GovChime
Notice ID: 89724fb7fd4347e0a46fd7294ca79fd8Award NoticeAwarded

H259--ELECTRICAL DISTRIBUTION SYSTEM TESTING BY 7/1/2022-6/30/2023

Awarded on June 28, 2022. Full description on SAM.gov.

Awarded tounder 36C25222P0832 (source: SAM.gov award notice)• $326.1K

Overview

Posted
June 28, 2022
Notice type
Award Notice
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
541350: Building Inspection Services
Agency
Department of Veterans Affairs

Notice details

Place of performance
OSCAR JOHNSON VA MEDICAL CENTER 325 EAST H STREET, IRON MOUNTAIN, 49801-4760
Last updated
Sep 9, 2025
Award date
Jun 28, 2022
Award amount (SAM.gov award notice)
$326.1K

Identifiers

Solicitation number
36C25222Q0586
Notice ID
89724fb7fd4347e0a46fd7294ca79fd8
Award number (PIID)
36C25222P0832

Description

The Contractor shall provide all labor, supervision, materials, tools, and equipment necessary to provide maintenance, inspection, testing, and calibration of the Electrical Power Distribution System and all of its components. located at the Oscar G. Johnson VA Medical Center, Iron Mountain, MI 49801.

Full description on SAM.gov

Award Overview

Award Number

36C25222P0832

Award Amount (SAM.gov award notice)

$326.1K

Award Date

Jun 28, 2022

Awardee

Awardee UEI

QHUDB4KNZNX5

Original Solicitation

Notice ID: 89724fb7fd4347e0a46fd7294ca79fd8

Posted Date: Jun 28, 2022

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

3
  • 36C25224P0733
    SDV SERVICES INC
    Department of Veterans AffairsNAICS 541350
    $293.0KSigned Jun 28, 2026
  • 36C25224P0733
    SDV SERVICES, INC.
    Department of Veterans AffairsNAICS 541350
    $293.0KSigned Mar 26, 2026
  • 36C25224P0733
    SDV SERVICES, INC.
    Department of Veterans AffairsNAICS 541350
    $160.1KSigned Mar 25, 2025

Contacts

Documents

No documents available.

Lifecycle

Solicitation:36C25222Q0586
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. Pre-SolicitationJun 1, 2022

