Notice ID: 5533e59c5fd1a557f3de6b3c374981efSources Sought
J--SPECIAL-Electrical Repairs to Orange Loop Adapter Replacement
Archived on April 21, 2018. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 12:00 AM UTC−05:00
- Posted
- March 16, 2018
- Notice type
- Sources Sought
Notice details
- Office
- 252-NETWORK CONTRACT OFFICE 12 (36C252)
- Place of performance
- 3001 Green Bay Road;North Chicago Il 60064;Southern Tier 60064 USA
- PSC
- J: MAINT, REPAIR, REBUILD EQUIPMENT
- Last updated
- Sep 10, 2025
Identifiers
- Solicitation number
- 36C25218Q0649
- Notice ID
- 5533e59c5fd1a557f3de6b3c374981ef
Description
Page | 1 of 2 Statement of Work Provide labor, material and equipment to replace damaged adapter and 200amp load break for the orange loop in pedestal #170 feeding building 6 and replacing dielectric oil in HV switches. GENERAL: Contractor shall provide and install an APC module for the APC UPS at the Captain James A. Lovell Federal Health Care Center, located at 3001 Green Bay Rd, North Chicago, IL 60064 CONFORMANCE STANDARDS: All services provided under this contract must be performed in conformance with the Occupational Safety and Health Administration (OSHA), and Original Equipment Manufacturer standards and specifications Delivery Requirements: Deliver Building 32 at 3001 Green Bay Rd, North Chicago, IL 60064 SERVICES REQUIRED: Provide labor, material and equipment to replace damaged adapter and 200amp load break for the orange loop in pedestal #170 feeding building 6 and replacing dielectric oil in HV switches. CONTRACTOR REQUIREMENTS: Contractor shall perform work in a professional manner and to the highest standards Contractor shall check in with the electric shop at time of arrival and checkout as defined in service hours. POC is the electric shop supervisor, 224-610-3510 Contractor must be licensed/certified by the State of Illinois. Contractor shall be required to follow all ICRA requirements set forth by the infection control staff. Contractor to remove all trash and debris at the completion of job. The work area is to be kept clean at all times. The Contractor is to insure that all tools, equipment and material are kept and placed in an orderly fashion to have as little impact on daily operations of the hospital, staff and patients. Owner s manual will be supplied as part of the close out documentation. Contractor shall be required to complete a Captain James A. Lovell Federal Health Care Center Service Ticket when the work is completed. Contractor shall perform a function test in the presence of a VA employee designated by the electric shop supervisor. NOTE: All work is expected to encounter normal conditions. Contractor to Install equipment in accordance with the manufacturers installation instructions. If anything unusual is encountered the VA will be notified and pricing will adjust accordingly. PAYMENT FOR SERVICES: Invoices will be paid in arrears on a monthly basis upon completion of the services. Each invoice must include VA purchase order number, and invoice number and the month of the service being invoiced. The invoice should be mailed to the address identified herein. SECURITY REQUIREMENTS: The Contractor s employees shall wear visible identification and company uniforms approved by the COR at all times while on the premises of the VAMC. It is the responsibility of the Contractor to park in the appropriate designated parking areas. Information on parking is available from the VA Police Section or from the COTR. The VAMC will not invalidate or make reimbursement for parking violations of the Contractor under any conditions. Smoking is prohibited inside any buildings at the VAMC. Possession of weapons is prohibited. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
36C25218Q0649- Market Research
Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)
- Market ResearchCurrentMar 16, 2018
J--SPECIAL-Electrical Repairs to Orange Loop Adapter Replacement
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
36C25218Q0649
Archive Date
Apr 21, 2018
Office Address
MILWAUKEE, WI, 53214