GovChime
Notice ID: 3e0bdbe7585541caa0960edf9d95be84Award NoticeAwarded

H259--CIRCUIT BREAKER TESTING BASE 9/1/22-8/31/23

Awarded on August 22, 2022. Full description on SAM.gov.

Awarded tounder 36C25222P1003 (source: SAM.gov award notice)• $122.9K

Overview

Posted
August 22, 2022
Notice type
Award Notice
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
238210: Electrical Contractors and Other Wiring Installation Contractors
Agency
Department of Veterans Affairs

Notice details

Place of performance
CLEMENT ZABLOCKI VA MEDICAL CENTER 5000 W. NATIONAL AVENUE, MILWAUKEE, 53295-0001
Last updated
Sep 9, 2025
Award date
Aug 22, 2022
Award amount (SAM.gov award notice)
$122.9K

Identifiers

Solicitation number
36C25222Q0752
Notice ID
3e0bdbe7585541caa0960edf9d95be84
Award number (PIID)
36C25222P1003

Description

The Contractor shall provide all travel, labor, labor hours, management, materials, tools, and equipment necessary to provide circuit breaking testing located at the Clement J. Zablocki Medical Center, Milwaukee, WI 53295, as defined in the Scope of Work (SOW). Testing shall be performed in the month of April each year.

Full description on SAM.gov

Award Overview

Award Number

36C25222P1003

Award Amount (SAM.gov award notice)

$122.9K

Award Date

Aug 22, 2022

Awardee

Awardee UEI

QHUDB4KNZNX5

Original Solicitation

Notice ID: 3e0bdbe7585541caa0960edf9d95be84

Posted Date: Aug 22, 2022

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

5
  • 36C25525P0402
    SDV SERVICES, INC.
    Department of Veterans AffairsNAICS 238210
    $30.9KSigned Jul 29, 2025
  • 36C24225P0232
    SDV SERVICES, INC.
    Department of Veterans AffairsNAICS 238210
    $130.3KSigned Jun 3, 2025
  • 36C25524P0588
    SDV SERVICES, INC.
    Department of Veterans AffairsNAICS 238210
    $44.8KSigned Jan 8, 2025
  • 36C25524P0588
    SDV SERVICES, INC.
    Department of Veterans AffairsNAICS 238210
    $39.9KSigned Nov 30, 2024
  • 36C24225P0232
    SDV SERVICES, INC.
    Department of Veterans AffairsNAICS 238210
    $95.6KSigned Nov 22, 2024

Contacts

Documents

No documents available.

Lifecycle

Solicitation:36C25222Q0752
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. Pre-SolicitationJul 27, 2022