    H259--ELECTRICAL DISTRIBUTION SYSTEM TESTING BASE + 4 OYS

    Notice a9aada416b504d2a81fd33a64786b275 on SAM.gov

  2. SolicitationJun 1, 2022

    H259--ELECTRICAL DISTRIBUTION SYSTEM TESTING BASE + 4 OYS

    Notice c7d4eeb88388444d91365b1d1f5d6c5d on SAM.gov

  3. AwardedCurrentJun 28, 2022

    H259--ELECTRICAL DISTRIBUTION SYSTEM TESTING BY 7/1/2022-6/30/2023

    Notice 89724fb7fd4347e0a46fd7294ca79fd8 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Arc Flash Hazard Analyses Scope of Work General Contractor shall conduct an Arc Flash Hazard Analyses in accordance with National Fire Protection Association (NFPA) 70E, Standard for Electrical Safety in the Workplace, NFPA 70, National Electric Code and Institute of Electrical and Electronics Engineers (IEEE) Guide for the Specification of Scope and Deliverable Requirements for an Arc-Flash Hazard Calculation Study in Accordance with IEEE Std 1584. The study will conform to the editions for the above-referenced standards in effect as of the date of the solicitation. The study shall include all significant locations in the electrical distribution system (switchboards, switchgear, motor control centers, panelboards, busways, etc.) from the incoming utility equipment or cabling down to 208V systems. Data collection and documentation shall include the 208V system. The study shall be performed using software programs specifically designed to standards governing short-circuit; protective coordination and arc flash hazard calculations. Final submittals shall include a formal reporting of findings, collect data and study calculations in a comprehensive report. Arc Flash Hazard Analyses Requirements The Arc Flash Hazard Analyses will consist of the following phases or requirements: Data Gathering and Field Verification Contractor shall: Field-verify and mark up existing single line drawings needed to perform an accurate study. In the event single-line drawings are not available, Contractor shall develop single-line drawings to reflect the as built configuration of the facility electrical system. Gather and document necessary system data required to complete the study. Data should include but is not limited to (as applicable): Location (building, room, etc.) Equipment Identification Equipment Information Manufacturer, Model, Catalog Number and Type Equipment Rating (Voltage, Ampacity, Interrupting Rating, etc.) Configuration (Main Lug, Main breaker, Number of breakers, etc.) Overcurrent Protection Relaying Type, Manufacturer, Function(s), CT and PT ratios, etc. Fuses Type, Manufacturer, Rating, etc. Existing Settings Cable Type, Size and Length (lengths are to be field confirmed) Cable Busway Type, Manufacturer, Rating and Length Motor Load and Contactor Data (record data and application for motors 25 HP and above) Contractor must coordinate with facility engineering staff to obtain necessary power company data such as minimum and maximum fault currents as well as X/R ratios. Correspondence documenting utility data shall be included in the final submittal. Data collection requires the removal and/or opening of equipment to field verify data. Data collection requires observing each piece of equipment covered by this study. Contractor shall record and report any deficiencies, such as missing identifying labels, warning labels, non-functioning latches or locks, missing hardware (covers, screws, breaker blank fillers, etc.), etc. Short Circuit Study Contractor shall use field-verified single line drawings and data to perform a three-phase bolted fault short-circuit momentary and interrupting duties system short circuit calculation for the facilities electrical system. The calculations shall be conducted in accordance with applicable ANSI C37.010, C37.5, C37.13, NFPA 70E, NEMA, and NEC standards and codes. At a minimum the following location shall be included: Electric utility supply termination point. Incoming switchgear. Unit substation primary and secondary terminals. Low voltage switchgear. Motor control center Standby generator and automatic transfer switch. Branch panelboard. The study shall identify and report data used in the calculations in both descriptive terms (cable wire size, motor hp, transformer kVA and impedance, etc.) and impedance values. Transformer nameplate impedance shall be used when available. A section of the study shall be devoted to verification of equipment duty ratings identifying whether equipment is within or operating outside it interrupting rating. Short circuit calculations must be tabulated and included with the project submittals. Protective Device Coordination Study Contractor shall provide a Protective Device Coordination Study to determine satisfactory setting and ratings for the facility s major protective devices in accordance with applicable industrial standards such as ANSI/IEEE 399 and ANSI/IEEE 242. Coordination Study results must include time-current curves (TCC) supporting findings and recommendation to be provided with project submittals. Deficiencies in device settings or-rated equipment are to be noted in the report. Protective device settings are to be tabulated separately and included within the report. Arc Flash Hazard Analyses Contractor shall perform an Arc Flash Hazard Analyses in compliance with IEEE 1584, NFPA 70 and NFPA 70E. Flash protection boundary and incident energy levels shall be calculated at all significant locations in the electrical distribution system. Incident energy calculations must consider multiple system scenarios (normal) to establish the worst-case incident energy level for each equipment studied under this study. Additionally, calculations should emphasize a conservative approach for the protection of personnel. Incident energy and flash protection boundary calculations results must be tabulated and included with project submittals. Protective Device