Notice ID: 8f80303d04974d8dab0ed637f6d0f51aAward NoticeAwarded
Z1DA--556-20-002 Replace Greenhouse Homes HVAC (VA-22-00024652)
Awarded on March 31, 2022. Full description on SAM.gov.
Awarded tounder 36C25222C0042 (source: SAM.gov award notice)• $4.7M
Overview
- Posted
- April 1, 2022
- Notice type
- Award Notice
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- NAICS
- 238220: Plumbing, Heating, and Air-Conditioning Contractors
- Agency
- Department of Veterans Affairs
Notice details
- Place of performance
- Captain James A. Lovell Federal Health Care Center (FHCC) 3001 Green Bay Road North Chicago, IL, 60064-3048
- Last updated
- Sep 9, 2025
- Award date
- Mar 31, 2022
- Award amount (SAM.gov award notice)
- $4.7M
Identifiers
- Solicitation number
- 36C25222B0015
- Notice ID
- 8f80303d04974d8dab0ed637f6d0f51a
- Award number (PIID)
- 36C25222C0042
Description
IFB 36C25222B0015 Project: 556-20-002 Replace Greenhouse Homes HVAC RESPONSES TO REQUEST FOR INFORMATION (RFI) REV3 Specification Section 283100, Page 12-13: Please confirm the requirement for the spare equipment being requested. Some of the spare equipment being requested is not part of the base BOM. ANSWER: The spare equipment listed in the specifications are only for equipment being used as part of the base BOM. Specification Section 283100, Page 6-8: Please confirm that the requested guarantee period is to be 5 years as stated. 5 years will add a significant cost to the fire alarm price. ANSWER: The warranty period shall be based on the equipment manufacturer s actual warranty. Per sheet S-501 detail 5 the plans are calling for top, brace and bottom rails. In the specifications (32 31 13 chain link fences and gate) paragraph 2.2 line C fence frame work it is called as brace rails, top rail, bottom rail and intermediate rail. Please clarify if this is top, bottom, and brace or top, middle, and bottom fence. ANSWER: Top Rail is the top horizontal fence rail. Bottom rail is the bottom horizontal fence rail. Intermediate rail is the middle horizontal rail. Brace rail is a diagonal brace rail.
Award Overview
Award Number
36C25222C0042
Award Amount (SAM.gov award notice)
$4.7M
Award Date
Mar 31, 2022
Awardee
Awardee UEI
PTSCYLWKCFK3
Original Solicitation
Notice ID: 8f80303d04974d8dab0ed637f6d0f51a
Posted Date: Apr 1, 2022
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $4.4MSigned Oct 6, 2026
- $4.4MSigned Oct 6, 2026
- $5.9MSigned Sep 12, 2026
- $4.1MSigned Aug 11, 2026
- $5.9MSigned May 28, 2026
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
36C25222B0015- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- Pre-SolicitationJan 14, 2022
Z1DZ--556-20-002 Replace Greenhouse Homes HVAC (VA-22-00024652)
- 7×SolicitationFeb 8, 2022
Z1DZ--556-20-002 Replace Greenhouse Homes HVAC (VA-22-00024652)
- AwardedCurrentApr 1, 2022
Z1DA--556-20-002 Replace Greenhouse Homes HVAC (VA-22-00024652)
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
36C25222B0015
Archive Date
May 1, 2022
Office Address
MILWAUKEE, WI, 53214