    H259--CIRCUIT BREAKER TESTING BASE + 4 OYS

    Notice 1fd1a977296b49459c0e1ab6677548ef on SAM.gov

  2. SolicitationJul 27, 2022

    H259--CIRCUIT BREAKER TESTING BASE + 4 OYS

    Notice f49cc216e14d430cb92b7a697af3cb16 on SAM.gov

  3. AwardedCurrentAug 22, 2022

    H259--CIRCUIT BREAKER TESTING BASE 9/1/22-8/31/23

    Notice 3e0bdbe7585541caa0960edf9d95be84 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
65%
Solicitation11/20/2026
No Solicitation is currently available. This source's sought notice is for planning purposes only. All information contained herein is preliminary and subject to changes and/or cancellation at the discretion of the Government. Interested vendors shall respond to this notice voluntarily, and at no cost to the Government. The information requested will be used solely within the Department of Veterans Affairs to facilitate decision-making and will not be disclosed outside of the Government. Based upon information received in response to this Sources Sought Notice the Government shall decide on a procurement strategy, which shall include the type of small business set-aside, if appropriate. The eventual procurement strategy and set-aside, if appropriate, is solely within the discretion of the Government. The applicable North American Industry Classification System (NAICS) Code is 238210, Commercial and Institutional Building Construction, and the small business size standard is $19M. Potential Offerors must be registered in the System for Award Management (SAM) to be eligible for an award (See https://www.sam.gov/SAM/pages/public/index.jsf ). Potential Offerors must also have a current Online Representations and Certification Application on file with SAM. Service-disabled veteran-owned Small Businesses and Veteran-Owned Small Businesses shall have their ownership and control verified by the Department of Veterans Affairs (VA) and be listed in the U.S. Small Business Administration (SBA) at https://www.sba.gov/. Description of Services Triennial Circuit Breaker and Feeder Testing. Location: VA Reno Health Care System (VARHCS), Reno, NV. The Department of Veterans Affairs, Sierra Nevada Health Care System, Reno, NV has a requirement for Triennial Circuit Breaker and Feeder Testing per ANSI/NETA MTS. Contractor shall furnish all labor, materials, equipment, supervision and testing for the complete testing of Medium Voltage oil-cooled switches, liquid-filled and air-cooled transformers, low and medium voltage circuit breakers (225A 3-pole and above), and feeder cables. Work includes Very Low Frequency (VLF) testing of MV cables, torqueing and meggering of connections, functional testing/exercising of breakers, standard and infrared photography of electrical equipment, site visits of all MV vaults, overcurrent protective device coordination study with updated single-line diagrams, and arc flash hazard analysis with new labels for the entire campus. Testing shall be performed during off-hours (6PM-6AM and weekends), and photography during normal hours. Final report, photos, studies in PDF/CAD, and cost estimates for deficiencies and full MV cable replacement are required within 7 days of completion. Period of Performance (POP) Period of Performance: 60-90 days after NTP. Sources Sought Information The Government requests that interested parties review the Description of Services and provide the following capability information to the Contracting Specialist, Alex Arter, at alex.arter@va.gov, by 12:00 PM PST on October 2, 2026: Business Size (Large/Small) Business Socio-Economic Status (SDVOSB, WOSB, 8(a), HUBZone, etc.) SAM record UEI number Ability and experience in managing projects between $250,000.00 and $750,000.00. Include general information and technical background describing your firm's experience on contracts requiring similar efforts to meet the program objectives [NETA testing, VLF, breaker testing 225A+, IR scanning, coordination/arc flash study]. Anticipated Teaming Arrangements (if any). List of Projects (Government and Commercial) that are similar in scope and size. List of Sub-Contractors you intend to use on a project of this size and scope. How does your company intend to meet the Limitations on Subcontracting as per 13 CFR 125.6? Are your Subcontractors from the local area or will they be coming from out of the area? If out of the area, from where? Interested parties shall not submit more than 10 single-sided, type-written pages using Times New Roman 12-point font or larger. Published literature may be any number of pages. The Government will use this information when determining its business type decision. This Sources Sought Notice is not to be construed as a commitment by the Government. No contract will be awarded as a direct result of this announcement.
65%
Market Research10/02/2026
3-Year Electrical Testing and Repair Contract Performance Work Statement (PWS) General Requirements: Contractor shall furnish all supplies, materials, equipment, personnel/labor and technical supervision required to perform inspections, repairs, testing, cleaning, calibrations and adjustments on the electrical power distribution system and associated equipment at the Hampton Veterans Affairs Medical Center within the allotted time frame of this contract. This is a 4160 volt primary system that includes various secondary voltages and both emergency and normal power sources. A comprehensive list of equipment is included in this contract as well as a dollar amount to be set aside for repairs. All inspections and testing procedures must meet the criteria of the original equipment manufacturer along with the latest editions of the following codes, standards and specifications listed: ANSI, IEEE, ICEA, NETA, NEMA, NFPA, JCAHO and VA regulations. The contractor shall be responsible