Notice ID: 6ce2c00c4764446d9e0db5f73a39fc3dAward NoticeAwarded

Z1NB--585-21-116 Replace Chiller Plant Ph2 Construction at the Oscar G. Johnson VA Medical Center

Awarded on January 26, 2023. Full description on SAM.gov.

Awarded tounder 36C25223C0023 (source: SAM.gov award notice)• $5.3M

Overview

Posted
January 26, 2023
Notice type
Award Notice
Set-aside
Total Small Business Set-Aside (FAR 19.5)

Notice details

Place of performance
Oscar G. Johnson VA Medical Center 325 E. H. Street, Iron Mountain, 49801-4760
Last updated
Sep 9, 2025
Award date
Jan 26, 2023
Award amount (SAM.gov award notice)
$5.3M

Identifiers

Solicitation number
36C25223B0003
Notice ID
6ce2c00c4764446d9e0db5f73a39fc3d
Award number (PIID)
36C25223C0023

Description

SOLICITATION 36C25223B0003 AMENDMENT 002 January 12, 2023 Project: 585-21-116 Replace Chiller Plant Phase 2 Location: Oscar G. Johnson VA Medical Center in Iron Mountain. MI Amendment 002 hereby incorporates the following clarifications/change(s) into the solicitation package: VENDOR QUESTIONS, submitted 1/5/2023: In the Specifications 23 09 23 -46 (D) and on the Flow Meter schedule on page M601-2 of the mechanical drawings, the Electromagnetic Flow Meters are required to be FSM-3 and FT 3100 types or equal complete with a BTU measurement system. The schedule on M601-2 does not list chiller 3 to receive a newly specified Electromagnetic BTU Flow Meter. The current flow meter installed in Chiller 3 is an Onicon F-1200 that does not currently have a BTU measuring system installed. Please advise if the flow meter on chiller 3 is to remain as is or changed to a specified type? VA REPLY: Keep flow meter on Chiller 3. If the flow meter on chiller 3 is to remain as is, please advise if a BTU measuring system should be added or if it should remain as is. VA REPLY: Add BTU measuring system. If the flow meter on chiller 3 is to be changed out, please advise on type of meter FSM-3 or FT-3100? VA REPLY: Flow meter on Chiller 3 to remain. In the Specifications 23 09 93 -16 (H) Chiller Minimum Flow By-Pass Valve is described to be Normally Open. In the mechanical drawings page MP103-2, Detail D7 displays this valve as Normally Closed. Please advise as to the normal position of the Chiller Minimum Flow By-Pass Valve. VA REPLY: Normal position of Chiller minimum flow by-pass valve to be open. In the Specifications 23 09 15-4 thru 10, PLC Input/Output Summary Table lists a Service Shutdown Switch for Campus Chilled Water System, Chillers 1-4, 7 and 9. Please advise as to the intended locations and sequence of operation for these switches. VA REPLY: Switch to safely shut down chiller via BAS panel. In the Specifications 23 09 15-9, PLC Input/Output Summary Table lists points for Dry Cooler Chiller 7 The existing control on the dry cooler consists of six (6) digital outputs directly controlling the fans within the cooler. This chiller is not equipped with a single Run Status or Alarm digital input signals. Please advise design intent for hardwired control points for the dry cooler. VA REPLY: Six (6) digital outputs staggered for control. Omit Run Status or Alarm digital input signal points. Mechanical drawing MP103-2 details eleven (11) locations to provide programming for ether an existing or newly installed energy control valve. Electrical drawing E103-2 details locations for eight (8) data drops provided for the energy control valves. Three (3) energy control valves from MP103-2 detail D4 and F5 are missing data drops on E103-2. Is it the design intent to leave three (3) energy control valves not integrated or is should E103-2 be revised to include all eleven (11) locations depicted on MP103-2? VA REPLY: These three (3) valves are already wired. Also, omit P-9 and P-10. The contractual period of performance (SF-1442, Page 1, Block 11) is being revised from 300 calendar days to 740 calendar days. Phase 0 for pre-construction, submittals, material orders and deliveries is 80 weeks (560 calendar days); Phase 1 for site mobilization, field work, testing, inspections and administrative closeout is 180 calendar days (6 months). SAM labor wages rates have been updated. See attachment (S02 Att3.R1 Wage Determination MI20230117 2023.01.06). The bid opening date has not changed. Bids must be delivered to the following address NLT Thursday, January 19, 2023 at 13:00 CST: Department of Veterans Affairs 115 S. 84th Street, Suite 101 Milwaukee, WI 53214 Attention: Kristi Kluck, Kristi.Kluck3@va.gov Ref: 36C25223B0003 ATTACHMENTS

Full description on SAM.gov

Award Overview

Award Number

36C25223C0023

Award Amount (SAM.gov award notice)

$5.3M

Award Date

Jan 26, 2023

Awardee

Awardee UEI

NH6RBGMBK3R9

Original Solicitation

Notice ID: 6ce2c00c4764446d9e0db5f73a39fc3d

Posted Date: Jan 26, 2023

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

1
  • 36C25225P1115
    VALLEY MECHANICAL INC
    Department of Veterans AffairsNAICS 238220
    $22.3KSigned Aug 28, 2025

Contacts

Documents

No documents available.

Lifecycle

Solicitation:36C25223B0003
  1. Market Research
  2. Pre-Solicitation
  3. Solicitation
  4. Awarded

This opportunity has been awarded.

  1. Market ResearchOct 19, 2022

    Z1DZ--585-21-116 Replace Chiller Plant Phase 2 (Construction) at the Oscar G. Johnson VA Medical Center Iron Mountain, MI

    Notice 0c6e4e1f026540d0834dbf6e6a9f29f3 on SAM.gov

  2. Pre-SolicitationNov 28, 2022

    Z1NB--585-21-116 Replace Chiller Plant - Phase 2 (Construction) at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI

    Notice 6b6fe991359c48a58b681bcfe11e10fd on SAM.gov

  3. 3×
    SolicitationDec 12, 2022

    Z1NB--585-21-116 Replace Chiller Plant - Phase 2 (Construction) at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI

    Notice b5f33426bdf64ad3b83b07bbf039c123 on SAM.gov

  4. AwardedCurrentJan 26, 2023

    Z1NB--585-21-116 Replace Chiller Plant Ph2 Construction at the Oscar G. Johnson VA Medical Center

    Notice 6ce2c00c4764446d9e0db5f73a39fc3d on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

36C25223B0003

Archive Date

Feb 2, 2023

Office Address

MILWAUKEE, WI, 53214