GovChime
Notice ID: 0ff790754150b672538e01bd470cac0cAward NoticeAwarded

C--A/E IDIQ Design Contract

Awarded on May 24, 2018. Full description on SAM.gov.

Awarded tounder 36C25218D0156 (source: SAM.gov award notice)• $0

Overview

Posted
May 24, 2018
Notice type
Award Notice
NAICS
541310: Architectural Services
Agency
Department of Veterans Affairs

Notice details

PSC
C: ARCHITECT/ENGINEER SERVICES
Last updated
Sep 10, 2025
Award date
May 24, 2018
Award amount (SAM.gov award notice)
$0

Identifiers

Solicitation number
36C25218R0705
Notice ID
0ff790754150b672538e01bd470cac0c
Award number (PIID)
36C25218D0156

Description

No Description Provided

Full description on SAM.gov

Award Overview

Award Number

36C25218D0156

Award Amount (SAM.gov award notice)

$0

Award Date

May 24, 2018

Awardee

Awardee UEI

DFS9NKSDUUY5

Original Solicitation

Notice ID: 0ff790754150b672538e01bd470cac0c

Posted Date: May 24, 2018

Original Response Deadline: Not specified

Task Orders Under This IDV

Top 10 by total obligated

10
  • 36C25218N9280
    USFIN DEVELOPMENT LLC
    Department of Veterans AffairsNAICS 541310
    $442.3KSigned May 7, 2020
  • 36C25218N9280
    USFIN DEVELOPMENT LLC
    Department of Veterans AffairsNAICS 541310
    $442.3KSigned Aug 31, 2020
  • 36C25218N9280
    USFIN DEVELOPMENT LLC
    Department of Veterans AffairsNAICS 541310
    $442.3KSigned Feb 3, 2020
  • 36C25218N9280
    USFIN DEVELOPMENT LLC
    Department of Veterans AffairsNAICS 541310
    $442.3KSigned Nov 6, 2019
  • 36C25218N9280
    USFIN DEVELOPMENT LLC
    Department of Veterans AffairsNAICS 541310
    $442.3KSigned May 1, 2019
  • 36C25218N9280
    USFIN DEVELOPMENT LLC
    Department of Veterans AffairsNAICS 541310
    $442.3KSigned Aug 15, 2019
  • 36C25218N9280
    USFIN DEVELOPMENT LLC
    Department of Veterans AffairsNAICS 541310
    $442.3KSigned Aug 15, 2019
  • 36C25218N9280
    USFIN DEVELOPMENT LLC
    Department of Veterans AffairsNAICS 541310
    $442.3KSigned Oct 22, 2020
  • 36C25218N9280
    USFIN DEVELOPMENT LLC
    Department of Veterans AffairsNAICS 541310
    $442.3KSigned Aug 28, 2018
  • 36C25218N9280
    USFIN DEVELOPMENT LLC
    Department of Veterans AffairsNAICS 541310
    $442.3KSigned Nov 26, 2018

More From This Vendor

Top 5 most recent

5
  • 36C25225C0008
    USFIN DEVELOPMENT LLC
    Department of Veterans AffairsNAICS 541310
    $64.4KSigned Sep 1, 2026
  • 36C25225C0008
    USFIN DEVELOPMENT LLC
    Department of Veterans AffairsNAICS 541310
    $64.4KSigned Apr 27, 2026
  • 36C25225C0008
    USFIN DEVELOPMENT LLC
    Department of Veterans AffairsNAICS 541310
    $64.4KSigned Sep 2, 2025
  • 36C25221N0630
    USFIN DEVELOPMENT LLC
    Department of Veterans AffairsNAICS 541310
    $28.8KSigned May 12, 2025
  • 36C25222N0196
    USFIN DEVELOPMENT LLC
    Department of Veterans AffairsNAICS 541310
    $79.6KSigned Mar 10, 2025

Contacts

Documents

No documents available.

Lifecycle

Solicitation:36C25218R0705
  1. Awarded

This opportunity has been awarded.