for supplying all portable power required to power up any and all test equipment necessary throughout these tests. The use of normal or emergency building power will not be allowed. The contractor shall be responsible for securing all manufacturers information, curves, data, procedures and any other information necessary to conduct specific tests on equipment and systems. Prior to beginning field-testing, the testing organization shall submit test procedures and a detailed test schedule to the Electrical Supervisor for each item of equipment to be field-tested. No testing is to be performed until after the test procedures and schedules have been approved. The contractor shall be responsible for all coordination between Dominion Virginia Power (if applicable), station supervisory personnel and test personnel for scheduling shut-downs, system tests and tests on system components. The V.A Medical Center Electrical Staff will be responsible for conducting the actual scheduled outages and reenergizing of circuits and components on V.A. premises and V.A. owned equipment only. Lockout/Tagout of this equipment will be performed jointly between the V. A. Medical Center Electricians and the Contractor. The contractor will be responsible for removal and replacement of any and all breakers needing to be tested. All breakers being removed will be properly reinstalled. Any and all conductors removed from a breaker will be properly terminated back to that breaker and any and all lugs will be properly torqued to manufacturers specifications. Testing shall commence and be completed within nine (9) consecutive days, beginning on a Saturday and ending on the following Sunday. The specific dates shall be coordinated with the COTR. All outages shall be scheduled with the COTR two weeks in advance of testing start date. Testing dates may change due to inclement weather, however, the COTR shall first be notified and approve any changes necessary. Contractor shall anticipate all work to be done after normal working hours. Outages will be scheduled at night between the hours of 5:00 p.m. and midnight and between the hours of 7:00 am and 5:00 p.m. on weekends. However the Contractor should be prepared to work longer hours should problems develop to assure restoration of power. Daytime hours, during the week, may be approved under certain circumstances if there is no impact to building occupants. This would be a rare instance, thus Contractor should anticipate overtime hours for all contract requirements. Equipment Repairs: Minor repairs shall include but not be limited to such items as loose bolts, loose or broken lugs, wiring terminals, heaters, malfunctioning targets, dirty/high resistance connections, etc and shall be corrected on site during testing if possible. Repair or replacement of larger items such as breakers shall also be performed during this outage if possible. However if parts are not readily available, these items will be repaired or replaced under a separate smaller outage and will be scheduled after parts or components are available. Contractor shall set aside a line item not to exceed $50,000 for repair or replacement parts with this contract. All repairs shall be invoiced under this line item at the conclusion of the contract. This amount is to be used for bidding purposes. However a materials breakdown will be required with the final invoice and Contractor shall be paid actual costs with appropriate mark up s up to $50,000 for parts. Contractor is not to exceed this amount without prior written approval of the Contracting Officer. Minimum Equipment Test Requirements: 5 KV AIR CIRCUIT BREAKERS 1. The breakers will be removed from their compartments. The compartments shall be cleaned and inspected. Shutters shall be cleaned, inspected, and tested for proper operation. The racking mechanisms shall also be cleaned, lubricated and tested for proper operation. 2. All cable termination s, both primary and secondary, shall he checked for signs of overheating, proper tightness and support. 3. All exposed bus connections shall be checked for signs of overheating and for proper tightness. 4. The arc chutes will be removed, cleaned and inspected. 5. The entire breaker and the mechanism will be inspected. 6. The entire operating mechanism will be thoroughly cleaned, lubricated and exercised. 7. All of the interior components of the circuit breaker will be thoroughly cleaned. 8. The contacts and current carrying assemblies will be inspected for burning, pitting, arcing, worn fingers, garter springs etc. 9. The contacts will be cleaned and anti-oxidant grease will be applied to the breaker s main contacts. 10. The breaker contact resistance will be measured and recorded. 11. An insulation resistance test will be performed and results recorded. 12. The breaker will then be closed manually to ensure proper closing and trip operations. 13. Any and all interlocks will be checked and proper operation will be verified. 14. The breaker will be electrically operated when test stands are available, or the breaker will be operated from its cubicle, if the system allows. 15. All indicating devices such as lights, flags, switches etc. shall be tested for proper operation. Any that are not operating properly shall be repaired at that time if possible. 16. All heat strips throughout the enclosure shall be made operational, by repair or replacement, prior to completion of inspection. ENCLOSED AIR BREAK SWITCHES (MEDIUM VOLTAGE) 1. After shutdown, the entire switch mechanism will be cleaned and inspected. 2. The switch contacts will be checked for proper alignment. Anti-oxidant grease will be applied to the main contacts. 3. The switch s arcing contacts will be checked for the proper opening sequence relative to the main contacts. 