Settings Contractor shall set adjustable protective devices to reflect proposed settings identified in the Protective Coordination Study. This must be coordinated with facility engineering staff as certain device settings can only be performed during a power outage. Equipment Labeling and Miscellaneous Work Contractor shall provide and install arc flash warning labels for designated electrical devices evaluated under this study. All arc flash labels shall comply with NFPA 70E and include: Equipment name or identifying designation Nominal voltage Flash hazard boundary Hazard risk category Incident energy Working distance Arc flash labels shall be machine printed with no field markings. Single labels shall be provided for designated equipment evaluated under this study. Contractor shall install applicable labels (customary warning labels high voltage, owner-provided equipment identification labels, etc.) found missing or deficient while collecting field data and as agreed with the facility engineering staff. Exit Briefing Upon completion of the study but prior to issuing study submittals, Contractor shall conduct an exit briefing for facility engineering staff and others designated representatives. The briefing shall include: Overview of each study phase and related issues. Notable arc flash hazard areas. Recommended solutions for mitigating dangerous arc flash hazard levels to include potential implementation of maintenance settings. National Electric Code (NEC) violations noted during the study. Other electrical safety related issues. Recommendations. Submittals Upon completion of the Arc Flash Hazard Analyses, Contactor shall submit four (4) bound copies including electronic version on CD or DVD of the final report containing the following: Power System Studies - The completed short-circuit, protective device coordination arc flash hazard analysis studies shall include the following sections: Executive Summary. Descriptions, purpose, basis, and scope of the studies. Tabulation of circuit breaker, fuse, and other protective device ratings versus calculated short-circuit duties. Protective device time versus current coordination curves, tabulations of relay and circuit breaker trip unit settings, and fuse selection Fault current calculations including a definition of terms and guide for interpretation of the computer printout. Details of the incident energy and flash protection boundary calculations. Recommendations for system improvements, where needed. Electrical system one-line diagram in printed and electronic version. The electronic version must be in AutoCad and PDF formats. SKM Compatible Data Import Files. Supplemental Report: Contractor shall prepare a report documenting findings and observation not addressed elsewhere in the submittals. This section shall include condition of found equipment and corrective actions taken to resolve or repair same. Qualifications All work shall be conducted under the supervision and approval of a Registered Professional Electrical Engineer (PE). The PE shall have a minimum of five (5) years experience in performing and interpreting power systems studies. Project Duration Contractor shall complete all work within 180 days of notice to proceed. Scheduling Contractor shall perform onsite work during normal operating hours (7:30 AM to 4:30 PM), Monday through Friday. Work to be performed outside of normal working hours must be coordinated with and approved by the COR. Work requiring a power outage must be submitted in writing (including date and duration of outage) to the COR not later than two weeks prior to the requested date.
96%
Special Notice11/02/2026
Tri-Annual Electrical Inspection IAW the Performance Work Statement. Total Small Business Set-Aside, Quotes are due on 11/20/2026 at 16:00 (4pm) PST.
55%
Combined Synopsis11/20/2026
Tri-Annual Electrical Inspection IAW the Performance Work Statement. Total Small Business Set-Aside, Quotes are due on 11/20/2026 at 16:00 (4pm) PST.
55%
Combined Synopsis11/20/2026
Travis AFB intends to established a Firm Fixed Price contract for Hot Sticks and Gloves Testing. This will be a 5 year service contract. The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and labor to test, inspect, and service necessary to test 127 pairs of gloves and 2 blankets every 6 months and 3 hot sticks once a year in accordance with the following ASTM/ANSI/OSHA of Electrical Hot Line Tools located at Travis Air Force Base (AFB), California. And any addtional requierments IAW the PWS. Following the contract award, services must commence within 30 days. Once items are shipped and received, the turnaround time for testing and returning them is strictly 30 calendar days. To be considered for award, offerors must concurrently submit a Technical Capability Sheet, an Independent Price Quote, and a completed Contractor Responsibility Verification; failure to submit all required deliverables at the time of submission will result in the package being deemed non-responsive and excluded from evaluation. PRICING AND INVOICING INSTRUCTIONS: The contractor shall quote a Firm-Fixed Price for the overall annual requirement under Parent CLIN 0001 (expressed as 1 LOT), which must equal the sum of the underlying Sub-CLINs (0001AA, 0001AB, and 0001AC). Partial Payments: Progressive (partial) payments are authorized. The contractor shall submit a separate invoice and Receiving Report in WAWF immediately following the completion, return shipment, and Government acceptance of each individual cycle (Sub-CLIN). Please see Solicitation Notice for more information and how this contract will be evaluated.
54%
Combined Synopsis11/30/2026
EMI QUALIFICATION TESTING SEE PDF ATTACHMENT FOR SUMMARY DETAILS
52%
Solicitation12/12/2025

Additional Details

Solicitation Number

36C25222Q0586

Archive Date

Jul 8, 2022

Office Address

MILWAUKEE, WI, 53214