  1. AwardedCurrentMay 24, 2018

    C--A/E IDIQ Design Contract

    Notice 0ff790754150b672538e01bd470cac0c on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
AMENDMENT A0001 Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice REQUEST FOR SF 330 36C25227Q0013 Project 578-27-003: Renovate A Section 1st Floor Bldg. 1 (AE) Design/Engineering Services SF-330 Package Due: October 30, 2026, at 1:00 p.m. CST (see details below) Points of Contact: Donita.Grace@va.gov INTRODUCTION: THIS IS A TOTAL 100% SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB) SET-ASIDE in accordance with Public Law 109-461. This is a Request for SF330s for Architect/Engineer (A/E) Design Services for Project Number 578-27-003: Renovate A Section 1st Floor Bldg. 1 (AE) at the Edward J. Hines VA Hospital in Hines, IL. THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. NO SOLICITATION PACKAGE WILL BE ISSUED via SAM.gov. A request for proposal will be issued directly to the top-rated firm for which negotiations will commence in accordance with FAR part 36. The anticipated A/E design services, to be awarded, will be procured in accordance with the Selection of Architects and Engineers Act (Public Law 92- 582), FAR Part 36.6 and VA Acquisition Regulation 836.6. Period of Performance: 449 Calendar Days Contract Type: Firm-Fixed-Price Estimated Magnitude of Construction: Between $10,000,000 and $20,000,000 NAICS Code: 541310 Size Standard: $12.5 Million SBA & SAM : in accordance with VAAR 819.7003, at the time of SF330 submission and prior to award of any contract, the offeror must represent to the contracting officer that it is a (1) SDVOSB eligible firm; (2) Small business concern under the North American Industry Classification System (NAICS) code assigned to the acquisition; and (3) SDVOSB listed as verified in SBA at: https://veterans.certify.sba.gov/ Additionally, all eligible firms must be registered and current in the System for Award Management (SAM) database to be evaluated and eligible for contract award. If the firm is not registered in SAM, you may register online at https://www.sam.gov. 1. PURPOSE: This Source Selection Plan (SSP) outlines the procedures that will be used to solicit architectural and engineering (AE) design services for Project 578-27-003 Renovate A Section on First Floor of Building 1. The goal of this project is to provide complete AE design services to renovate section A of the 1st floor of building 1. 2. ACQUISISTION DESCRIPTION: 2.1: RFI: A Request for Information shall be published to https://sam.gov whereby interested architect-engineering companies shall submit an SF330 package. This competitive procurement shall utilize a best value trade-off source selection process identified in FAR 15. 2.1.a: Source Selection Evaluation Board (SSEB): For the purpose of this acquisition, the SSEB will be same as the Technical Evaluation Board (TEB). 2.1.b: Below are the individual (TEB) evaluation criteria and ratings for the SF330s, listed in descending order of importance. FACTOR 1: SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE (30 Maximum Points) Subfactor 1A: Specialized Experience (15 Points). Subfactor 1B: Additional Experience (10 points). Subfactor 1C: Technical Competence (5 points). The A/E Firm shall demonstrate its specialized experience and technical competence in the design and construction period services for projects of similar size and complexity. Specialized project experience should include design of renovations to existing hospitals, renovations to buildings constructed prior to 1970 w/space constraints, design of Pathology Suites, and HVAC upgrades to existing hospitals. Additional experience includes mechanical, electrical, and structural engineering, architecture, interior design and finishes, physical security upgrades, building management systems/building automation systems (BMS/BAS), Computer-Aided Design and Drafting (CADD), critical path scheduling, fire protection, construction infection control protocols, design and installation of biological refrigeration and preservation systems, design and installation of vacuum tube transport systems, and project phasing and coordination in an active hospital setting. Offeror shall provide a minimum of three (3), and no more than five (5) recent and relevant Government and private experience projects similar in size, scope, and complexity, and experience with the type of projects/competence above. Relevant is defined as those task requirements identified in the Statement of Work. Recent is defined as services provided within the past seven (7) years with at least 50% of the Construction completed. At a minimum, include the following for each submitted project (if applicable): Project title, location, contract number, and detailed narrative describing the scope of services provided including the type of work performed by the offeror and its role in the project i.e., prime contract, Teaming Partner, or subcontractor. Project Owner, owner s point of contact including telephone number and email address. Services & Deliverables provided under the contract/task order Period of Performance, including start and completion dates for design and construction if applicable. Estimated cost of construction based on AE s design Final construction cost (or projected final construction cost if still underway) The percentage of total cost resulting from changes due to AE omissions. To demonstrate technical competence, the offeror shall include narratives of how the firm addresses each of the following topics. Simply restating this list will not be sufficient. The management approach The coordination of disciplines and subcontractors Quality control procedures Familiarity with VA Design Guides/Manuals, Master Specifications and other applicable standards. FACTOR 2: PROFESSIONAL QUALIFICATIONS (20 Maximum Points) Subfactor 2A: Key Positions (15 Points). Subfactor 2B: SDVOSB Compliance (5 Points). The architects and engineers on the firm s staff representing the project or signing/stamping drawings in each discipline must possess a minimum of five (5) years of experience and are required to be licensed, registered, or certified by a U.S. state, the District of Columbia, or a U.S. territory. Provide professional license jurisdiction of issue and license numbers and/or proof of licensure. A resume for each of these key positions must be provided, corresponding with the title matching the disciplines listed for the project. At a minimum, the offeror must describe the professional qualifications and specific experience in the required disciplines within the past five (5) years. Key positions and disciplines required for this project include, but are not limited to: Project Manager Architect Mechanical Engineer Electrical Engineer Plumbing Engineer Structural Engineer Interior Designer The evaluation will consider education, certifications, training, registration, overall and relevant experience and longevity with the firm. Offer must include the following statement of SDVOSB compliance when submitting the personnel proposed to perform the work under this requirement: I [signatory authority] ______________________, [company] _____________________; certify that the team proposed to perform under this requirement demonstrates the capability of 50% SDVOSB performance in compliance of 48 CFR 852.219-10. FACTOR 3: PAST PERFORMANCE (20 Maximum Points) Subfactor 3A: Past Performance of projects identified in FACTOR 1. (15 Points). Subfactor 3B: Average Past Performance of all projects (5 Points). Provide CPARS data for all projects identified in FACTOR 1. For any project that does NOT have CPARS data available, a Past Performance Questionnaire (PPQ) is required to be submitted with the SF330. Please utilize the attached PPQ document. CPARS data and PPQs will not be included in the page count. All projects provided in the SF330 must be completed by the office/ branch/ individual team member performing the work under this contract. The following information must be clearly specified on each performance report: Contract/task order number Project title Prime firm Start date Completion date Offers shall only include CPARS data for the projects listed in FACTOR 1. The contracting officer shall directly retrieve CPARS reviews from www.CPARS.gov to determine average past performance of previous projects. Government Past Performance Information Systems may be accessed. Evaluating past performance and experience may include information provided by the firm, customer inquiries, Government databases, publicly available sources, and additional projects in CPARS. Failure to provide requested data, accessible points of contact or valid phone numbers could result in a firm being considered less qualified. FACTOR 4: QUALITY CONTROL (10 Maximum Points) Subfactor 4A: Management approach (5 Points). Subfactor 4B: Quality methodology (5 Points). The A/E Firm shall describe its management approach, regarding coordination of disciplines and subcontractors, familiarity of the prime firm and any key subcontractors with VA Design Guides/Manuals, Master Specifications, ASHRAE standards, NEC, and other applicable standards. A/E Firm shall also provide the following: Quality Control organization, and management structure. Methods and procedures for control and prevention of nonconformances during design, preconstruction, and construction. Methods and procedures for nonconformance remediation at all stages of project. Methods and procedures for control and prevention of cost, and schedule overruns. Summarized schedules for selected three previous design projects that show initial approved project schedule, and any updates to schedule with time extensions. Provide a narrative to describe reasons and justifications for any deviations