4. The switch s operating mechanism will be inspected for wear and proper operation. The entire mechanism will be cleaned and lubricated. All interlocks will be tested and proper operation will be verified. 5. Fuses will be inspected; size and type will be recorded. 6. All phase isolation barriers will be cleaned, and the barriers will be checked for contamination and corona damage. 7. All insulators will be cleaned and visually inspected for cracks and chips. 8. All exposed bus and cable connections will be checked for proper tightness and for evidence of overheating, burning or tracking. 9. All lightning arrestors will be cleaned and inspected for broken or damaged porcelain and subjected to an insulation resistance test. Results shall be recorded. 10. All ground connections will be inspected and repaired if found to be inadequate. 11. Contact resistance and insulation resistance tests will be performed, where possible, and the results recorded. 12. All heat strips throughout the enclosure shall be made operational, by repair or replacement, prior to completion of inspection. OIL-FILLED TRANSFORMERS 1. The transformers will be inspected for leaks, poor seals and or gaskets, and for proper oil levels. 2. The transformer tank and its cooling fins will be inspected for rust, chipped paint, dents, and proper connection to ground. 3. All of the bushings will be cleaned, inspected for cracks and or chips. proper tightness. and evidence of overheating. 4. All gauges and alarm devices will he inspected, recorded and reset where applicable. 5. Insulation resistance tests of each transformer winding will he performed, where possible and the results recorded. 6. Turns ratio test shall be performed and recordings documented. 7. The oil will be sampled and tested in accordance with ASTM procedures. All sampling devices used will be new, clean and sealed with thread sealant. Drip pans shall be installed under all the valves prior to any oil removal. The contractor will clean up any and all oil lost during sampling. DRY-TYPE TRANSFORMERS 1. Check enclosure for dents, loose bolts, proper ventilation, anchoring and grounding. 2. The inside of the transformer shall be cleaned and all electrical terminations will be checked for signs of overheating and proper tightness. 3. Insulation resistance tests of each transformer winding will be performed, where possible and the results recorded. 4. Turns ratio test shall be performed and recordings documented. SWITCHGEAR AND STRUCTURE 1. After power shutdown, the entire switchgear interior will be thoroughly cleaned. 2. Exposed bus connections will be checked for proper tightness. 3. All of the bus insulators will be thoroughly cleaned and visually inspected for cracks and chips. 4. All control switches, auxiliary relays, and devices will be cleaned, lubricated (if applicable), and checked for proper operation. 5. All disconnect switches will be cleaned, lubricated, adjusted and an anti-oxidant grease applied to the contacts. 6. The lightning arrestors will be cleaned and subjected to an insulation resistance test. Results will be recorded. 7. An insulating resistance test of the bus will be performed. Results will be recorded. LOW VOLTAGE AIR CIRCUIT BREAKERS 1. Each breaker will have its inspection covers removed and the breaker will be thoroughly cleaned. 2. All contact surfaces will be cleaned to assure maximum conductance. 3. Anti-oxidant grease will be applied to the breaker s main contacts. 4. Mechanisms will be checked and lubricated. The mechanical operation will be verified. 5. A current equal to 90 and 110 percent of the breaker s trip coil setting will be applied to verify proper pick-up of the tripping mechanism. 6. Primary injection testing shall be performed in order to verify that all long-time, short time, instantaneous and ground fault set points are properly set. Those that are not shall be properly adjusted and retested. Units will be tested by passing multiples of their ratings through each phase of the breaker. The resultant trip-times will be recorded. 7. Contact resistance will be measured and contacts will be adjusted, where possible, for maximum surface contact and pressure. Value of contact resistance tests will be recorded. 8. An insulation resistance test will be performed from each pole to the other two poles and to ground, and the values recorded. 9. On draw out breakers, the breaker carriage and racking mechanism will be cleaned and lubricated. OIL DISCONNECT SWITCHES 1. The switch mechanism will be opened where applicable. 2. The switch contacts will he inspected and cleaned where applicable. 3. The switch s operating mechanism will he visually and manually inspected for wear, operation, binding and then cleaned and lubricated. 4. The switch s insulating fluid will be sampled. tested and fluid levels returned to normal. 5. The complete unit will then be reassembled and tested for proper operation. 6. The contractor will clean up any and all oil lost during sampling. 7. Insulation resistance tests will be performed where accessible and results recorded. MOLDED CASE CIRCUIT BREAKERS (ELECTRICAL TEST) 1. Each molded case circuit breaker will be inspected in its enclosure for proper installation. 2. The covers of breakers, which are removable, will be removed. 3. The interior and exterior of the breaker will then be thoroughly cleaned. 4. The breaker will be inspected for burning, overheating, wear, proper alignment and general condition. 5. Primary injection testing shall be performed in order to verify that all of the manufacturers curve characteristics; such as long time pick-up and delay, short time pick-up and delay, ground fault pickup and delay and instantaneous pick-up points, are all properly set. Those that are not shall be properly adjusted and retested. 