confidence (1-3): Based on the offeror s recent/relevant performance record, the Government has little expectation that the offeror will be able to successfully perform the required effort. Some doubt exists based on past performance that they could satisfy the terms and conditions of the contract. No Confidence (0): Based on the offeror s recent/relevant performance record, the Government has little expectations that the offeror will be able to successfully perform the required effort. Significant doubt exists based on the offeror s past performance that they can satisfy the requirements of the contract. Rating of criterion 6 shall be a score of 0 for outside of range and 10 for inside of range PLEASE NOTE: The AE Evaluation Board must be provided with complete and accurate information for ALL nine (9) evaluation factors above in order to rank as qualified and eligible firms. Therefore, the AE firm must expand upon, as it deems necessary, on any evaluation factor not well demonstrated or addressed with Part 1A to Part IG and Part II of the SF330. The AE firm shall use Part IH and/or use additional sheets to supplement/address all evaluation factors to clearly demonstrate its qualifications. LIMITATIONS 852.219-10 VA Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside (DEC 2009) (a) Definition. For the Department of Veterans Affairs, Service-disabled veteran-owned small business concern : (1) Means a small business concern: (i) Not less than 51 percent of which is owned by one or more service-disabled veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled veterans (or eligible surviving spouses); (ii) The management and daily business operations of which are controlled by one or more service-disabled veterans (or eligible surviving spouses) or, in the case of a service-disabled veteran with permanent and severe disability, the spouse or permanent caregiver of such veteran. (iii) The business meets Federal small business size standards for the applicable North American Industry Classification System (NAICS) code identified in the solicitation document; and (iv) The business has been verified for ownership and control and is so listed in the Small Business Pages database, (SBA s Small Business Search); (2) Service-disabled veteran means a veteran, as defined in 38 U.S.C. 101(2), with a disability that is service-connected, as defined in 38 U.S.C. 101(16). (b) General. (1) Offers are solicited only from service-disabled veteran-owned small business concerns. Offers received from concerns that are not service-disabled veteran-owned small business concerns shall not be considered. (2) Any award resulting from this solicitation shall be made to a service-disabled veteran-owned small business concern. (c) Agreement. A service-disabled veteran-owned small business concern agrees that in the performance of the contract, in the case of a contract for: (1) Services (except construction), at least 50 percent of the cost of personnel for contract performance will be spent for employees of the concern or employees of other eligible service-disabled veteran-owned small business concerns. (2) Supplies (other than acquisition from a nonmanufacturer of the supplies), at least 50 percent of the cost of manufacturing, excluding the cost of materials, will be performed by the concern or other eligible service-disabled veteran-owned small business concerns. (3) General construction, at least 15 percent of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other eligible service-disabled veteran-owned small business concerns; or (4) Construction by special trade contractors, at least 25 percent of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other eligible service-disabled veteran-owned small business concerns. (d) A joint venture may be considered a service-disabled veteran owned small business concern if (1) At least one member of the joint venture is a service-disabled veteran-owned small business concern and makes the following representations: That it is a service-disabled veteran-owned small business concern, and that it is a small business concern under the North American Industry Classification Systems (NAICS) code assigned to the procurement. (2) Each other concern is small under the size standard corresponding to the NAICS code assigned to the procurement; and (3) The joint venture meets the requirements of paragraph 7 of the explanation of Affiliates in 19.101 of the Federal Acquisition Regulation. (4) The joint venture meets the requirements of 13 CFR 125.15(b). (e) Any service-disabled veteran-owned small business concern (non-manufacturer) must meet the requirements in 19.102(f) of the Federal Acquisition Regulation to receive a benefit under this program. SUBMISSION REQUIREMENTS: Unless paper offers are specifically authorized in an individual solicitation, all responses to solicitations must be submitted electronically as described below. Responses submitted in a paper form are unacceptable. Failure to comply with this requirement may jeopardize the possibility of receiving an award due to noncompliance with the submission requirements. EMAIL SUBMISSION REQUIREMENTS Interested firms having the capabilities to perform this work must submit: ONE (1) ELECTRONIC SF 330, including Parts I and II, and attachments (if any) to idalia,algarin@va.gov no later than 12PM, Eastern Standard Time (EST) on November 13, 2026. Submittals received after the date and time identified will not be considered. The submittal will be date and time stamped by the Microsoft Email system and will be the official record of receipt for the submission. All SF 330 submissions shall be clearly indicated in subject line, displaying the solicitation number and project number and title (abbreviated and shortened is okay). Submission is to be no more than a total of fifty (50) pages; size of emails is not to exceed 10 megabytes (MB). If more than one email is sent, please number emails in subject lines as 1 of 2, 2 of 2 etc. All SF 330 submissions must include the following information either on the SF 330 or by accompanying document: Cover Page with Solicitation Number, Project Number and Title Table of Contents Copy of valid state registration for each lead designer Copy of current https://veterans.certify.sba.gov/ SDVOSB/VOSB certification DUNS Number Cage Code Tax ID number Email address and Phone number (including the area code) of the Primary Point of Contact. | Market Research | 541330 | Service-Disabled Veteran-Owned Small Business Set-Aside | 10/09/2026 | 11/13/2026 | Canandaigua, NY | |
| Awarded | 541330 | Service-Disabled Veteran-Owned Small Business Set-Aside | 09/29/2026 | Open | - |
Additional Details
Solicitation Number
36C25026R0020
Archive Date
Dec 17, 2025
Office Address
DAYTON, OH, 45428