from initial schedule. Summarized cost estimates for selected three previous design projects that show initial approved total project cost estimate, and any increases to initial cost estimates. Provide a narrative to describe reasons and justifications for any deviations from initial estimates. Describe any unforeseen conditions that arose during construction for your last three projects. Provide a narrative to describe how your firm assisted the project management team to correct those deficiencies, and any methods used to mitigate extra costs and increases in project schedule. FACTOR 5: CAPACITY (10 Maximum Points) Subfactor 5A: Capacity to complete work within required timeline (5 Points). Subfactor 5B: Resource management and project management (5 Points). The A/E Firm shall attest to its capacity to accomplish the work in the required time. The evaluation will consider the firm s ability to meet the schedule of the overall project, as well as the available capacity of personnel in key disciplines. The A/E Firm shall also provide the following: A list that shows the total number of design and project professionals who are currently employed at the firm with professional titles for each. Total number of projects in study or planning stages Total number of active design projects Total number of active construction phase services A list of personnel assigned to each of the above projects An analysis and report of available capacity of key personnel for immediate new work The respondent shall: Summarize its approach to staffing and company resource management For the key personnel on the proposed project team, tabulate their current and projected workload as percentages of their available individual capacity. List all work awarded to the A/E Firm by the VA during the previous 12 months, as well as any current indefinite delivery, indefinite quantity (IDIQ) contracts that it has. List the current stage and percentage of completion for non-IDIQ projects. A signed statement shall be provided stating that the firm acknowledges that prior to award of the contract, it is required to notify the Government of any changes in its capacity that could limit its ability to perform the work within the required time. FACTOR 6: GEOGRAPHIC LOCATION (5 Maximum Points) Location of the firm, as measured by the travel time (hours) between the Offeror s principal business location and Edward Hines, Jr. VAMC, Hines, IL. Architect must provide details of travel between their main office and Edward Hines Jr, VAMC Hines, IL. This includes but not limited to airport travel time, driving distance, etc. If the architect has a satellite location, the architect must provide details of a fully staffed and well-established satellite office. Leasing documentation may be requested. FACTOR 7: EXPERIENCE IN CONSTRUCTION PERIOD SERVICES (5 Maximum Points) The A/E Firm shall demonstrate its experience in providing Construction Period Services for hospital facilities, particularly in HVAC renovation projects. The respondent shall provide a narrative that describes the methods and procedures used to implement each of the following Construction Period Services tasks: Professional field inspections during the construction period, with descriptions of types of inspections provided, and methods used for inspections and reporting during each phase of construction Review of construction submittals Support in answering requests for information during the construction period Support of construction contract changes to include updated drawings, drafting statements of work, and cost estimates. Weekly construction meeting participation Closeout documents to include final inspections and as-recorded drawings. SECONDARY SELECTION CRITERION*: FACTOR 8: CLAIMS (-5 to 0 Maximum Points) Subfactor 8: Record of significant claims against the firm because of improper or incomplete architectural and engineering services. (-5 to 0 Points). * The secondary selection criterion is used as a tiebreaker, if necessary, in ranking the most highly qualified firms following the completion of discussions. The secondary selection criterion will not be applied when determining a firm s SF330 submission. 2.1.c: After TEB Individual Ratings of the SF330s are completed, the TEB shall convene and develop consensus ratings for the seven evaluation factors of the SF330s as defined above. COMMENT DESCRIPTION DEFINITIONS Strong point: Provides Merit/advantages to VA that increase the likelihood of successful contract performance. Weak point: Flaws/disadvantages that increase the likelihood of unsuccessful contract performance. 2.2.c: The eighth factor (Secondary Selection Criterion) will only be used if needed. The TEB shall provide a listing, in order of preference, of the firms considered most highly qualified to perform the work. The contracting officer shall issue a Request for Proposal (RFP) to the architect-engineer the TEB recommends for negotiations. 3. SOURCE SELECTION PROCESS: 3.1 SF330 Reviews: The board will review and evaluate the submitted SF330 s in accordance with the stated evaluation criteria to determine each individual offeror s ability and capability to perform the work required and confirmation of determination of responsibility per FAR 9.1. a) TECHNICAL EVALUATION BOARD SF330 INDIVIDUAL EVALUATIONS (1) Each board member will conduct an independent review and evaluation and complete an evaluation rating sheet for EACH SF330. Each category will be addressed with strengths or weaknesses noted. (2) The evaluation will be in accordance with the Evaluation Factors which are listed in the solicitation. b) TECHNICAL EVALUATION BOARD SF330 CONSENSUS (1) After each member has completed their independent evaluation, the Chairperson will discuss the evaluations with the entire team and assure each evaluation is complete. (2) During these discussions, the board will reach a consensus rating for each SF330 and document ratings using the consensus evaluation worksheets. The SF330 can be downloaded through the GSA Forms Library at: https://www.gsa.gov/forms-library/architect-engineer-qualifications. No Fax Responses will be accepted: personal visits for discussing this announcement will not be entertained or scheduled. Questions may be directed only by e-mail to Donita.Grace@va.gov. VA Primary Point of Contact: Donita Grace, NCO 12 Contract Specialist, Donita.Grace@va.gov. The page limit for SF330 s will be 30 pages max., any pages after 30 will not be considered. See attached document: P01 - SOW 578-27-003 Renovate A Section 1st Floor Bldg. 1
-Combined Synopsis11/16/2026
Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice REQUEST FOR SF 330 36C25227Q0013 Project 578-27-003: Renovate A Section 1st Floor Bldg. 1 (AE) Design/Engineering Services SF-330 Package Due: October 30, 2026, at 1:00 p.m. CST (see details below) Points of Contact: Donita.Grace@va.gov INTRODUCTION: THIS IS A TOTAL 100% SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB) SET-ASIDE in accordance with Public Law 109-461. This is a Request for SF330s for Architect/Engineer (A/E) Design Services for Project Number 578-27-003: Renovate A Section 1st Floor Bldg. 1 (AE) at the Edward J. Hines VA Hospital in Hines, IL. THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. NO SOLICITATION PACKAGE WILL BE ISSUED via SAM.gov. A request for proposal will be issued directly to the top-rated firm for which negotiations will commence in accordance with FAR part 36. The anticipated A/E design services, to be awarded, will be procured in accordance with the Selection of Architects and Engineers Act (Public Law 92- 582), FAR Part 36.6 and VA Acquisition Regulation 836.6. Period of Performance: 449 Calendar Days Contract Type: Firm-Fixed-Price Estimated Magnitude of Construction: Between $10,000,000 and $20,000,000 NAICS Code: 541310 Size Standard: $12.5 Million SBA & SAM : in accordance with VAAR 819.7003, at the time of SF330 submission and prior to award of any contract, the offeror must represent to the contracting officer that it is a (1) SDVOSB eligible firm; (2) Small business concern under the North American Industry Classification System (NAICS) code assigned to the acquisition; and (3) SDVOSB listed as verified in SBA at: https://veterans.certify.sba.gov/ Additionally, all eligible firms must be registered and current in the System for Award Management (SAM) database to be evaluated and eligible for contract award. If the firm is not registered in SAM, you may register online at https://www.sam.gov. 1. PURPOSE: This Source Selection Plan (SSP) outlines the procedures that will be used to solicit architectural and engineering (AE) design services for Project 578-27-003 Renovate A Section on First Floor of Building 1. The goal of this project is to provide complete AE design services to renovate section A of the 1st floor of building 1. 2. ACQUISISTION DESCRIPTION: 2.1: RFI: A Request for Information shall be published to https://sam.gov whereby interested architect-engineering companies shall submit an SF330 package. This competitive procurement shall utilize a best value trade-off source selection process identified in FAR 15. 2.1.a: Source Selection Evaluation Board (SSEB): For the purpose of this acquisition, the SSEB will be same as the Technical Evaluation Board (TEB). 