6. Contact resistance will be measured and the results recorded. 7. An insulation resistance test will be performed and the results recorded. 8. The breakers with instantaneous trip units, with a cable connection capability, will be tested. 9. The breaker s trip time will then be compared to the manufacturer s characteristic curve. MOLDED CASE CIRCUIT BREAKERS (MECHANICAL TESTS) 1. The molded case circuit breakers will be inspected in their enclosures for proper installation. 2. The covers of breakers, which are removable, will be removed. 3. The interior and exterior of the breaker will then be thoroughly cleaned. The breaker will be inspected for burning, overheating, wear, proper alignment and general condition. 4. The breaker will be mechanically exercised and lubricated. 5. Mechanically trip all circuit breakers equipped with push to test capabilities 6. Where possible, contact and insulation resistance will be measured. Results will be recorded. PROTECTIVE RELAYS 1. Relays in draw-out cases will be removed from the case and thoroughly inspected, cleaned and tested. 2. The disks, target rockers and similar moving parts will be inspected. 3. The interiors of draw-out cases will be cleaned, the covers cleaned and the gaskets inspected. 4. The relays will then be electrically tested with current or voltage as required in accordance with the manufacturer s procedures. Relays with characteristic curves will be tested at three tap or pick-up multiples (of found settings). 5. The targets and seal-in units of all relays will be tested to assure proper operation. 6. The relay circuit will be tested to assure that the relay will respond to primary voltages or currents as appropriate. 7. Test tripping of circuit breakers will be performed where an outage can be arranged. INSTRUMENTATION CALIBRATION 1. Examine all devices for damage and wire connection tightness. 2. Perform a calibration test on all meters using a standard and power supply to determine accuracy at each cardinal point. 3. On meters supplied with transducers, the calibration will be performed from the transducer. 4. All instrument multipliers will be verified. 5. Meter selector switches will be inspected for proper application and operation. WATT HOUR METER CALIBRATION 1. Visual and mechanical inspection: Examine all devices for mechanical or electrical damage and wire connection tightness. Check conditions of meter face and face gaskets. 2. Electrical tests: Check calibration of all meters at five points using full scale test instruments. Calibrate watt-hour meters to one-half percent (0.5%). Verify all instrument multipliers. Meter selector switches will be inspected for proper application and operation. TRANSFORMER & CIRCUIT BREAKER INSULATING OIL The insulating fluids will be sampled and tested from each oil-filled device. Sample containers will be new, sealed and opened only immediately prior to filling. Sampling of oils will be accomplished in accordance with ASTM D-923 and sampling of askarels will be done in accordance with D-1809. The oil samples will be returned to the laboratory and tested for the following: TEST DESIGNATION TEST METHOD 1. Color/Visual ASTM Dl 500-D2 1 29/D 1524 2. Dielectric Breakdown ASTM D877 3. Neutralization Number ASTM D974 4. Specific Gravity ASTM D1298 5. Moisture Content ASTM D1533 6. Dissolved Gas in Oil Analysis (500k VA and up) Required Qualifications of Testing Organization and Personnel: The testing firm shall be an independent testing organization, which can function as an unbiased testing authority, professionally independent of any manufacturer, or supplier of equipment or systems evaluated by the testing firm. The testing firm shall meet the criteria for full membership or be a full member company of the InterNational Electrical Testing Association. Proof of this membership is to be included with the proposal package. The testing organization that is employed under this contract shall have been regularly engaged in the testing of electrical materials, devices, installations and systems for a minimum of five years. Proof of this experience is to be included with the proposal package. All work under this contract shall be performed under the supervision of the testing organization s Professional Engineer who will be available to discuss any and all procedures used to test, survey, report and service the equipment required under this contract. Testing, inspection, calibration and adjustments shall be performed by Field Engineers/Technicians certified by the National Institue for Certification in Engineering Technologies (NICET) and/or the International Electrical Testing Association (NETA) and have a minimum of five years of experience inspecting, testing and calibrating electrical distribution equipment, systems and devices. Proof of experience is to be included with the proposal package. The testing organization shall only utilize field engineers and technicians who are regularly employed by the firm or testing service. The testing organization shall submit the names, certification numbers and resumes of the Registered Professional Engineer, the lead Field Engineer/Technician and all other Field Engineers/Technicians who will be performing tests and inspections under this contract. This information is to be included with the proposal package. Test assistants and apprentices may be assigned to the project as assistants to certified Engineers/Technicians at a ratio not to exceed one certified Engineer/Technician to one non-certified assistant or apprentice. The testing organization shall have a calibration program, which assures that all test instruments are calibrated in accordance with the International Electrical Testing Association (NETA). The accuracy shall be directly traceable to the National Institute of