2.1.b: Below are the individual (TEB) evaluation criteria and ratings for the SF330s, listed in descending order of importance. FACTOR 1: SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE (30 Maximum Points) Subfactor 1A: Specialized Experience (15 Points). Subfactor 1B: Additional Experience (10 points). Subfactor 1C: Technical Competence (5 points). The A/E Firm shall demonstrate its specialized experience and technical competence in the design and construction period services for projects of similar size and complexity. Specialized project experience should include design of renovations to existing hospitals, renovations to buildings constructed prior to 1970 w/space constraints, design of Pathology Suites, and HVAC upgrades to existing hospitals. Additional experience includes mechanical, electrical, and structural engineering, architecture, interior design and finishes, physical security upgrades, building management systems/building automation systems (BMS/BAS), Computer-Aided Design and Drafting (CADD), critical path scheduling, fire protection, construction infection control protocols, design and installation of biological refrigeration and preservation systems, design and installation of vacuum tube transport systems, and project phasing and coordination in an active hospital setting. Offeror shall provide a minimum of three (3), and no more than five (5) recent and relevant Government and private experience projects similar in size, scope, and complexity, and experience with the type of projects/competence above. Relevant is defined as those task requirements identified in the Statement of Work. Recent is defined as services provided within the past seven (7) years with at least 50% of the Construction completed. At a minimum, include the following for each submitted project (if applicable): Project title, location, contract number, and detailed narrative describing the scope of services provided including the type of work performed by the offeror and its role in the project i.e., prime contract, Teaming Partner, or subcontractor. Project Owner, owner s point of contact including telephone number and email address. Services & Deliverables provided under the contract/task order Period of Performance, including start and completion dates for design and construction if applicable. Estimated cost of construction based on AE s design Final construction cost (or projected final construction cost if still underway) The percentage of total cost resulting from changes due to AE omissions. To demonstrate technical competence, the offeror shall include narratives of how the firm addresses each of the following topics. Simply restating this list will not be sufficient. The management approach The coordination of disciplines and subcontractors Quality control procedures Familiarity with VA Design Guides/Manuals, Master Specifications and other applicable standards. FACTOR 2: PROFESSIONAL QUALIFICATIONS (20 Maximum Points) Subfactor 2A: Key Positions (15 Points). Subfactor 2B: SDVOSB Compliance (5 Points). The architects and engineers on the firm s staff representing the project or signing/stamping drawings in each discipline must possess a minimum of five (5) years of experience and are required to be licensed, registered, or certified by a U.S. state, the District of Columbia, or a U.S. territory. Provide professional license jurisdiction of issue and license numbers and/or proof of licensure. A resume for each of these key positions must be provided, corresponding with the title matching the disciplines listed for the project. At a minimum, the offeror must describe the professional qualifications and specific experience in the required disciplines within the past five (5) years. Key positions and disciplines required for this project include, but are not limited to: Project Manager Architect Mechanical Engineer Electrical Engineer Plumbing Engineer Structural Engineer Interior Designer The evaluation will consider education, certifications, training, registration, overall and relevant experience and longevity with the firm. Offer must include the following statement of SDVOSB compliance when submitting the personnel proposed to perform the work under this requirement: I [signatory authority] ______________________, [company] _____________________; certify that the team proposed to perform under this requirement demonstrates the capability of 50% SDVOSB performance in compliance of 48 CFR 852.219-10. FACTOR 3: PAST PERFORMANCE (20 Maximum Points) Subfactor 3A: Past Performance of projects identified in FACTOR 1. (15 Points). Subfactor 3B: Average Past Performance of all projects (5 Points). Provide CPARS data for all projects identified in FACTOR 1. For any project that does NOT have CPARS data available, a Past Performance Questionnaire (PPQ) is required to be submitted with the SF330. Please utilize the attached PPQ document. CPARS data and PPQs will not be included in the page count. All projects provided in the SF330 must be completed by the office/ branch/ individual team member performing the work under this contract. The following information must be clearly specified on each performance report: Contract/task order number Project title Prime firm Start date Completion date Offers shall only include CPARS data for the projects listed in FACTOR 1. The contracting officer shall directly retrieve CPARS reviews from www.CPARS.gov to determine average past performance of previous projects. Government Past Performance Information Systems may be accessed. Evaluating past performance and experience may include information provided by the firm, customer inquiries, Government databases, publicly available sources, and additional projects in CPARS. Failure to provide requested data, accessible points of contact or valid phone numbers could result in a firm being considered less qualified. FACTOR 4: QUALITY CONTROL (10 Maximum Points) Subfactor 4A: Management approach (5 Points). Subfactor 4B: Quality methodology (5 Points). The A/E Firm shall describe its management approach, regarding coordination of disciplines and subcontractors, familiarity of the prime firm and any key subcontractors with VA Design Guides/Manuals, Master Specifications, ASHRAE standards, NEC, and other applicable standards. A/E Firm shall also provide the following: Quality Control organization, and management structure. Methods and procedures for control and prevention of nonconformances during design, preconstruction, and construction. Methods and procedures for nonconformance remediation at all stages of project. Methods and procedures for control and prevention of cost, and schedule overruns. Summarized schedules for selected three previous design projects that show initial approved project schedule, and any updates to schedule with time extensions. Provide a narrative to describe reasons and justifications for any deviations from initial schedule. Summarized cost estimates for selected three previous design projects that show initial approved total project cost estimate, and any increases to initial cost estimates. Provide a narrative to describe reasons and justifications for any deviations from initial estimates. Describe any unforeseen conditions that arose during construction for your last three projects. Provide a narrative to describe how your firm assisted the project management team to correct those deficiencies, and any methods used to mitigate extra costs and increases in project schedule. FACTOR 5: CAPACITY (10 Maximum Points) Subfactor 5A: Capacity to complete work within required timeline (5 Points). Subfactor 5B: Resource management and project management (5 Points). The A/E Firm shall attest to its capacity to accomplish the work in the required time. The evaluation will consider the firm s ability to meet the schedule of the overall project, as well as the available capacity of personnel in key disciplines. The A/E Firm shall also provide the following: A list that shows the total number of design and project professionals who are currently employed at the firm with professional titles for each. Total number of projects in study or planning stages Total number of active design projects Total number of active construction phase services A list of personnel assigned to each of the above projects An analysis and report of available capacity of key personnel for immediate new work The respondent shall: Summarize its approach to staffing and company resource management For the key personnel on the proposed project team, tabulate their current and projected workload as percentages of their available individual capacity. List all work awarded to the A/E Firm by the VA during the previous 12 months, as well as any current indefinite delivery, indefinite quantity (IDIQ) contracts that it has. List the current stage and percentage of completion for non-IDIQ projects. A signed statement shall be provided stating that the firm acknowledges that prior to award of the contract, it is required to notify the Government of any changes in its capacity that could limit its ability to perform the work within the required time. FACTOR 6: GEOGRAPHIC LOCATION (5 Maximum Points) Location of the firm, as measured by the travel time (hours) between the Offeror s principal business location and Edward Hines, Jr. VAMC, Hines, IL. Architect must provide details of travel between their main office and Edward Hines Jr, VAMC Hines, IL. This includes but not limited to airport travel time, driving distance, etc. If the architect has a satellite location, the architect must provide details of a fully staffed and well-established satellite office. Leasing documentation may be requested. FACTOR 7: EXPERIENCE IN CONSTRUCTION PERIOD SERVICES (5 Maximum Points) The A/E Firm shall demonstrate its experience in providing Construction Period Services for hospital facilities, particularly in HVAC renovation projects. The respondent shall provide a narrative that describes the methods and procedures used to implement each of the following Construction Period Services tasks: Professional field inspections during the construction period, with descriptions of types of inspections provided, and methods used for inspections and reporting during each phase of construction Review of construction submittals Support in answering requests for information during the construction period Support of construction contract changes to include updated drawings, drafting statements of work, and cost estimates. Weekly construction meeting participation Closeout documents to include final inspections and as-recorded drawings. SECONDARY SELECTION CRITERION*: FACTOR 8: CLAIMS (-5 to 0 Maximum Points) Subfactor 8: Record of significant claims against the firm because of improper or incomplete architectural and engineering services. (-5 to 0 Points). * The secondary selection criterion is used as a tiebreaker, if necessary, in ranking the most highly qualified firms following the completion of discussions. The secondary selection criterion will not be applied when determining a firm s SF330 submission. 2.1.c: After TEB Individual Ratings of the SF330s are completed, the TEB shall convene and develop consensus ratings for the seven evaluation factors of the SF330s as defined above. COMMENT DESCRIPTION DEFINITIONS Strong point: Provides Merit/advantages to VA that increase the likelihood of successful contract performance. Weak point: Flaws/disadvantages that increase the likelihood of unsuccessful contract performance. 2.2.c: The eighth factor (Secondary Selection Criterion) will only be used if needed. The TEB shall provide a listing, in order of preference, of the firms considered most highly qualified to perform the work. The contracting officer shall issue a Request for Proposal (RFP) to the architect-engineer the TEB recommends for negotiations. 3. SOURCE SELECTION PROCESS: 3.1 SF330 Reviews: The board will review and evaluate the submitted SF330 s in accordance with the stated evaluation criteria to determine each individual offeror s ability and capability to perform the work required and confirmation of determination of responsibility per FAR 9.1. a) TECHNICAL EVALUATION BOARD SF330 INDIVIDUAL EVALUATIONS (1) Each board member will conduct an independent review and evaluation and complete an evaluation rating sheet for EACH SF330. Each category will be addressed with strengths or weaknesses noted. (2) The evaluation will be in accordance with the Evaluation Factors which are listed in the solicitation. b) TECHNICAL EVALUATION BOARD SF330 CONSENSUS (1) After each member has completed their independent evaluation, the Chairperson will discuss the evaluations with the entire team and assure each evaluation is complete. (2) During these discussions, the board will reach a consensus rating for each SF330 and document ratings using the consensus evaluation worksheets. The SF330 can be downloaded through the GSA Forms Library at: https://www.gsa.gov/forms-library/architect-engineer-qualifications. No Fax Responses will be accepted: personal visits for discussing this announcement will not be entertained or scheduled. Questions may be directed only by e-mail to Donita.Grace@va.gov. VA Primary Point of Contact: Donita Grace, NCO 12 Contract Specialist, Donita.Grace@va.gov. The page limit for SF330 s will be 30 pages max., any pages after 30 will not be considered. See attached document: P01 - SOW 578-27-003 Renovate A Section 1st Floor Bldg. 1
-Combined Synopsis10/30/2026
This procurement is restricted to Service Disabled Veteran Owned Small Business (SDVOSB) firms located within a 300 mile radius of the Battle Creek VA Medical Center, 5500 Armstrong Rd, Battle Creek, MI 49037. The mile restriction is in compliance with VAAR 805.207 (b). This requirement is being procured in accordance with the VAAR 836.606-73 as implemented in FAR Subpart 36.6. Description of work to be performed includes: Architect-Engineering services are required for Schematics, Design Development, Construction Documents, Technical Specifications, Construction Period Services, Site Visits, Cost Estimates, and all other related information for Project #515-14-123, Replace Fire Alarm System. The project will include design work for the preparation of 100% complete working drawings and contract documents using edited VA Master Specifications to complete the following: I. STATEMENT OF AE TASKS A. The AE shall furnish all services for a complete schematic design, design development, construction documents, bid documents, site visits, cost estimates, as-built documentation, and construction period services and all other related information for project 515-14-123 Replace Fire Alarm System for 30 buildings at the Battle Creek VA Medical Center in Battle Creek, MI. 1) Necessary site survey work such as verifying existing conditions, verifying record drawings, and verifying and analyzing utility systems shall be accomplished in conjunction with preparation of Schematic Design, and Design Development. 2) The A/E shall design a station wide fire monitoring system to be installed parallel to the existing system. Redundant monitoring: primary at building 25 and redundant at police department building 2. The system shall be designed to be monitored by wireless network including transmitters, receivers, and transceivers, including all permits, and FCC application for equipment frequency allocation. 3) The A/E shall evaluate each building to determine which field devices need to be added in accordance with current codes. 4) The AE will be required to attend in person (or Senior Delegate of AE) to pre-bid meetings, a pre-construction meeting, project construction meetings and a final inspection meeting. There will also be various construction site meetings that will require a representative of the AE. 5) AE will provide meeting notes / minutes for meetings and conference calls. 6) The A-E shall provide competent design and construction period services utilizing individuals who are adequately knowledgeable of the various design disciplines including but not limited to architectural and engineering of structural, mechanical, electrical, and special systems as required by the project. Changes in personnel from those who are proposed in negotiations, interviews, kick-off meeting, and/or A-E submission forms must be approved in writing. The registered individuals who will stamp the completed documents shall accomplish engineering design work. B. The AE shall provide cost estimation, project scheduling & phasing, bid period and construction period services as further described in the contract. Estimates shall have a full itemized line item breakout commensurate with the degree of design accomplished. At the Schematic Design phase, square foot estimates would be adequate. As the design progresses in detail, so the estimate would progress in detail. C. The AE shall provide bid documents in both hard paper copies and electronic format. Electronic format shall include AutoCAD and Microsoft Word/Excel as well as PDF format for all. Final PDF of the construction drawings shall include the professional stamp. D. AE shall design construction to phase and coordinate work to minimize disruptions to medical center operations. Outages shall be minimized and temporary conditions planned to maintain critical utility systems. Suitable space/access for mechanical room equipment maintenance must be maintained throughout construction. To keep the number of outages to a minimum, group common work. Phasing of interruptions shall be clearly indicated on the construction documents. E. A-E shall design within funding limitations. AE shall coordinate cost control measures with COR to design within funding limits. Cost control alternatives shall be explored in Design Development (DD's). The AE is required by national VA directive to include a 20% bid deduction. F. Review AE Quality Alerts from the TIL. Design completion timeframe of 190 days after receipt of the Notice to proceed. The A/E firm shall also be required to perform construction period services after award of the construction project contract. In accordance with FAR 36.204, the estimated magnitude of the resulting construction project is between $1,000,000 and $5,000,000. Qualifications (SF330) submitted by each firm for Project #515-14-123 for "Replace Fire Alarm System" will be reviewed and evaluated based on the following criteria: Prospective firms are required to address all selection criteria within submitted SF330 packages using additional pages as required and SF 330 submissions including any additional pages are not to exceed fifty (50) pages. Selection criteria shall be in accordance with Federal Acquisition Regulation (FAR) Part 36.602-1 and VA Acquisition Regulation (VAAR) Part 836.602-1 as follows: (1) Professional Qualifications: the qualifications of the individuals which will be used for these services will be examined for experience and education and their record of working together as a team. The specific disciplines which will be evaluated are architectural, engineering, and estimating. (2) Specialized Experience and Technical Competence: specific experience and technical skill in the type and scope of work required, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials. (3) Capacity to Accomplish the Work: the general work load and staffing capacity of the design office which will be responsible for the majority of the design and the ability to accomplish the work in the required time will be evaluated. (4) Past Performance: the past performance of the firm on contracts relevant in scope to the advertised project that were accomplished with the Department of Veterans Affairs, other Government agencies, and private industry in terms of cost control, quality of work, and compliance with performance schedules will be examined. Project past performance references older than 3 years will receive a lesser score than those references for projects accomplished within the past 3 years. (5) Location of Design Firm: the geographic proximity of each firm to the location