Standards and Technology (NIST). Up to date calibration labels shall be visible on all the test equipment or that equipment will not be allowed to be used under this contract. Equipment List: The following equipment needs to be added or removed for 2023: 148 HE panel (add) New MRI (add) OR HE Panel (add) Building 159 (remve breakers but keep transformer) Building 152 (remove) will need to add new gear associated with building 44 B1dg# Equipment Type Quantity Rating 11O/11OA Switchgear Structure Medium Voltage Switches 2 Medium Voltage Fuse Panels 2 Transformer 500 KVA (pad mount) Transformer 1000 KVA (pad mount) 1 Transformer 1500 KVA (pad mount) 1 11OA ED Switchboard Square D Volt Meter 1 KWH Meter 1 Ammeter 1 Molded Case w/ Micrologic (main) 1 1000 Amp Molded Case w/ Micrologic 1 450 Amp Molded Case 1 400 Amp Molded Case 3 225 Amp Molded Case 1 200 Amp Molded Case 1 175 Amp Molded Case 3 150 Amp Molded Case 3 110 Amp Molded Case 1 100 Amp Molded Case 1 70 Amp Transformer 300 KVA (dry type) 1 ER Switchboard Square D Molded Case w/ Micrologic 1 1000 Amp Molded Case 1 600 Amp Molded Case 2 400 Amp Molded Case 1 300 Amp Molded Case 2 225 Amp Molded Case 1 200 Amp Molded Case 2 150 Amp Molded Case w/Micrologic 1 150 Amp Molded Case w/Micrologic 4 110 Amp Molded Cade w/Micrologic 1 600 Amp MPD1 (one) Switchboard Square D Volt Meter 1 KWH Meter 1 Ammeter 1 Rack In Breaker (main) 1 2000 Amp Molded Case w/Micrologic 1 1000 Amp Molded Case w/Micrologic 3 300 Amp Molded Case w/Micrologic 1 250 Amp Molded Case w/Micrologic 1 225 Amp Molded Case w/Micrologic 1 200 Amp Molded Case w/Micrologic 14 150 Amp Molded Case w/Micrologic 2 125 Amp Molded Case w/Micrologic 4 100 Amp MPD2 (two) Switchboard Square D Volt Meter 1 KWH Meter 1 Ammeter 1 Rack In Breaker (main) 1 4000 Amp Molded Case w/Micrologic 6 400 Amp Molded Case w/Micrologic 1 225 Amp Molded Case w/Micrologic 3 200 Amp Molded Case w/Micrologic 12 150 Amp Molded Case w/Micrologic 1 125 Amp Molded Case w/Micrologic 2 100 Amp 11OB Switchgear Structure Medium Voltage Switches 3 Medium Voltage Fuse Panels 3 Transformer 1000 KVA 3 Switchboard 1(one) G.E. Plug-ins Molded Case TQL 1 100 Amp Molded Case TQL 1 400 Amp Molded Case TQL 4 600 Amp Molded Case TQL 1 2000 Amp Molded Case TQL 1 1000 Amp Switchboard 2 (two) G.E. Plug-ins Molded Case TQL 4 600 Amp Molded Case TQL 2 800 Amp Molded Case TQL 1 2000 Amp Switchboard 3 (three) G.E. Plug-ins Molded Case TQL 2 225 Amp Molded Case TQL 2 300 Amp Molded Case TQL 4 400 Amp Molded Case TQL 1 600 Amp Molded Case TQL 1 2000 Amp Emergency Panel Board 1 (one) HE Molded Case TQL 2 250 Amp Molded Case TQL 3 600 Amp Molded Case TQL 2 800 Amp Molded Case TQL 1 1200 Amp 146 Switchgear Structure G.E. Load Interrupter Switch 1 Medium Voltage Fuse Panel 1 Transformer 1500 KVA 1 Switchboard G.E. AV-Line Volt Meter 1 Ammeter 1 Ground Break System 1 AKW Breaker (main) 1 2000 Amp Versatrip Breaker 1 600 Amp Versatrip Breaker 1 300 Amp Versatrip Breaker 1 150 Amp 116 Switchgear Structure Medium Voltage Switches 2 Medium Voltage Fuse Panels Transformer 500 KVA (pad mount) 1 Transformer 150 KVA (pad mount) 1 Switchboard Square D Voltmeter 1 KWH Meter 1 Ammeter 1 Molded Case (main) 1 2000 Amp Molded Case 4 400 Amp Molded Case 2 225 Amp Molded Case 9 200 Amp Molded Case 3 150 Amp Molded Case 2 30 Amp 148 Switchgear Structure G.E. Load Interrupter Switch 1 Medium Voltage Fuse Panel 1 Transformer 1000 KVA (pad mount) 1 Switchboard G.E. AV-Line Voltmeter 1 KWH Meter 1 Ammeter 1 Power Break Breaker (main) 1 1200 Amp Power Break Breaker (auto transfer) 1 200 Amp Versatrip Breaker 3 600 Amp Versatrip Breaker 6 300 Amp Versatrip Breaker 1 400 Amp 129 Switchgear Structure Transformer 300KVA (pad mount) 1 Switchboard Square D Voltmeter 1 KWH Meter 1 Ammeter 1 Molded Case (main) 1 1200 Amp Molded Case 3 400 Amp Molded Case 1 600 Amp Molded Case 1 300 Amp Molded Case 2 225 Amp Molded Case 1 150 Amp Molded Case 1 100 Amp 15 Switchgear Structure Medium Voltage Switches 1 Medium Voltage Fuse Panels 1 Transformer 300 KVA 1 Switchboard Square D Volt Meter 1 KWH Meter 1 Ammeter 1 Molded Case (main) 1 600Amp Molded Case 1 300 Amp Molded Case 1 225 Amp Molded Case 1 150 Amp Molded Case 2 100 Amp Molded Case 4 50 Amp 159 Switchgear Structure Transformer 150 KVA (pad mount) 1 Switchboard Square D Volt Meter 1 KWH Meter 1 Ammeter 1 Molded Case (main) 1 1200 Amp Molded Case 2 800 Amp Molded Case 2 225 Amp Molded Case 2 150 Amp Molded Case 1 100 Amp 151 Switchgear Structure Transformer 300 KVA (pad mount) 1 Switchboard Square D Voltmeter 1 KWH Meter 1 Ammeter 1 Molded Case (main) 1 1000 Amp Molded Case 2 600 Amp Molded Case 2 225 Amp 152 Switchgear Structure Medium Voltage Switches 3 Medium Voltage Fuse Pane1 1 Transformer O KVA (pad mount) 1 Switchboard Square D Volt Meter 1 KWH Meter 1 Ammeter 1 Molded Case (main) 1 2000 Amp Molded Case 2 800 Amp Molded Case 3 400 Amp Molded Case 1 225 Amp Molded Case 3 200 Amp Molded Case 1 30 Amp 154 Switchgear Structure Transformer 750 KVA (pad mount) 1 Switchboard Arrow Hart Volt Meter 1 KWH Meter 1 Ammeter 1 Molded Case 1 800 Amp Molded Case 2 700 Amp Molded Case 1 600 Amp 155 Switchgear Structure Transformer 500 KVA (pad mount) 1 Switchboard Arrow Hart Volt Meter 1 KWH Meter 1 Ammeter 1 Molded Case 2 600 Amp 156 Switchgear Structure Transformer 750 KVA (pad mount) 1 Switchboard Square D Volt Meter 1 KWH Meter 1 Ammeter 1 Molded Case (main) 1 2000 Amp Molded Case 1 1000 Amp Molded Case 2 400 Amp Molded Case 1 350 Amp Molded Case 3 200 Amp Molded Case 2 60 Amp Molded Case 1 40 Amp Molded Case 1 30 Amp 158 Switchgear Structure Medium Voltage Switches 1 Medium Voltage Fuse Panels 1 135 Switchgear Structure Medium Voltage Switches 1 Medium Voltage Fuse Panels 1 Transformer 500 KVA (pad mount) 1 Switchboard Square D Molded Case (main) 1 800 Amp