of the VA Medical Center will be evaluated. This criterion will apply to the office from which the majority of the design services will be performed. Scoring will be based off of the proposed location of the prime contractor firm for this category. Scoring shall be as follows: within 75 miles - Excellent (Blue); 76-125 miles - Very Good (Green); 126-175 miles - Acceptable (Yellow); 176 - 225 miles - Marginal (Orange); 226 - 300 miles - Poor (Red). (6) Claims and Terminations: record of significant claims against the firm or terminated contracts because of improper or incomplete architectural and engineering services will be examined. (7) Reputation in A-E Community: reputation and standing of the firm and its principal officials with respect to professional performance, general management, and cooperativeness. (8) Specific experience and qualifications: of personnel proposed for assignment to the project and their record of working together as a team. FAILURE TO CLEARLY ADRESS ALL EIGHT LISTED EVALUATION CRITERIA AND INFORMATION REQUIRED BY THE SUBMISSION REQUIREMENTS BELOW MAY RESULT IN REJECTION OF SF330. The NAICS Codes for this procurement is 541310 Architectural Services and small business size standard of $7.5 Million. Award of a Firm Fixed Price contract is anticipated. Anticipated time for completion of design is approximately 190 calendar days including time for VA reviews. The A/E firm shall also be required to perform construction period services if award of a construction project contract is made. DATABASE REGISTRATION INFORMATION: VERIFICATION OF STATUS OF APPARENTLY SUCCESSFUL OFFEROR THIS ACQUISITION IS 100% SET-ASIDE FOR QUALIFIED SERVICE DISABLED VETERAN OWNED SMALL BUSINESS AE FIRMS IN COMPLIANCE WITH VAAR 852.219.10. ONLY BUSINESSES VERIFIED AND LISTED IN THE VENDOR INFROMATION PAGES DATABASE (http://www.vetbiz.gov) SHALL BE CONSIDERED. SYSTEM FOR AWARD MANAGEMENT (SAM): Federal Acquisition Registrations require that federal contractors register in the System for Award Management (SAM) database at www.sam.gov and enter all mandatory information into the system. Award cannot be made until the contractor has registered. Offerors are encouraged to ensure that they are registered in SAM prior to submitting their qualifications package. THE EXCLUDED PARTIES LIST SYSTEM (EPLS): To ensure that the individuals providing services under the contract have not engaged in fraud or abuse regarding Sections 1128 and 1128A of the Social Security Act regarding federal health care programs, the contractor is required to check the Excluded Parties List System (EPLS) located at www.sam.gov for each person providing services under this contract. Further the contractor is required to certify that all persons listed in the qualifications package have been compared against the EPLS list and are NOT listed. During the performance of this contract the Contractor is prohibited from using any individual or business listed on the List of Excluded Individuals/Entities. E-VERIFY SYSTEM: Companies awarded a contract with the federal government shall be required to enroll in E-Verify within 30 days of the contract award date. They shall also need to begin using the E-Verify system to confirm that all of their new hires and their employees directly working on federal contracts are authorized to legally work in the United States. E-Verify is an Internet-based system that allows an employer, using information reported on an employee's Form I-9, to determine the eligibility of that employee to work in the United States. There is no charge to employers to use E-Verify. (FAR 52.222-54) Qualified A-E firms are required to respond if interested by submitting one (1) original completed Standard Form 330 qualification package Parts I and II to include all consultants (form available on-line at: http://www.gsa.gov/portal/forms/download/116486) Must include in Part I Section H an organizational chart of the firm (excludes consultants) and a design quality management plan. Submission information incorporated by reference is not allowed. All submissions must be bound in some manner (spiral, wire, binder, etc.) and a CD copy of the Standard Form 330. Completed SF330s can be delivered to Battle Creek VA Medical Center, Attn: Craig Jenkins, Contract Specialist, NCO 10 West Contracting Office (90VC), Building 9, 5500 Armstrong Rd, Battle Creek, MI 49037, no later than 3:00 p.m. EDT, April 11, 2016. Outermost envelope or packaging shall clearly identify Solicitation number and project. Information shall be submitted via commercial express service. No hand carried deliveries. Telegraphic, email, and facsimile forms are prohibited. All submissions must be bound in some manner (spiral, wire, binder, etc.). Award of any resultant contract is contingent upon the availability of funds. No solicitation document is available and no other information pertaining to project scope, etc. is available at this time. Any request for assistance with submission or other procedural matters shall be submitted via email only (craig.jenkins@va.gov) telephone inquiries will not be honored. After the evaluation of SF330 submissions in accordance with the evaluation criteria, three or more of the most highly qualified firms will be chosen for interviews to present their approach to the design to arrive at selection of the number one firm for negotiations. The contract is anticipated to be awarded in JUNE/JULY 2016. The Government will not pay nor reimburse any costs associated with responding to this request. The Government is under no obligation to award a contract as a result of this announcement.
-Pre-Solicitation04/11/2006
SOURCES SOUGHT SYNOPSIS The Department of Veterans Affairs is issuing this sources sought synopsis as a means of conducting market research to identify parties having an interest in and the resources to support a requirement for Elevator Testing Services located at FHCC VAMC , North Chicago IL. o Captain James A. Lovell Federal Health Care Center, North Chicago, IL. The result of this market research will contribute to determining the method of procurement. The applicable North American Industry Classification System (NAICS) code assigned to this procurement is 341350. THERE IS NO SOLICITATION AT THIS TIME. This request for capability information does not constitute a request for proposals; submission of any information in response to this market survey is purely voluntary; the government assumes no financial responsibility for any costs incurred. Background: The purpose of this Contract is to provide for the inspection/testing of the vertical transportation system located at the Captain James A. Lovell Federal Health Care Center ( FHCC ), 3001 Green Bay Road, North Chicago, IL 60064-3048, as set forth in this Performance Work Statement. A complete listing of all vertical transportation system components, including thirty-one (31) elevators, two (2) cart lifts, and two (2) dumbwaiters (collectively VTS components ), is set forth in the Vertical Transportation System Schedule at the end of this Performance Work Statement. Any additional vertical transportation system components put into service after award of this Contract shall be included in the Vertical Transportation System Schedule at price(s) consistent with the current Price Schedule. A complete listing of all VTS Components, including twenty-nine (31) elevators, two (2) cart lifts, and two (2) dumbwaiters, is set forth in the Vertical Transportation System Schedule at the end of this Statement of Work. Any additional vertical transportation system components put into service after award of this Contract shall be included in the Vertical Transportation System Inventory at price(s) consistent with the current Price Schedule. If your organization has the potential capacity to perform these contract services, please provide the following information: 1) Organization name, address, email address, website address, if applicable, telephone number, and size and type of ownership for the organization; and 2) Tailored capability statements addressing the particulars of this effort and documentation supporting claims of organizational and staff capability. If significant subcontracting or teaming is anticipated in order to deliver technical capability, organizations should address the administrative and management structure of such arrangements. The Government will evaluate market information to ascertain potential market capacity to provide services consistent in scope and scale with those described in this notice and otherwise anticipated. BASED ON THE RESPONSES TO THIS SOURCES SOUGHT NOTICE/MARKET RESEARCH, THIS REQUIREMENT MAY BE SET-ASIDE FOR SDVOSB. Telephone inquiries will not be accepted or acknowledged, and no feedback or evaluations will be provided to companies regarding their submissions. Submission Instructions: Interested parties who consider themselves qualified to perform the above-listed services are invited to submit a response to this Sources Sought Notice by 10:00AM Local Time (Central) on November 11th, 2026. All responses under this Sources Sought Notice shall be emailed to Michelle.Klug2@va.gov. STATEMENT OF WORK Inspections Overview: The Contractor shall perform Annual Category 1, Semiannual, and Full-Load Category 5 VTS component inspection/testing as follows: a. Annual Category 1 inspection/testing is typically conducted in May of each year; a. Semiannual inspection/testing is typically conducted in November of each year; and b. Full-Load Category 5 testing will be performed in November 2027. c. Note: Typical inspection/testing dates are subject to change, in FHCC s sole discretion. Basic Contractor Responsibilities: The Contractor shall provide all personnel, equipment, material, parts, software, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary for execution of the work to be performed under this Contract. Any work found to be non-conforming to the terms of this Contract shall be promptly corrected by the Contractor at no additional cost to the Government. All work shall be performed in a neat and professional manner, including the removal of all trash and debris at the completion of all work. Contractor Limitations: The Contractor performing inspection/testing under this Contract is prohibited from performing any repairs or other work on any of the VTS components covered by this Contract. Safety: All work performed under this Contract shall conform to such safety precautions as the FHCC Fire/Safety and Engineering Departments determine, in their sole discretion, to be necessary, in addition to all other requirements set forth elsewhere in the Contract. Inspection/Testing Standards. 1. All inspection/testing of FHCC s vertical transportation system components shall comply with the most current version of the following standards: a. American Society of Mechanical Engineers ( ASME ) 17.1: Handbook on Safety Code for Elevators and Escalators; b. ASME 17.2: Guide for Inspection of Elevators, Escalators, and Moving Walks; c. ASME 17.3: Safety Code for Existing Elevators and Escalators; d. National Fire Protection Association ( NFPA ) 70: National Electrical Code; and e. NFPA 70E: Standard for Electrical Safety in the Workplace. 2. During any inspection/testing, parts shall be removed and equipment cleaned, as necessary, to determine their exact condition. All parts shall be properly reinstalled after removal. 3. All inspections shall be performed in the presence of an elevator maintenance technician, currently under contract as the VA elevator maintenance contractor, and the COR or designated FHCC representative. 4. Immediately following the conclusion of each inspection/testing, the Contractor shall brief the COR or designated FHCC representative regarding the inspection/testing results, including without limitation: code violations, safety concerns, and immediate maintenance needs. 5. The COR, in the COR s sole discretion, may reject any work performed under this Contract that is noncompliant with any of the requirements set forth in this Contract. All rejected work shall be corrected as quickly as reasonably possible at no additional expense to the Government. Inspection Checklists: The Contractor shall provide a fully completed inspection checklist applicable to each VTS component using the Checklist for Inspection of Electric Elevators The comments section of each checklist shall include a. If the VTS component is safe operating condition; a. If the VTS component will perform in accordance with Original Equipment Manufacturer ( OEM ) standards; b. Whether the VTS component has been altered, except in conformity with all applicable standards set forth in this Contract; c. If the VTS component has any deficiencies, referencing the appropriate standard as applicable; and d. Whether there are any recommended VTS component repairs or upgrades. e. Documentation. Upon completion of the inspection/testing of all FHCC s VTS components, the Contractor shall provide a report within thirty (30) days to the COR and other FHCC personnel as directed. The report shall be electronically submitted in pdf format utilizing word processing to the maximum extent practicable; individual file size shall not exceed 7 MB. Each report should include: Certificates of Inspection: The Certificate of Inspection for each VTS component shall include the following information: a. Location (building and city/state); a. Identification number; b. Capacity; c. Speed; d. Date of inspection; e. Name of inspector and company; f. Inspector s signature; and g. Inspector s Qualified Elevator Inspector ( QEI ) number. Scheduling Inspection/Testing: The Contractor shall coordinate a mutually agreeable time with the COR at least thirty (30) days prior to the typical inspection months, as defined above. Hours for Inspection/Testing: All work performed under this Contract shall be performed during normal hours of facility operation, as defined below, except for inspection/testing that, in the COR s judgment, may severely impact elevator service. Inspection/testing that severely impacts elevator service shall be conducted after normal hours of facility operation at no additional cost to the Government. Reinspection: If any VTS component(s) require reinspection, the Contractor shall: a. Provide a quote to the COR for the reinspection(s) at a price consistent with the Price Schedule s Unit Price for the current contract period; and a. Coordinate reinspection(s) with the COR only after a Contract Modification has been awarded authorizing such reinspection. b. Inspector Qualifications. Inspectors performing VTS component inspection/testing under this Contract shall be a currently certified Qualified Elevator Inspector by an ASME-accredited organization, in accordance with ASME QEI-1: Standard for the Qualification of Elevator Inspectors. Inspectors performing work under this Contract shall be regularly employed by the Contractor. The Contractor shall provide a copy of each inspector s QEI-1 certification to the COR prior to any VTS component inspection/testing being performed. c. Scheduling. d. On-Site Work Requirements. In addition to any other requirements set forth in this Contract, the Contractor shall comply with the following on-site work requirements: Contractor Orientation/Training: The Contractor shall attend an orientation prior to beginning any work under this Contract, at the COR s discretion. This orientation may include the following topics: Contract terms and conditions; performance monitoring; badging procedures; safety; fire procedures; severe weather procedures; disease transmission; infection control; disaster procedures; and any other topic deemed necessary by the COR. At the COR s discretion, the Contractor may be responsible for providing some or all this information/training to its employees, as directed by the COR. Check-in/Check-out Requirements: The Contractor shall comply with all facility check-in and screening requirements. Upon successful completion of the facility s check-in and screening process, the Contractor shall check-in with the COR, or the COR s designee, advising them of the nature and location of the work to be accomplished. The Contractor shall check-out with the COR, or the COR s designee, at the conclusion of such work, prior to departing the VA facility, advising them of the work completed and any problems/issues identified. Hours of Operation: Normal hours of facility operation ( Business Hours ) are Monday through Friday, 7:00 a.m. 3:30 p.m. Local Time, except for the following Federal Holidays: a. New Year s Day; a. Birthday of Martin Luther King, Jr.; b. Washington s Birthday; c. Memorial Day; d. Juneteenth National Independence Day; e. Independence Day; f. Labor Day; g. Columbus Day; h. Veterans Day; i. Thanksgiving Day; j. Christmas Day; **** Any other day declared a Federal Holiday by Presidential Proclamation**** Noninterference with Facility Functions: The Contractor shall perform its services under this Contract in a manner that does not interfere with the facility s functions, including maintaining all tools and equipment in an orderly fashion and cleaning the work area at the conclusion of a service visit. The Contractor shall interrupt its work at any time to not interfere with the normal functioning of the facility, including utility services, fire protection systems, and passage of facility patients, personnel, equipment, and carts. In the event of an emergency, Contractor MANUFACTURER TYPE ELEVATOR # LOCATION Inspection Frequency 1 SMARTRISE/HW TRACTION P-1 BLDG. 133 CA Annual May/Semi-Annual November 2 SMARTRISE/HW TRACTION P-2 BLDG. 133 CA Annual May/Semi-Annual November 3 SMARTRISE/HW TRACTION P-3 BLDG. 133 CA Annual May/Semi-Annual November 4 MID-AMERICAN TRACTION P-4 BLDG. 131 Annual May/Semi-Annual November 5 MID-AMERICAN TRACTION P-5 BLDG. 131 Annual May/Semi-Annual November 6 SMARTRISE/HW TRACTION P-7 BLDG. 133 Annual May/Semi-Annual November 7 SMARTRISE/HW TRACTION P-8 BLDG. 133 Annual May/Semi-Annual November 8 SMARTRISE TRACTION P-10 BLDG. 134 Annual May/Semi-Annual November 9 SMARTRISE TRACTION P-11 BLDG. 134 Annual May/Semi-Annual November 10 SMARTRISE TRACTION P-13 BLDG. 135 Annual May/Semi-Annual November 11 SMARTRISE TRACTION P-18 BLDG. 1 Annual May/Semi-Annual November 12 MID-AMERICAN HYDRAULIC P-20 BLDG. 46 Annual May/Semi-Annual November 13 MID-AMERICAN TRACTION P-21 BLDG. 66 Annual May/Semi-Annual November 14 MID-AMERICAN TRACTION P-22 BLDG. 7 Annual May/Semi-Annual November 15 MID-AMERICAN HYDRAULIC P-23 BLDG. 4 Annual May/Semi-Annual November 16 MID-AMERICAN HYDRAULIC P-24 BLDG. 133 Annual May/Semi-Annual November 17 SCHUMACKER ELEVATOR HYDRAULIC P-25 PARKING GARAGE 195 Annual May/Semi-Annual November 18 SCHUMACKER ELEVATOR HYDRAULIC P-26 PARKING GARAGE Annual May/Semi-Annual November 19 SCHUMACKER ELEVATOR HYDRAULIC P-1 BLDG. 133EF Annual May/Semi-Annual November 20 SCHUMACKER ELEVATOR HYDRAULIC P-2 BLDG. 133EF Annual May/Semi-Annual November 21 SMARTRISE HYDRAULIC S-1 BLDG. 133CA Annual May/Semi-Annual November 22 SCHUMACKER ELEVATOR HYDRAULIC S-1 BLDG. 133EF Annual May/Semi-Annual November 23 SCHINDLER HYDRAULIC S-2 BLDG. 6 Annual May/Semi-Annual November 24 SCHINDLER HYDRAULIC S-3 BLDG. 6 Annual May/Semi-Annual November 25 MID-AMERICAN TRACTION S-6 BLDG. 131 Annual May/Semi-Annual November 26 SMARTRISE TRACTION S-9 BLDG. 133 Annual May/Semi-Annual November 27 SMARTRISE TRACTION S-12 BLDG. 134 Annual May/Semi-Annual November 28 SMARTRISE TRACTION SF-14 BLDG. 135 Annual May/Semi-Annual November 29 KONE TRACTION P-27 PARKING GARAGE 196 Annual May/Semi-Annual November 30 TAC32H HYDRAULIC 556FH-ELEV-001-CO100 CORRIDOR 100 Annual May/Semi-Annual November 31 SMARTRISE HYDRAULIC 5-ELEV-E1-CO101 CORRIDOR 101 Annual May/Semi-Annual November FHCC VERTICAL TRANSPORTATION SYSTEM SCHEDULE ELEVATORS CART LIFTS MANUFACTURER CART LIFT # LOCATION INSPECTION FREQUENCY 1 LIFT-O-MATIC CART LIFT 1 BLDG. 133CA Annual May/Semi-Annual November 2 LIFT-O-MATIC CART LIFT 2 BLDG. 133CA Annual May/Semi-Annual November DUMBWATIERS DUMBWAITER # LOCATION INSPECTION FREQUENCY 1 DUMBWAITER 1 BLDG. 133 Annual May/Semi-Annual November 2 DUMBWAITER 2 BLDG. 133CA Annual May/Semi-Annual November