Molded Case 1 400 Amp Molded Case 1 300 Amp Molded Case 2 200 Amp Molded Case 1 100 Amp Molded Case 1 90 Amp Molded Case 2 40 Amp Molded Case 1 30 Amp Molded Case 1 15 Amp 137 Switchgear Structure Transformer 750 KVA (pad mount) 1 Switchboard ITE Voltmeter 2 KWH Meter 2 Ammeter 2 Rack In Breaker (main) 1 2500 Amp Rack In Breaker 3 800 Amp Rack In Breaker 4 400 Amp Rack In Breaker 10 225 Amp Rack In Breaker 1 200 Amp Rack In Breaker 1 40 Amp 139 Switchgear Structure Medium Voltage Vault 1 Rack In Breaker (ITE 5kV) 10 Time Overcurrent Relays 32 Voltmeter 10 Ammeter 10 Control and Instrument Switches 9 144 Switchgear Structure Molded Case 1 800 Amp Molded Case 1 400 Amp 113 Switchgear Structure (Eaton) Molded Case Breaker 7 225 Amp Molded Case Breaker 1 600 Amp Molded Case Breaker 2 400 Amp Molded Case Breaker 3 200 Amp Transformer 112.5KVA (pad mounted) 1 Transformer 30KVA (suspended) 2 Transformer 75KVA (suspended) 1 Transformer 15KVA (suspended) 1 Formal Reports: The testing organization shall submit three copies of the Comprehensive Inspection and Testing report (through the Prime Contractor if applicable) to the COTR within 30 calendar days following the conclusion of testing. The report shall be itemized by building and shall include, at a minimum, complete nameplate data, age, maximum loading in amperes (where applicable), and the condition as found and as modified for each piece of equipment and device tested. Notification in writing shall be submitted immediately to the COTR upon completion of testing for any equipment or component deemed to be in a critical state including recommendations for corrective action. A Registered Professional Engineer shall make certification.
57%
Solicitation11/10/2026
This Presolicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Items, as supplemented with additional information included in this notice. The Presolicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2024-02 published in the Federal register December 22, 2023. This solicitation is for a Small Business Set-Aside. The associated North American Industrial Classification System (NAICS) code for this procurement is 238210 (Electrical Contractors and Other Wiring Installation Contractors) with a small business size standard of $19 Million Dollars. The FSC/PSC is J061 (Maintenance, Repair, and Rebuilding of Equipment-Electric Wire and Power Distribution Equipment).
57%
Pre-Solicitation11/10/2026
Arc Flash Hazard Analyses Scope of Work General Contractor shall conduct an Arc Flash Hazard Analyses in accordance with National Fire Protection Association (NFPA) 70E, Standard for Electrical Safety in the Workplace, NFPA 70, National Electric Code and Institute of Electrical and Electronics Engineers (IEEE) Guide for the Specification of Scope and Deliverable Requirements for an Arc-Flash Hazard Calculation Study in Accordance with IEEE Std 1584. The study will conform to the editions for the above-referenced standards in effect as of the date of the solicitation. The study shall include all significant locations in the electrical distribution system (switchboards, switchgear, motor control centers, panelboards, busways, etc.) from the incoming utility equipment or cabling down to 208V systems. Data collection and documentation shall include the 208V system. The study shall be performed using software programs specifically designed to standards governing short-circuit; protective coordination and arc flash hazard calculations. Final submittals shall include a formal reporting of findings, collect data and study calculations in a comprehensive report. Arc Flash Hazard Analyses Requirements The Arc Flash Hazard Analyses will consist of the following phases or requirements: Data Gathering and Field Verification Contractor shall: Field-verify and mark up existing single line drawings needed to perform an accurate study. In the event single-line drawings are not available, Contractor shall develop single-line drawings to reflect the as built configuration of the facility electrical system. Gather and document necessary system data required to complete the study. Data should include but is not limited to (as applicable): Location (building, room, etc.) Equipment Identification Equipment Information Manufacturer, Model, Catalog Number and Type Equipment Rating (Voltage, Ampacity, Interrupting Rating, etc.) Configuration (Main Lug, Main breaker, Number of breakers, etc.) Overcurrent Protection Relaying Type, Manufacturer, Function(s), CT and PT ratios, etc. Fuses Type, Manufacturer, Rating, etc. Existing Settings Cable Type, Size and Length (lengths are to be field confirmed) Cable Busway Type, Manufacturer, Rating and Length Motor Load and Contactor Data (record data and application for motors 25 HP and above) Contractor must coordinate with facility engineering staff to obtain necessary power company data such as minimum and maximum fault currents as well as X/R ratios. Correspondence documenting utility data shall be included in the final submittal. Data collection requires the removal and/or opening of equipment to field verify data. Data collection requires observing each piece of equipment covered by this study. Contractor shall record and report any deficiencies, such as missing identifying labels, warning labels, non-functioning latches or locks, missing hardware (covers, screws, breaker blank fillers, etc.), etc. Short Circuit Study Contractor shall use field-verified single line drawings and data to perform a three-phase bolted fault short-circuit momentary and interrupting duties system short circuit calculation for the facilities electrical system. The calculations shall be conducted in accordance with applicable ANSI C37.010, C37.5, C37.13, NFPA 70E, NEMA, and NEC standards and codes. At a minimum the following