-Market Research11/11/2026
Arc Flash Hazard Analyses Scope of Work General Contractor shall conduct an Arc Flash Hazard Analyses in accordance with National Fire Protection Association (NFPA) 70E, Standard for Electrical Safety in the Workplace, NFPA 70, National Electric Code and Institute of Electrical and Electronics Engineers (IEEE) Guide for the Specification of Scope and Deliverable Requirements for an Arc-Flash Hazard Calculation Study in Accordance with IEEE Std 1584. The study will conform to the editions for the above-referenced standards in effect as of the date of the solicitation. The study shall include all significant locations in the electrical distribution system (switchboards, switchgear, motor control centers, panelboards, busways, etc.) from the incoming utility equipment or cabling down to 208V systems. Data collection and documentation shall include the 208V system. The study shall be performed using software programs specifically designed to standards governing short-circuit; protective coordination and arc flash hazard calculations. Final submittals shall include a formal reporting of findings, collect data and study calculations in a comprehensive report. Arc Flash Hazard Analyses Requirements The Arc Flash Hazard Analyses will consist of the following phases or requirements: Data Gathering and Field Verification Contractor shall: Field-verify and mark up existing single line drawings needed to perform an accurate study. In the event single-line drawings are not available, Contractor shall develop single-line drawings to reflect the as built configuration of the facility electrical system. Gather and document necessary system data required to complete the study. Data should include but is not limited to (as applicable): Location (building, room, etc.) Equipment Identification Equipment Information Manufacturer, Model, Catalog Number and Type Equipment Rating (Voltage, Ampacity, Interrupting Rating, etc.) Configuration (Main Lug, Main breaker, Number of breakers, etc.) Overcurrent Protection Relaying Type, Manufacturer, Function(s), CT and PT ratios, etc. Fuses Type, Manufacturer, Rating, etc. Existing Settings Cable Type, Size and Length (lengths are to be field confirmed) Cable Busway Type, Manufacturer, Rating and Length Motor Load and Contactor Data (record data and application for motors 25 HP and above) Contractor must coordinate with facility engineering staff to obtain necessary power company data such as minimum and maximum fault currents as well as X/R ratios. Correspondence documenting utility data shall be included in the final submittal. Data collection requires the removal and/or opening of equipment to field verify data. Data collection requires observing each piece of equipment covered by this study. Contractor shall record and report any deficiencies, such as missing identifying labels, warning labels, non-functioning latches or locks, missing hardware (covers, screws, breaker blank fillers, etc.), etc. Short Circuit Study Contractor shall use field-verified single line drawings and data to perform a three-phase bolted fault short-circuit momentary and interrupting duties system short circuit calculation for the facilities electrical system. The calculations shall be conducted in accordance with applicable ANSI C37.010, C37.5, C37.13, NFPA 70E, NEMA, and NEC standards and codes. At a minimum the following location shall be included: Electric utility supply termination point. Incoming switchgear. Unit substation primary and secondary terminals. Low voltage switchgear. Motor control center Standby generator and automatic transfer switch. Branch panelboard. The study shall identify and report data used in the calculations in both descriptive terms (cable wire size, motor hp, transformer kVA and impedance, etc.) and impedance values. Transformer nameplate impedance shall be used when available. A section of the study shall be devoted to verification of equipment duty ratings identifying whether equipment is within or operating outside it interrupting rating. Short circuit calculations must be tabulated and included with the project submittals. Protective Device Coordination Study Contractor shall provide a Protective Device Coordination Study to determine satisfactory setting and ratings for the facility s major protective devices in accordance with applicable industrial standards such as ANSI/IEEE 399 and ANSI/IEEE 242. Coordination Study results must include time-current curves (TCC) supporting findings and recommendation to be provided with project submittals. Deficiencies in device settings or-rated equipment are to be noted in the report. Protective device settings are to be tabulated separately and included within the report. Arc Flash Hazard Analyses Contractor shall perform an Arc Flash Hazard Analyses in compliance with IEEE 1584, NFPA 70 and NFPA 70E. Flash protection boundary and incident energy levels shall be calculated at all significant locations in the electrical distribution system. Incident energy calculations must consider multiple system scenarios (normal) to establish the worst-case incident energy level for each equipment studied under this study. Additionally, calculations should emphasize a conservative approach for the protection of personnel. Incident energy and flash protection boundary calculations results must be tabulated and included with project submittals. Protective Device Settings Contractor shall set adjustable protective devices to reflect proposed settings identified in the Protective Coordination Study. This must be coordinated with facility engineering staff as certain device settings can only be performed during a power outage. Equipment Labeling and Miscellaneous Work Contractor shall provide and install arc flash warning labels for designated electrical devices evaluated under this study. All arc flash labels shall comply with NFPA 70E and include: Equipment name or identifying designation Nominal voltage Flash hazard boundary Hazard risk category Incident energy Working distance Arc flash labels shall be machine printed with no field markings. Single labels shall be provided for designated equipment evaluated under this study. Contractor shall install applicable labels (customary warning labels high voltage, owner-provided equipment identification labels, etc.) found missing or deficient while collecting field data and as agreed with the facility engineering staff. Exit Briefing Upon completion of the study but prior to issuing study submittals, Contractor shall conduct an exit briefing for facility engineering staff and others designated representatives. The briefing shall include: Overview of each study phase and related issues. Notable arc flash hazard areas. Recommended solutions for mitigating dangerous arc flash hazard levels to include potential implementation of maintenance settings. National Electric Code (NEC) violations noted during the study. Other electrical safety related issues. Recommendations. Submittals Upon completion of the Arc Flash Hazard Analyses, Contactor shall submit four (4) bound copies including electronic version on CD or DVD of the final report containing the following: Power System Studies - The completed short-circuit, protective device coordination arc flash hazard analysis studies shall include the following sections: Executive Summary. Descriptions, purpose, basis, and scope of the studies. Tabulation of circuit breaker, fuse, and other protective device ratings versus calculated short-circuit duties. Protective device time versus current coordination curves, tabulations of relay and circuit breaker trip unit settings, and fuse selection Fault current calculations including a definition of terms and guide for interpretation of the computer printout. Details of the incident energy and flash protection boundary calculations. Recommendations for system improvements, where needed. Electrical system one-line diagram in printed and electronic version. The electronic version must be in AutoCad and PDF formats. SKM Compatible Data Import Files. Supplemental Report: Contractor shall prepare a report documenting findings and observation not addressed elsewhere in the submittals. This section shall include condition of found equipment and corrective actions taken to resolve or repair same. Qualifications All work shall be conducted under the supervision and approval of a Registered Professional Electrical Engineer (PE). The PE shall have a minimum of five (5) years experience in performing and interpreting power systems studies. Project Duration Contractor shall complete all work within 180 days of notice to proceed. Scheduling Contractor shall perform onsite work during normal operating hours (7:30 AM to 4:30 PM), Monday through Friday. Work to be performed outside of normal working hours must be coordinated with and approved by the COR. Work requiring a power outage must be submitted in writing (including date and duration of outage) to the COR not later than two weeks prior to the requested date.
-Special Notice11/02/2026

Additional Details

Solicitation Number

36C25218R0705

Archive Date

Jul 23, 2018

Office Address