location shall be included: Electric utility supply termination point. Incoming switchgear. Unit substation primary and secondary terminals. Low voltage switchgear. Motor control center Standby generator and automatic transfer switch. Branch panelboard. The study shall identify and report data used in the calculations in both descriptive terms (cable wire size, motor hp, transformer kVA and impedance, etc.) and impedance values. Transformer nameplate impedance shall be used when available. A section of the study shall be devoted to verification of equipment duty ratings identifying whether equipment is within or operating outside it interrupting rating. Short circuit calculations must be tabulated and included with the project submittals. Protective Device Coordination Study Contractor shall provide a Protective Device Coordination Study to determine satisfactory setting and ratings for the facility s major protective devices in accordance with applicable industrial standards such as ANSI/IEEE 399 and ANSI/IEEE 242. Coordination Study results must include time-current curves (TCC) supporting findings and recommendation to be provided with project submittals. Deficiencies in device settings or-rated equipment are to be noted in the report. Protective device settings are to be tabulated separately and included within the report. Arc Flash Hazard Analyses Contractor shall perform an Arc Flash Hazard Analyses in compliance with IEEE 1584, NFPA 70 and NFPA 70E. Flash protection boundary and incident energy levels shall be calculated at all significant locations in the electrical distribution system. Incident energy calculations must consider multiple system scenarios (normal) to establish the worst-case incident energy level for each equipment studied under this study. Additionally, calculations should emphasize a conservative approach for the protection of personnel. Incident energy and flash protection boundary calculations results must be tabulated and included with project submittals. Protective Device Settings Contractor shall set adjustable protective devices to reflect proposed settings identified in the Protective Coordination Study. This must be coordinated with facility engineering staff as certain device settings can only be performed during a power outage. Equipment Labeling and Miscellaneous Work Contractor shall provide and install arc flash warning labels for designated electrical devices evaluated under this study. All arc flash labels shall comply with NFPA 70E and include: Equipment name or identifying designation Nominal voltage Flash hazard boundary Hazard risk category Incident energy Working distance Arc flash labels shall be machine printed with no field markings. Single labels shall be provided for designated equipment evaluated under this study. Contractor shall install applicable labels (customary warning labels high voltage, owner-provided equipment identification labels, etc.) found missing or deficient while collecting field data and as agreed with the facility engineering staff. Exit Briefing Upon completion of the study but prior to issuing study submittals, Contractor shall conduct an exit briefing for facility engineering staff and others designated representatives. The briefing shall include: Overview of each study phase and related issues. Notable arc flash hazard areas. Recommended solutions for mitigating dangerous arc flash hazard levels to include potential implementation of maintenance settings. National Electric Code (NEC) violations noted during the study. Other electrical safety related issues. Recommendations. Submittals Upon completion of the Arc Flash Hazard Analyses, Contactor shall submit four (4) bound copies including electronic version on CD or DVD of the final report containing the following: Power System Studies - The completed short-circuit, protective device coordination arc flash hazard analysis studies shall include the following sections: Executive Summary. Descriptions, purpose, basis, and scope of the studies. Tabulation of circuit breaker, fuse, and other protective device ratings versus calculated short-circuit duties. Protective device time versus current coordination curves, tabulations of relay and circuit breaker trip unit settings, and fuse selection Fault current calculations including a definition of terms and guide for interpretation of the computer printout. Details of the incident energy and flash protection boundary calculations. Recommendations for system improvements, where needed. Electrical system one-line diagram in printed and electronic version. The electronic version must be in AutoCad and PDF formats. SKM Compatible Data Import Files. Supplemental Report: Contractor shall prepare a report documenting findings and observation not addressed elsewhere in the submittals. This section shall include condition of found equipment and corrective actions taken to resolve or repair same. Qualifications All work shall be conducted under the supervision and approval of a Registered Professional Electrical Engineer (PE). The PE shall have a minimum of five (5) years experience in performing and interpreting power systems studies. Project Duration Contractor shall complete all work within 180 days of notice to proceed. Scheduling Contractor shall perform onsite work during normal operating hours (7:30 AM to 4:30 PM), Monday through Friday. Work to be performed outside of normal working hours must be coordinated with and approved by the COR. Work requiring a power outage must be submitted in writing (including date and duration of outage) to the COR not later than two weeks prior to the requested date.
54%
Special Notice11/02/2026

Additional Details

Solicitation Number

36C25222Q0752

Archive Date

Sep 1, 2022

Office Address

MILWAUKEE, WI, 53214